This is a design plans document prepared by Hanover Engineering for the Borough of Fountain Hill, Pennsylvania, in support of the Hertzog Avenue Reconstruction Project. The project encompasses approximately 2,960 square yards of street reconstruction, 1,770 feet of curb replacement, and 5,975 square yards of sidewalk and curb ramp replacement on Hertzog Avenue from Broadway to Moravia Street. The scope of work also includes installation of erosion and sediment control facilities and other miscellaneous improvements. The document contains design base plans labeled FH25-19(A) Design Base-01 through FH25-19(A) Design Base-04, with permanent seeding specifications included. Bid submission via the PennBid Program is required by 1:00 p.m. prevailing time on Tuesday, May 19, 2026, with public opening of proposals scheduled for 3:00 p.m. the same day. Final questions must be submitted no later than 4:00 p.m. on Wednesday, May 13, 2026. All bid documents are available at no cost online through the PennBid portal at https://pennbid.bonfirehub.com.

Each proposal must be accompanied by a bid bond, certified check, bank cashier's check, or other acceptable security in the amount of 10 percent of the total base bid. Bids remain effective for 60 calendar days from the bid opening date and cannot be withdrawn during this period. The project is partially funded through a Community Development Block Grant (CDBG). The low-bid contractor must pursue Minority and Women Business Enterprise (MBE/WBE) firm participation for subcontractors in accordance with Executive Orders 11625 and 12138. The project is subject to Davis-Bacon Act minimum wage rates, the Public Works Employment Verification Act, and non-discrimination and equal employment opportunity regulations. The Borough of Fountain Hill reserves the right to waive any informalities, irregularities, defects, errors, or omissions in any or all bids, and to accept or reject any or all parts of the bid.

View the file

Other files

File Type Posted
1-CherryStreetAlleyPaving Plans.pdf PDF
2-CherryStreetAlleyPaving ProjectManual.pdf PDF
1-HertzogAve ProjectManual.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Br od he ad

R oa d, S ui te

Be th le he m , P

A

7-

P :61

0.

1.

F:

0.

1.

H an ov er

En g.

co m

Be th le he m O ffi ce

Br od he ad

R oa d, S ui te

Be th le he m , P

A

7-

0.

1.

F:

0.

1.

H an ov er

En g.

co m

Be th le he m O

Br od he ad

R oa d, S ui te

Be th le he m , P

A

7-

0.

1.

F:

0.

1.

H an ov er

En g.

co m

Be th le he m O

Permanent Seeding

Br od he ad

R oa d, S ui te

Be th le he m , P

A

7-

0.

1.

F:

0.

1.

H an ov er

En g.

co m

Be th le he m O

FH25-19(A) Design Base-01
FH25-19(A) Design Base-02
FH25-19(A) Design Base-03
FH25-19(A) Design Base-04

File details come from the government source that posted it. Updated .