2-Lehigh Ramp - Div-01 Compiled.pdf
PDF 1 MB Posted
- Attached to
- Lehigh Elementary School Concrete Ramp Project
- Solicitation number
- C-267-425
- Issued by
- San Bernardino County, California
About this file
This is a compiled specification and contract document for the Lehigh Elementary School Concrete Ramp Project in California, detailing construction and project management requirements for a portable concrete ramp replacement. The document encompasses general conditions, contract forms, quality requirements, testing procedures, and coordination protocols that establish the framework for project execution. The specifications address submittal procedures, product substitutions, construction scheduling through network analysis, preconstruction and progress meeting requirements, and field engineering responsibilities including survey work and elevation verification. Key personnel designations must be submitted within fifteen calendar days prior to construction commencement, and a preconstruction conference is mandatory within fifteen calendar days of fully executed contract documents. Progress meetings are required at minimum weekly throughout the project duration, with mandatory attendance from the job superintendent, construction manager, project engineer, project inspector, architect of record, and relevant subcontractors and suppliers.
The document establishes comprehensive quality assurance and testing protocols in compliance with California Building Code standards, Title 24 regulations, and Division of State Architect (DSA) requirements. The district will fund first inspections and tests required by Title 24, including earthwork testing, concrete mix design tests, structural steel inspection, plumbing and electrical system testing, and heating, ventilation, and air conditioning system testing. Contractor responsibilities include notifying the district forty-eight hours in advance of work requiring testing or inspection, providing access and facilities for inspections, and reimbursing the district for retests, reinspections, and any testing performed due to contractor error. A qualified testing laboratory employed by or contracted with the district will conduct all required inspections and testing under the direction of a registered engineer. The contractor is responsible for obtaining all necessary regulatory approvals for material substitutions and shall reimburse the district for all costs associated with obtaining such approvals, regardless of whether substitutions are ultimately accepted or rejected.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| 011100-Summary-Work-v2022-1 |
| 011210-Contract-Forms-Submittals-2022 |
| 012000-Price-Payment-2022 |
| 012100-Allowances-v2022 |
| 012510-Product-Options-Substitutions-v2022 |
| 1. GENERAL |
| 1.5.1. Requests for substitution must be submitted with bid documents and shall only be permitted as indicated in and in accordance with requirements specified in the Instructions to Bidders and the Special Conditions. |
| 1.5.2. The Bid shall be based upon the standards of quality established by those items of equipment and/or materials which are specifically identified in the Contract Documents. |
| 1.5.3. Burden of proof of merit of requested substitution is the responsibility of the Contractor. |
| 1.5.4. It is the sole responsibility of Contractor to submit the proper content of any requests for substitutions at the time of bid submission. |
| 1.6. REGULATORY REQUIREMENTS |
| 1.6.1. It shall be the responsibility of Contractor to obtain all regulatory approvals required for proposed substitutions. |
| 1.6.2. All regulatory approvals shall be obtained for proposed substitutions prior to submittal of substitution request to Architect. |
| 1.6.3. All costs incurred by the District in obtaining regulatory approvals for proposed substitutions to include the costs of the Architect and any authority having jurisdiction over the Project shall be reimbursed to the District. Costs of these services shall be reimbursed regardless of final acceptance or rejection of substitution. |
| 1.6.4. Substitutions of materials or work procedures which affect the health, safety and welfare of the public shall have prior approval of the Division of the State Architect (DSA) field representative. |
