This is a Request for Quotations (RFQ) issued by the U.S. Embassy in Djibouti for preventive maintenance services and replacement of an Automatic Transfer Switch (ATS) at the CMR residence. The solicitation number is 19DJ1026Q0017, with a site visit scheduled for August 11, 2026, at 10:00 a.m. and quotations due by August 23, 2026, at 16:30 p.m. The contract will be awarded on a firm fixed-price basis payable entirely in U.S. Dollars to the responsible company submitting the lowest acceptable offer without discussions, though the Government reserves the right to conduct discussions if needed. Quotations must remain valid for a minimum of four months from Government receipt.

The scope of work requires a qualified electrical contractor to remove an existing phase-sensing ATS and supply and install a new delayed-type (Open Transition) ATS with specifications of 600A, 400V, 50Hz, preferably ASCO POWER brand with accessories (11BE, 18RX, 72EE, 125A). The contractor must complete removal and installation within five hours, provide all equipment, labor, materials, and installation plans, and comply with standards including UL 1008, NFPA 70, NFPA 110, and ANSI/IEEE 446. Key deliverables include as-built wiring diagrams in PDF and AutoCAD formats, manufacturer's data sheets, commissioning and maintenance manuals with preventive maintenance schedules, and weekly work reports. All offerors must be registered in SAM with a current UEI number, possess required local licenses and permits, provide proof of adequate insurance including Defense Base Act coverage, demonstrate relevant past performance with client references, and have no political or business affiliations contrary to U.S. interests. Value Added Tax will be invoiced separately as a line item.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Embassy of the United States of America Djibouti, Republic of Djibouti

Date: July 29, 2026

Dear Prospective Quoter:

Subject: Request for Quotations number 19DJ1026Q0017

Enclosed is a Request for Quotations (RFQ) for FAC: Project: CMR - ATS Replacement.

If you would like to submit quotation, follow the instructions in Section 3 of the solicitation, complete the required portions of the attached document, and submit it to the address shown on the Standard Form 1449 that follows this letter.

The U.S. Government intends to award a contract/purchase order to the responsible company submitting an acceptable offer at the lowest price. We intend to award a contract/purchase order based on initial quotations, without holding discussions, although we may hold discussions with companies in the competitive range if there is a need to do so.

A site visit and pre-quotation conference will held on August 11, 2026, at 10.00 a.m. All interested contractors must contact procurement department at djiboutiprocbids@state.gov and copy to kayadse@state.gov with the names of their attendees no later than August 09, 2026, at 13.00 p.m.

Quotations submittals are due by August 23, 2026, at 16:30 p.m. It is important to make sure the submission is made in specific size and format; in MS-Word 2007/2010 or MS-Excel 2007/2010 or Adobe Acrobat (pdf) file format. The file size must not exceed 30MB. If the file size should exceed the 30MB, the submission must be made in separate files and attached to separate emails with less than 30MB each.

Request For Information deadline is on August 13, 2026, at 14.00 p.m. and submitted to djiboutiprocbids@state.gov and copy to kayadse@state.gov.

In order for a quotation to be considered, you must also complete and submit the following:

1. SF-1449

2. Section I, Pricing

3. Section 5 Representations and Certifications

4. Additional information as required in Section 3

5. Proof of SAM Registration

Offerors shall be registered in the SAM (System for Award Management) database at https://www.sam.gov prior to submittal of their offer/proposal as prescribed under FAR

4.1102. Failure to be registered at time of proposal submission may deem the offeror’s proposal to be considered non-responsible and no further consideration will be given. Therefore, offerors mailto:djiboutiprocbids@state.gov mailto:kayadse@state.gov mailto:djiboutiprocbids@state.gov mailto:kayadse@state.gov https://www.sam.gov/ are highly encouraged to register immediately if they are interested in submitting a response to this requirement.

Sincerely, Jesse C. Flowers Contracting Officer

TABLE OF CONTENTS

SECTION 1 - THE SCHEDULE

• SF 1449 cover sheet

• Continuation To SF-1449, RFQ Number 19DJ1026Q0017, Prices, Block 23

• Continuation To SF-1449, RFQ Number 19DJ1026Q0017, Schedule Of

Supplies/Services, Block 20 Description/Specifications/Work Statement

• Attachment 1 to Description/Specifications/Performance Work Statement, Government Furnished Property

SECTION 2 - CONTRACT CLAUSES

• Contract Clauses

• Addendum to Contract Clauses - FAR and DOSAR Clauses not Prescribed in Part

SECTION 3 - SOLICITATION PROVISIONS

• Solicitation Provisions

• Addendum to Solicitation Provisions - FAR and DOSAR Provisions not

Prescribed in Part 12

SECTION 4 - EVALUATION FACTORS

• Evaluation Factors

• Addendum to Evaluation Factors - FAR and DOSAR Provisions not Prescribed in

Part 12

SECTION 5 - REPRESENTATIONS AND CERTIFICATIONS

• Offeror Representations and Certifications

• Addendum to Offeror Representations and Certifications - FAR and DOSAR

Provisions not Prescribed in Part 12

The bid schedule shall be as follows:

Request for Information (from offerors)

August 13, 2026

RFQ clarification from Requesting Office

August 17, 2026

Quotation Due date

Submitted quotations, including price, must be valid for no less than four months from Government receipt of quotation.

