This document is a Quality Assurance Surveillance Plan (QASP) for a Department of the Navy contract providing wireless mobility services. The contract is an indefinite delivery, indefinite quantity multiple award and has a one-year base period followed by nine one-year options. Performance will be evaluated quarterly against objectives for technical quality, schedule, management, and customer relations. Acceptable performance is defined as an average rating of three on a five-point scale. Order-level reports will be rolled up into an annual report to assess the contractor's performance against requirements and address any issues that arise.
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan (QASP) 1 Introduction This Attachment provides a summary of the QASP performance requirements for the Department of the Navy – Wireless Services Spiral 4, Indefinite Delivery, Indefinite Quantity Multiple Award Contracts (IDIQ, MACs). The purpose of any QASP is to provide a structured process for managing the Contracts’ performance and reducing performance risk. It emphasizes communication during all phases of performance.
The DON Wireless Services Contracts Contracting Officer’s Representative (COR) will use a matrixed approach to conduct Contract surveillance, including observations from the Task Order COR, Customer, or other Government personnel. Additionally, some aspects of performance will require contributions from the Ordering Office relative to the Task Order administration or similar matters.
1.1 Purpose
This QASP describes the systematic methods used to measure the Contractor’s performance. The QASP additionally provides the Government a means for evaluating whether the Contractor is complying with the terms and conditions of the Contract. The QASP is the primary tool for documenting Contractor performance. The QASP defines roles and responsibilities, identifies the performance objectives, and defines methodologies used to monitor and evaluate Contractor performance, and describes the analysis of quality assurance monitoring results.
Authority for issuance of this QASP is provided at FAR 52.246-4 Inspection of Services-Fixed Price, which provides for inspections and acceptance of the services, and documentation called for in the Contract to be accomplished by the Procuring Contracting Officer (PCO) or their duly authorized representative, the COR. The Government shall perform inspections and tests in a manner that will not delay Contractor performance.
1.2 Quality Performance Surveillance Strategy
The Contractor may develop and utilize their own staffing and procedures, for use on a continuous basis, for self-inspecting each performance objective and other performance requirements outlined in the terms and conditions. It is the Contractors responsibility to internally monitor business processes and practices to ensure performance is managed effectively.
The Contracting Officer and the COR will monitor performance, review performance and any other documentation provided, to determine how the Contractor is performing against the performance objectives. To monitor performance, the Ordering COR and COR will utilize the QASP performance standards and methods of surveillance as indicated within each performance objective table. The Evaluation Rating Definitions (Table 1) shall be utilized to assign appropriate ratings for each performance objective rated.
1.3 Roles and Responsibilities
1.3.1 Contract Ordering Officer
The Ordering Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the Contract terms and conditions, and safeguards the interests of the United States in the contractual relationship. The Ordering Officer is ultimately responsible for determining the adequacy of Department of the Navy Wireless Services Contracts Spiral 4 Attachment 3: Quality Assurance Surveillance Plan (QASP) the Contractor’s performance. The Ordering Officer will consider all information received from Order COR when determining the adequacy of the Contractor’s performance.
The Ordering Officers functions include:
· Monitors, assesses, and communicates the Contractor performance.
· Reviews the Order COR’s performance reports (CPARS report if over threshold or Quality Assurance (QA) report) and approves them.
· Assures that the Contractor receives impartial, fair, and equitable treatment under the Contract.
1.3.2 Task Order Contracting Officer’s Representative (COR)
The Order COR, assigned by the Ordering Officer, performs quality assurance functions for the Contract wireless mobility services. The Order COR uses the QASP to conduct the oversight and surveillance process. The purpose is to ensure that the Contractor meets the performance standards contained in the terms and conditions of the Contract. The Order COR is not empowered to make any contractual commitments or to authorize any contractual change on the Government’s behalf.
The Order COR functions include:
· Provides continuous technical oversight of the Contractor’s performance.
· Assists in acquisition planning.
· Provides technical assistance to the Ordering Officer.
· Maintains proficiency in Order surveillance procedures.
· Performs surveillance in accordance with the QASP and provides Ordering Officer documentation of surveillance observations.
· Notifies the Ordering Officer of any significant performance deficiencies.
· Monitors, assesses and communicates Contractor performance to the Ordering Officer.
· Collect all relevant documentation, to include relevant e-mails and documented phone conversations, and/or Contractor invoices submitted.
