QUESTIONS FROM PROSPECTIVE VENDORS.pdf
PDF 170 KB Posted
- Attached to
- Installation of Cummins NG Generator at CGR
- Solicitation number
- 19CA7025Q0004
- Issued by
-
Department of State
About this file
This document contains questions and answers from a pre-proposal site visit for a Request for Quotation (RFQ 19CA7025Q0004) for the Installation of Cummins NG Generator at CGR, conducted on June 13, 2025. The document addresses three specific vendor inquiries regarding the project: generator placement location (at the back of the garage), basement room wall thickness (approximately 12" thick), and removal of existing Tesla Walls and Solar Panel equipment (to be removed by contractors). The site visit was originally scheduled for June 5, 2025, and the document provides critical logistical details for potential vendors preparing to submit a quotation for the generator installation project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ No. 19CA7025Q0004 - Installation of Cummins NG Generator at CGR.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS FROM PROSPECTIVE VENDORS (RFQ: 19CA7025Q0004)
Pre-proposal Site Visit: June 5, 2025
Project: Installation of Cummins NG Generator at CGR
Date: June 13, 2025
1. What would be the Generator placement location?
Answer: Generator placement location will be at back of the garage.
2. How thick is the wall of the basement room (for wiring purposes).
Answer: It is about 12” thick
3. Will the Tesla wall stay or removed? If removed, will the contractor have to remove it?
Answer: The Tesla Walls and Solar Panel equipment will be removed by contractors.