August 23, 2026

TEP Drafting

August 24- 25, 2026

Technical Evaluation Result Report

August 26- 30, 2026

Award decision

August 31 to Sept 01, 2026

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER

PR16056588

PAGE 1 OF

2. CONTRACT NO.

3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER

5. SOLICITATION

NUMBER

19DJ1026Q0017

6. SOLICITATION ISSUE

DATE

07/29/2026

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

Jesse Flowers

b. TELEPHONE NUMBER (No collect calls)

21453000

8. OFFER DUE DATE/

LOCAL TIME

08/23/2026 at 16:30

9. ISSUED BY

10. THIS ACQUISITION

UNRESTRICTED

SET ASIDE: %

GENERAL SERVICES OFFICER

SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS

U.S. EMBASSY

DJIBOUTI Tel: 21 453000

HUBZONE SMALL

BUSINESS

(WOSB) ELLIGIBLE UNDER THE WOMEN-

OWNED

SMALL BUSINESS PROGRAM NAICS:

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

EDWOSB

8 (A) SIZE STANDARD:

11. DELIVERY FOR FOB

DESTINAT-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS 13a. THIS CONTRACT

IS A

RATED ORDER

UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ IFB RFP

15. DELIVER TO CODE 16. ADMINISTERED BY CODE

U.S. EMBASSY DJIBOUTI

PB 185 LOT NUMBER 350-B

LOTISSEMENT HARAMOUS

TEL: 00253 21 45 30 00

REPUBLIC OF DJIBOUTI

See block 9

17a. CONTRACTOR/

OFFERER

COD

E

FACILIT

Y CODE

18a. PAYMENT WILL BE MADE BY

U.S. EMBASSY DJIBOUTI (FMO)

PB 185 LOT NUMBER 350-B

LOTISSEMENT HARAMOUS

CODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS

BLOCK

BELOW IS CHECKED SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANT

ITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

Item 1

FAC: Project: CMR - ATS Replacement

SERVICE

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (For Govt.

Use Only)

27a.SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5

ARE ATTACHED. ADDENDA

ARE ARE NOT

ATTACHED

27b.CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS

ATTACHED. ADDENDA

ARE ARE NOT

ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND

RETURN _1___ COPIES TO ISSUING OFFICE. CONTRACTOR AGREES

TO FURNISH AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE

IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT

TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.

29. AWARD OF CONTRACT: REF. _________________ OFFER

DATED ____________. YOUR OFFER ON SOLICITATION (BLOCK 5),

INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET

FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF

CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (Type or print)

30c. DATE SIGNED

31b. NAME OF CONTRACTING OFFICER (Type or print)

31c. DATE SIGNED

SECTION 1 - THE SCHEDULE

CONTINUATION TO SF-1449

RFQ NUMBER 19DJ1026Q0017

PRICES, BLOCK 23

1. DESCRIPTION

A. The American Embassy in Djibouti requires preventive maintenance services for ATS Replacement at the CMR residence in accordance with the performance work statement

(PWS).

This requirement will be procured as a firm fixed price contract, payable entirely in U.S.

Dollars (USD).

A. The contract will be awarded on a one-time basis.

QUALITY ASSURANCE AND SURVEILLANCE PLAN (QASP)

This plan provides an effective method to promote satisfactory contractor performance. The QASP provides a method for the Contracting Officer's Representative (COR) to monitor Contractor performance, advise the Contractor of unsatisfactory performance, and notify the Contracting Officer of continued unsatisfactory performance. The Contractor, not the Government, is responsible for management and quality control to meet the terms of the contract. The role of the Government is to monitor quality to ensure that contract standards are achieved.

Performance Objective Scope of Work

Paragraphs Performance Threshold

Services.

Performs all FAC: Project: CMR - ATS Replacement services set forth in the scope of work.

Section 1 through Section 10 & Appendix (Figure 1 to 3)

All required services are performed and no more than two

(3) customers’ complaints are received per month.

1. SURVEILLANCE. The COR will receive and document all complaints from Government personnel regarding the services provided. If appropriate, the COR will send the complaints to the Contractor for corrective action.

2. STANDARD. The performance standard is that the Government receives no more than one two (3) customer’s complaint per month. The COR shall notify the Contracting Officer of the complaints so that the Contracting Officer may take appropriate action to enforce the inspection clause (FAR 52.212.4, Contract Terms and Conditions - Commercial Products and Commercial Services (NOV 2023), if any of the services exceed the standard.

3. PROCEDURES.

(a) If any Government personnel observe unacceptable services, either incomplete work or required services not being performed they should immediately contact the COR.

(b) The COR will complete appropriate documentation to record the complaint.

https://www.acquisition.gov/far/52.212-4

(c) If the COR determines the complaint is invalid, the COR will advise the complainant. The COR will retain the annotated copy of the written complaint for his/her files.

(d) If the COR determines the complaint is valid, the COR will inform the Contractor and give the Contractor additional time to correct the defect, if additional time is available. The COR shall determine how much time is reasonable.

(e) The COR shall, as a minimum, orally notify the Contractor of any valid complaints.

(f) If the Contractor disagrees with the complaint after investigation of the site and challenges the validity of the complaint, the Contractor will notify the COR. The COR will review the matter to determine the validity of the complaint.

(g) The COR will consider complaints as resolved unless notified otherwise by the complainant.

(h) Repeat customer complaints are not permitted for any services. If a repeat customer complaint is received for the same deficiency during the service period, the COR will contact the Contracting Officer for appropriate action under the Inspection clause.

II. PRICING

FAC: Project: CMR - ATS Replacement

Total Price (Including all labor, materials overhead, profit and DBA)

Submitted quotations, including price, must be valid for no less than four months from Government receipt of quotation. All prices shall be in Dollars.