| 1.7. SUBSTITUTION REPRESENTATION |
| 1.7.1. In submitting a request for substitution, Contractor makes the representation that: |
| 1.7.1.1. Contractor has investigated the proposed substitution and determined that it meets or exceeds the quality level of the specified product; |
| 1.7.1.2. Contractor has determined that all components of the proposed substitution are identical and fully interchangeable with the product name and number specified; |
| 1.7.1.3. Contractor will provide the same warranty or guarantee for the substitution as for the specified product; |
| 1.7.1.4. Contractor will coordinate installation and make changes to other work which may be required for the work to be completed with no additional cost to the District; |
| 1.7.1.5. Contractor waives claims for additional cost or time extension which may subsequently become apparent; and |
| 1.7.1.6. Contractor will reimburse District for the cost of District’s and Architect's review or redesign services associated with substitution request. |
| 1.8. SUBMITTAL PROCEDURE |
| 1.8.1. Submit one (1) copy of each request. |
| 1.8.2. Submit request using District’s Substitution Request Form as indicated in Contract Forms and Submittals. Substitution requests that are not on District’s required form shall be returned without review. |
| 1.8.3. Request to include sufficient data so that direct comparison of proposed substitution can be made. |
| 1.8.4. Provide complete documentation for each request. Documentation shall include the following information, as appropriate, as a minimum: |
| 1.8.5. Inadequate warranty, vagueness of submittal, failure to meet specified requirements, or submittal of insufficient data will be cause for rejection of substitution request. |
| 1.9. DISTRICT’S REVIEW |
| 1.9.1. The District will accept or reject proposed substitution within a reasonable amount of time. |
| 1.9.2. If a request is made prior to bid opening and the District has not completed its review, Contractor shall base its bid on the product specified only. |
| 1.9.3. There shall be no claim for additional time for review of proposed substitutions. |
| 1.9.4. Final acceptance of a substitution submitted prior to the date established for the receipt of bids will be in the form of an addendum. |
| 012600-Contract-Modification-v2022 |
| 012610-Request-for-Info-v2022 |
| 013100-Coord-Project-Meetings-v2022 |
| 1. GENERAL |
| 1.1. RELATED DOCUMENTS AND PROVISIONS: |
| 1.1.3. Supplemental Conditions (if any); |
| 1.1.4. Technical Specifications. |
| 1.1.5. 01 32 16 Construction Schedule – Network Analysis |
| 1.1.6. 01 33 00 Submittals |
| 1.2. SECTION INCLUDES |
| 1.2.1. Coordination Responsibilities of the Contractor. |
| 1.2.2. Field Engineering Responsibilities of the Contractor. |
| 1.2.3. Preconstruction Conference. |
| 1.2.4. Progress Meetings. |
| 1.2.5. Pre-Installation Conferences. |
| 1.2.6. Post Construction Dedication. |
| 1.3. COORDINATION RESPONSIBILITIES OF THE CONTRACTOR |
| 1.3.1. Coordinate scheduling, submittals, and Work of the Specifications to assure efficient and orderly sequence of installation of interdependent construction elements, with provisions for accommodating items installed later. |
| 1.3.2. Prior to commencement of a particular type or kind of Work examine relevant information, contract documents, and subsequent data issued to the Project. |
| 1.3.3. Verify that utility requirement characteristics of operating equipment are compatible with building utilities. Coordinate Work of various sections having interdependent responsibilities for installing, connecting to, and placing in service such equipment. |
| 1.3.4. Closing up of holes, backfilling, and other covering up operations shall not proceed until all enclosed or covered Work and inspections have been completed. Verify before proceeding. |
| 1.3.5. Coordinate space requirements and installation of mechanical and electrical Work which are indicated diagrammatically on Drawings. Follow routing shown for pipes, ducts, and conduit as closely as practicable; place runs parallel with line of building. Utilize spaces efficiently to maximize accessibility for other installations, for maintenance, and for repairs. |
