2-Ashley Way Bid Set 5-28-26.pdf

PDF 4 MB Posted

Attached to
Schuylkill Valley School District Ashley Way Water Connection Project
Solicitation number
Not on record
Issued by
Berks County, Pennsylvania

About this file

This is a bid set document for the Schuylkill Valley School District Ashley Way Water Connection Project, prepared by engineering firm Spotts, Stevens & McCoy for the Borough of Leesport, Berks County, Pennsylvania. The project consists of installing approximately 875 linear feet of 8-inch ductile iron pipe (DIP) water main, including a meter pit, connections to existing water mains, associated fittings and valves, and restoration of disturbed areas. The project site is located at Ashley Way near Schuylkill Valley Elementary School in Ontelaunee Township, Berks County. Sealed bids are due online through the PennBid Program by 10:00 am local time on June 16, 2026, with paper bids not accepted. The construction documents were issued for bidding on May 28, 2026, and include water line layout plans, profiles, erosion and sedimentation control plans and narratives, construction details, and meter pit specifications. All proposed work shall comply with Pennsylvania Act 287 utility notification requirements, with contractors required to contact the One Call System at least three working days prior to construction start.

Bid security and performance and payment bonds equal to 100% of the contract amount are required from the successful bidder. Pennsylvania prevailing wage rates apply to all work performed on the project. The bid documents indicate contact information for several utility companies that may be affected by the construction, including Crown Castle (fiber optic), Pennsylvania Electric Company, Cable Protection Services Inc., and Frontier Communications. The project limits disturbance to approximately 0.104 acres, with work confined to areas near the school parking lot and driveway. Temporary and permanent erosion and sedimentation control measures, including filter socks, inlet protection, and permanent seeding with mulching, are specified throughout the construction sequence. All construction vehicles must be cleaned of sediment before leaving the site, and excess materials must be removed or legally disposed of. The Borough of Leesport reserves the right to reject any or all bids submitted and to waive any informalities in the bidding process.

View the file

Other files

File Type Posted
1-Project Manual.pdf PDF
3-Addendum No. 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1047 North Park Road Reading, PA 19610-0307 610.621.2000

701 Creekside Lane Lititz, PA 17543 717.568.2678

Engineers and Consultants

SPOTTS, STEVENS & MCCOY

ssmgroup.com

READING

LANCASTER

Roma Corporate Center, Suite 106 1605 N Cedar Crest Blvd Allentown, PA 18104 610.849.9700

LEHIGH VALLEY

101 East Evans Street West Chester, PA 19380 610.621.2000

WEST CHESTER

100499.0088-G.0-01

INDEX TO DRAWINGS

DWG NO. DESCRIPTION

G.0-01 COVER SHEET

W.1-01 WATER LINE LAYOUT PLAN

W.1-02 WATER LINE PROFILE

LOCATION MAP

PLAN SUBMITTAL/REVISION DATE

ISSUED FOR BIDDING 05/28/26

W.2-50 W.2-51 W.2-52

EROSION & SEDIMENTATION CONTROL PLAN

EROSION & SEDIMENTATION CONTROL NARRATIVE

EROSION & SEDIMENTATION CONTROL DETAILS

W.6-01 W.6-02

CONSTRUCTION DETAILS

METER PIT DETAILS

CROWN CASTLE

1500 CORPORATE DRIVE

CANONSBURG, PA 15317

CONTACT: FIBER DIG TEAM PERSONNEL

EMAIL: fiber.dig@crowncastle.com 800-654-3110

PENNSYLVANIA ELECTRIC CO.

341 WHITE POND DRIVE

AKRON, OH, 44320

CONTACT: MELLYSSA ADAMS

EMAIL: madams@firstenergycorp.com 330-252-4013

CABLE PROTECTION SERVICES INC.

PO BOX 4846

MIDLOTHIAN, VA 23112

CONTACT: DEBBIE KING

EMAIL: debbie_king@cableps.com 804-562-3409

FRONTIER COMMUNICATIONS OF PA INC.

300E LAIRD STREET

WILKES BARRE, PA 18702

CONTACT: MICHAEL NAVICH

EMAIL: michael.navich@ftr.com 570-208-3375

AutoCAD SHX Text

COPYRIGHT 2026 SPOTTS, STEVENS & MCCOY

AutoCAD SHX Text

SCALE: 1" = 1000'

AutoCAD SHX Text

BOROUGH OF LEESPORT

AutoCAD SHX Text

BERKS COUNTY, PA

AutoCAD SHX Text

BY

AutoCAD SHX Text

PREPARED FOR

AutoCAD SHX Text

SCHUYLKILL VALLEY SCHOOL DIST.

AutoCAD SHX Text

ASHLEY WAY WATER CONNECTION

AutoCAD SHX Text

DIGITAL FILENAME: 100499.0088-G.0-01

AutoCAD SHX Text

SITE

AutoCAD SHX Text 20261472744

ONLY

Way (T-747)

Schuylkill Valley

Elementary School

Ashley

N or th P ar k

R oa d R ea di ng , P

A

-0

0.

1.

C re ek si de L an e

Li tit z, P

A

7.

8.

E ng in ee rs a nd C on su lta nt s

SP

O

TT

S, S

TE

VE

N S

M

C C

O Y ss m gr ou p.

co m

R E

A D

IN

G

L A

N C

A S

T E

R

R om a C or po ra te

C en te r, S ui te

N

C ed ar C re st

B lv d A lle nt ow n, P A

0.

9.

L E

H

IG

H V

A L

L E

Y

E as t E va ns S tre et

W es t C he st er

, P A

0.

1.

W E

S T

C H

E S

T E

R

D

ES

C R

IP

TI

O N

N O

D

AT

E

M

AD

E C

H

KD

AP

VD

A 5/

/2

IS

SU

ED

F O

R B

ID

D

IN

G

TJ

R

JM

N

JM

N

R

EL

EA

SE

D F

O R

N O

T

FO

R C

O N

ST

R

U C

TI

O

N

PR

O

JE

C T

M

AN

AG

ER

D

AT

E:

N .B

BA

SE

B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C

H

KD

BI

D

D

IN

G

JM

N

5/

/2

TJ

R

JM

N

JM

N

C O

PY

R

IG

H

T

SP

O

TT

S, S

TE

VE

N S

M

C C

O Y

DIGITAL FILENAMEDATE

WORK ORDER NUMBER

DRAWING NUMBER

BO

R

O U

G H

O F

LE

ES

PO

R

T O

N

TE

LA

U

N

EE

T O

W N

SH

IP

, B

ER

KS

C

O U

N

TY

, P

EN

N

SY

LV

AN

IA

SC

H

U

YL

KI

LL

V

AL

LE

Y

SC

H

O O

L D

IS

TR

IC

T

AS

H

LE

Y

W

AY

W

AT

ER

C

O N

N

EC

TI

O

N W

AT

ER

L

IN

E

LA

YO

U

T

PL

AN

7/03/24 100499.0088

W1-01

100499.0088

W.1-01

AutoCAD SHX Text

DY/4"

AutoCAD SHX Text

SW/4"

AutoCAD SHX Text

DY/4"

AutoCAD SHX Text

DY/4"

AutoCAD SHX Text

DY/4"

AutoCAD SHX Text

SW/4"

AutoCAD SHX Text

SW/4"

AutoCAD SHX Text

SW/4"

AutoCAD SHX Text

DY/4"

AutoCAD SHX Text

SW/4"

AutoCAD SHX Text

SW/4"

AutoCAD SHX Text 8" PVC Sanitary

AutoCAD SHX Text Inv. 333.99

AutoCAD SHX Text

18" RCP

AutoCAD SHX Text Inv. 331.38

AutoCAD SHX Text

18" RCP

AutoCAD SHX Text Inv. 331.38

AutoCAD SHX Text Inv. 324.31

AutoCAD SHX Text Overhead Wires

AutoCAD SHX Text Rip-Rap

AutoCAD SHX Text Inv. 334.31

AutoCAD SHX Text

18" CMP

AutoCAD SHX Text Elec. Pullbox

AutoCAD SHX Text Inv. 331.22

AutoCAD SHX Text Rip-Rap

AutoCAD SHX Text

8" PVC

AutoCAD SHX Text 8" PVC Sanitary

AutoCAD SHX Text 8" PVC Sanitary

AutoCAD SHX Text

8" PVC

AutoCAD SHX Text S

AutoCAD SHX Text San. MH Top 344.7 Inv. 337.31

AutoCAD SHX Text Sign in Planter

AutoCAD SHX Text Light

AutoCAD SHX Text Light

AutoCAD SHX Text Paved Parking Lot

AutoCAD SHX Text Paved Parking Lot

AutoCAD SHX Text Paved Drive

AutoCAD SHX Text Paved

AutoCAD SHX Text Drive

AutoCAD SHX Text Sign

AutoCAD SHX Text Concrete Walk

AutoCAD SHX Text 70' R/W

AutoCAD SHX Text 100' R/W

AutoCAD SHX Text

20" DIP

AutoCAD SHX Text 20" DIP (Approx. Location)

AutoCAD SHX Text 12" Waterline (Approx.)

AutoCAD SHX Text 6" Gasline (Approx. Location)

AutoCAD SHX Text UG Fiber Optic Cable (Approx. Location)

AutoCAD SHX Text UG Fiber Optic Cable (Approx. Location)

AutoCAD SHX Text Concrete

AutoCAD SHX Text Curb

AutoCAD SHX Text Concrete

AutoCAD SHX Text Walk

AutoCAD SHX Text UG Fiber Optic Cable (Approx. Location)

AutoCAD SHX Text UG Fiber Optic Cable (Approx. Location)

AutoCAD SHX Text Water Meter

AutoCAD SHX Text Ryder Truck Rental, Inc. Instrument No. 2016032557 PIN 68540100006261

AutoCAD SHX Text Bellante Properties Instrument No. 2014006766 PIN 68540100005809

AutoCAD SHX Text Ashley Furniture Industries, Inc. R.B.V. 4203, Page 731 PIN 68540100020080

AutoCAD SHX Text

8" GV

AutoCAD SHX Text 12"x8" TEE

AutoCAD SHX Text

8" GV

AutoCAD SHX Text

8" GV

AutoCAD SHX Text

PROP METER PIT

AutoCAD SHX Text

8" 45°BENDS

AutoCAD SHX Text

PROP. 8" DIP

AutoCAD SHX Text

PROP. 8" DIP

AutoCAD SHX Text

8" 45°BENDS

AutoCAD SHX Text

PROP. 8" DIP

AutoCAD SHX Text

PROP. 8" DIP

AutoCAD SHX Text

8" 11-1/4°BEND

AutoCAD SHX Text

LIMIT OF PAVEMENT MILL AND OVERLAY

AutoCAD SHX Text

PROP. 8" DIP

AutoCAD SHX Text

8" GV

AutoCAD SHX Text

TIE TO EXIST. 8" WATER

AutoCAD SHX Text P

AutoCAD SHX Text L

AutoCAD SHX Text P

AutoCAD SHX Text L

AutoCAD SHX Text P

AutoCAD SHX Text L

AutoCAD SHX Text P

AutoCAD SHX Text L

AutoCAD SHX Text 15'

AutoCAD SHX Text

LIMIT OF PAVEMENT MILL AND OVERLAY

AutoCAD SHX Text

8" 45°BEND

AutoCAD SHX Text

8" 11-1/4°BENDS

AutoCAD SHX Text

8" 45°BEND

AutoCAD SHX Text

8" 45°BEND

AutoCAD SHX Text

%%USOURCE OF TITLE

AutoCAD SHX Text BEING THE SAME PROPERTY WHICH NORTH CENTRAL BERKS SCHOOL AUTHORITY BY DEED DATED OCTOBER 1, 1985 AND RECORDED IN RECORD BOOK VOLUME 1885, PAGE 216, BERKS COUNTY RECORDS AT READING, PENNSYLVANIA, GRANTED AND CONVEYED UNTO SCHUYLKILL VALLEY SCHOOL DISTRICT. PIN 68540005293976

AutoCAD SHX Text COORDINATES ARE BASED ON NORTH AMERICAN DATUM OF 1983 AND ELEVATIONS ARE BASED ON NORTH AMERICAN VERTICAL DATUM OF 1988, OBTAINED BY A VIRTUAL REFERENCE SPATIAL SYSTEM.

