2. Gauley House HVAC Replacement - SOW.docx

DOCX document 1 MB Posted

Attached to
Gauley Ranger Station HVAC Replacement Federal contract opportunity
Solicitation number
12445525Q0010
Issued by
Department of Agriculture Forest Service

About this file

This document is a Statement of Work (SOW) for the Gauley House HVAC Replacement project by the US Department of Agriculture. The project involves replacing the existing HVAC system with a new 10kw air handler and 2-ton heat pump, including installation of a new programmable thermostat, necessary wiring, electrical disconnects, and a concrete paver pad. The contractor must be licensed in West Virginia, maintain liability insurance, and comply with all applicable electrical and building codes.

The key deliverables include installing the heat pump package unit connected to existing ductwork, placing a new thermostat, and removing and disposing of the existing furnace system. The work is to be completed during regular business hours (Monday-Friday, 8:00am to 5pm), with no weekend or holiday work permitted without written authorization from the Contracting Officer. The project is associated with Solicitation Number 12445525Q0010 for the Monongahela National Forest, located in Richwood, WV, with all questions due by March 21, 2025.

View the file

Other files for this federal contract opportunity

Other files attached to Gauley Ranger Station HVAC Replacement, newest first.
File Type Posted
Gauley House HVAC Replacement - Updated.pdf PDF
Sol_12445525Q0010_Amd_0001.pdf PDF
Gauley House HVAC Replacement - QA 3-20-25.pdf PDF
2. Gauley House HVAC Replacement - SOW (REV) 3-18-25.pdf PDF
Gauley House HVAC Replacement - QA 3-18-25.pdf PDF
4. Gauley House Vicinity Map.pdf PDF
12445525Q0010.pdf PDF
5. SBA_WD_DBA_WV.pdf PDF
1. Gauley House HVAC Replacement Specifications.docx DOCX document
3. Gauley House HVAC Replacement - SOI.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Gauley House HVAC Replacement Statement of Work

Contents

Project3
General Information3
1.0 Scope of Work3
2.0 Background3
Contractor Requirements3
3.0 Technical Requirements / Tasks3
4.0 Government Furnished3
5.0 Deliverables / Schedule3
6.0 Photographs4

Project Gauley House HVAC Replacement

General Information

1.0 Scope of Work

The project will include the installation of 1 new 10kw air handler, and a 2-ton heat pump with a new thermostat, wiring, connection to existing ductwork, electrical disconnects, and construction of one new concrete paver pad for the heat pump. The project will also include the removal and disposal of the existing furnace system.

2.0 Background

System check found that the outdoor unit was not running. Testing determined that the compressor has failed. Due to the age of the system and the cost to repair, recommendation is for full equipment replacement.

Contractor Requirements

3.0 Technical Requirements / Tasks

Contractor shall be licensed in the state of West Virginia and maintain liability insurance. All work must comply with applicable electrical and building codes. All applicable codes will supersede any other documentation or requirements provided.

4.0 Government Furnished

Government shall furnish access to the facility during regular business hours (Monday-Friday 8:00am to 5pm), as well as restroom facilities onsite. No work shall be permitted on weekends or on federal holidays without the written permission of the CO. Any government provided property shall be returned prior to payment of the final invoice.

5.0 Deliverables / Schedule

Key Deliverables

Item No.
Deliverable
Objective
Due
0001
Install 2 Ton Heat Pump Package Unit.
Install new 2 Ton Heat pump package and connect to existing building ductwork. Install 1 new pad for heat pump at the residence location using concrete pavers. Install all necessary new wiring to power the unit and electrical disconnect boxes. Placement of all components as specified by the COR.
End of Period of Performance
0002
Install New Thermostat
Install a new 7-day programmable thermostat at a location specified by the COR.
End of Period of Performance
Item No.
Deliverable
Objective
Due
0003
Remove and dispose of 1 Existing Furnace
Remove all existing components, connections, and controls for the existing unit. All demoed materials shall be removed from the project site and legally disposed of off Government property in an approved landfill. Repair wall penetrations where material is removed.
End of Period of Performance

6.0 Photographs

Photo 1: Outdoor unit.

Photo 2: Indoor unit.

image1.png image2.jpeg image3.jpeg