· Develops a QA report for each Order and maintains a Quality Assurance file that accurately documents the Contractor’s actual performance.
· For urgent concerns discovered during the Order performance period, or during the QA Report process, where timeliness of Contractor performance concerns need to be processed quickly, the Order COR shall notify the Ordering Officer of any significant performance deficiencies as soon as possible and not wait for all documentation to be collected.
2 Performance Objectives The Contractor shall provide wireless mobility services pursuant to the requirements outlined in the terms and conditions. While the Contractor is fully expected to comply with all requirements, the Government’s assessment of performance will primarily focus on the performance objectives detailed below. The level of acceptance for each objective is established IAW evaluation criteria listed herein for Technical/Quality, Schedule, Management, and Customer Relations, and numeric grades are to be assigned for each ranging from one (1) to five (5). As described in Section 3.1, an overall numeric goal of three (3) is targeted for each performance objective. Ratings of “4 or 5” may be assigned if the Contractor performed single or multiple significant events that were of benefit to the Government, and there were NO significant weaknesses identified. A fundamental principle of assigning ratings is that Contractors will not be assessed a rating lower than three (3) solely for not performing beyond the requirements of the Order.
The Contractors performance objectives are summarized in the following table. However, additional performance element requirements may be included for specific Orders by the Ordering Office at the Order Level.
2.1 Performance Objective #1 – Technical/ Quality
Quality of the wireless mobility services and devices provided shall conform at least to the quality standards contained herein.
Specific performance standards and surveillance methods for quality include, but are not limited to:
2.1.1 Coverage
Performance Element
Performance Standard
Surveillance
Acceptable Quality Level
Voice & Texts Coverage
| Voice and texts coverage, reception and transmission for all Contractor provided coverage locations |
| Assessment by the Ordering COR with input from end users |
| Within the Geographical Area(s) specified in the subject order in accordance with PWS Sections 6.6.2b and 6.6.3, and for the Radio Access Network(s) specified in the subject order in accordance with PWS Section 6.3, 100% of the devices have the minimum coverage specified for the subject order for either Legacy Coverage as defined and measured in PWS Section 6.6.1, or for Other Level of Service Coverage as defined and measured in PWS Section 6.6.2. |
| Data Coverage |
| Data coverage, reception, and transmission |
| Assessment by the Ordering COR with input from end users |
Within the Geographical Area(s) specified in the subject order in accordance with PWS Sections 6.6.2b and 6.6.3, and for the Radio Access Network(s) specified in the subject order in accordance with PWS Section 6.3, 100% of the devices have the minimum coverage specified for the subject order for either Legacy Coverage as defined and measured in PWS Section 6.6.1, or for Other Level of Service Coverage as defined and measured in PWS Section 6.6.2.
Email Coverage
| Email coverage, reception and transmission |
| Assessment by the Ordering COR with input from end users |
Within the Geographical Area(s) specified in the subject order in accordance with PWS Sections 6.6.2b and 6.6.3, and for the Radio Access Network(s) specified in the subject order in accordance with PWS Section 6.3, 100% of the devices have the minimum coverage specified for the subject order for either Legacy Coverage as defined and measured in PWS Section 6.6.1, or for Other Level of Service Coverage as defined and measured in PWS Section 6.6.2.
Paging Coverage
| Paging coverage, reception, and transmission of messaging |
| Assessment by the Ordering COR with input from end users |
| 100% of devices have coverage within the geographical area specified in the subject order in accordance with PWS Section 3.2.2. |
2.2 Performance Objective #2 – Schedule
The Schedule Performance Objective assess the timeliness of the Contractor for the Orders, milestones, delivery schedules and administrative requirements.
Specific standards and surveillance methods for schedule include, but are not limited to:
2.2.1 Delivery of Devices
Performance Element
Performance Standard
Delivery of Devices
| Shipment and delivery of devices upon issuance of Order. |
| Assessment by the Order COR. |
| 90% of the devices shall be shipped within three (3) business days and delivered within 5 business days of issuance. |
2.3 Performance Objective #3 – Management
Management assess the integration and coordination of all activity needed to execute the Order, specifically the timeliness, completeness and quality of problem identification, corrective action plans, quotes submittals, the Contractor’s history of reasonable and cooperative behavior (to include timely identification of issues in controversy), customer satisfaction, and timely award.
Specific standards and surveillance methods for management include, but are not limited to:
2.3.1 Invoices
Performance Element
Performance Standard
Invoices Content of invoices are in compliance w/ Contract terms and conditions.
Invoice submissions are timely, accurate, and complete – submit invoices into Wide Area Work Flow (WAWF) in a timely manner (90 days).
| Review and acceptance of the invoice by the Order COR identified in Order. |
| 100% of the invoices are timely. 95% of invoice issues resolved within 60 days. |
Invoice Notifications
| Notify Order COR or Ordering Officer within two (2) days of posting invoices on the DON Wireless Services Contract Dedicated Website. |
| Assessment by the Order COR for invoice reviews. |
| 90% of the time notifications are made within one to two business days of posting invoice. |
2.3.2 Order Modifications
Performance Performance Standard Surveillance Acceptable Quality Level Element
Modifications
| Responsive to modification requests – communicating with Ordering Officer by email or phone within a reasonable timeframe. |
| Assessment by |
the Ordering Officer.
90% of the time email responses/notification are made to the Ordering Officer within one (1) business day.
2.3.3 Reporting
Performance Element
Performance Standard Surveillance
Reporting
| Reporting is performed in accordance with the Contract requirements and is to be timely and accurate. |
| Assessment of Reports by |
DON Wireless Services Contract COR and Order COR.
95% of reports are submitted within the timeframes identified within the Contract requirement terms and conditions..
2.3.4 DON Wireless Services Contract, Spiral 4, Dedicated Website
Performance Performance Standard Surveillance Element
Group – Enterprise Level
| Website components are provided in accordance with the Contract requirements consistent with the Enterprise Level group. |
| Assessment by the DON Wireless Services Contract COR. |
| Meets 100% of the website components required in accordance with the Contract requirement terms. |
Website – General and Order Level
| Website components are provided in accordance with the Contract requirements consistent with the General and Order Level group. |
| Assessment by the Ordering Officer, Order COR, and end user. |
| Meets 100% of the website components required in accordance with the Contract requirements. |
2.4 Performance Objective #4 – Customer Relations
Customer Relations assess the Contractor’s history of reasonable and cooperative behavior (to include timely identification of issues in controversy), customer satisfaction, and timely award.
Specific standards and surveillance methods for customer relations include, but is not limited to:
2.4.1 Customer Service
Performance Element
Performance Standard
Customer Service
| Customer Service is to be provided consistently to standards detailed in the Contract requirement terms. |
| Assessment of compliance by Ordering Officer, Order COR, DON Wireless Services Contract COR, PCO, end users, and any other Government representative. |
| Contractor performs customer service and meets the requirements 100% of the time. |
Issue Resolution Work with the PCO, DON Wireless Services Contract COR, Ordering Officer, Order COR, end user, and any other Government representative to resolve issues
| Assessment of compliance by Ordering Officer, Order COR, DON Wireless Services Contract COR, PCO, end users, and any other Government representative. |
| Contractor performs issue resolution 100% of the time. |
3 Quality Assurance Monitoring
3.1 Quality Assurance Reporting: To be submitted into SPM (Surveillance Procurement Module) located in PIEE (Procurement Integrated Enterprise Environment)
Contractor performance will be assessed both individually (per Task Order) and annually (a roll-up of quarterly performance). The Order COR will complete a Quality Assurance (QA) report for each Order via SPM, the report shall also be included in each Order, and submitted via email to the DON Wireless Services Contract COR quarterly*. Additionally, the DON Wireless Services Contract COR shall submit an annual QA report to the PCO 60 days before the end of each ordering period to capture a roll-up from the quarterly performance reports within each year.
QASP reporting is completed using surveillance information observed by the Order COR and any other Government notes communicated during the performance period of each Order. The QASP score for a particular Order will be computed as the average of each applicable performance objective listed in Section 2. Similarly, the overall QASP score for the quarter will be computed as the average of all Orders during that quarter. A numeric goal of three (3) (Satisfactory) is expected for each performance objective. An average QASP score for an Order of less than three (3) is considered less than satisfactory performance for that Order. Likewise, an overall average QASP score for the quarter of less than three (3) is considered less than satisfactory performance for the quarter.
*A quarter is defined as a 3-month period of time beginning on the first month of the fiscal year. If the period of performance begins after a quarter begins, the first quarter will include the portion leading up to the first quarter plus the first quarter. The final quarter will be defined as any period of performance left after the last completed quarter.