AutoCAD SHX Text

%%UPROJECT DATUM

AutoCAD SHX Text PA ONE CALL SERIAL NUMBER: 20261472744 MUNICIPALITY: ONTELAUNEE TOWNSHIP, BERKS COUNTY IT IS THE CONTRACTORS RESPONSIBILITY TO COMPLY WITH THE PENNSYLVANIA ACT 287 AND TO CONTACT THE "ONE CALL SYSTEM" THREE (3) WORKING DAYS (UNLESS OTHERWISE NOTED) PRIOR TO START OF CONSTRUCTION.

AutoCAD SHX Text Scale 1"=30'

AutoCAD SHX Text 15'

AutoCAD SHX Text 30'

AutoCAD SHX Text 0'

AutoCAD SHX Text 30'

AutoCAD SHX Text 60'

AutoCAD SHX Text

GRAPHIC SCALE

NOTES: 1. ALL PROPOSED PIPE SHALL BE CLASS 52 UNLESS OTHERWISE NOTED. ALL PROPOSED PIPE SHALL BE CLASS 52 UNLESS OTHERWISE NOTED. 2. CONTRACTOR TO VERIFY DEPTH AND LOCATION OF ALL UTILITIES PRIOR TO CONTRACTOR TO VERIFY DEPTH AND LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION. 3. CONTRACTOR SHALL PROTECT ALL UTILITIES ABOVE AND BELOW GROUND, TO CONTRACTOR SHALL PROTECT ALL UTILITIES ABOVE AND BELOW GROUND, TO UTILITY OWNER'S SATISFACTION AT NO ADDITIONAL COST. 4. ANY UTILITY DISTURBED BY CONTRACTOR SHALL BE RESTORED TO THEIR ANY UTILITY DISTURBED BY CONTRACTOR SHALL BE RESTORED TO THEIR PRE-CONSTRUCTION CONDITION. 5. ALL FITTINGS AND VALVES SHALL UTILIZE MEGALUG JOINT RESTRAINT. ALL FITTINGS AND VALVES SHALL UTILIZE MEGALUG JOINT RESTRAINT. 6. A MINIMUM OF 2 JOINTS ON EACH SIDE OF A FITTING SHALL BE RESTRAINED A MINIMUM OF 2 JOINTS ON EACH SIDE OF A FITTING SHALL BE RESTRAINED WITH FIELD-LOK GASKETS. 7. CONTRACTOR SHALL VERIFY LINE SIZES, ELEVATIONS OF EXISTING WATER LINES CONTRACTOR SHALL VERIFY LINE SIZES, ELEVATIONS OF EXISTING WATER LINES PRIOR TO MAKING CONNECTIONS. 8. ALL EXISTING VALVES NO LONGER IN SERVICE SHALL BE ABANDONED IN PLACE ALL EXISTING VALVES NO LONGER IN SERVICE SHALL BE ABANDONED IN PLACE AND VALVE BOXES SHALL BE REMOVED AT NO ADDITIONAL COST. 9. EXISTING FIRE HYDRANTS NO LONGER IN SERVICE SHALL BE REMOVED BY EXISTING FIRE HYDRANTS NO LONGER IN SERVICE SHALL BE REMOVED BY CONTRACTOR AT NO ADDITIONAL COST AND BACKFILLED WITH 2A STONE. 10. CONTRACTOR SHALL NOT USE RISER ADJUSTMENT ON SANITARY MANHOLES. CONTRACTOR SHALL NOT USE RISER ADJUSTMENT ON SANITARY MANHOLES.

Ashley Way

Parking Lot / Driveway

N or th P ar k

R oa d R ea di ng , P

A

-0

0.

1.

C re ek si de L an e

Li tit z, P

A

7.

8.

E ng in ee rs a nd C on su lta nt s

SP

O

TT

S, S

TE

VE

N S

M

C C

O Y ss m gr ou p.

co m

R E

A D

IN

G

L A

N C

A S

T E

R

R om a C or po ra te

C en te r, S ui te

N

C ed ar C re st

B lv d A lle nt ow n, P A

0.

9.

L E

H

IG

H V

A L

L E

Y

E as t E va ns S tre et

W es t C he st er

, P A

0.

1.

W E

S T

C H

E S

T E

R

D

ES

C R

IP

TI

O N

N O

D

AT

E

M

AD

E C

H

KD

AP

VD

A 5/

/2

IS

SU

ED

F O

R B

ID

D

IN

G

TJ

R

JM

N

JM

N

R

EL

EA

SE

D F

O R

N O

T

FO

R C

O N

ST

R

U C

TI

O

N

PR

O

JE

C T

M

AN

AG

ER

D

AT

E:

N .B

BA

SE

B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C

H

KD

BI

D

D

IN

G

JM

N

5/

/2

TJ

R

JM

N

JM

N

C O

PY

R

IG

TT

S, S

TE

VE

N S

M

C C

O Y

DIGITAL FILENAMEDATE

WORK ORDER NUMBER

DRAWING NUMBER

BO

R

O U

G H

O F

LE

ES

PO

R

T O

N

TE

LA

U

N

EE

T O

W N

SH

IP

, B

ER

KS

C

O U

N

TY

, P

EN

N

SY

LV

AN

IA

SC

H

U

YL

KI

LL

V

AL

LE

Y

SC

H

O O

L D

IS

TR

IC

T

AS

H

LE

Y

W

AY

W

AT

ER

C

O N

N

EC

TI

O

N W

AT

ER

L

IN

E

PR

O

FI

LE

7/03/24 100499.0088

W1-02

100499.0088

W.1-02

AutoCAD SHX Text Existing Grade

AutoCAD SHX Text 8" San (Approx.)

AutoCAD SHX Text 8" San (Approx.)

AutoCAD SHX Text Existing Grade

AutoCAD SHX Text Existing Grade

AutoCAD SHX Text 6" Gas (Approx.)

AutoCAD SHX Text Fiber Optic Cables (Approx.)

AutoCAD SHX Text 12" Water (Approx.)

AutoCAD SHX Text 12"x8" TEE

AutoCAD SHX Text

8" GV

AutoCAD SHX Text

24" MIN.

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

METER PIT

AutoCAD SHX Text

8" GV

AutoCAD SHX Text

8" GV

AutoCAD SHX Text

PROP. 8" DIP

AutoCAD SHX Text

PROP. 8" DIP

AutoCAD SHX Text

PROP. 8" DIP

AutoCAD SHX Text

4'-0" MIN.

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

4'-0" MIN.

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

4'-0" MIN.

AutoCAD SHX Text

TYP.

AutoCAD SHX Text 8"x6" Tee (Approx.)

AutoCAD SHX Text

PROP. 8" DIP

AutoCAD SHX Text

PROP. 8" DIP

AutoCAD SHX Text

PROP. 8" DIP

AutoCAD SHX Text

8" GV

AutoCAD SHX Text

TIE TO EXIST. 8" WATER

AutoCAD SHX Text

GRAPHIC SCALE

AutoCAD SHX Text 15'

AutoCAD SHX Text 30'

AutoCAD SHX Text 0'

AutoCAD SHX Text 30'

AutoCAD SHX Text 60'

AutoCAD SHX Text Horizontal Scale 1"=30'

Vertical Scale 1"=5'

ONLY

Way (T-747) Ashley

DbA

DbB

DbB DbA

DbB

N or th P ar k

R oa d R ea di ng , P

A

-0

0.

1.

C re ek si de L an e

Li tit z, P

A

7.

8.

E ng in ee rs a nd C on su lta nt s

SP

O

TT

S, S

TE

VE

N S

M

C C

O Y ss m gr ou p.

co m

R E

A D

IN

G

L A

N C

A S

T E

R

R om a C or po ra te

C en te r, S ui te

N

C ed ar C re st

B lv d A lle nt ow n, P A

0.

9.

L E

H

IG

H V

A L

L E

Y

E as t E va ns S tre et

W es t C he st er

, P A

0.

1.

W E

S T

C H

E S

T E

R

D

ES

C R

IP

TI

O N

N O

D

AT

E

M

AD

E C

H

KD

AP

VD

A 5/

/2

IS

SU

ED

F O

R B

ID

D

IN

G

TJ

R

JM

N

JM

N

R

EL

EA

SE

D F

O R

N O

T

FO

R C

O N

ST

R

U C

TI

O

N

PR

O

JE

C T

M

AN

AG

ER

D

AT

E:

N .B

BA

SE

B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C

H

KD

BI

D

D

IN

G

JM

N

5/

/2

TJ

R

JM

N

JM

N

C O

PY

R

IG

TT

S, S

TE

VE

N S

M

C C

O Y

DIGITAL FILENAMEDATE

WORK ORDER NUMBER

DRAWING NUMBER

BO

R

O U

G H

O F

LE

ES

PO

R

T O

N

TE

LA

U

N

EE

T O

W N

SH

IP

, B

ER

KS

C

O U

N

TY

, P

EN

N

SY

LV

AN

IA

SC

H

U

YL

KI

LL

V

AL

LE

Y

SC

H

O O

L D

IS

TR

IC

T

AS

H

LE

Y

W

AY

W

AT

ER

C

O N

N

EC

TI

O

N

ER

O

SI

O N

A N

D S

ED

IM

EN

TA

TI

O

N C

O N

TR

O

L

PL

AN

8/01/24 100499.0088

W2-50

100499.0088

W.2-50

AutoCAD SHX Text

DY/4"

AutoCAD SHX Text

SW/4"

AutoCAD SHX Text

DY/4"

AutoCAD SHX Text

DY/4"

AutoCAD SHX Text

DY/4"

AutoCAD SHX Text

SW/4"

AutoCAD SHX Text

SW/4"

AutoCAD SHX Text

SW/4"

AutoCAD SHX Text

DY/4"

AutoCAD SHX Text

SW/4"

AutoCAD SHX Text

SW/4"

AutoCAD SHX Text 8" PVC Sanitary

AutoCAD SHX Text Inv. 333.99

AutoCAD SHX Text

18" RCP

AutoCAD SHX Text Inv. 331.38

AutoCAD SHX Text

18" RCP

AutoCAD SHX Text Inv. 331.38

AutoCAD SHX Text Inv. 324.31

AutoCAD SHX Text Overhead Wires

AutoCAD SHX Text Rip-Rap

AutoCAD SHX Text Inv. 334.31

AutoCAD SHX Text

18" CMP

AutoCAD SHX Text Elec. Pullbox

AutoCAD SHX Text Inv. 331.22

AutoCAD SHX Text Rip-Rap

AutoCAD SHX Text

8" PVC

AutoCAD SHX Text 8" PVC Sanitary

AutoCAD SHX Text 8" PVC Sanitary

AutoCAD SHX Text

8" PVC

AutoCAD SHX Text Sign in Planter

AutoCAD SHX Text Light

AutoCAD SHX Text Light

AutoCAD SHX Text Paved Parking Lot

AutoCAD SHX Text Paved Drive

AutoCAD SHX Text Paved

AutoCAD SHX Text Drive

AutoCAD SHX Text Sign

AutoCAD SHX Text Concrete Walk

AutoCAD SHX Text 20" DIP (Approx. Location)

AutoCAD SHX Text 12" Waterline (Approx.)