| 1.3.6. In finished areas except as otherwise indicated, conceal pipes, ducts, and wiring within the construction. Coordinate locations of fixtures and outlets with finish elements. |
| 1.3.7. In locations where several elements of mechanical and electrical Work must be sequenced and positioned with precision in order to fit into available space, prepare coordination drawings showing the actual conditions required for the installation. Prepare coordination drawings prior to purchasing, fabricating, or installing any of the elements required to be coordinated. |
| 1.3.8. Closing up of walls, partitions or furred spaces, backfilling, and other covering up operations shall not proceed until all enclosed or covered Work and inspections have been completed. Verify before proceeding. |
| 1.3.9. Coordinate completion and cleanup of Work of separate sections in preparation for completion and for portions of Work designated for District’s occupancy. |
| 1.3.10. After District occupancy of Project, coordinate access to Site for correction of defective Work and Work not in accordance with Contract Documents, to minimize disruption of District's activities. |
| 1.3.11. Coordinate all utility company Work in accordance with the Contract Documents. |
| 1.3.12. Key Personnel Names: Within fifteen (15) calendar days prior to starting construction operations, submit a list of key personnel assignments, including superintendent and other personnel in attendance at Project site. Identify individuals and their duties and responsibilities; list addresses and telephone numbers, including home and office telephone numbers. Provide names, addresses, and telephone numbers of individuals assigned as standbys in the absence of individuals assigned to Project. Post copies of list in Project meeting room, in temporary field office, and by each temporary telephone. Keep list current at all times. |
| 1.4. FIELD ENGINEERING RESPONSIBILITIES OF THE CONTRACTOR |
| 1.4.1. Contractor shall employ a Land Surveyor registered in the State of California and acceptable to the Architect. |
| 1.4.2. Control datum for survey is that established by District provided survey. Contractor to locate and protect survey control and reference points. |
| 1.4.3. Replace dislocated survey control points based on original survey control. |
| 1.4.4. Provide field engineering services. Establish elevations, lines, and levels utilizing recognized engineering survey practices. |
| 1.4.5. Upon completion of Work, submit certificate signed by the Land Surveyor that elevations and locations of Work are in conformance with Contract Documents. Record deviations on Record Drawings. |
| 1.5. PRECONSTRUCTION CONFERENCE |
| 1.5.1. Construction Manager or Project Engineer will schedule a conference immediately after, and in no case more than fifteen (15) calendar days after, receipt of fully executed Contract Documents prior to Project mobilization. |
| 1.5.2. Mandatory Attendance: Construction Manager, Project Engineer, Project Inspector, Architect of Record, Contractor, Contractor's Project Manager, and Contractor's Job/Project Superintendent. |
| 1.5.3. Optional Attendance: Architect's consultants, and utility company representatives. |
| 1.5.4. Construction Manager shall preside at conference and prepare and record minutes and distribute copies. |
| 1.5.5. Agenda: |
| 1.5.5.1. Execution of Owner-Contractor Agreement. |
| 1.5.5.2. Issue Notice to Proceed. |
| 1.5.5.3. Submission of executed bonds and insurance certificates. |
| 1.5.5.4. Distribution of Contract Documents. |
| 1.5.5.5. Submission of list of Subcontractors, list of Products, Schedule of Values, and Progress Schedule. |
| 1.5.5.6. Designation of responsible personnel representing the parties. |
| 1.5.5.7. Procedures for processing Change Orders. |
| 1.5.5.8. Procedures for Request for Information. |
| 1.5.5.9. Procedures for testing and inspecting. |
| 1.5.5.10. Procedures for processing applications for payment. |
| 1.5.5.11. Procedures for Project closeout. |
| 1.5.5.12. Use of Premises. |
| 1.5.5.13. Work restrictions. |
| 1.5.5.14. District’s occupancy requirements or options. |
| 1.5.5.15. Responsibility for temporary facilities and controls. |
| 1.5.5.16. Construction waste management and recycling. |
| 1.5.5.17. Parking availability. |