III. VALUE ADDED TAX

VALUE ADDED TAX. Value Added Tax (VAT) is not included in the CLIN rates. Instead, it will be priced as a separate Line Item in the contract and on Invoices. Local law dictates the portion of the contract price that is subject to VAT; this percentage is multiplied only against that portion. It is reflected for each performance period. The portions of the solicitation subject to VAT are:

CONTINUATION TO SF-1449,

RFQ NUMBER 19DJ1026Q0017

SCHEDULE OF SUPPLIES/SERVICES, BLOCK 20

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

1. GENERAL INFORMATION

1.1. The United States Embassy in DJIBOUTI requires the professional services of a qualified electrical contractor cost proposals to remove the existing automatic transfer switch (ATS), then supply and install a new ATS from phase-sensing to delayed type (Open Transition).

1.2. The Contractor shall perform the removal and installation as described into this Scope of work (SOW). The Contractor shall provide all equipment, labor, materials, and installation plans.

1.3. This project includes feeder circuits, connection to the existing electrical distribution system, control circuits. The Contractor shall also provide testing and coordination for a safe and fully operational ATS.

2. PROJECT REQUIREMENTS

2.1. The requirements in this Scope of Work serve as direction to the Contractor for the development, execution, and delivery of a completely operational and automatic transfer switch. The Contractor shall review this Scope of Work and be familiar with the project requirements. A thorough knowledge of the project is required to achieve a substantive quality finished product.

2.2. The contractor must be able to remove the existing ATS and install the new ATS within five (5) hours, connecting the utility, load, generator and auxiliary cables.

3. PROJECT DESCRIPTION

3.1. This project consists of removing the old ATS, supplying and installing a new ATS with the same specifications except for the type of transition from the phase sensing to the delayed type at CMR.

4. SCOPE

4.1. PRIOR TO IMPLEMENTATION

4.1.1. Submit to the CO and/or COR within 5 days of Notice to Proceed, document submittal package that includes:

4.1.1.1. A list of all employees who will be working on this project including full name (as shown on ID), ID number, and ID type (passport, Djiboutian ID, etc.).

4.1.1.2. A list of all major equipment (trucks, cranes, etc.) to be used on this project.

4.1.2. Submit a schedule for performance of the work. Work will be completed within 30 days of notice to proceed.

4.1.3. The COR, Facilities Engineer and the Contractor shall review the method statement submitted with the technical proposal, before the contract award, and agree to a sequencing and phasing plan. The Contractor shall commence work after ensuring availability of material and tools, and notice to proceed given by the COR.

4.2. STANDARDS AND CODES

4.2.1. The ATS units and accessories, including installation of same, shall meet or exceed the applicable requirements of the following standards and codes (latest edition):

4.2.1.1. UL 1008 - Standard for Automatic Transfer Switches.

4.2.1.2. NFPA 70 - National Electrical Code, including use in emergency and standby systems in accordance with Articles 517, 700, 701, and 702

4.2.1.3. NFPA 110 – Standard for Emergency and Standby Power Systems

4.2.1.4. ANSI/IEEE Standard 446 - Recommended Practice for Emergency and

Standby Power Systems for Commercial and Industrial Applications

4.2.1.5. NEMA ICS10 (formerly ICS2-447) - AC Automatic Transfer Switch

Equipment.

4.2.1.6. Comply with requirements of the OBO Electrical Code (NFPA 70, “National Electrical Code” as amended by OBO).

4.2.1.7. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100 of NFPA 70 for emergency service under UL 1008, by a testing agency acceptable to Project Director/COR based upon input from OBO/PDCS/DE/EE.

4.2.1.8. Comply with NFPA 110.

4.2.1.9. Comply with Level 1 equipment according to NFPA 110.

4.2.1.10. Occupational Safety and Health Administration (OSHA) Regulations, 29 CFR 1910.333 and 29 CFR 1910.147.

4.2.1.11. ASCO - Manufacturer's Guidelines.

4.3. IMPLEMENTATION

4.3.1. REMOVAL OF THE EXISTING ATS

4.3.1.1. The CMR residence is operational facility; therefore, the Contractor shall ensure that electric power is available at all times except on scheduled outages acceptable to the contracting officer’s representative (COR).

4.3.1.2. The contractor shall be required to coordinate all power shutdowns with the Facilities Engineer in consultation with the occupant of the Residence. In no instance is the contractor authorized to work on energized circuits or otherwise change circuit status without prior approval from the Facilities Engineer.

4.3.1.3. The U.S. Government can deny or defer a requested outage if they see the need.

4.3.1.4. Turn Off Load Side: Ensure all downstream (load side) circuits are turned off to prevent back feeding.

4.3.1.5. Disconnect Utility Power: Switch off the main power source feeding the ATS. Lockout and tagout (LOTO) the utility breaker.

4.3.1.6. Disconnect Generator Power: If there is a backup generator, turn it off and engage LOTO on the generator side as well.

4.3.1.7. Use a Multimeter: Measure voltages at the input and output terminals to confirm there is no live power.

4.3.1.8. Double-Check: Ensure both the utility and generator inputs show no voltage to avoid electrical shock or equipment damage.

4.3.1.9. Label Connections: Label all control, monitoring, and sensing wires connected to the ATS for easy reinstallation if needed.

4.3.1.10. Remove Control Wires: Carefully disconnect control wiring, following your labels to keep track.

4.3.1.11. Remove Utility, Generator, and Load Wires: Disconnect the large power cables on the utility, generator, and load sides of the ATS.

