2-2026-04-10 - MS-944 for Water Main Break Restoration Addendum 1.pdf
PDF 1 MB Posted
- Attached to
- Salt Shed Replacement
- Solicitation number
- Not on record
- Issued by
- Lancaster County, Pennsylvania
About this file
This is Addendum 1 to the proposal and contract documents for a water main break restoration project in West Earl Township, Lancaster County, Pennsylvania, issued by Lancaster Civil Engineering Co. on April 10, 2026. The project scope encompasses final restoration work at the intersection of S.R. 0772 (S. State Street) and Locust Street (T-795), including mobilization and demobilization, maintenance and protection of traffic, superpave base course placement (6 inches depth), superpave wearing course placement (2 inches depth with milling and pavement markings), cement concrete sidewalk installation, plain cement concrete curb installation, inlet box replacement (20 units) with pipe reconnections, and subbase #2A stone placement. The addendum clarifies and revises the original contract documents by adding Item 8 (2A Stone) to the schedule of prices, revising the temporary pavement depth specification to 8 inches to 11 inches in the special provisions and sketch plan, and adding provisions for installation of additional 2A stone as needed prior to paving. Sealed bids were due at 10:00 a.m. on Wednesday, April 22, 2026, via the PennBid Program on a unit price basis, with the bid security requirement of 10 percent of the bid amount, Workmen's Compensation Affidavit, Public Works Employment Verification Form, and Anti-Collusion Affidavit required to accompany proposals. The successful bidder must complete all work by July 30, 2026, with liquidated damages of $870.00 per calendar day for delays beyond that date, and must maintain pavement repairs for one year following completion.
As a local highway project with an estimated cost of less than $100,000, the project is not subject to Pennsylvania Department of Labor and Industry prevailing wage rates per PA Act 89. Bid security remains open for 60 days from the date of bid opening and may not be withdrawn during this period. The successful bidder must furnish performance and payment bonds equal to 100 percent of the contract price and maintain comprehensive insurance coverage including workers' compensation at statutory limits, commercial general liability of $2,000,000 aggregate, automobile liability of $2,000,000 combined single limit, and excess or umbrella liability of $1,000,000 per occurrence. The contractor is responsible for submitting approved PennDOT Bituminous Asphalt Mix designs and Concrete Mix Design Forms (TR-4221) a minimum of five to ten working days prior to work commencement and providing daily material certifications on TR-465 or CS-4171 forms within 24 hours of material placement. No site visit or pre-bid conference is mandated, allowing contractors to assess project conditions independently. West Earl Township reserves the right to reject any and all bids submitted or any part thereof and may waive any defects, errors, omissions, irregularities, or informalities in bids received.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WATER MAIN BREAK RESTORATION APRIL 2026
WEST EARL TOWNSHIP LCEC PROJECT NO: 53-136
ADDENDA 009113 - 1
DOCUMENT 009113 - ADDENDA
1.1 PROJECT INFORMATION
A. Project Name: Water Main Break Restoration.
B. Owner: West Earl Township
C. Owner Project Number: n/a.
D. Engineer: Lancaster Civil Engineering Co.
E. Engineer Project Number: 53-136.
F. Date of Addendum: April 10, 2026.
1.2 NOTICE TO BIDDERS
A. This Addendum is issued to all registered plan holders in PennBID pursuant to the Instructions to Bidders. This Addendum serves to clarify, revise, and supersede information in the Project
Manual, Drawings, and any previously issued Addenda. Portions of the Addendum affecting the
Contract Documents will be incorporated into the Contract by enumeration of the Addendum in the Owner/Contractor Agreement.