AutoCAD SHX Text 6" Gasline (Approx. Location)

AutoCAD SHX Text UG Fiber Optic Cable (Approx. Location)

AutoCAD SHX Text UG Fiber Optic Cable (Approx. Location)

AutoCAD SHX Text Concrete

AutoCAD SHX Text Curb

AutoCAD SHX Text Concrete

AutoCAD SHX Text Walk

AutoCAD SHX Text UG Fiber Optic Cable (Approx. Location)

AutoCAD SHX Text UG Fiber Optic Cable (Approx. Location)

AutoCAD SHX Text Water Meter

AutoCAD SHX Text Ashley Furniture Industries, Inc. R.B.V. 4203, Page 731 PIN 68540100020080

AutoCAD SHX Text

8" GV

AutoCAD SHX Text 12"x8" TEE

AutoCAD SHX Text

8" GV

AutoCAD SHX Text

8" GV

AutoCAD SHX Text

PROP METER PIT

AutoCAD SHX Text

8" 45°BENDS

AutoCAD SHX Text

PROP. 8" DIP

AutoCAD SHX Text

PROP. 8" DIP

AutoCAD SHX Text

8" 45°BENDS

AutoCAD SHX Text

PROP. 8" DIP

AutoCAD SHX Text

PROP. 8" DIP

AutoCAD SHX Text

8" 11-1/4°BEND

AutoCAD SHX Text

LIMIT OF PAVEMENT MILL AND OVERLAY

AutoCAD SHX Text

PROP. 8" DIP

AutoCAD SHX Text

8" GV

AutoCAD SHX Text

TIE TO EXIST. 8" WATER

AutoCAD SHX Text P

AutoCAD SHX Text L

AutoCAD SHX Text P

AutoCAD SHX Text L

AutoCAD SHX Text P

AutoCAD SHX Text L

AutoCAD SHX Text P

AutoCAD SHX Text L

AutoCAD SHX Text 15'

AutoCAD SHX Text

LIMIT OF PAVEMENT MILL AND OVERLAY

AutoCAD SHX Text

8" 45°BEND

AutoCAD SHX Text

8" 11-1/4°BENDS

AutoCAD SHX Text

8" 45°BEND

AutoCAD SHX Text

8" 45°BEND

AutoCAD SHX Text

ROCK CONSTRUCTION ENTRANCE

AutoCAD SHX Text Soil Type Boundary Line

AutoCAD SHX Text

18" FILTER SOCK

AutoCAD SHX Text

12" FILTER SOCK

AutoCAD SHX Text

LIMITS OF CONSTRUCTION

AutoCAD SHX Text Scale 1"=30'

AutoCAD SHX Text 15'

AutoCAD SHX Text 30'

AutoCAD SHX Text 0'

AutoCAD SHX Text 30'

AutoCAD SHX Text 60'

AutoCAD SHX Text

GRAPHIC SCALE

AutoCAD SHX Text

LOCATION MAP SCALE:1"=1000'

AutoCAD SHX Text THE PROJECT SITE IS NOT LOCATED WITHIN ANY FLOOD PLAIN AREAS AS PER FEMA PANEL NUMBER 42011C0354G, EFF. 7-03-12.

AutoCAD SHX Text PROJECT IS LOCATED WITHIN THE SCHUYLKILL RIVER WATERSHED. THE RIVER IS CLASSIFIED AS A WARM WATER FISHES (WWF) AND MIGRATORY FISHES (MF) IN CHAPTER 93.

AutoCAD SHX Text

%%UE & S PLAN PREPARER:

AutoCAD SHX Text

ROMA CORP. CENTER

AutoCAD SHX Text

1605 N. CEDAR CREST BLVD, SUITE 106

AutoCAD SHX Text

(610) 849-9700

AutoCAD SHX Text

ALLENTOWN, PA 18104

AutoCAD SHX Text

SSM GROUP, INC.

AutoCAD SHX Text

JASON M. NEWHARD

AutoCAD SHX Text

%%UE & S LEGEND

AutoCAD SHX Text

SOIL TYPE BOUNDARY LINE

AutoCAD SHX Text

LIMITS OF DISTURBANCE - 0.104 ACRES

AutoCAD SHX Text

INLET PROTECTION

AutoCAD SHX Text

IP

AutoCAD SHX Text

FILTER SOCK

AutoCAD SHX Text

FS

AutoCAD SHX Text

FH

AutoCAD SHX Text Exist. Water Lateral

AutoCAD SHX Text Exist. Utility Pole & Pole w/Guy

AutoCAD SHX Text Exist. Water Line

AutoCAD SHX Text Exist. Storm Sewer Line

AutoCAD SHX Text Exist. Sanitary Line

AutoCAD SHX Text Exist. Light Pole

AutoCAD SHX Text W

AutoCAD SHX Text Exist. Water Valve

AutoCAD SHX Text Exist. Sign

AutoCAD SHX Text

%%ULEGEND

AutoCAD SHX Text Exist. Right-Of-Way Line

AutoCAD SHX Text

18" CPP

AutoCAD SHX Text Inlet

AutoCAD SHX Text

LP

AutoCAD SHX Text San. MH

AutoCAD SHX Text Tele. MH

AutoCAD SHX Text

WV

AutoCAD SHX Text Exist. Fire Hydrant

AutoCAD SHX Text Exist. Telephone Manhole

AutoCAD SHX Text Exist. Sanitary Manhole

AutoCAD SHX Text Exist. Storm Sewer Inlet

AutoCAD SHX Text Exist. Tree

AutoCAD SHX Text Exist. Property Line

AutoCAD SHX Text Exist. Curb

AutoCAD SHX Text Exist. Gas Line (Approx. Loc.)

AutoCAD SHX Text G

AutoCAD SHX Text Exist. Underground Electric Line

AutoCAD SHX Text E

AutoCAD SHX Text Exist. Water Curb Stop

AutoCAD SHX Text

CS

AutoCAD SHX Text Exist. Gas Valve

AutoCAD SHX Text

GV

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text Exist. Underground Telephone Line

AutoCAD SHX Text Tel

AutoCAD SHX Text S

AutoCAD SHX Text Existing Features Have Slanted Text Labels

AutoCAD SHX Text Exist. 5' Contour

AutoCAD SHX Text Exist. 1' Contour

AutoCAD SHX Text Exist. Overhead Wires

AutoCAD SHX Text OH Wires

AutoCAD SHX Text Storm MH

AutoCAD SHX Text Exist. Sanitary Manhole

AutoCAD SHX Text

PROPOSED WATER LINE

AutoCAD SHX Text

SITE

AutoCAD SHX Text

%%USOIL TYPES FROM USDA WEB SOIL SURVEY%%U:

AutoCAD SHX Text DbA - Duffield silt loam, 0 to 3 percent slopes

AutoCAD SHX Text DbB - Duffield silt loam, 3 to 8 percent slopes

AutoCAD SHX Text

THE EARTH'S SURFACE

AutoCAD SHX Text

NOTIFICATION OF EXCAVATORS, DESIGNERS,

AutoCAD SHX Text

PENNSYLVANIA ACT 38

AutoCAD SHX Text

ANYWHERE

AutoCAD SHX Text

IN THE COMMONWEALTH.

AutoCAD SHX Text

OR ANY PERSON PREPARING TO DISTURB

AutoCAD SHX Text

(1991) REQUIRES

PROJECT SERIAL NUMBER: 20261472744

N or th P ar k

R oa d R ea di ng , P

A

-0

0.

1.

C re ek si de L an e

Li tit z, P

A

7.

8.

E ng in ee rs a nd C on su lta nt s

SP

O

TT

S, S

TE

VE

N S

M

C C

O Y ss m gr ou p.

co m

R E

A D

IN

G

L A

N C

A S

T E

R

R om a C or po ra te

C en te r, S ui te

N

C ed ar C re st

B lv d A lle nt ow n, P A

0.

9.

L E

H

IG

H V

A L

L E

Y

E as t E va ns S tre et

W es t C he st er

, P A

0.

1.

W E

S T

C H

E S

T E

R

D

ES

C R

IP

TI

O N

N O

D

AT

E

M

AD

E C

H

KD

AP

VD

A 5/

/2

R

EL

EA

SE

D

F O

R B

ID

D

IN

G

TJ

R

JM

N

JM

N

R

EL

EA

SE

D F

O R

N O

T

FO

R C

O N

ST

R

U C

TI

O

N

PR

O

JE

C T

M

AN

AG

ER

D

AT

E:

N .B

BA

SE

B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C

H

KD

BI

D

D

IN

G

JM

N

5/

/2

TJ

R

JM

N

JM

N

C O

PY

R

IG

TT

S, S

TE

VE

N S

M

C C

O Y

DIGITAL FILENAMEDATE

WORK ORDER NUMBER

DRAWING NUMBER

BO

R

O U

G H

O F

LE

ES

PO

R

T O

N

TE

LA

U

N

EE

T O

W N

SH

IP

, B

ER

KS

C

O U

N

TY

, P

EN

N

SY

LV

AN

IA

SC

H

U

YL

KI

LL

V

AL

LE

Y

SC

H

O O

L D

IS

TR

IC

T

AS

H

LE

Y

W

AY

W

AT

ER

C

O N

N

EC

TI

O

N

ER

O

SI

O N

S

ED

IM

EN

TA

TI

O

N C

O N

TR

O

L N

AR

R

AT

IV

E

8/01/24 100499.0088

W2-51

100499.0088

W.2-51

SOILS INFORMATION

THE SOIL TYPES FOR THE PROJECT ARE SHOWN ON THE EROSION AND

SEDIMENTATION CONTROL PLAN SHEETS. THE SOIL TYPES ARE FROM

THE USDA WEB SOIL SURVEY.