Annually, or as required, the Government will input performance evaluations into the Department of Defense (DoD) Contractor Performance Assessment Reporting System (CPARS). The Order COR is responsible for inputting performance ratings into CPARS for every Order that exceeds $1M and providing the finalized assessment to the DON Wireless Services Contract COR. In these instances, Contractors are required to obtain CPARS accounts for electronic distribution of assessments. CPARS accounts can be established at https://cpars.gov.
3.2 Quality Assurance Results
The PCO will provide the QA Annual Report to the Contractor, via email, within 30 days after the end of each ordering period. Briefings regarding Contractor performance, via teleconference meeting, will be discussed during CONTRACT Annual reviews and/or Progress Reviews.
The PCO/Ordering Officer may require the Contractor’s Dedicated Project Manager, or a designated alternate, to meet with the DON Wireless Services Contract COR as deemed necessary to discuss the performance evaluation. The Order COR/DON Wireless Services Contract COR will conduct in-depth reviews with the Contractor as needed.
However, if the need arises, the Contractor will meet with the PCO/Ordering Officer, as often as required, to formulate tactical and long–term courses of action. The agenda of the reviews may discuss:
· Performance measured by the metrics and trends
· Issues and concerns of both parties
· Recommendations made by the Government based on feedback and assessments
· Issues arising from independent reviews and inspections
3.3 Negative Performance
The PCO will evaluate the QA Annual Report results should performance not meet the QASP standards. As determined by the PCO, in the event the Contractor fails to perform, the Contractor may be barred from being awarded additional Orders for a specified period and/or may receive negative past performance ratings.
If the Contractor's overall performance is unsatisfactory, as documented within the quarterly evaluations, the PCO and COR will provide in writing a report identifying the issues that have resulted in the performance being evaluated as “unsatisfactory”. In response, the Contractor shall provide the below information to the PCO and COR, in writing within five (5) calendar days of receipt of the report:
· Reason(s) for unsatisfactory performance,
· Action(s) the Contractor proposes to take to remedy the deficiencies; and,
· Any measures the Contractor plans to adopt to ensure that similar deficiencies will not reoccur in the future.
Based upon the Contractor’s past performance and their response to the aforementioned information, the PCO will determine if any further action(s) need to be taken.
3.3.1 Off Ramping
Contractor is rated less than “satisfactory” for multiple performance objectives during QA reports or CPARS assessments throughout a quarterly reporting period, the following may apply:
a. Off-ramped from the DON Wireless Services Contracts
· During the Contract annual review, if the PCO determines that the Contractor has failed to perform satisfactorily, the Contractor may be off-ramped.
Table (1)
Evaluation Rating Definitions
| Rating |
| Definition |
| Note |
Exceptional Performance meets Contract terms and condition requirements and exceeds many to the Government’s benefit. The contractual performance of the element or being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
To justify an Exceptional rating, identify multiple significant events and state how they were of benefit to the Government. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO severe issues identified.
Very Good
Performance meets Contract terms and condition requirements and exceeds some to the Government’s benefit. The contractual performance of the element being evaluated was accomplished with some minor problems for which corrective actions taken by the Contractor was effective.
To justify a Very Good rating, identify a significant event and state how it was a benefit to the Government. There should have been no severe issues identified.
Satisfactory
Performance meets Contract terms and condition requirements. The performance of the element contains some minor problems for which corrective actions taken by the Contractor were appropriate or were satisfactory.
To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the Contract/Order. A fundamental principle of assigning ratings is that Contractors will not be evaluated with a rating lower than Satisfactory solely for not performing beyond the requirements of the Contract/Order. Vendors that meet acceptable performance will receive a rating of satisfactory.
Marginal
Performance does not meet some Contract term and condition requirements. The performance of the element being evaluated reflects a serious problem for which the Contractor has not yet identified corrective actions. The Contractor’s proposed actions appear only marginally effective or were not fully implemented.
To justify Marginal performance, identify a significant event for each objective that the Contractor had trouble overcoming and state how it impacted the Government
Unsatisfactory
Performance does not meet most Contract term and condition requirements and recovery is not likely in a timely manner. The performance of the element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
To justify an Unsatisfactory rating, identify multiple significant events in each category that the Contractor had trouble overcoming and state how it impacted the Government. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.