B. The Bidder shall acknowledge receipt of this Addendum in the appropriate space in PennBID.
1.3 ATTACHMENTS
A. This Addendum includes the following attached Documents and Specification Sections:
1. MS-944 Proposal & Contract for Water Main Break Restoration, dated 4/10/2026, revised sheets only.
1.4 REVISIONS TO PREVIOUS ADDENDA
A. There are no revisions to prior addenda.
1.5 REVISIONS TO DIVISION 00 PROCUREMENT REQUIREMENTS AND CONTRACTING
REQUIREMENTS
A. Attachment 1 – Proposal & Contract MS-944, (reissued).
1. Schedule of Prices: Item #8 added (2A Stone). Also added in PennBid.
B. Special Provisions, (reissued).
1. Paragraph 5.a: Revised to specify temporary pavement depth of 8” to 11”.
2. Paragraph 10: Added to address the installation of 2A stone needed prior to paving.
WATER MAIN BREAK RESTORATION APRIL 2026
WEST EARL TOWNSHIP LCEC PROJECT NO: 53-136
ADDENDA 009113 - 2
C. Water Main Break Sketch Plan (reissued).
1. Revised to show temporary pavement depth varies from 8” to 11”.
D. Pavement Restoration Detail (reissued).
1. Revised to clarify that additional 2A stone be installed as needed.
END OF DOCUMENT 009113
County:
LS Mobilization
LS
SY
SY
SF
LF
EA
TON
SUBTOTAL
EACH MUST BE INCLUDED.
Project Number: 53-136
LOCATION OF WORK:
5 80 Cement Concrete Sidewalk
Superpave Base Course, PG 64S-22, 0.3 to 3 million ESALs, 25.0mm, 6” Depth, including temporary pavement removal
1 1
T H
IS
P
O R
T
IO
N T
O B
E C
O M
P L
E T
E D
B Y
T H
E M
U N
IC
IP
A L
IT
Y
Intersection of S.R. 0772 (S. State Street) and Locust Street (T-795) in West Earl Township.
DESCRIPTION OF WORK:
As indicated below and in Attachment 1-A, Special Conditions, Highway Occupancy Permit, Details, and the Sketch Plan.
Total
SCHEDULE OF PRICES
ATTACHMENT 1
TO MS - 944 ( PROPOSAL AND CONTRACT MS - 944 )
Lancaster Municipality: West Earl Township
- 3 -
Maintenance and Protection of Traffic 2 1
3 175
* DESCRIPTION:
Must include ADT on wearing surfaces
USE OF CUTBACK ASPHALT IS PROHIBITED
BETWEEN MAY 1st AND OCTOBER 31st, EXCEPT
AS NOTED IN BULLETIN NO. 25.
SUBTOTAL FROM OTHER ATTACHMENTS
BID TOTAL FOR A NON OPTION / PHASE BID
4 251
Superpave Wearing Course, PG 64S-22, 0.3 to 3 million ESALs, 12.5 mm, SRL-E, 2” Depth, including milling & pavement markings
OPTION 3 OR PHASE 3 BID TOTAL
ESCALATOR CLAUSE:( if adopted by Municipality.)
The Municipality has not adopted an escalator clause.
Item
1 No.
Approximate
2 Quantities
Unit
*Description
Unit
5 Price
40 Plain Cement Concrete Curb
Subbase, #2A Stone
OPTION 1 OR PHASE 1 BID TOTAL
OPTION 2 OR PHASE 2 BID TOTAL
Inlet Box Replacement, including all pipe reconnections
Water Main Break Restoration
West Earl Township
Special Provisions
1. COMPLETION OF WORK: After starting work, the contractor shall work continuously, utilizing not less than the normal five (5) day week, excluding holidays, unless otherwise stated. He/She shall at no time cease operations for any reason other than inclement weather without the express permission of the
Engineer. Upon completion of the work, the contractor must supply to the municipality a completed MS-
NCP, Notice of Completion form, along with any other necessary supporting documents. This information should be supplied to the municipality within one month of completing the work.
2. SITE RESTORATION: The site restoration shall consist of the following work: (a) protect existing surfaces to the extent possible during construction and clean to existing conditions at a minimum; (b) grading adjoining ground to 4:1 max slopes; (c) furnishing and placing topsoil, seed, mulch and soil supplements in all areas of earth disturbance and all areas where concrete, asphalt, or stone is removed and not replaced; (d) prompt removal of debris and all site cleanup. The site restoration area shall include all areas disturbed as part of the water main repair and as part of this restoration work. All seeded areas must be fully established, free of weeds and surface irregularities, with coverage exceeding 70 percent.