LAND USES: PAST, PRESENT, AND PROPOSED

THE PROJECT SITE, AS IT IS TODAY, WILL REMAIN THE SAME AFTER

CONSTRUCTION ACTIVITIES ARE COMPLETED.

RECEIVING WATERS OF THE COMMONWEALTH CH. 93 CLASSIFICATION

THE PROJECT SITE DRAINS TO THE SCHUYLKILL RIVER, WHICH IS

CLASSIFIED AS WARM WATER FISHES (WWF) AND MIGRATORY FISHERY

( MF) ACCORDING TO PA CHAPTER 93 WATER QUALITY STANDARDS.

THERE ARE NO WETLANDS WITHIN THE PROJECT SITE. THE PROJECT

SITE IS NOT LOCATED WITHIN ANY FLOODPLAINS AS SHOWN ON THE

E&S PLANS.

DESCRIPTION OF BMPS

BMPS USED PRIOR TO CONSTRUCTION

PRIOR TO THE START OF CONSTRUCTION, A STAGING AREA WILL BE

ESTABLISHED IN A LOCATION MUTUALLY AGREED UPON BY THE

CONTRACTOR AND THE OWNER. THE STAGING AREA SHALL BE

MAINTAINED IN AN ORDERLY FASHION AND WILL BE REQUIRED TO

INSTALL ALL NECESSARY BMP MEASURES IN ORDER TO ALLOW

NON-SEDIMENT LADEN RUNOFF FROM THE STAGING AREA. ROCK

CONSTRUCTION ENTRANCES SHALL BE INSTALLED AS INDICATED ON

THE PLANS.

BMPS USED DURING CONSTRUCTION

DURING CONSTRUCTION, ALL EROSION AND SEDIMENTATION

CONTROLS SHALL BE INSTALLED IN ACCORDANCE WITH THE DETAILS

AND SPECIFICATIONS PROVIDED ON THE PLANS AND IN THIS REPORT.

ALL EROSION AND SEDIMENTATION CONTROLS SHALL BE INSTALLED

AND STABILIZED PRIOR TO SITE DISTURBANCE AND CONSTRUCTION.

THE FOLLOWING TEMPORARY CONTROL MEASURES WILL BE USED

DURING CONSTRUCTION ACTIVITIES:

1. INLET FILTER BAG PROTECTION.

2. COMPOST FILTER SOCK.

BMPS USED AFTER CONSTRUCTION

AFTER ALL CONSTRUCTION ACTIVITIES ARE COMPLETE, ALL REMAINING

DISTURBED AREAS WILL BE STABILIZED WITH PERMANENT SEEDING.

AFTER FINAL STABILIZATION (MINIMUM UNIFORM 70% PERENNIAL

VEGETATION COVER OR PERMANENT NON-VEGETATIVE COVER WITH A

DENSITY SUFFICIENT TO RESIST ACCELERATED EROSION AND

SEDIMENTATION) HAS BEEN ACHIEVED, THE CONTRACTOR MUST

REMOVE ALL TEMPORARY EROSION AND SEDIMENTATION CONTROLS.

ANY AREAS THAT ARE DISTURBED DURING REMOVAL OF THE

TEMPORARY CONTROL MEASURES MUST BE STABILIZED IMMEDIATELY.

ALL PERMANENT CONTROL MEASURES USED AFTER CONSTRUCTION

SHALL BE INSTALLED IN ACCORDANCE WITH THE DETAILS AND

SPECIFICATIONS PROVIDED ON THE PLANS. THE FOLLOWING

PERMANENT CONTROL MEASURES WILL BE USED AFTER

CONSTRUCTION:

1. PERMANENT RESTORATION.

STAGING OF EARTHMOVING ACTIVITIES

GENERAL COMMENTS

1. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE

INSTALLATION AND MAINTENANCE OF ALL EROSION AND

SEDIMENT CONTROLS PROPOSED FOR THIS PROJECT. EROSION

AND SEDIMENT CONTROLS SHALL BE CONSTRUCTED, STABILIZED,

AND FUNCTIONAL BEFORE SITE DISTURBANCE WITHIN THE

TRIBUTARY AREAS OF THOSE CONTROLS.

2. A COPY OF THE EROSION & SEDIMENT CONTROL PLANS SHALL BE

POSTED AT THE CONSTRUCTION SITE IN ACCORDANCE WITH

PENNSYLVANIA STATE LAW.

3. THE GENERAL CONTRACTOR SHALL NOTIFY THE BERKS COUNTY

CONSERVATION DISTRICT AT LEAST 72 HOURS PRIOR TO THE

START OF CONSTRUCTION.

4. ALL CONSTRUCTION VEHICLES SHALL BE ADEQUATELY CLEANED

OF ALL SEDIMENT PRIOR TO LEAVING THE SITE VIA THE MACADAM

ROAD SURFACE. OTHERWISE, ALL CONSTRUCTION VEHICLES

SHALL LEAVE THE SITE VIA A FLATBED TRAILER AND SHALL BE

LOADED WITHIN THE LIMITS OF DISTURBANCE. THE FLATBED

TRAILER SHALL REMAIN ON THE MACADAM ROAD SURFACE AT

ALL TIMES.

5. CONSTRUCTION SHALL REMAIN WITHIN THE LIMITS OF

DISTURBANCE UNTIL THE WORK IS STABILIZED. AT NO TIME

SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS

OUTSIDE THE LIMIT OF DISTURBANCE BOUNDARIES SHOWN ON

THE PLAN MAPS. THESE AREAS MUST BE CLEARLY MARKED AND

FENCED OFF BEFORE CLEARING AND GRUBBING OPERATIONS

BEGIN.

6. AREAS UTILIZED FOR CONSTRUCTION STAGING AND LAY DOWN

SHALL BE STABILIZED AT ALL TIMES DURING CONSTRUCTION.

7. ALL STRIPPING OF VEGETATION, GRADING, FILLING AND

EXCAVATION SHALL BE DONE IN SUCH A WAY AS TO MINIMIZE

EROSION. WHEREVER NOTED ON THE PLANS, NATURAL

VEGETATION SHALL BE RETAINED, PROTECTED AND

SUPPLEMENTED. DISTURBED AREAS SHALL BE KEPT TO A

PRACTICAL MINIMUM AND STABILIZED AS QUICKLY AS POSSIBLE

IN ACCORDANCE WITH THE TEMPORARY OR PERMANENT

MEASURES OUTLINED IN THE SEEDING AND MULCHING

SCHEDULES.

8. AREAS TO BE FILLED ARE TO BE CLEARED, GRUBBED, AND

STRIPPED OF TOPSOIL TO REMOVE TREES, VEGETATION, ROOTS,

AND OTHER OBJECTIONABLE MATERIAL.

9. TOPSOIL REQUIRED FOR THE ESTABLISHMENT OF VEGETATION

SHALL BE STOCKPILED AT THE LOCATION(S) SHOWN ON THE PLAN

MAPS(S) IN THE AMOUNT NECESSARY TO COMPLETE THE FINISH

GRADING OF ALL EXPOSED AREAS THAT ARE TO BE STABILIZED

BY VEGETATION. EACH STOCKPILE SHALL BE PROTECTED IN THE

MANNER SHOWN ON THE PLAN DRAWINGS. STOCKPILE HEIGHTS

SHALL NOT EXCEED 35 FEET. STOCKPILE SLOPES SHALL BE 2H:1V

OR FLATTER. STOCKPILES SHALL BE STABILIZED IMMEDIATELY.

10. ALL CONSTRUCTED AND DISTURBED SLOPES (3:1 OR STEEPER)

SHALL BE SEEDED AND STABILIZED WITH EROSION CONTROL

BLANKET.

11. ALL EARTHEN FILLS SHALL BE PLACED IN COMPACTED LAYERS

NOT TO EXCEED 9 INCHES IN THICKNESS.

12. FILL MATERIALS SHALL BE FREE OF FROZEN PARTICLES, BRUSH,

ROOTS, SOD, OR OTHER FOREIGN OR OBJECTIONABLE

MATERIALS THAT WOULD INTERFERE WITH OR PREVENT

CONSTRUCTION OF SATISFACTORY FILLS. FROZEN MATERIALS

OR SOFT, MUCKY, OR HIGHLY COMPRESSIBLE MATERIALS SHALL

NOT BE INCORPORATED INTO FILLS. FILL SHALL NOT BE PLACED

ON SATURATED OR FROZEN SURFACES.

13. ALL OFF-SITE WASTE AND BORROW AREAS MUST HAVE AN E&S

PLAN APPROVED BY A COUNTY CONSERVATION DISTRICT OR DEP

FULLY IMPLEMENTED PRIOR TO BEING ACTIVATED.

14. SEDIMENT REMOVED FROM EROSION AND SEDIMENT CONTROLS

MAY BE USED AS TOPSOIL, IF SUITABLE, OR SHALL BE PROPERLY

DISPOSED OF IN LANDSCAPED AREAS OUTSIDE OF STEEP

SLOPES, WETLANDS, FLOODPLAINS AND DRAINAGE SWALES, OR

DISPOSED OF LEGALLY, OFFSITE.

15. AREAS WHICH ARE TO BE TOPSOILED SHALL BE SCARIFIED TO A

MINIMUM DEPTH OF 4 INCHES PRIOR TO PLACEMENT OF TOPSOIL.

AREAS TO BE VEGETATED SHALL HAVE A MINIMUM 6 INCHES OF

TOPSOIL IN PLACE PRIOR TO SEEDING AND MULCHING. FILL 3:1

OR GREATER SHALL HAVE A MINIMUM OF 2 INCHES OF TOPSOIL.

16. ALL PUMPING OF SEDIMENT LADEN WATER SHALL BE THROUGH A

DIRT BAG FILTRATION DEVICE (I.E.: PUMPED WATER FILTER BAG),

OR EQUIVALENT SEDIMENT REMOVAL FACILITY, OVER STABILIZED

AREAS DOWNSTREAM OF ANY EARTH DISTURBANCE. DISCHARGE

POINTS SHOULD BE ESTABLISHED TO PROVIDE FOR MAXIMUM

DISTANCE TO ACTIVE WATERWAYS.

17. SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION

SHALL BE HANDLED IN ACCORDANCE WITH THE STANDARD AND

SPECIFICATION FOR SUBSURFACE DRAIN OR OTHER APPROVED

METHOD.

18. STORMWATER RUNOFF SHALL BE PREVENTED FROM ENTERING

STORM SEWER FACILITIES VIA AN OPEN TRENCH. IF ANY

EMERGENCY REPAIRS/REPLACEMENT OF STORM SEWER

FACILITIES MUST OCCUR, RUNOFF SHALL BE PREVENTED FROM

ENTERING THE FACILITIES AT THE POINTS OF

REPAIR/REPLACEMENT.

19. UPON REDUCTION, LOSS OR FAILURE OF THE EROSION AND

SEDIMENT CONTROLS, IMMEDIATE ACTION SHALL BE TAKEN TO

RESTORE THE CONTROLS OR PROVIDE AN ALTERNATIVE METHOD

OF CONTROL.