| 1.5.5.18. Office, work and storage areas. |
| 1.5.5.19. Equipment deliveries and priority. |
| 1.5.5.20. Security. |
| 1.5.5.21. Progress cleaning. |
| 1.5.5.22. Review required submittals. |
| 1.6. PROGRESS MEETINGS |
| 1.6.1. Construction Manager shall schedule and administer meetings throughout progress of the Work at a minimum of every week. |
| 1.6.2. Construction Manager or Project Engineer will make arrangements for meetings, prepare agenda, and preside at meetings as well as record minutes and distribute copies. |
| 1.6.3. Attendance Required: Job Superintendent, Construction Manager, Project Engineer, Project Inspector, Architect of Record, Subcontractors, and suppliers as appropriate to agenda topics for each meeting. |
| 1.6.4. District has authority to schedule mandatory meetings other than those listed, as necessary. |
| 1.7. PRE-INSTALLATION CONFERENCES |
| 1.7.1. When required in individual specification section, Construction Manager and/or Contractor shall convene a pre-installation conference prior to commencing Work of the section. Refer to individual specification section for timing requirements of conference. |
| 1.7.2. Contractor shall require its Subcontractors and suppliers directly affecting, or affected by, Work of the specific section to attend. |
| 1.7.3. Notify the Construction Manager, Project Engineer, Project Inspector, and Architect of Record a minimum of five (5) business days in advance of meeting date. |
| 1.7.4. A pre-installation conference may coincide with a regularly scheduled progress meeting. |
| 1.7.5. Construction Manager shall prepare agenda, preside at conference, record minutes, and distribute copies within three (3) calendar days after conference to participants. |
| 1.7.6. The purpose of the meeting will be to review Contract Documents, conditions of installation, preparation and installation procedures, and coordination with related Work and manufacturer's recommendations. |
| 1.7.7. Pre-installation Schedule: As a minimum, Work being installed under the Contract Documents technical sections will require pre-installation conferences. Contractor shall review the technical specifications and add all additional requirements for pre-installation meetings contained in those sections. |
| 1.8. POST CONSTRUCTION DEDICATION |
| 1.8.1. Attendance Required: Project Superintendent, Contractor, Project Manager, major Subcontractors, Construction Manager, Project Engineer, Project Inspector, and Architect of Record. |
| 1.8.2. Preparation prior to Dedication: Contractor and appropriate Subcontractors and suppliers shall: |
| 1.8.2.1. Assist District in operation of mechanical devices and systems. |
| 1.8.2.2. Verify operation and adjust controls for communication systems. |
| 1.8.2.3. Assist District in operation of lighting systems. |
| 013216-Schedule-2022 |
| 013300-Submittals-v2022 |
| 014000-Quality-Requirements-2022 |
| 014213-Abbreviations-Acronyms-v2022 |
| 014216-Definitions-References-v2022 |
| 014529-Testing-Laboratory-Services-v2022 |
| 1. GENERAL |
| 1.2.2. Testing Laboratories and Agencies |
| 1.2.3. Tests and Inspections |
| 1.2.4. Selection and Payment |
| 1.2.5. District's Testing Laboratory Responsibilities |
| 1.2.6. Laboratory reports. |
| 1.2.7. Limits on testing laboratory authority. |
| 1.2.8. Contractor responsibilities. |
| 1.2.9. Schedule of inspections and tests. |
| 1.2.10. Project Inspector’s Access to Site |
| 1.3.1. ASTM D3740 - Practice for Evaluation of Agencies Engaged in Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction. |
| 1.3.2. ASTM E329 - Recommended Practice for Inspection and Testing Agencies for Concrete, Steel, and Bituminous Materials as Used in Construction. |
| 1.3.3. CBC - California Building Code. |
| 1.3.4. UBC - Uniform Building Code. |
| 1.3.5. Title 24, Parts 1 and 2, of the California Code of Regulations. Contractor shall keep a copy of these available at the job Site for ready reference during construction |
| 1.3.6. DSA - Division of the State Architect, Office of Regulation Services, Structural Safety Section. DSA shall be notified at or before the start of construction. |