Any re-seeding shall be completed as deemed necessary during the contract and maintenance period.
Payment for this item of work will be incidental to the contract.
3. MOBILIZATION: Mobilization and demobilization, assembling and setting up for all items of work, PA One
Call, storage areas (locations to be pre-approved with Township), sanitary and other facilities, as required by local and State laws and regulations. The cost of local permits and/or any other initial expense required for the start of work will be included in this item; including all required coordination and testing for the associated HOP permit, the submission of Shop Drawings and record drawings to the Borough
Engineer. The bid will be based on a lump sum basis to be paid based on the percentage of completion submitted. Once the project reaches 75% complete, the mobilization will be paid in full.
4. MAINTENANCE AND PROTECTION OF TRAFFIC: The maintenance of traffic will be the responsibility of the contractor. This includes all labor, materials and equipment necessary to maintain public roadway and pedestrian traffic, including flaggers, control and safety devices, control of dust, any necessary detour facilities and other special requirements for the safe and expeditious movement of traffic in accordance with PennDOT Publication 213 and all conditions of the associated HOP Permit. Traffic patterns must be returned to normal operations at the end of a workday. Any open excavation must be protected in accordance with Pub 408, Section 901.3(j) (full backfill and/or steel plates). The contractor shall provide notification to all homeowners and businesses affected by the work at least three (3) working days prior to beginning any excavation/demolition. The contractor shall coordinate all planned interruptions to traffic with the Township prior at least 5 days prior to commencing construction. It will be necessary to meet with the local police to outline the proposed traffic maintenance plan and to ascertain what assistance will be available for this purpose.
5. Superpave Base Course, PG 64S-22, 0.3 to 3 million ESALs, 25.0 mm, 6” Depth, including temporary pavement removal:
a. General: All labor, materials and equipment necessary for pavement installation as specified, including but not limited to: sawcut and removal of existing temporary asphalt pavement, approximately 8” to 11” thick, and placement of base course in accordance with the Sketch Plan, Details, and Highway Occupancy Permit.
b. Materials: As specified in PennDOT Publication 408, Sections 313 (Base Course).
c. Construction Methods: As specified in PennDOT Publication 408, Sections 313 (Base Course).
d. Certifications: The contractor is responsible to ensure that the proper material is provided by supplying a copy of an approved PennDOT Bituminous Asphalt Mix design a minimum of five (5) working days prior to the start of the work. The contractor will also supply the Township with a daily bituminous material certification on a TR-465 or CS- 4171 form within twenty-four (24) hours of placing the bituminous material for each day’s placement.
6. Superpave Wearing Course, PG 64S-22, 0.3 to 3 million ESALs, 12.5 mm, SRL-E, 2” Depth, including milling and pavement markings:
e. General: All labor, materials and equipment necessary for pavement installation as specified, including but not limited to: milling 2” of existing asphalt material, tack coat, sealing all vertical joints, and placement of wearing course, and replacing all pavement markings in accordance with the Sketch Plan, Details, and Highway Occupancy Permit. The driveway restoration and tie-in will be paid for under this item.
f. Materials: As specified in PennDOT Publication 408, 413 (Wearing Courses).
g. Construction Methods: As specified in PennDOT Publication 408, 413 (Wearing Courses).
h. Certifications: The contractor is responsible to ensure that the proper material is provided by supplying a copy of an approved PennDOT Bituminous Asphalt Mix design a minimum of five (5) working days prior to the start of the work. The contractor will also supply the Township with a daily bituminous material certification on a TR-465 or CS- 4171 form within twenty-four (24) hours of placing the bituminous material for each day’s placement.