20. WHERE EROSION AND SEDIMENT CONTROLS ARE FOUND TO BE

INOPERATIVE OR INEFFECTIVE DURING AN INSPECTION, OR ANY

OTHER TIME, THE GENERAL CONTRACTOR SHALL IMMEDIATELY

CONTACT THE BERKS COUNTY CONSERVATION DISTRICT, BY

PHONE OR PERSONAL CONTACT, FOLLOWED BY THE SUBMISSION

OF A WRITTEN REPORT WITHIN FIVE (5) DAYS OF THE INITIAL

CONTACT.

21. IN THE EVENT THAT ARCHEOLOGICAL ARTIFACTS ARE

DISCOVERED, THE GENERAL CONTRACTOR SHALL ENSURE

PROTECTION AND REPORT THE DISCOVERY TO THE OWNER AND

THE DIRECTOR OF THE BUREAU OF HISTORIC PRESERVATION,

HISTORICAL AND MUSEUM COMMISSION, P.O. BOX 1026,

HARRISBURG, PA 17120.

22. IF SINKHOLES ARE ENCOUNTERED DURING CONSTRUCTION, THE

OWNER SHALL RETAIN THE SERVICES OF A QUALIFIED

GEOLOGIST OR GEOTECHNICAL ENGINEER FOR THEIR

PROFESSIONAL OPINION AND REMEDIAL RECOMMENDATIONS.

23. ANY AND ALL SEDIMENT TRACKED ONTO ADJACENT ROADS OR

PARKING AREAS SHALL BE REMOVED AND RETURNED TO THE

CONSTRUCTION AREA, BY THE END OF EACH WORKING DAY.

REMOVAL MAY BE COMPLETED THROUGH USE OF MECHANICAL

OR HAND TOOLS, BUT SEDIMENT SHALL NEVER BE WASHED OFF

THE ROAD SURFACE WITH WATER.

24. UPON TEMPORARY CESSATION OF AN EARTH DISTURBANCE OR

ANY STAGE OR PHASE OF AN ACTIVITY WHERE A CESSATION OF

EARTH DISTURBANCE ACTIVITIES EXCEED 4 DAYS, THE SITE

SHALL BE IMMEDIATELY SEEDED, MULCHED, OR OTHERWISE

PROTECTED FROM ACCELERATED EROSION AND SEDIMENTATION

PENDING FUTURE EARTH DISTURBANCE ACTIVITIES.

25. UPON COMPLETION OF AN EARTH DISTURBANCE ACTIVITY OR

ANY STAGE OR PHASE OF AN ACTIVITY, THE OPERATOR SHALL

IMMEDIATELY STABILIZE THE DISTURBED AREAS SO AS TO

PROTECT FROM ACCELERATED EROSION. DURING

NON-GERMINATING PERIODS, MULCH MUST BE APPLIED AT THE

SPECIFIED RATES. DISTURBED AREAS WHICH ARE NOT AT

FINISHED GRADE AND WHICH WILL BE RE-DISTURBED WITHIN 1

YEAR MAY BE STABILIZED IN ACCORDANCE WITH TEMPORARY

SEEDING SPECIFICATIONS. DISTURBED AREAS, WHICH ARE

EITHER AT FINISHED GRADE OR WILL NOT BE RE-DISTURBED

WITHIN 1 YEAR, MUST BE STABILIZED IN ACCORDANCE WITH

PERMANENT SEEDING SPECIFICATIONS.

26. UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND

PERMANENT STABILIZATION OF ALL DISTURBED AREAS, THE

OWNER AND/OR OPERATORS SHALL CONTACT THE BERKS

COUNTY CONSERVATION DISTRICT FOR A FINAL INSPECTION

PRIOR TO THE REMOVAL OF TEMPORARY EROSION AND

SEDIMENT CONTROLS.

27. AN AREA SHALL BE CONSIDERED TO HAVE ACHIEVED FINAL

STABILIZATION WHEN IT HAS A MINIMUM OF 70% UNIFORM

PERENNIAL VEGETATIVE COVER OR OTHER PERMANENT

NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST

ACCELERATED SURFACE EROSION AND SUBSURFACE

CHARACTERISTICS SUFFICIENT TO RESIST SLIDING OR OTHER

MOVEMENTS. AFTER FINAL SITE STABILIZATION HAS BEEN

ACHIEVED, TEMPORARY EROSION AND SEDIMENT CONTROLS

SHALL BE REMOVED. AREAS DISTURBED DURING REMOVAL OF

THE CONTROLS SHALL BE STABILIZED IMMEDIATELY.

28. ALTERNATE PRODUCTS TO THOSE SPECIFIED ON THE DRAWINGS

MUST BE REVIEWED AND APPROVED AS EQUAL BY THE OWNER,

ENGINEER AND CONSERVATION DISTRICT.

29. THE OPERATOR SHALL REMOVE FROM THE SITE, RECYCLE OR

DISPOSE OF ALL BUILDING MATERIALS AND WASTES IN

ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE

MANAGEMENT REGULATIONS AT 25 PA CODE 260.1 ET SEQ., 271.1

E. SEQ. AND 287.1 ET SEQ.

30. BEFORE DISPOSING OF SOIL OR RECEIVING BORROW FOR THE

SITE, THE OPERATOR SHALL ASSURE THAT EACH SPOIL OR

BORROW AREA HAS AN EROSION AND SEDIMENT CONTROL PLAN

APPROVED BY THE GOVERNING CONSERVATION DISTRICT, AND

WHICH IS BEING IMPLEMENTED AND MAINTAINED IN

ACCORDANCE WITH CHAPTER 102 REGULATIONS. THE

OPERATOR SHALL NOTIFY THE BERKS COUNTY CONSERVATION

DISTRICT IN WRITING OF ALL RECEIVING SPOIL AND BORROW

AREAS ONCE THEY HAVE BEEN IDENTIFIED.

31. E&S BMPS SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL

AREAS TRIBUTARY TO THEM ARE PERMANENTLY STABILIZED OR

UNTIL THEY ARE REPLACED BY ANOTHER BMP APPROVED BY THE

BERKS COUNTY CONSERVATION DISTRICT OR DEP.

32. FAILURE TO CORRECTLY INSTALL E&S BMPS, FAILURE TO

PREVENT SEDIMENT-LADEN RUNOFF FROM LEAVING THE

CONSTRUCTION SITE, OR FAILURE TO TAKE IMMEDIATE

CORRECTIVE ACTION TO RESOLVE FAILURE OF E&S BMPS MAY

RESULT IN ADMINISTRATIVE, CIVIL, AND/OR CRIMINAL PENALTIES

BEING INSTITUTED BY THE PENNSYLVANIA DEPARTMENT OF

ENVIRONMENTAL PROTECTION AS DEFINED IN SECTION 602 OF

THE PENNSYLVANIA CLEAN STREAMS LAW. THE CLEAN STREAMS

LAW PROVIDES FOR UP TO $10,000 PER DAY IN CIVIL PENALTIES,

UP TO $10,000 IN SUMMARY CRIMINAL PENALTIES, AND UP TO

$25,000 IN MISDEMEANOR CRIMINAL PENALTIES FOR EACH

VIOLATION.

CONSTRUCTION SEQUENCE

ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN

ACCORDANCE WITH THE FOLLOWING SEQUENCE. EACH STAGE SHALL

BE COMPLETED IN COMPLIANCE WITH CHAPTER 102 REGULATIONS

BEFORE ANY FOLLOWING STAGE IS INITIATED. THE GENERAL

CONTRACTOR SHALL TAKE INTO ACCOUNT THE LOCAL WEATHER

FORECAST PRIOR TO BEGINNING ANY EXCAVATION ACTIVITIES.

DEVIATION FROM THAT SEQUENCE MUST BE APPROVED BY THE BERKS

COUNTY CONSERVATION DISTRICT OR BY THE DEPARTMENT PRIOR TO

IMPLEMENTATION. EACH STEP OF THE SEQUENCE SHALL BE

COMPLETED BEFORE PROCEEDING TO THE NEXT STEP, EXCEPT

WHERE NOTED.

AT LEAST SEVEN (7) DAYS BEFORE STARTING ANY EARTH

DISTURBANCE ACTIVITIES, THE OPERATOR SHALL CONTACT ALL

CONTRACTORS INVOLVED IN THOSE ACTIVITIES, THE LANDOWNER, ALL

APPROPRIATE MUNICIPAL OFFICIALS, THE EROSION AND SEDIMENT

CONTROL PLAN PREPARER, AND A REPRESENTATIVE OF THE BERKS

COUNTY CONSERVATION DISTRICT TO SCHEDULE AN ON-SITE

PRECONSTRUCTION MEETING. ALSO, AT LEAST THREE (3) DAYS

BEFORE STARTING ANY EARTH DISTURBANCE ACTIVITIES, ALL

CONTRACTORS INVOLVED IN THOSE ACTIVITIES SHALL NOTIFY THE

PENNSYLVANIA ONE CALL SYSTEM, INC. AT 1-800-242-1776 FOR BURIED

UTILITIES LOCATION.

1. DUE TO THE NATURE OF THIS PROJECT, NO ROCK

CONSTRUCTION ENTRANCES ARE PROPOSED. INSTEAD, ALL

CONSTRUCTION VEHICLES SHALL LEAVE THE SITE VIA A FLATBED

TRAILER AND SHALL BE LOADED WITHIN THE LIMITS OF

DISTURBANCE. ALL CONSTRUCTION VEHICLES SHALL BE

ADEQUATELY CLEANED OF ALL SEDIMENT PRIOR TO LEAVING THE

LIMIT OF DISTURBANCE. THE FLATBED TRAILER SHALL REMAIN

ON THE MACADAM ROAD SURFACE AT ALL TIMES.

2. DELINEATE AND MARK THE LIMIT OF DISTURBANCE (I.E. SURVEY

STAKES, POST AND ROPE, ORANGE CONSTRUCTION FENCE, ETC.).

ALL CONSTRUCTION ACTIVITIES SHALL REMAIN WITHIN THIS LIMIT

AT ALL TIMES.

3. INSTALL FILTER BAG INLET PROTECTION, AS INDICATED.

4. COMMENCE EXCAVATION AND WATER LINE INSTALLATION.

EXCAVATE TRENCH TO PROPOSED ELEVATION. THE QUANTITY

OF EXCAVATION COMPLETED IN ONE (1) DAYS' TIME SHALL BE

LIMITED TO THE AMOUNT OF PIPING WHICH CAN BE INSTALLED IN

ONE (1) WORKING DAYS' TIME PERIOD. ALL EXCAVATED

MATERIALS SHALL BE DEPOSITED UPSLOPE OF THE TRENCH. AS

SOON AS THE PIPE IS INSTALLED, PLACE DESIGNATED DIRECT

COVER AND DESIGNATED TRENCH BACKFILL, AND RESTORE

TRENCH TO NEAR ORIGINAL ELEVATION. BACKFILL TRENCH AT

END OF EACH WORK DAY. INITIAL GRADE MAY BE SLIGHTLY

LOWER THAN SURROUNDING ELEVATIONS TO MINIMIZE RUNOFF.