| 1.4.1. The District and Architect or their appointed representatives will review the Work and the Contractor shall provide facilities and access to the Work at all times as required to facilitate this review. Administration by the Architect and any consulting Structural Engineer will be in accordance with applicable regulations, including, without limitation, 24 C.C.R. § 4-341. |
| 1.4.2. One or more Project Inspector(s) approved by DSA and employed by or in contract with the District( “Project Inspector”), will observe the Work in accordance with 24 C.C.R. §§ 4-333(b) and 4-342: |
| 1.4.3. Project Inspector shall have access to the Work wherever it is in preparation or progress for ascertaining that the Work is in accordance with the Contract Documents and all applicable code sections. Contractor shall provide facilities and access as required and shall provide assistance for sampling or measuring materials. |
| 1.4.3.1. Project Inspector will notify District and Architect and inform Contractor of any observed failure of Work or material to conform to Contract Documents. |
| 1.4.3.2. The Project Inspector shall observe and monitor all testing and inspection activities required. |
| 1.4.4. Contractor shall conform with all applicable laws as indicated in the Contract Documents, including, without limitation, to 24 C.C.R. § 4-343. Contractor shall supervise and direct the Work and maintain a competent superintendent on the Project who is authorized to act in all matters pertaining to the Work. The Contractor shall inspect all materials, as they arrive, for compliance with the Contract Documents. Contractor shall reject defective Work or materials immediately upon delivery or failure of the Work or material to comply with the Contract Documents. The Contractor shall submit verified reports as indicated in the Contract Documents, including, without limitation, the Specifications and as required by 24 C.C.R. § 4-336. |
| 1.5. TESTING LABORATORIES AND AGENCIES |
| 1.5.1. Testing agencies and tests shall be in conformance with the Contract Documents and the requirements of 24 C.C.R. § 4-335. |
| 1.5.2. Testing and inspection in connection with earthwork shall be under the direction of the District's consulting soils engineer ("Soils Engineer”). |
| 1.5.3. Testing and inspection of construction materials and workmanship shall be performed by a qualified laboratory ("Testing Laboratory" or “Laboratory”). The Testing Laboratory shall be under direction of an engineer registered in the State of California, shall conform to requirements of ASTM E329, and shall be employed by or in contract with the District. |
| 1.6. TESTS AND INSPECTIONS |
| 1.6.1. Contractor shall be responsible for notifying District and Project Inspector of all required tests and inspections. Contractor shall notify District and Project Inspector forty-eight (48) hours in advance of performing any Work requiring testing or inspection. |
| 1.6.2. Contractor shall provide access to Work to be tested and furnish incidental labor, equipment, and facilities to facilitate all inspections and tests. |
| 1.6.3. District will pay for first inspections and tests required by the Title 24 and other inspections or tests that District and/or Architect may direct to have made, including, but not limited to, the following principal items: |
| 1.6.3.1. Tests and observations for earthwork and pavings. |
| 1.6.3.2. Tests for concrete mix designs, including tests of trial batches. |
| 1.6.3.3. Tests and inspections for structural steel work. |
| 1.6.3.4. Field tests for framing lumber moisture content. |
| 1.6.3.5. Additional tests directed by District that establish that materials and installation comply with the Contract Documents. |
| 1.6.3.6. Test and observation of welding and expansion anchors. |
| 1.6.3.7. Factory observation of components and assembly of modular prefabrication structures and buildings. |
| 1.6.4. District may at its discretion, pay and back charge Contractor for: |
| 1.6.4.1. Retests or reinspections, if required, and tests or inspection required due to Contractor error or lack of required identifications of material. |
| 1.6.4.2. Uncovering of work in accordance with Contract Documents. |
| 1.6.4.3. Testing done on weekends, holidays, and overtime will be chargeable to Contractor for the overtime portion. |
| 1.6.4.4. Testing done off site. |
| 1.6.5. Testing and inspection reports and certifications: |