4.3.1.12. Grounding: Make sure any grounding wires are also disconnected but marked clearly.

4.3.1.13. Follow LOTO Procedures: Lockout/tagout is essential at all power sources.

4.3.1.14. Use Appropriate PPE: Even with power off, use PPE when handling electrical equipment.

4.3.2. INSTALLATION OF THE NEW ATS

4.3.2.1. The Contractor shall be thoroughly familiar with the ATS manufacturer’s installation requirements.

4.3.3. Automatic Transfer Switches

4.3.3.1.ATS Specification:

4.3.3.1.1. Brand: ASCO POWER (Preferred)

4.3.3.1.2. Amps: 600A

4.3.3.1.3. Volts: 400V, 50Hz

4.3.3.1.4. Accessories: 11BE, 18RX, 72EE, 125A.

4.3.3.2.General Purpose Automatic Transfer Switch: (GP-ATS): To be used for the CMR generator. The general-purpose Automatic Transfer Switch (GP-ATS) shall be 4-pole and have a continuous current rating equal to or greater than the prime current rating of the genset. Switch configuration shall be "break" before "make" arranged such that all four poles open and close simultaneously and shall be mechanically interlocked to prevent simultaneous closing of normal and emergency contacts. The main switch contacts shall be long life, high pressure, silver alloy, and have separate arcing contact areas. There shall be two sets of form "C" auxiliary contacts (one for each source) rated at 10 amps continuous and 250 V. The three leads from each set of contacts shall be wired to six terminals on the consumers terminal strip (see subpara.

below on "Terminals (ATS)"). The ATS components shall be in a NEMA 1 enclosure arranged for wall mounting.

4.3.3.3.Sequence of operation (ATS):

4.3.3.3.1. When the voltage on any phase of the normal source

(commercial power) is reduced to 80 percent of rated voltage (adjustable from 75 percent to 98 percent of pickup voltage) for more than 10 seconds (adjustable 0 to 15), the starting contacts shall close.

4.3.3.3.2. When the genset has started and obtained 90 percent of rated voltage (adjustable 85- 100 percent) on all phases and rated frequency, the load shall be transferred to the genset after 30 seconds (adjustable 2 to 120).

4.3.3.3.3. When the normal source has been restored and the voltage of all phases has been within 90 percent of rated voltage (adjustable 85-100 percent) for 15 minutes (adjustable 0 - 30), the load shall transfer to normal power.

4.3.3.3.4. The genset shall continue to run for 10 (adjustable 1 to 10) minutes before it automatically stops. The system shall now be ready for another failure cycle.

4.3.3.4.Neutral bus (ATS): The neutral bus shall be electrically isolated from the ATS enclosure and shall be rated at full capacity of the switch. There shall be sufficient terminals to accommodate the load neutral, the normal source neutral, the emergency source neutral, ground electrode conductor, and an equipment bonding jumper.

4.3.3.5.Equipment Ground Bus (ATS): The equipment ground bus shall be electrically bonded to the ATS enclosure. It shall have one terminal sized to accommodate the equipment bonding jumper, and a second terminal sized to accommodate the equipment grounding conductor.

4.3.3.6.Lugs (ATS): All cable terminations for genset (source two), load and normal (source one) power shall have tinned copper lugs sized to accept a conductor one size larger than required for the current rating.

4.3.3.7.Manual Operation (ATS): The ATS shall have a permanently mounted handle capable of operating the switch mechanism to accomplish both a transfer and retransfer of rated load.

4.3.3.8.Controls (ATS): There shall be a three position, key operated switch labeled "TEST", "NORMAL" and "RETRANSFER" located on the enclosure door.

4.3.3.8.1. Test position (ATS): In the "TEST" position the genset shall automatically start coming up to rated speed and rated voltage, but the ATS shall not transfer the load to the genset.

4.3.3.8.2. Normal position (ATS): In the "NORMAL" position the ATS functions in the completely automatic mode.

4.3.3.8.3. Retransfer position (ATS): In the "RETRANSFER" position the ATS immediately transfers the load to commercial source bypassing any preset transfer delays.

4.3.3.9.Indicators (ATS): There shall be four indicator lights, properly labeled as to function mounted on the enclosure door. Two of the indicator lights are to be labeled to show the position of the main switch. The other two indicating lights are to be labeled to show the status of the two sources.

4.3.3.10. Terminals (ATS): A terminal strip(s) for customers use, located inside the ATS enclosure, shall be provided to facilitate the interconnection between the transfer switch and the genset. There shall be a minimum of twenty terminal points available for customer use.

Three of these terminals shall be wired to each of the two sets of form C contacts from the main switch auxiliary relays; one terminal shall be wired to accept the genset battery B+; one terminal shall be wired to accept the genset battery (B-); and one terminal shall be wired to serve as the remote start signal source for the genset. The remaining terminals will be unused spares.

4.3.3.11. ATS shall match the final approved construction drawings.

4.3.3.12. ATS 4-pole: The 4-pole ATS shall have four poles and shall meet all preceding requirements for GP-ATS.

4.3.3.13. ATS mounted battery charger where required: There shall be a static battery charger mounted inside the ATS enclosure. This battery charger shall be the temperature compensated constant voltage type rated to match the battery voltage of the genset, with over-current control to limit the output current to 10 amps even when connected to a dead battery. The charger output shall be prewired to the B+ and B- terminals of the customer terminal strip.

4.3.4. PREVENTIVE MAINTENANCE SCHEDULE

4.3.4.1.The contractor shall provide the following preventative maintenance checklist for the below frequencies:

4.3.4.1.1. Weekly

4.3.4.1.2. Monthly

4.3.4.1.3. Quarterly

4.3.4.1.4. Annual

4.3.4.2.The preventive maintenance checklist shall have the below information for each frequencies mentioned above:

4.3.4.2.1. Frequency type

4.3.4.2.2. Description of the equipment

4.3.4.2.3. Asset type of equipment

4.3.4.2.4. Task Summary

4.3.4.2.5. (T)ools, (S)afety Equipment, and (M)aterials Required

4.3.4.2.6. Safety Procedures

4.3.4.2.7. Procedures

4.3.4.3. Procedure for Installing a New Automatic Transfer Switch (ATS)

4.3.4.3.1. Tighten electrical connectors and terminals according to manufacturer's published torque tightening values. If manufacturer's torque values are not indicated, use those specified in UL 486A and UL 486B.

4.3.4.3.2. Utility Power: Connect the input terminals of the ATS to the utility power source as specified in the wiring diagram.

4.3.4.3.3. Generator Power: Connect the generator input terminals to the backup generator following the manual’s instructions.

4.3.4.3.4. Load Connections: Connect the ATS output terminals to the load (distribution panel or critical circuits), ensuring all connections are secure.

4.3.4.3.5. Label Control Wires: If necessary, label each wire for easier identification during maintenance.

4.3.4.3.6. Attach Control Wires: Connect the control and monitoring wires as indicated in the installation manual. These may include generator start/stop signals, status indicators, and remote monitoring lines.

4.3.4.3.7. Secure Connections: Ensure all connections are properly tightened and insulated to prevent arcing or loose connections.

4.3.4.3.8. Proper Grounding: Ensure that the ATS is properly grounded according to NEC and local codes. Grounding helps protect equipment and personnel from electrical faults.

4.3.4.3.9. Check Grounding Connections: Confirm all grounding connections are secure and that they meet local code requirements.

4.3.4.3.10. Power-Up Sequence: Carefully re-energize the utility and generator power sources following safety procedures.

4.3.4.3.11. Conduct a Functional Test: Perform a test to verify that the ATS automatically switches between power sources as intended. Simulate a power outage to observe the switch from utility power to generator power and back.

4.3.4.3.12. Check Control Functionality: Ensure that control signals and monitoring features work correctly, such as remote start/stop functions and status indicators.

4.3.4.3.13. Inspect Connections: Double-check all connections, wiring, and fastenings.

4.3.4.3.14. Confirm Code Compliance: Ensure the installation meets NEC, OSHA, and any local code requirements.

4.3.4.3.15. Document Installation: Record all relevant details, including wiring diagrams, test results, and any unique configurations.

5. AFTER IMPLEMENTATION

5.1. After completing equipment installation, inspect unit components. Remove paint splatters and other spots, dirt, and debris. Repair damaged finish to match original finish.

5.2. Clean equipment internally, on completion of installation, according to manufacturer's written instructions.

5.3. Testing Witnessing (COR)

5.3.1. The U.S. Government (COR) shall witness this testing and provide acceptance of the results. The Contractor shall submit the detailed written result of the operational testing, and shall certify the overall result, pass, or fail.

5.3.2. With Contracting Officer’s Representative (COR) approval, the Contractor shall correct any problems discovered during the above tests and repeat the tests at no cost to the U.S. Government.

5.3.3. Re-testing of the system shall be coordinated with the COR until a passing (satisfactory) result is obtained.

5.4. Final Acceptance

5.4.1. Upon successful testing and demonstration of the completed project, the

Contractor shall submit written operation testing results, and copies of completed manufacturer’s recommended testing checklists. Embassy Contracting Officer or their representative shall then conduct the final inspection and acceptance of the project and prepare acceptance documentation.

6. PERSONNEL, TOOLS, CONSUMABLE MATERIALS AND SUPPLIES

6.1. The Contractor shall provide certified/skilled technicians with the appropriate tools and equipment for this project, safety inspection, and testing as required by this Contract. The Contractor shall provide all of the necessary materials and supplies to install, maintain, service, inspect and test all the systems.

6.2. All materials used on this work shall be new and conforming to the contract specifications as per US and local codes.

6.3. Contractor shall submit material samples and catalog for pre-approval.

6.4. All materials used on the project shall be approved by the Contracting Officer

Representative (COR) before use. Any changes/substitutes on material shall be approved by COR before proceeding.

7. SAFETY & SPECIAL INSTRUCTIONS

7.1. Contractor is responsible and shall continue management and implementation of a safety and health program throughout renovation.

7.2. The Contracting Officer and the Post Occupational Safety and Health Officer [POSHO] reserve the right to suspend work when and where Contractor's safety and health program is considered to be operating in an inadequate or non-complying manner.

7.3. Contractor shall provide all Personal Protective Equipment for the workers as per the requirement of the site.

7.4. Work will be stopped in case the proper protection equipment is not found with the workers and the lapse of time shall be at the Contractor’s expense.

7.5. Contractor will not leave the work site in an unsafe condition or any other condition that might cause injury to personnel, damage to existing work, plants, or equipment.

7.6. Contractor will use all safety gadgets e.g., hard hats, cotton, plastic gloves and goggles as required on site to avoid the accident.

7.7. Any equipment or work considered dangerous shall be immediately discontinued.

7.8. Contractor shall provide a comprehensive safety plan when biding for construction project Scope of Work that will be reviewed by the POSHO and/or APOSHO.

7.9. The contractor shall provide all required personal protective equipment (PPE) for all the workers on site and shall enforce the use of the appropriate gear for specific hazards.

7.10. The Contractor shall attend a safety briefing with the POSHO and/or APOSHO to review the contractor’s safety plan before mobilizing to execute the project.

7.11. The Contractor shall follow the BARRICADING AND FENCING safety regulations when applicable.

7.12. The Contractor shall follow the FALL PROTECTION safety regulations when applicable.

7.13. The Contractor shall follow the HAZARDOUS safety regulations when applicable.

7.14. The Contractor shall follow the HAND AND POWER TOOL SAFETY regulations when applicable.

7.15. The Contractor shall follow the SCAFFOLDING safety regulations when applicable.

7.16. The Contractor shall follow the NOISE safety regulations when applicable.

8. WARRANTY

8.1. The contractor shall guarantee that all work performed will be free from all defects in workmanship and materials.

8.2. The contract further guarantees that if, during a period of one year from the date of the certificate of completion and acceptance of the work, any such defects will be repaired by the contractor at his own cost.

9. ADMINISTRATION

9.1. Point Of Contact (Poc): The Contractor shall appoint a project manager to act on behalf of the Contractor as the (POC) for all communications between the Contractor and (COR).

9.2. Contracting Officer’s Representative (COR): The designated COR for this Task Order is the Facilities Manager (FM). All administrative matters, and request for technical clarifications and assistance regarding this Task Order shall be directed to the (FM).

9.3. Payments: Invoice shall be submitted to the (COR) upon completion of all works and after handing over to the (COR). Invoice shall include the contract number.

9.4. Termination: If, for convenience to the Embassy, any phase or task of the delivery order is deemed unfeasible by Embassy, the United States Government may at this point pay the Contractor of this project for the work done to date and terminate the remaining portion of the delivery order.

9.5. The Contractor shall NOT conduct any work that is beyond this Statement of Work (SOW) unless directed in writing by the Contracting Officer (COR). Any work done by the Contractor beyond this (SOW) without direction from the (COR) will be at the Contractor’s own risk and at no cost to the Government.

9.6. Workmanship

9.6.1. Workers working on the site shall be skilled in their job and have related job experience.

9.7. Working Hours

9.7.1. Working hours shall be 8:00 A.M. to 4:30 P.M Sunday to Thursday.

9.7.2. No work shall be done holidays without prior approval of the Contracting Officer.

9.7.3. The embassy’s current holiday schedule will be shared with the contractor once

NTP provided.

10. REQUIREMENTS AND DELIVERABLES

10.1. The Contractor must submit a list of personnel with ID type and numbers to the COR within 1 week of notice to proceed. Security clearances must be completed on all personnel prior to being granted access to the embassy commencement of work.

Security clearances may take several weeks to more than a month.

10.2. The Contractor shall inform and provide in writing transportation details (vehicle registration number, drivers name, and date of delivery) to the COR at least 24 hours in advance for material deliveries.

10.3. Contractor shall give workers names at least 5 days in advance to get the security clearance. All the workers shall have an official photo ID or photo ID with the company name on it.

10.4. A Site Visit must be completed no later than 1 week after Notice to Proceed (NTP).

10.5. The Contractor must notify the COR, in writing, within 1 week of the site visit to perform this Scope of Work.

10.6. The site visit report must outline site conditions, note discrepancies, operational condition of equipment, and related safety concerns.

10.7. Upon completion of installation and testing, the Contractor shall provide the following documentation deliverables to the COR for review and final acceptance:

10.7.1. As-built wiring diagrams in both PDF and AutoCAD (DWG) formats.

10.7.2. Manufacturer’s data sheets and test certificates for all installed equipment.

10.7.3. Commissioning and maintenance manual, including preventive maintenance schedules and recommended spare parts list.

10.8. Work reports:

10.8.1. The Contractor shall provide a summary report after the initial site visit and each week after during the duration of the contract, delivered to the COR.

10.8.1.1. The report must include verification of SOW completion, equipment/tool status for the week, any outstanding discrepancies that were not corrected under this site visit.

*** END of SOW ***

SECTION 2 - CONTRACT CLAUSES

52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS

(NOV 2023) IS INCORPORATED BY REFERENCE. (SEE SF-1449,

BLOCK 27A)

FAR 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders—Commercial Products and Commercial Services (JAN 2025)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (Dec 2023) (Section 1634 of Pub. L. 115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).

(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) ( 31 U.S.C. 3903 and 10 U.S.C. 3801).

(6) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).

(7) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108-78 ( 19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

__ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Jun 2020), with Alternate I (Nov 2021) (41 U.S.C. 4704 and 10 U.S.C. 4655).

__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov 2021) (41 U.S.C. 3509)).

__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

__ (4) 52.203-17, Contractor Employee Whistleblower Rights (Nov 2023) ( 41 U.S.C. 4712);

this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community—see FAR 3.900(a).

_X_ (5) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) (Pub. L. 109-282) ( 31 U.S.C. 6101 note).

__ (6) [Reserved].

__ (7) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

__ (8) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

https://www.acquisition.gov/far/52.203-19#FAR_52_203_19 https://www.acquisition.gov/far/52.204-23#FAR_52_204_23 https://www.acquisition.gov/far/52.204-25#FAR_52_204_25 https://www.acquisition.gov/far/52.209-10#FAR_52_209_10 https://www.acquisition.gov/far/52.232-40#FAR_52_232_40 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3903&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section3801&num=0&edition=prelim https://www.acquisition.gov/far/52.233-3#FAR_52_233_3 https://www.acquisition.gov/far/52.233-4#FAR_52_233_4 https://www.acquisition.gov/far/52.203-6#FAR_52_203_6 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section4655&num=0&edition=prelim https://www.acquisition.gov/far/52.203-13#FAR_52_203_13 https://www.acquisition.gov/far/52.203-15#FAR_52_203_15 https://www.acquisition.gov/far/52.203-17#FAR_52_203_17 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section4712&num=0&edition=prelim https://www.acquisition.gov/far/3.900#FAR_3_900 https://www.acquisition.gov/far/52.204-10#FAR_52_204_10 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section6101&num=0&edition=prelim https://www.acquisition.gov/far/52.204-14#FAR_52_204_14 https://www.acquisition.gov/far/52.204-15#FAR_52_204_15

_X_ (9) 52.204-27, Prohibition on a ByteDance Covered Application (Jun 2023) (Section 102 of Division R of Pub. L. 117-328).

__ (10) 52.204-28, Federal Acquisition Supply Chain Security Act Orders—Federal Supply Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts. (Dec 2023) ( Pub. L. 115–390, title II).

__ (11)

(i) 52.204-30, Federal Acquisition Supply Chain Security Act Orders—Prohibition. (Dec 2023) ( Pub. L. 115–390, title II).

__ (ii) Alternate I (Dec 2023) of 52.204-30.

_X_ (12) 52.209-6, Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded.

(Jan 2025) ( 31 U.S.C. 6101 note).

__ (13) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) ( 41 U.S.C. 2313).

__ (14) [Reserved].

__ (15) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Oct 2022) ( 15 U.S.C. 657a).

__ (16) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Oct 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

__ (17) [Reserved] __ (18)

(i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).

__ (ii) Alternate I (Mar 2020) of 52.219-6.

__ (19)

(i) 52.219-7, Notice of Partial Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).

__ (ii) Alternate I (Mar 2020) of 52.219-7.

__ (20) 52.219-8, Utilization of Small Business Concerns (Jan 2025)( 15 U.S.C. 637(d)(2) and (3)).

__ (21)

(i) 52.219-9, Small Business Subcontracting Plan (Jan 2025) ( 15 U.S.C. 637(d)(4)).

__ (ii) Alternate I (Nov 2016) of 52.219-9.

__ (iii) Alternate II (Nov 2016) of 52.219-9.

__ (iv) Alternate III (Jun 2020) of 52.219-9.

__ (v) Alternate IV (Jan 2025) of 52.219-9.

__ (22)

(i) 52.219-13, Notice of Set-Aside of Orders (Mar 2020) (15 U.S.C. 644(r)).

__ (ii) Alternate I (Mar 2020) of 52.219-13.

__ (23) 52.219-14, Limitations on Subcontracting (Oct 2022) (15 U.S.C. 657s).

__ (24) 52.219-16, Liquidated Damages—Subcontracting Plan (Sep 2021) (15 U.S.C. 637(d)(4)(F)(i)).

__ (25) 52.219-27, Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled Veteran-Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program (Feb 2024) (15 U.S.C. 657f).

__ (26)

(i) 52.219-28, Post award Small Business Program Representation (Jan 2025) (15 U.S.C. 632(a)(2)).

__ (ii) Alternate I (Mar 2020) of 52.219-28.

__ (27) 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (Oct 2022) (15 U.S.C. 637(m)).

https://www.acquisition.gov/far/52.204-27#FAR_52_204_27 https://www.acquisition.gov/far/52.204-28#FAR_52_204_28 https://www.govinfo.gov/link/plaw/115/public/390 https://www.acquisition.gov/far/52.204-30#FAR_52_204_30 https://www.govinfo.gov/link/plaw/115/public/390 https://www.acquisition.gov/far/52.204-30#FAR_52_204_30 https://www.acquisition.gov/far/52.209-6#FAR_52_209_6 https://www.govinfo.gov/link/uscode/31/6101 https://www.acquisition.gov/far/52.209-9#FAR_52_209_9 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section2313&num=0&edition=prelim https://www.acquisition.gov/far/52.219-3#FAR_52_219_3 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637a&num=0&edition=prelim https://www.acquisition.gov/far/52.219-4#FAR_52_219_4 https://www.acquisition.gov/far/52.219-6#FAR_52_219_6 https://www.acquisition.gov/far/52.219-6#FAR_52_219_6 https://www.acquisition.gov/far/52.219-7#FAR_52_219_7 https://www.acquisition.gov/far/52.219-7#FAR_52_219_7 https://www.acquisition.gov/far/52.219-8#FAR_52_219_8 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637&num=0&edition=prelim https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637&num=0&edition=prelim https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-13#FAR_52_219_13 https://www.acquisition.gov/far/52.219-13#FAR_52_219_13 https://www.acquisition.gov/far/52.219-14#FAR_52_219_14 https://www.acquisition.gov/far/52.219-16#FAR_52_219_16 https://www.acquisition.gov/far/52.219-27#FAR_52_219_27 https://www.acquisition.gov/far/52.219-28#FAR_52_219_28 https://www.acquisition.gov/far/52.219-28#FAR_52_219_28 https://www.acquisition.gov/far/52.219-29#FAR_52_219_29

__ (28) 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Oct 2022) (15 U.S.C. 637(m)).

__ (29) 52.219-32, Orders Issued Directly Under Small Business Reserves (Mar 2020) ( 15 U.S.C. 644(r)).

__ (30) 52.219-33, Nonmanufacturer Rule (Sep 2021) ( 15 U.S.C. 637(a)(17)).

__ (31) 52.222-3, Convict Labor (Jun 2003) (E.O.11755).

_X_ (32) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Jan 2025)( E.O. 13126).

__ (33) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

__ (34)

(i) 52.222-26, Equal Opportunity (Sep 2016) (E.O.11246).

__ (ii) Alternate I (Feb 1999) of 52.222-26.

__ (35)

(i) 52.222-35, Equal Opportunity for Veterans (Jun 2020) ( 38 U.S.C. 4212).

__ (ii) Alternate I (Jul 2014) of 52.222-35.

__ (36)

(i) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) ( 29 U.S.C. 793).

__ (ii) Alternate I (Jul 2014) of 52.222-36.

_X_ (37) 52.222-37, Employment Reports on Veterans (Jun 2020) ( 38 U.S.C. 4212).

__ (38) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).

_X_ (39)

(i) 52.222-50, Combating Trafficking in Persons (Nov 2021) (22 U.S.C. chapter 78 and E.O.