7. CONCRETE SIDEWALK:
a. General: All labor, materials and equipment necessary for concrete sidewalk installation as specified, including but not limited to: removal of existing temporary material, subgrade preparation, compacted stone base, forming, concrete placement and finishing, curing, and joint sealing (¾” width) in accordance with the Sketch Plan and Highway Occupancy Permit.
b. Materials: As specified in PennDOT Publication 408, Section 676 (Cement Concrete Sidewalk).
c. Construction Methods: In accordance with RC-67M and as specified in PennDOT Publication
408, Section 676 (Cement Concrete Sidewalk).
d. Certifications: The contractor is responsible to ensure that the proper material is provided by supplying a copy of an approved PennDOT Concrete Mix Design Form (TR-4221) a minimum of five (5) working days prior to the start of the work. The contractor will supply the Township with a CS- 4171 form within twenty-four (24) hours of placing the concrete material for each day’s placement.
8. CONCRETE CURB:
a. General: All labor, materials and equipment necessary for concrete curb installation as specified, including but not limited to: removal of existing material and asphalt, subgrade preparation, subbase stone, forming, concrete placement and finishing, curing in accordance with the Sketch
Plan and Highway Occupancy Permit. No differentiation in payment shall be made for depressed or transition curb.
b. Materials: As specified in PennDOT Publication 408, Section 630 (Plain Cement Concrete Curb).
c. Construction Methods: In accordance with RC-67M and as specified in PennDOT Publication
408, Section 630 (Plain Cement Concrete Curb).
d. Certifications: The contractor is responsible to ensure that the proper material is provided by supplying a copy of an approved PennDOT Concrete Mix Design Form (TR-4221) a minimum of five (5) working days prior to the start of the work. The contractor will supply the Township with a CS- 4171 form within twenty-four (24) hours of placing the concrete material for each day’s placement.
9. INLET BOX REPLACEMENT:
a. General: All all labor, materials and equipment necessary for replacing an existing inlet box with a with Standard Inlet Box (24” x 45”) and resetting the existing Type C Concrete Top Unit, including but not limited to: sawcut and removal of existing asphalt a minimum distance of 12” from the existing inlet, excavation, shoring and dewatering as needed, removal of existing inlet box, bedding (2A stone, 12” min), inlet box, re-connection of outgoing elliptical concrete pipe, setting inlet top unit, backfill, grouting, adjustment to finish grade, and all appurtenances required to complete the installation in accordance with the Sketch Plan and Highway Occupancy Permit. The contractor shall properly dispose of all removed materials.
b. Materials: As specified in PennDOT Publication 408, Section 605 (Endwalls, Inlets, Manholes, and
Spring Boxes).
c. Construction Methods: In accordance with RC-45M and RC-46M and as specified in PennDOT
Publication 408, Section 605 (Endwalls, Inlets, Manholes, and Spring Boxes).
d. Certifications: The contractor shall supply a product submittal a minimum of ten (10) working days prior to the start of the work for the inlet, grout, mortar, stone, and any other material proposed.
10. SUBBASE #2A STONE:
i. General: All labor, materials and equipment necessary for pavement subbase preparation as specified, including but not limited to: compaction of existing stone material, placement and compaction of additional stone to subbase elevation (8” from final surface) in accordance with the
Sketch Plan, Details, and Highway Occupancy Permit. Paid for in tonnage of additional stone installed.
j. Materials: As specified in PennDOT Publication 408, Sections 350 (Subbase).
k. Construction Methods: As specified in PennDOT Publication 408, Sections 350 (Subbase).
l. Certifications: The contractor shall supply a product submittal a minimum of ten (10) working days prior to the start of the work and shall provide delivery tickets for each day’s placement.
WATER MAIN BREAK
SKETCH PLAN
Project No: 53-136 Date: 4/6/2026 Drawn by: BSC/TJA Scale: 1"=20' Sheet No.: 1 of 1
Lancaster Civil P.O. Box 8972
Lancaster, PA 17604 www.lancastercivil.com p: 717-799-8599
8" to 11"
ADD ADDITIONAL 2A STONE AS NEEDED