IN THE EVENT EXCESS FILL REMAINS AFTER BACKFILLING AND

COMPACTION IS COMPLETED, STOCKPILE SOIL AND INSTALL SILT

FENCE DOWNSLOPE OF STOCKPILE AREA. TEMPORARILY

STABILIZE STOCKPILE. TEMPORARY STOCKPILES SHALL BE

LOCATED WITHIN THE LIMIT OF DISTURBANCE. AT EARLIEST

CONVENIENCE, DISPOSE OF EXCESS FILL LEGALLY OFFSITE.

5. BACKFILL ANY SETTLED AREAS OF THE TRENCH TO MATCH

SURROUNDING GRADES. PERMANENTLY STABILIZE DISTURBED

AREAS.

6. AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED,

TEMPORARY EROSION AND SEDIMENT CONTROLS SHALL BE

REMOVED. AREAS DISTURBED DURING REMOVAL OF THE

CONTROLS SHALL BE STABILIZED IMMEDIATELY. AN AREA SHALL

BE CONSIDERED TO HAVE ACHIEVED FINAL STABILIZATION WHEN

IT HAS A MINIMUM OF 70% UNIFORM PERENNIAL VEGETATIVE

COVER OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A

DENSITY SUFFICIENT TO RESIST ACCELERATED SURFACE

EROSION AND SUBSURFACE CHARACTERISTICS SUFFICIENT TO

RESIST SLIDING OR OTHER MOVEMENTS.

BMP MAINTENANCE AND OPERATION PROGRAM

1. THE GENERAL CONTRACTOR WILL BE RESPONSIBLE FOR THE

COMPLETE CONSTRUCTION, STABILIZATION AND MAINTENANCE

OF ALL EROSION AND SEDIMENT CONTROL FACILITIES.

2. STOCKPILES OF WOOD CHIPS, CRUSHED STONE, AND OTHER

MULCHES SHALL BE READILY AVAILABLE AT THE PROJECT SITE

AT ALL TIMES.

3. UNTIL THE SITE HAS ACHIEVED FINAL STABILIZATION, THE

GENERAL CONTRACTOR SHALL PROPERLY IMPLEMENT, OPERATE

AND MAINTAIN ALL EROSION AND SEDIMENT CONTROLS.

MAINTENANCE SHALL INCLUDE INSPECTIONS OF ALL EROSION

AND SEDIMENT CONTROLS FOR CONDITION AND INTEGRITY

AFTER EACH STORM EVENT, AND ON A WEEKLY BASIS. ALL

PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING

CLEANOUT, REPAIR, REPLACEMENT, REGRADING, RESEEDING,

REMULCHING, AND RENETTING SHALL BE PERFORMED

IMMEDIATELY. A WRITTEN REPORT MUST BE COMPLETED TO

DOCUMENT EACH INSPECTION AND ALL BMP REPAIR,

REPLACEMENT, AND MAINTENANCE ACTIVITIES. EROSION AND

SEDIMENT CONTROLS SHALL BE MAINTAINED IN THE FOLLOWING

MANNER:

INLET FILTER BAG PROTECTION:

A. FILTER BAGS SHALL TRAP ALL PARTICLES LARGER THAN 150

MICRONS.

B. INSTALL FILTER BAGS ACCORDING TO THE

MANUFACTURER'S SPECIFICATIONS.

C. INSPECT INLET FILTER BAGS ON A WEEKLY BASIS AND

AFTER EACH RUNOFF EVENT.

D. REMOVE SEDIMENT FROM INLET FILTER BAGS AFTER EACH

STORM EVENT, OR WHEN THE DISTANCE BETWEEN THE

GRATE AND THE SEDIMENT LEVEL IS REDUCED TO 18".

E. CLEAN AND/OR REPLACE FILTER BAGS WHEN THE BAG IS

ONE-HALF FULL.

F. REPLACE DAMAGED FILTER BAGS.

G. COMPLETE NEEDED REPAIRS IMMEDIATELY AFTER THE

INSPECTION.

COMPOST FILTER SOCK:

A. SEE DETAIL ON SHEET W.2-62 FOR INSTALLATION AND

MAINTENANCE DETAILS.

4. IF CONCENTRATED FLOWS ARE IDENTIFIED THAT ARE NOT

ADDRESSED IN THIS REPORT, THE APPROPRIATE STEPS SHALL

BE TAKEN TO MITIGATE THE CONDITION. CHANGES TO THE

DESIGN, CONFIGURATION OR TIMING OF ELEMENTS DESCRIBED IN

THIS REPORT MUST BE REPORTED TO THE APPROPRIATE

REGULATORY AUTHORITIES. THE FOLLOWING INSTRUCTIONS

SHALL BE FOLLOWED:

A. SHOULD UNFORESEEN EROSIVE CONDITIONS DEVELOP

DURING CONSTRUCTION, THE APPROPRIATE ACTION SHALL

BE TAKEN TO REMEDY SUCH CONDITIONS AND TO PREVENT

DAMAGE TO ADJACENT PROPERTIES AS A RESULT OF

INCREASED RUNOFF AND/OR SEDIMENT DISPLACEMENT.

STOCKPILES OF WOOD CHIPS, CRUSHED STONE AND

OTHER MULCHES SHALL BE HELD ONSITE TO DEAL

IMMEDIATELY WITH EMERGENCY PROBLEMS OF EROSION.

B. THE GENERAL CONTRACTOR IS ADVISED TO BECOME

THOROUGHLY FAMILIAR WITH THE PROVISIONS OF

APPENDIX 64, EROSION CONTROL RULES AND

REGULATIONS, TITLE 25, PART 1, DEPARTMENT OF

ENVIRONMENTAL PROTECTION, SUB-PART C, PROTECTION

OF NATURAL RESOURCES, ARTICLE III, WATER RESOURCES,

CHAPTER 102, EROSION CONTROL.

C. A COPY OF THIS EROSION AND SEDIMENT CONTROL

REPORT AND PLANS SHALL BE POSTED AT THE

CONSTRUCTION SITE IN ACCORDANCE WITH PENNSYLVANIA

STATE LAW.

PROCEDURES FOR DISPOSAL OF MATERIALS

POTENTIAL CONSTRUCTION WASTES ANTICIPATED FROM THIS

PROJECT INCLUDE BUT ARE NOT LIMITED TO: TOPSOIL/FILL MATERIAL,

BUILDING MATERIALS, AND EXCAVATED ROCK. ALL BUILDING

MATERIALS AND WASTES SHALL BE REMOVED FROM THE SITE,

RECYCLED, OR DISPOSED OF IN ACCORDANCE WITH THE DEPARTMENT

OF SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA CODE 260.1 ET

SEQ., 271.1 ET SEQ., AND 287.1 ET SEQ.

EXCAVATED MATERIAL SHALL BE PLACED DIRECTLY INTO

CONSTRUCTION VEHICLES. ANY SOIL OR ROCK THAT IS REMOVED

FROM THE SITE WILL REQUIRE A SEPARATE EROSION AND

SEDIMENTATION CONTROL PLAN PROVIDED BY THE CONTRACTOR. ALL

SOILS REMOVED FROM AN E&S BMP DURING ROUTINE MAINTENANCE

SHALL BE REMOVED FROM THE PROJECT AREA AND TAKEN AS SOIL

STOCKPILE TO THE OFF-SITE STOCKPILE AREA.

GEOLOGIC CONDITIONS WITH POTENTIAL TO CAUSE POLLUTION

BASED ON SITE GEOLOGY, THERE ARE NO KNOWN GEOLOGIC

CONDITIONS WITH THE POTENTIAL TO CAUSE POLLUTION.

POTENTIAL THERMAL IMPACTS

SINCE THIS PROJECT ONLY INCLUDES TRENCHING FOR A WATER LINE

INSTALLATION, THERE IS NO POTENTIAL FOR THERMAL IMPACTS ON

SURFACE WATERS DURING OR AFTER CONSTRUCTION.

SEEDING AND MULCHING SCHEDULES

1. TEMPORARY SEEDING

A. TEMPORARY SEEDING SHALL BE DONE IN DISTURBED

AREAS WHERE NO ACTIVE WORK WILL BE PERFORMED.

ANY DISTURBED AREA ON WHICH ACTIVITY HAS CEASED

MUST BE SEEDED AND MULCHED IMMEDIATELY.

B. DURING NON-GERMINATING PERIODS, ONLY MULCH

SHOULD BE APPLIED AT THE RECOMMENDED RATES.

C. DISTURBED AREAS WHICH ARE NOT AT FINISHED GRADE

AND WHICH WILL BE RE-DISTURBED WITHIN ONE (1) YEAR

MAY BE SEEDED AND MULCHED WITH A QUICK GROWING

TEMPORARY SEED MIXTURE.

D. DISTURBED AREAS WHICH ARE EITHER AT FINISHED GRADE

OR WILL NOT BE DISTURBED AGAIN WITHIN ONE (1) YEAR

MUST BE SEEDED WITH A PERMANENT SEED MIXTURE AND

MULCHED.

E. TEMPORARY SEEDING STEPS:

(1) APPLY AGRICULTURAL LIMESTONE OR HYDRATED

LIME AT A RATE OF ONE (1) TON PER ACRE.

(2) APPLY FERTILIZER AT THE APPLICATION RATE OF

50-50-50 (N-P2O5-K2O) POUNDS PER ACRE (LBS./ACRE).

(3) WORK THE LIMESTONE AND FERTILIZER INTO THE

SOIL.

(4) UTILIZE THE FOLLOWING SEEDING TYPES, RATES AND

TIME SCHEDULE:

TEMPORARY SEEDING

SEASON RATE TYPE

MARCH 1 TO AUGUST 15 40 LBS./ACRE ANNUAL RYEGRASS

AUGUST 16 TO OCTOBER 15 168 LBS./ACRE WINTER RYE

(5) APPLY HAY OR STRAW MULCH (IN ACCORDANCE WITH

SECTION NO. 5) AT A RATE OF THREE (3) TONS PER

ACRE.

F. ALL SEED SHALL BE LABELED, DATED AND THE QUALITY

CONSISTENT WITH SECTION NO. 2.

2. PERMANENT SEEDING

A. DISTURBED AREAS WHICH ARE EITHER AT FINISHED GRADE

OR WILL NOT BE DISTURBED AGAIN WITHIN ONE (1) YEAR

MUST BE SEEDED WITH A PERMANENT SEED MIXTURE AND

MULCHED.

B. SEEDING SHALL BE DONE DURING PERIODS FROM APRIL

15TH TO OCTOBER 1ST, UNLESS OTHERWISE DIRECTED. IF

SEEDING IS DONE AFTER OCTOBER 1ST, DORMANT SEED

MUST BE USED AND DISTURBED AREAS MUST BE MULCHED.