13627).

__ (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

__ (40) 52.222-54, Employment Eligibility Verification (Jan 2025) ( Executive Order 12989).

(Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in FAR 22.1803.)

__ (41)

(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) ( 42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ (42) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (May 2024) ( 42 U.S.C. 7671, et seq.).

__ (43) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (May 2024) ( 42 U.S.C. 7671, et seq.).

__ (44) 52.223-20, Aerosols (May 2024) ( 42 U.S.C. 7671, et seq.).

__ (45) 52.223-21, Foams (May 2024) ( 42 U.S.C. 7671, et seq.).

_X_ (46) 52.223-23, Sustainable Products and Services (May 2024) ( E.O. 14057, 7 U.S.C.

8102, 42 U.S.C. 6962, 42 U.S.C. 8259b, and 42 U.S.C. 7671l).

__ (47)

(i) 52.224-3 Privacy Training (Jan 2017) ( 5 U.S.C. 552 a).

__ (ii) Alternate I (Jan 2017) of 52.224-3.

__ (48)

(i) 52.225-1, Buy American-Supplies (Oct 2022) (41 U.S.C. chapter 83).

__ (ii) Alternate I (Oct 2022) of 52.225-1.

__ (49) https://www.acquisition.gov/far/52.219-30#FAR_52_219_30 https://www.acquisition.gov/far/52.219-32#FAR_52_219_32 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section644&num=0&edition=prelim https://www.acquisition.gov/far/52.219-33#FAR_52_219_33 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637&num=0&edition=prelim https://www.acquisition.gov/far/52.222-3#FAR_52_222_3 https://www.acquisition.gov/far/52.222-19#FAR_52_222_19 https://www.federalregister.gov/executive-order/13126 https://www.acquisition.gov/far/52.222-21#FAR_52_222_21 https://www.acquisition.gov/far/52.222-26#FAR_52_222_26 https://www.acquisition.gov/far/52.222-26#FAR_52_222_26 https://www.acquisition.gov/far/52.222-35#FAR_52_222_35 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://www.acquisition.gov/far/52.222-35#FAR_52_222_35 https://www.acquisition.gov/far/52.222-36#FAR_52_222_36 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title29-section793&num=0&edition=prelim https://www.acquisition.gov/far/52.222-36#FAR_52_222_36 https://www.acquisition.gov/far/52.222-37#FAR_52_222_37 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://www.acquisition.gov/far/52.222-40#FAR_52_222_40 https://www.acquisition.gov/far/52.222-50#FAR_52_222_50 https://www.acquisition.gov/far/52.222-50#FAR_52_222_50 https://www.acquisition.gov/far/52.222-54#FAR_52_222_54 https://www.federalregister.gov/executive-order/12989 https://www.acquisition.gov/far/22.1803#FAR_22_1803 https://www.acquisition.gov/far/52.223-9#FAR_52_223_9 https://www.acquisition.gov/far/52.223-9#FAR_52_223_9 https://www.acquisition.gov/far/52.223-11#FAR_52_223_11 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.223-12#FAR_52_223_12 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.223-20#FAR_52_223_20 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.223-21#FAR_52_223_21 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.223-23#FAR_52_223_23 https://www.federalregister.gov/executive-order/14057 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title7-section8102&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title7-section8102&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section6962&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section8259&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.224-3#FAR_52_224_3 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title5-section552&num=0&edition=prelim https://www.acquisition.gov/far/52.224-3#FAR_52_224_3 https://www.acquisition.gov/far/52.225-1#FAR_52_225_1 https://www.acquisition.gov/far/52.225-1#FAR_52_225_1

(i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (NOV 2023) ( 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, 19 U.S.C.

chapter 29 (sections 4501-4732), Public Law 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.

__ (ii) Alternate I [Reserved].

__ (iii) Alternate II (Jan 2025) of 52.225-3.

__ (iv) Alternate III (Feb 2024) of 52.225-3.

__ (v) Alternate IV (Oct 2022) of 52.225-3.

__ (50) 52.225-5, Trade Agreements (NOV 2023) ( 19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

_X_ (51) 52.225-13, Restrictions on Certain Foreign Purchases (Feb 2021) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

__ (52) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. Subtitle A, Part V, Subpart G Note).

__ (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).

__ (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).

_X_ (55) 52.226-8, Encouraging Contractor Policies to Ban Text Messaging While Driving (May 2024) ( E.O. 13513).

__ (56) 52.229-12, Tax on Certain Foreign Procurements (Feb 2021).

_X_ (57) 52.232-29, Terms for Financing of Purchases of Commercial Products and Commercial Services (Nov 2021) (41 U.S.C. 4505, 10 U.S.C. 3805).

__ (58) 52.232-30, Installment Payments for Commercial Products and Commercial Services (Nov 2021) (41 U.S.C. 4505, 10 U.S.C. 3805).

X__ (59) 52.232-33, Payment by Electronic Funds Transfer-System for Award Management (Oct2018) ( 31 U.S.C. 3332).

__ (60) 52.232-34, Payment by Electronic Funds Transfer-Other than System for Award Management (Jul 2013) (31 U.S.C. 3332).

__ (61) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C. 3332).

__ (62) 52.239-1, Privacy or Security Safeguards (Aug 1996) ( 5 U.S.C. 552a).

_X_ (63) 52.240-1, Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act-Covered Foreign Entities (Nov 2024) (Sections 1821-1826, Pub. L. 118-31, 41 U.S.C. 3901 note prec.).

__ (64) 52.242-5, Payments to Small Business Subcontractors (Jan 2017) (15 U.S.C. 637(d)(13)).

__ (65)

(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Nov 2021) ( 46…