| 1.6.5.1. If initially received by Contractor, Contractor shall provide to each of the following a copy of the agency or laboratory report of each test or inspection or certification: District; Construction Manager, if any; Architect; Consulting Engineer, if any; Other Engineers on the Project, as appropriate; and; Project Inspector. |
| 1.6.5.2. When the test or inspection is one required by the Title 24, a copy of the report shall also be provided to the DSA. |
| 1.7. SELECTION AND PAYMENT |
| 1.7.1. District will hire and pay for services of an independent Testing Laboratory to perform specified inspection and testing as specified by District's Testing Laboratory. |
| 1.7.2. District’s hiring of Testing Laboratory shall in no way relieve Contractor of its obligation to perform work in accordance with requirements of Contract Documents. |
| 1.8. DISTRICT'S TESTING LABORATORY RESPONSIBILITIES |
| 1.8.1. Test samples of mixes submitted, as approved by Architect |
| 1.8.2. Perform specified inspection, sampling, and testing of Products in accordance with specified standards. |
| 1.8.3. Notify Architect and Contractor of observed irregularities or non-conformance of Work or Products. |
| 1.8.4. Attend preconstruction conferences and progress meetings when requested by Architect. |
| 1.9. LABORATORY REPORTS |
| 1.9.1. After each inspection and test, District shall then submit one copy of laboratory report to Contractor. Reports of test results of materials and inspections found not to be in compliance with the requirements of the Contract Documents shall be forwarded immediately. |
| 1.9.2. Each Testing Laboratory shall submit a verified report covering all of the tests which were required to be made by that agency during the progress of the Project. Such report shall be furnished each time that Work is suspended, covering the tests up to that time and at the Completion of the Project, covering all tests. |
| 1.10. LIMITS ON TESTING LABORATORY AUTHORITY |
| 1.10.1. Laboratory may not release, revoke, alter, or enlarge on requirements of Contract Documents. |
| 1.10.2. Laboratory may not approve or accept any portion of the Work. |
| 1.10.3. Laboratory may not assume any duties of Contractor. |
| 1.10.4. Laboratory has no authority to stop the Work. |
| 1.11. CONTRACTOR RESPONSIBILITIES |
| 1.11.1. Submit proposed items for testing as required herein and/or as further required in the Contract Documents to Architect for review in accordance with applicable specifications. |
| 1.11.2. Cooperate with Laboratory personnel, and provide access to the Work and to manufacturer's facilities. |
| 1.11.3. Notify Architect, District, and Testing Laboratory 48 hours prior to expected time for operations requiring inspection and testing services. |
| 1.11.4. When tests or inspections cannot be performed after such notice, reimburse District for Laboratory personnel and travel expenses incurred due to the Contractor's negligence. |
| 1.11.5. Contractor shall notify District a sufficient time in advance of the manufacture of material to be supplied by Contractor pursuant to the Contract Documents, which must by terms of the Contract be tested, in order that the District may arrange for the testing of same at the source of supply. Sufficient notice for local source of supply, within 200 miles, requires a notification of no less than two (2) business days. Non-local, including out of state, must provide notification of no less than fifteen (15) business days. |
| 1.11.5.1. Any material shipped by the Contractor from the source of supply prior to having satisfactorily passed such testing and inspection or prior to the receipt of notice that such testing and inspection will not be required shall not be incorporated in the Work. |
| 1.11.6. Contract and pay for services of District's Testing Laboratory to perform additional inspections, sampling and testing required when initial tests indicate Contractor's work and/or materials does not comply with Contract Documents. |
| 1.12. SCHEDULE OF INSPECTIONS AND TESTS |
| The Testing Laboratory shall perform tests and inspections for the following in conformance with the (CBC) California Building Code (International Building Code with State of California Amendments), California Code of Regulations, Title 24, Part 2: |
| Structural Tests and Special Inspections (Chapter 17A) |
| o Special Inspections (§ 1704A) |
| Soils and Foundations (Chapter 18A) |
| o Geotechnical Investigations (§ 1803A) |
| Concrete (Chapter 19A) |
| o Specifications for Tests and Materials |
| o Concrete Quality, Mixing and Placing |
| o Concrete Reinforcement and Anchor Testing Inspection (§ 1916A) |
| Masonry (Chapter 21A) |
| o Masonry Construction Materials (§ 2103A) |
| o Masonry Quality (§ 2103A) |
| o Quality Assurance (§ 2105A) |
| Structural Steel (Chapter 22A) |
| Structural Steel (§ 2205A) |
| Identification & Protection of Steel for Structural Purposes (§ 2203A) |
| o Inspection and Tests of Structural Steel (§ 2212A) |
| Wood (Chapter 23) |
| o Minimum Standards and Quality (§ 2303) |
| o Wood Construction (§ 1704A.6) |
| Exterior Walls (Chapter 14) |
| Masonry Units (§ 1404.4) |
| Masonry Construction Materials (§ 2103A) |
| o Exterior Insulation and Finish Systems (§ 1408) |
| Roof Assemblies and Roofing Structures (Chapter 15) |
| o Materials (§ 1506) |
| Aluminum (Chapter 20) |
| o Materials (§ 2002.1) |
| o Inspection (§ 2003.1) |
| 1.12.1. Plumbing |
| Testing as specified in Division 15 including, but not limited to: Sterilization, soil waste and vent, water piping, source of water, gas piping, downspouts and storm drains. |
| 1.12.2. Automatic Fire Sprinklers (where applicable) |
| Testing as specified in Division 15 shall include, but not be limited to: hydrostatic pressure. |
| 1.12.3. Heating, Ventilating and Air Conditioning |
| Testing as specified in Division 15 shall include, but not be limited to: Ductwork tests, cooling tower tests, boiler tests, controls testing, piping tests, water and air systems, and test and balance of heating and air conditioning systems. |
| 1.12.4. Electrical |
| Testing as specified in Division 16, including, but not limited to: Equipment testing, all electrical system operations, grounding system and checking insulation after cable is pulled. |
| 1.13. PROJECT INSPECTOR’S ACCESS TO SITE |
| 1.13.1. A Project Inspector employed by the District in accordance with the requirement of State of California Code of Regulations, Title 24, Part 1 will be assigned to the Work. Project Inspector’s duties are specifically defined in 24. C.C.R. §4�342, and as indicated in the General Conditions. |
| 1.13.2. District and Construction Manager shall at all times have access for the purpose of inspection to all parts of the Work and to the shops wherein the Work is in preparation, and Contractor shall at all times maintain proper facilities and provide safe access for such inspection. |
| 1.13.3. The Work in all stages of progress shall be subject to the personal continuous observation of the Inspector. Inspector shall have free access to any or all parts of the Work at any time. Contractor shall furnish the Inspector reasonable facilities for obtaining such information as may be necessary to keep Inspector fully informed respecting the progress and manner of the Work and the character of the materials. Inspection of the Work shall not relieve the Contractor from any obligation set forth in the Contract Documents. |
| 1.13.4. The Inspector is not authorized to change, revoke, alter, enlarge or decrease in any way any requirement of the Contract Documents, drawings, specifications or subsequent change orders. |
| 1.13.5. Whenever there is insufficient evidence of compliance with any of the provisions of Title 24 or evidence that any material or construction does not conform to the requirements of Title 24, the Division of the State Architect may require tests as proof of compliance. Test methods shall be as specified herein or by other recognized and accepted test methods determined by the Division of the State Architect. All tests shall be performed by a testing laboratory accepted by the Division of the State Architect. |
| 015000-Temporary-Facilities-Controls-v2022 |
| 015210-Site-Standards-v2022 |
| 016000-Materials-Equipment-v2022 |
| 016610-Delivery-Storage-Handling-v2022 |
| 017300-Execution-v2022 |
| 017310-Cutting-Patching-v2022 |
| 017700-Close-Out-Final-Cleaning-v2022 |
| 017823-Operation-Maintenance-Data-v2022 |
| 017836-Warranties-v2022 |
| 017839-Record-Documents-v2022 |