C. DISTURBED FINAL GRADED AREAS SHALL BE PERMANENTLY

SEEDED AS FOLLOWS:

(1) AREAS WHICH ARE TO BE TOPSOILED SHALL BE

SCARIFIED TO A MINIMUM DEPTH OF 4 INCHES PRIOR

TO PLACEMENT OF TOPSOIL. AREAS TO BE

VEGETATED SHALL HAVE A MINIMUM 6 INCHES OF

TOPSOIL IN PLACE PRIOR TO SEEDING AND MULCHING.

FILL 3:1 OR GREATER SHALL HAVE A MINIMUM OF 2

INCHES OF TOPSOIL.

(2) A SOIL ANALYSIS IS RECOMMENDED, BUT IN LIEU OF

AN ANALYSIS APPLY GROUND LIMESTONE OR

HYDRATED LIME AND FERTILIZER AT RATES

RECOMMENDED IN SECTION NO. 3 (OR AS SUGGESTED

BY THE SOILS TEST RESULTS [ONE (1) TEST PER 25

ACRES]).

(3) THE LIMESTONE AND FERTILIZER SHALL BE WORKED

INTO THE SOIL TO A MINIMUM DEPTH OF 6 INCHES.

(4) SEED SHALL NOT BE PLANTED AFTER HEAVY RAIN OR

WATERING.

(5) ALL SEED USED SHALL BE LABELED IN ACCORDANCE

WITH THE U.S. DEPARTMENT OF AGRICULTURE RULES

AND REGULATIONS UNDER THE FEDERAL SEED ACT IN

EFFECT AT THE TIME OF PURCHASE. INERT MATTER

SHALL NOT EXCEED 15% AND BLUE TAG CERTIFIED

SEED SHALL BE SUPPLIED WHEREVER POSSIBLE.

(6) SMOOTH AND FIRM SEED BED WITH CULTIPACKER OR

SIMILAR EQUIPMENT PRIOR TO SEEDING. APPLY SEED

UNIFORMLY BY HYDROSEEDING. COVER SEEDS WITH

½" OF SOIL (MINIMUM) WITH SUITABLE EQUIPMENT.

(7) APPLY MULCH (IN ACCORDANCE WITH SECTION NO. 5)

AT A RATE OF THREE (3) TONS PER ACRE.

PERMANENT SEEDING

SEASON RATE TYPE

MARCH 1 TO JUNE 1 & 4 LBS./1000 S.F. WINTER RYE 70%

AUGUST 15 TO OCTOBER 1 TALL FESCUE 22%

RED TOP 2%

BIRDSFOOT TREFOIL 6%

OCTOBER 1 TO MARCH 1 & 3 LBS./1000 S.F. WINTER RYE 47%

JUNE 1 TO AUGUST 15 RED TOP* 53%

[(*)USE DORMANT SEED, UNIFORMLY APPLIED, WORKED INTO A

DEPTH OF ¼ INCH. THE USE OF MULCH IS REQUIRED. THE USE

OF NETTING OR EROSION CONTROL MATS MAY BE REQUIRED.]

NOTE: SEEDING PERIODS AND SPECIFICATIONS MAY VARY DUE TO

SITE CONDITIONS AND VARIANCES FROM THE TIME THIS

REPORT IS WRITTEN AND APPROVED. IT MAY BE

NECESSARY TO ADAPT SEED SPECIFICATION, VARIETIES,

AND QUANTITIES. FOR SPECIAL CONDITIONS CONSULT

"GUIDELINES FOR RECLAMATION OF SEVERELY DISTURBED

AREAS", PENNSYLVANIA STATE UNIVERSITY.

3. FERTILIZER: APPLY GROUND LIMESTONE OR HYDRATED LIME AT

A RATE OF 4 TONS PER ACRE AND 100-200-200 POUNDS PER ACRE

(LBS./ACRE) FERTILIZER. THESE MATERIALS WILL BE UNIFORMLY

APPLIED AND WORKED INTO THE TOPSOIL TO A MINIMUM DEPTH

OF 6 INCHES.

4. HYDROSEEDING: AGRICULTURAL GRADE LIMESTONE AND WATER

(4000 LBS. LIMESTONE/1000 GALLONS OF H2O PER ACRE) ALONG

WITH THE SEED SHALL BE AS SPECIFIED ABOVE, AND FERTILIZER

SHALL BE APPLIED AT A RATE OF 50-100-100 POUNDS PER ACRE

(LBS./ACRE). SHOULD FERTILIZER BE APPLIED WITH AN

INOCULANT, THE MIXTURE SHALL NOT REMAIN IN A SLURRY FOR

MORE THAN ONE HOUR. SYNTHETIC MULCH BINDER, SUCH AS

CURASOL, DCA-70 OR TERRE-TACK SHALL BE USED PER THE

MANUFACTURER'S INSTRUCTIONS TO ANCHOR THE MULCH. THE

CONTRACTOR IS RESPONSIBLE FOR PROPER STABILIZATION. IF

SEVERAL APPLICATIONS OF HYDROSEEDING ARE REQUIRED TO

OBTAIN PROPER STABILIZATION, THE CONTRACTOR SHALL BE

RESPONSIBLE TO ENSURE THAT RE-APPLICATION IS DONE.

5. MULCHING: MULCHING SHALL BE APPLIED AS FOLLOWS:

A. STRAW

APPLY STRAW MULCH, FREE FROM UNDESIRABLE SEEDS

AND COARSE MATERIAL, AT A RATE OF THREE (3) TONS PER

ACRE. CHECK MULCHED AREAS PERIODICALLY AND

IMMEDIATELY AFTER STORMS AND HIGH WINDS. REPLACE

DAMAGED OR MISSING MULCH. APPLY A TACKIFIER AFTER

APPLYING THE STRAW MULCH. THE TACKIFIER MAY BE

CUT-BACK ASPHALT OR POLYMER SPRAY. APPLY THE

TACKIFIER AT A RATE OF 100-150 GALLONS PER ACRE WITH

SUITABLE EQUIPMENT.

B. FLEXTERRA FLEXIBLE GROWTH MEDIUM (FGM)

ALL CONSTRUCTED AND DISTURBED SLOPES (3:1 OR

GREATER) SHALL BE SEEDED AND STABILIZED WITH

FLEXTERRA FLEXIBLE GROWTH MEDIUM (FGM), AS

INDICATED, AT THE END OF EACH WORKING DAY. FGM

SHALL BE APPLIED IN ACCORDANCE WITH THE

MANUFACTURER'S SPECIFICATIONS.

C. EROSION CONTROL BLANKETS

THE USE AND INSTALLATION OF EROSION CONTROL

BLANKETS OR NETTING SHALL BE IN ACCORDANCE WITH

THE MANUFACTURER'S SPECIFICATION AND SHALL BE

SELECTED FOR THE PROPER APPLICATION AND

CONDITIONS.

CLEAN FILL AND ENVIRONMENTAL DUE DILIGENCE

1. APPLICANTS AND/OR OPERATORS MUST USE ENVIRONMENTAL

DUE DILIGENCE TO ENSURE THAT THE FILL MATERIAL

ASSOCIATED WITH THIS PROJECT QUALIFIES AS CLEAN FILL.

DEFINITIONS OF CLEAN FILL AND ENVIRONMENTAL DUE

DILIGENCE ARE PROVIDED BELOW. ALL FILL MATERIAL MUST BE

USED IN ACCORDANCE WITH THE DEPARTMENT'S POLICY

"MANAGEMENT OF FILL", DOCUMENT NUMBER 258-2182-773. A

COPY OF THIS POLICY IS AVAILABLE ONLINE AT

WWW.DEPWEB.STATE.PA.US. UNDER THE HEADING QUICK

ACCESS ON THE LEFT SIDE OF THE SCREEN, CLICK "FORMS AND

PUBLICATIONS." ON THE LEFT SIDE OF THE SCREEN CLICK

"TECHNICAL GUIDANCE DOCUMENTS - FINAL." THEN TYPE THE

DOCUMENT NUMBER 258-2182-773 INTO THE SEARCH WINDOW

AND CONDUCT THE SEARCH. CLICK ON "MANAGEMENT OF FILL."

2. CLEAN FILL IS DEFINED AS: UNCONTAMINATED, NON-WATER

SOLUBLE, NON-DECOMPOSABLE, INERT, SOLID MATERIAL. THE

TERM INCLUDES SOIL, ROCK, STONE, DREDGED MATERIAL, USED

ASPHALT, AND BRICK, BLOCK OR CONCRETE FROM

CONSTRUCTION AND DEMOLITION ACTIVITIES THAT IS SEPARATE

FROM OTHER WASTE AND IS RECOGNIZABLE AS SUCH. THE TERM

DOES NOT INCLUDE MATERIALS PLACED IN OR ON THE WATERS

OF THE COMMONWEALTH UNLESS OTHERWISE AUTHORIZED.

(THE TERM "USED ASPHALT" DOES NOT INCLUDE MILLED ASPHALT

OR ASPHALT THAT HAS BEEN PROCESSED FOR RE-USE.)

3. CLEAN FILL AFFECTED BY A SPILL OR RELEASE OF A REGULATED

SUBSTANCE: FILL MATERIALS AFFECTED BY A SPILL OR RELEASE

OF A REGULATED SUBSTANCE STILL QUALIFIES AS CLEAN FILL

PROVIDED THE TESTING REVEALS THAT THE FILL MATERIAL

CONTAINS CONCENTRATIONS OF REGULATED SUBSTANCES THAT

ARE BELOW THE RESIDENTIAL LIMITS IN TABLES FP-1A AND FP-1B

FOUND IN THE DEPARTMENT'S POLICY "MANAGEMENT OF FILL."

4. ANY PERSON PLACING CLEAN FILL THAT HAS BEEN AFFECTED BY

A SPILL OR RELEASE OF A REGULATED SUBSTANCE MUST USE

FORM F-001 TO CERTIFY THE ORIGIN OF THE FILL MATERIAL AND

THE RESULTS OF THE ANALYTICAL TESTING TO QUALIFY THE

MATERIAL AS CLEAN FILL. FORM F-001 MUST BE RETAINED BY THE

OWNER OF THE PROPERTY RECEIVING THE FILL. A COPY OF

FORM FP-001 CAN BE FOUND ONLINE.

5. ENVIRONMENTAL DUE DILIGENCE: INVESTIGATIVE TECHNIQUES,

INCLUDING, BUT NOT LIMITED TO, VISUAL PROPERTY

INSPECTIONS, ELECTRONIC DATA BASE SEARCHES, REVIEW OF

PROPERTY OWNERSHIP, REVIEW OF PROPERTY USE HISTORY,

SANBORN MAPS, ENVIRONMENTAL QUESTIONNAIRES,

TRANSACTION SCREENS, ANALYTICAL TESTING, ENVIRONMENTAL

ASSESSMENTS OR AUDITS. ANALYTICAL TESTING IS NOT A

REQUIRED PART OF DUE DILIGENCE UNLESS VISUAL INSPECTION

AND/OR REVIEW OF THE PAST LAND USE OF THE PROPERTY

INDICATES THAT THE FILL MAY HAVE BEEN SUBJECTED TO A

SPILL OR RELEASE OF REGULATED SUBSTANCE. IF THE FILL MAY

HAVE BEEN AFFECTED BY A SPILL OR RELEASE OF A REGULATED

SUBSTANCE, IT MUST BE TESTED TO DETERMINE IF IT QUALIFIES

AS CLEAN FILL. TESTING SHALL BE PERFORMED IN ACCORDANCE

WITH APPENDIX A OF THE DEPARTMENT'S POLICY "MANAGEMENT

OF FILL." FILL MATERIAL THAT DOES NOT QUALIFY AS CLEAN FILL

IS REGULATED FILL. REGULATED FILL IS WASTE AND MUST BE

MANAGED IN ACCORDANCE WITH THE DEPARTMENT'S MUNICIPAL

OR RESIDUAL WASTE REGULATIONS BASED ON 25 PA. CODE

CHAPTERS 287 RESIDUAL WASTE MANAGEMENT OR 271

MUNICIPAL WASTE MANAGEMENT, WHICHEVER IS APPLICABLE.

N or th P ar k

R oa d R ea di ng , P

A

-0

0.

1.

C re ek si de L an e

Li tit z, P

A

7.

8.

E ng in ee rs a nd C on su lta nt s

SP

O

TT

S, S

TE

VE

N S

M

C C

O Y ss m gr ou p.

co m

R E

A D

IN

G

L A

N C

A S

T E

R

R om a C or po ra te

C en te r, S ui te

N

C ed ar C re st

B lv d A lle nt ow n, P A

0.

9.

L E

H

IG

H V

A L

L E

Y

E as t E va ns S tre et

W es t C he st er

, P A

0.

1.

W E

S T

C H

E S

T E

R

D

ES

C R

IP

TI

O N

N O

D

AT

E

M

AD

E C

H

KD

AP

VD

A 5/

/2

R

EL

EA

SE

D

F O

R B

ID

D

IN

G

TJ

R

JM

N

JM

N

R

EL

EA

SE

D F

O R

N O

T

FO

R C

O N

ST

R

U C

TI

O

N

PR

O

JE

C T

M

AN

AG

ER

D

AT

E:

N .B

BA

SE

B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C

H

KD

BI

D

D

IN

G

JM

N

5/

/2

TJ

R

JM

N

JM

N

C O

PY

R

IG

TT

S, S

TE

VE

N S

M

C C

O Y

DIGITAL FILENAMEDATE

WORK ORDER NUMBER

DRAWING NUMBER

BO

R

O U

G H

O F

LE

ES

PO

R

T O

N

TE

LA

U

N

EE

T O

W N

SH

IP

, B

ER

KS

C

O U

N

TY

, P

EN

N

SY

LV

AN

IA

SC

H

U

YL

KI

LL

V

AL

LE

Y

SC

H

O O

L D

IS

TR

IC

T

AS

H

LE

Y

W

AY

W

AT

ER

C

O N

N

EC

TI

O

N

ER

O

SI

O N

S

ED

IM

EN

TA

TI

O

N C

O N

TR

O

L D

ET

AI

LS

D

ET

AI

LS

8/01/24 100499.0088

W2-52

100499.0088

W.2-52

AutoCAD SHX Text

LOCATED ON THE DOWNHILL SIDE OF THE PILE.

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

2 (TYP.)

AutoCAD SHX Text

AutoCAD SHX Text

35' MAX.

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

GRADE

AutoCAD SHX Text

AND SLOPES MUST BE 2:1 OR FLATTER. FILTER FENCE SHALL BE

AutoCAD SHX Text

UPON STOCKPILING. STOCKPILE HEIGHTS MUST NOT EXCEED 35 FEET

AutoCAD SHX Text

STRIP AND STOCKPILE TOPSOIL. SEED THE TOPSOIL PILES IMMEDIATELY

AutoCAD SHX Text %%u TYPICAL SOIL STOCKPILE

AutoCAD SHX Text %%u SINKHOLE TREATMENT

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text 6"to 12" TOPSOIL

AutoCAD SHX Text

2"BENTONITE LINER

AutoCAD SHX Text

OR BENTOMAT

AutoCAD SHX Text

3/4 DEPTH OF HOLE

AutoCAD SHX Text

USE FILTER MATERIAL

AutoCAD SHX Text

(R-3 STONE)

AutoCAD SHX Text (No.57 STONE)

AutoCAD SHX Text

USE FILTER MATERIAL

AutoCAD SHX Text

1/4 DEPTH OF HOLE

AutoCAD SHX Text

(DRAINAGE AREA 5 - 15 ACRES)

AutoCAD SHX Text DETAILS INTENDED ONLY AS A GENERAL GUIDE. IN THE EVENT OF A SINKHOLE, CONSULT A GEOTECHNICAL ENGINEER OR GEOLOGIST PRIOR TO REMEDIATING.

AutoCAD SHX Text

TOTAL DEPTH, D

AutoCAD SHX Text NOTES: 1. ALL TRENCH SPOILS SHALL BEE SIDE CAST ON THE UP SLOPE SIDE OF THE TRENCH. 2. ALL DISTURBED AREAS SHALL BE STABILIZED PRIOR TO THE END OF EACH WORKING DAY (WITH COMPACTED GRAVEL, SEEDING AND MULCH, MULCH CONTROL NETTING OR RIP-RAP DEPENDING ON CONDITIONS AND LOCATION.

AutoCAD SHX Text

DRAINAGE

AutoCAD SHX Text

DOWN SLOPE

AutoCAD SHX Text

UP SLOPE

AutoCAD SHX Text

SPOILS

AutoCAD SHX Text

TRENCH

AutoCAD SHX Text

(WIDTH MAY VARY)

AutoCAD SHX Text

UTILITY TRENCH

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

%%UTRENCH SPOIL SIDE CAST DETAIL

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

%%U FILTREXX SILTSOXX DETAIL

AutoCAD SHX Text

%%UPLAN VIEW

AutoCAD SHX Text

STAKE ON 10'

AutoCAD SHX Text

LINEAL SPACING

AutoCAD SHX Text

%%USECTION

AutoCAD SHX Text

%%UPLAN VIEW

AutoCAD SHX Text

WATER FLOW

AutoCAD SHX Text

WATER FLOW

AutoCAD SHX Text

AREA TO BE

AutoCAD SHX Text

PROTECTED

AutoCAD SHX Text

FILTREXX

AutoCAD SHX Text

COMPOST

AutoCAD SHX Text

WORK AREA

AutoCAD SHX Text 2" x 2"

AutoCAD SHX Text

WOODEN STAKE

AutoCAD SHX Text

SILTSOXX

AutoCAD SHX Text 3"-4"

AutoCAD SHX Text

AREA TO BE

AutoCAD SHX Text

PROTECTED

AutoCAD SHX Text

WORK AREA

AutoCAD SHX Text

FILTREXX

AutoCAD SHX Text

SILTSOXX

AutoCAD SHX Text

(12"-18" TYP.)

AutoCAD SHX Text

STAKE ON 10'

AutoCAD SHX Text

LINEAL SPACING

AutoCAD SHX Text

UPSLOPE

AutoCAD SHX Text

DOWNSLOPE

AutoCAD SHX Text

FILTREXX

AutoCAD SHX Text

COMPOST

AutoCAD SHX Text

SILTSOXX

AutoCAD SHX Text NOTES: 1. ALL MATERIAL TO MEET FILTREXX SPECIFICATIONS. 2. SILTSOXX COMPOST/SOIL/ROCK/SEED FILL TO MEET APPLICATION REQUIREMENTS. 3. SILTSOXX DEPICTED IS FOR MINIMUM SLOPES. GREATER SLOPES MAY REQUIRE LARGER SOCKS PER THE ENGINEER. 4. COMPOST MATERIAL TO BE DISPERSED ON SITE, AS DETERMINED BY ENGINEER.

AutoCAD SHX Text NOTES: 1. Filtrexx SiltSoxx are to be used in any area requiring sediment or erosion control where runoff is in the form of sheet flow or in areas that silt fence is normally considered acceptable. 2. Filtrexx SiltSoxx may be used on frozen ground; on pavement; on hard compact ground, and in areas where trenching is not allowed due to it causing additional sediment disturbing activities. 3. Place SiltSoxx on level contours to assist in dissipating flow into sheet flow rather than concentrated flows. Do not construct Soxx that concentrate runoff or channel water. Sheet flow of water should be perpendicular to the SiltSoxx at impact and relatively un-concentrated. 4. When possible, place SiltSoxx at 5' or greater distance away from the toe of the slopes in order for the water coming from the slopes to maximize space available for sediment deposit. 5. In order to prevent water flowing around the ends of SiltSoxx, the ends of the SiltSoxx must be constructed pointing upslope so the ends are at a higher elevation. Be sure to stake the ends of the Soxx to prevent movement during high flow events. 6. For permanent areas, seeded SiltSoxx allow vegetation to be established directly in the sock and immediately in front and back of the sock at a distance of 5 feet. 7. Sheet flow and runoff should not exceed height of SiltSoxx capacity in most storm events. If overflow of the Soxx is a possibility, larger Soxx should be constructed, or other possible sediment control tools may be used. Alternatively, a second set of Soxx may be constructed or used in combination with compost blankets to prevent sediment from moving. 8. Filtrexx SiltSoxx should be regularly inspected to make sure they hold their shape and are producing adequate flow through. If ponding becomes excessive, and sediment reaches the top of the Soxx, additional Soxx should be added in areas without disturbance of soil or collected sediment. 9. When construction is completed on site, the Soxx may be dispersed with a loader, rake, bulldozer or other device to be incorporated in the soil or left on top of the soil for final seeding to occur. The mesh netting material will be collected and disposed of in normal trash container or removed by the contractor. In cases where biodegradable or photodegradable products are used, they may be left on site at the direction of the engineer.

SUPPLIER INFO: GARDENIQUE LANDSCAPING 3234 ROUTE 309, BOX 340 OREFIELD, PA 18069

DOWNWARD THRUSTS UP TO 150 PSI WORKING PRESSURE

TYPICAL BLOCKING FOR HORIZONTAL AND VERTICAL

THRUST BLOCK DETAILS

MUNICIPAL STREET

TEMPORARY RESTORATION

MUNICIPAL STREET / PARKING LOT

FLEXIBLE PAVEMENT RESTORATION

N or th P ar k

R oa d R ea di ng , P

A

-0

0.

1.

C re ek si de L an e

Li tit z, P

A

7.

8.

E ng in ee rs a nd C on su lta nt s

SP

O

TT

S, S

TE

VE

N S

M

C C

O Y ss m gr ou p.

co m

R E

A D

IN

G

L A

N C

A S

T E

R

R om a C or po ra te

C en te r, S ui te

N

C ed ar C re st

B lv d A lle nt ow n, P A

0.

9.

L E

H

IG

H V

A L

L E

Y

E as t E va ns S tre et

W es t C he st er

, P A

0.

1.

W E

S T

C H

E S

T E

R

D

ES

C R

IP

TI

O N

N O

D

AT

E

M

AD

E C

H

KD

AP

VD

A…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .