RFP 19AQMM20R0064-0001 for M&E Services.pdf

PDF 244 KB Posted

Attached to
Monitoring and Evaluation (M&E) Services
Solicitation number
19AQMM20R0064
Issued by

About this file

This is a solicitation for monitoring and evaluation services to support the Bureau of International Narcotics and Law Enforcement Affairs and Office of Western Hemisphere Programs at the Department of State. Key details include:

  • The contractor shall provide a team of performance management experts based in Washington D.C. to develop performance measures, oversee personnel at overseas posts, and ensure reporting cycles and analytical reports.

  • In-country support is required in 18 locations in North America, Central America, South America, and the Caribbean to develop indicators, collect and manage data, and report on standardized strategic measures.

  • Data management support includes designing data collection tools, maintaining the data system, cleaning and entering data, and producing reports and visualizations. At least one specialist must be on-site.

  • Sustainability efforts include transitioning knowledge, systems and activities to State Department staff by contract end through training, manuals and mentoring.

  • The solicitation outlines objectives, deliverables, and requirements for key personnel positions including a program manager, deputy, M&E specialists, data management leads and an editor. Offerors must propose costs for the work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE RATING

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

02/10/2020

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

LMAQMCODE

OFFICE OF ACQUISITION MANAGEMENT

(A/LM/AQM)

PO BOX 9115, ROSSLYN STATION

US DEPARTMENT OF STATE

ARLINGTON, VA 22219

Stephanie Reid-Smith

NAME

TEL.

Reid-SmithSJ@state.gov

EMAIL

6. ISSUED BY CODE7. ADMINISTERED BY (If other than Item 6)

9A. AMENDMENT OF SOLICITATION NO.

19AQMM20R0064

CONTACT DUNS

CODE FACILITY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, country, state and ZIP Code) (X)

X 9B. DATED (SEE ITEM 11)

01/02/2020

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X XThe above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended, Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning ____copies of the amendment;(b)By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.____X

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to: (1) Extend the receipt of Offeror's proposals due date to: Friday, 28 February 2020 / 9:00 a.m. (EST); (2) Incorporate Responses to Vendor Solicitation Questions; (3) Amend the Travel and ODC CLINs to reflect the not-to-exceed amounts; and (4) Amend Statement of Work Section, Referenced Clause, Provisions L-002, M-007 and M-008 and Past Performance Questionnaire, in response to vendor questions. All other terms and conditions referenced this solicitation and associated amendments remain unchanged and in full effect.

NOTE: This amended solicitation reflects "print changes only" and not the entire original solicitation.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Stephanie Reid-Smith

(Signature of person authorized to sign)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED

By (Signature of Contracting Officer)

16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

02/13/2020

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

19AQMM20R0064

Table of Contents

Section Description Page Number

B Supplies or Services and Prices/Costs C Descriptions/Specifications/Statement of Work

SECTION C STATEMENT OF WORK

SECTION C STATEMENT OF WORK

I Contract Clauses 52.232-7 Payments under Time-and-Materials and Labor Hour Contracts (Aug 2012) 52.243-3 Changes-Time-and-Material or Labor-Hours (Sept 2000) 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders--Commercial Items (Oct 2019)

L Instructions, Conditions, and Notices to Offerors and Respondents

L-002 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS

L-002 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS...58

M Evaluation Factors for Award

M-007 TECHNICAL EVALUATION FACTORS

M-008 APPENDIX ONE - LABOR RATES TABLES

M-008 APPENDIX ONE - LABOR RATES TABLES

M-010 APPENDIX THREE - PAST PERFORMANCE QUESTIONNAIRE

M-010 APPENDIX THREE - PAST PERFORMANCE QUESTIONNAIRE

002 TRAVEL: As outlined in the Statement of Work, NOT-TO-EXCEED $120,000.00 per year

1.00 0.00

1.00 LT

Type of Contract Pricing:

Doc Ref No:

Delivery Date FOB:

003 OTHER DIRECT COSTS (ODCs): As outlined in the Statement of Work, NOT-TO-EXCEED $100,000.00 per year

1.00 0.00

1.00 LT

Type of Contract Pricing:

Doc Ref No:

Delivery Date FOB:

1002 OPTION YEAR ONE 1.00

0.00

1.00 LT

TRAVEL: As outlined in the Statement of Work, NOT-TO-EXCEED $120,000.00 per year

Type of Contract Pricing:

Doc Ref No:

Delivery Date FOB:

1003 OPTION YEAR ONE 1.00

0.00

1.00 LT

OTHER DIRECT COSTS (ODCs): As outlined in the Statement of Work, NOT-TO-EXCEED $100,000.00 per year

Type of Contract Pricing:

Doc Ref No:

Delivery Date FOB:

2002 OPTION YEAR TWO 1.00

0.00

1.00 LT

TRAVEL: As outlined in the Statement of Work, NOT-TO-EXCEED $120,000.00, per year

Type of Contract Pricing:

Doc Ref No:

Delivery Date FOB:

2003 OPTION YEAR TWO 1.00

0.00

1.00 LT

OTHER DIRECT COSTS (ODCs): As outlined in the Statement of Work, NOT-TO-EXCEED $100,000.00 per year

Type of Contract Pricing:

Doc Ref No:

Delivery Date FOB:

3002 OPTION YEAR THREE 1.00

0.00

1.00 LT

TRAVEL: As outlined in the Statement of Work, NOT-TO-EXCEED $120,000.00, per year

Type of Contract Pricing:

Doc Ref No:

Delivery Date FOB:

3003 OPTION YEAR THREE 1.00

0.00

19AQMM20R0064

Line Item Summary

Solicitation Number:

19AQMM20R0064

Contract Number: Title: INL/WHP Monitoring and Evaluation (M&E) Services

Date of Solicitation:

02/10/2020

Line Item No. Description Quantity Unit Unit Price Total Cost

1.00 LT

OTHER DIRECT COSTS (ODCs): As outlined in the Statement of Work, NOT-TO-EXCEED $100,000.00 per year

Type of Contract Pricing:

Doc Ref No:

Delivery Date FOB:

4002 OPTION YEAR FOUR 1.00

0.00

1.00 LT

TRAVEL: As outlined in the Statement of Work, NOT-TO-EXCEED $120,000.00, per year

Type of Contract Pricing:

Doc Ref No:

Delivery Date FOB:

4003 OPTION YEAR FOUR 1.00

0.00

1.00 LT

OTHER DIRECT COSTS (ODCs): As outlined in the Statement of Work, NOT-TO-EXCEED $100,000.00 per year

Type of Contract Pricing:

Doc Ref No:

Delivery Date FOB:

19AQMM20R0064

Line Item Summary

Solicitation Number:

19AQMM20R0064

Contract Number: Title: INL/WHP Monitoring and Evaluation (M&E) Services

Date of Solicitation:

02/10/2020

Line Item No. Description Quantity Unit Unit Price Total Cost

Section C- Descriptions/Specifications/Statement of Work

Clause SECTION C STATEMENT OF WORK was deleted or updated.

SECTION C STATEMENT OF WORK

STATEMENT OF WORK

FOR

Performance Measurement, Management and Analysis Support

INTRODUCTION:

The Bureau of International Narcotics and Law Enforcement Affairs (INL) is part of the Department of State’s (DOS) multi-faceted response to transnational crime. Dedicated to strengthening criminal justice systems, impeding the movement of illegal narcotics, ad-dressing corruption, and building capacity to counter many types of transnational crime, INL’s Office of Western Hemisphere Pro-grams (INL/WHP) plays a key role in leading the development and synchronization of U.S. foreign assistance in the region. INL/ WHP’s support is tailored to bolster the capacity of partner countries through regional and country-specific programs. Monitoring and evaluating (M&E) foreign assistance programs is imperative to the efficient administration of effective assistance and accountable re-porting to Congress and others in the oversight community.

INL/WHP recognizes the importance of and need for consistent and high-quality M&E of programs and is dedicated to the creation of effective performance indicators, processes, procedures, data management, and analytical reporting.

In 2017, INL/WHP procured an M&E contract that piloted new measure development. This project developed standardized strategic-level indicators that were collectable across the hemisphere, designed data collection templates and databases to centrally store the data, and produced an annual report. This contract will maintain and build on the progress made under the initial pilot while expand-ing the processes to develop additional strategic performance measures for use across the hemisphere, measures for implementing mechanisms, as well as produce country and region-specific reporting.

INL/WHP has reserved funds to support M&E of INL/WHP programs through the development of new indicators, the improvement of existing indicators, the development and maintenance of a data management system (such as Microsoft Excel or SharePoint), and the analysis and reporting of the progress and impact of INL/WHP programs, all of which must meet State Department technical and security requirements.

SCOPE OF WORK:

INL/WHP requires the services of an M&E contractor to develop M&E policies and procedures; create realistic and feasible perform-ance measures; support, manage, and conduct data collection efforts across the hemisphere; and develop and maintain an M&E data management, analysis, and reporting system and Standard Operating Procedures (SOPs).

NOTE: Data management and reporting tool shall be an off-the-shelf software; whose costs will not be associated with this con-tract. There are currently multiple tools. The contractor may be required to use one of the existing tools or use off-the-shelf existing systems to develop a new tool.

This contract will help INL/WHP comply with the Foreign Aid Transparency and Accountability Act of 2016 (FATAA), which codi-fies reporting on the performance of U. S. foreign assistance and its contribution to the policies and priorities undertaken by the Feder-al Government.

There are four (4) components of this contract:

Washington D.C.-Based M&E Support – The contractor shall furnish a team of performance management experts who will support INL/WHP in developing performance measures for INL/WHP programs and projects. This team shall be based in the Washington D.

C. metro area. This team will thoroughly define each performance measure, for example, through Performance Management Defini-tion Forms (PMDFs) and Variable Definition Forms (VDFs), which explain each measure and serve as a record of data collection methodology. This team will oversee the personnel located at various overseas posts as defined later in this solicitation and herein-after referred to as “in-country M&E Specialists,” prevent duplication of effort, establish and manage reporting cycles, and develop analytical reports for INL/WHP use. As required, this team may also deploy to develop performance measures in conjunction with the in-country M&E Specialists, develop Data Collection Tools (DCTs), and collect data from third party sources with prior written ap-proval of the Contracting Officer Representative (COR). These activities may also include creation of surveys, data comparisons, stat-istical analysis, or interviews. At the end of the contract, these M&E Specialists will be responsible for ensuring the transfer of all in-formation, SOPs, and data to D. C.-based INL/WHP employees and systems.

In-Country M&E Support - This contract shall require support for Posts within the Western Hemisphere with INL/WHP program-ming, as enumerated in the Personnel section of this solicitation. This support shall include developing strategic and project level in-dicators, collecting and managing both project and country-level data and will contribute to reporting against standardized strategic-level indicators across the Western Hemisphere. This shall include researching and partnering with other entities that are pursuing M&E efforts, requesting data from host governments, conducting open source research, and performing light data entry. These activ-ities may also include creation of surveys, semi-experimental comparisons, statistical analysis, and interviews. At the end of the con-tact, these M&E Specialists will be responsible for ensuring the transfer of all information, SOPs, and data to INL-designated in-country officers and INL/WHP.

Data Management Support – The contractor shall provide D. C.-based Data Management Specialist(s) who will design data collec-tion tools and support the development and maintenance of INL/WHP’s data management system. The Data Management Special-ist(s) will also assist in designing DCTs, including for implementers, support the M&E Specialists to enforce reporting cycles, clean and enter data, and produce analytical reports and data visualizations for INL/WHP use. At least one Data Management Specialist must be based on-site with access to all allowable INL systems, ensuring the data under the purview of this contract is always access-ible to stakeholders. The contractor may be required to conduct a significant amount of data entry. The Data Management Special-ist(s) shall provide instruction manuals and quick-guides for all templates, data management processes, and reporting activities to en-sure the complete and easy transfer of information from the contractor to INL/WHP-designated staff prior to the end of the contract.

Sustainability, Transition, Technical Assistance, and Training – The contractor shall train and provide technical assistance upon request to key stakeholders on the reporting process and templates as required by INL/WHP and/or Posts. The contractor shall per-form all activities to ensure program officers in Washington D. C. and Post are able to effectively access and use data stored in the commercially available system managed by the Data Management Specialists. Before the end of the contract, the contractor shall per-form all activities to ensure the successful transition of all indicators, data collection, data management, analysis, and reporting know-ledge, systems, processes, and activities to staff in INL/WHP and INL Sections overseas. While the process of ensuring sustainability and transition will take place throughout the contract, the contractor shall be responsible for completing training and mentoring for INL/WHP-designated staff prior to the end of the contract on the data measures, data collection methods, and use of the M&E system.

The individual schedule of these trainings will be determined by INL/WHP.

BUSINESS LICENSES:

The Contractor or sub-contractor shall have all appropriate business licenses to work in the country(ies) as outlined in the Solicitation.

Contractor shall submit with their technical proposal proof of business licenses or present a detailed plan as to how he/she will obtain business licenses prior to the required period of performance. Failure to provide proof of business licenses or a detailed plan will res-ult in a non-responsive to Solicitation. For this requirement, business license is required where key personnel are based and perform-ing core duties. The following locations are applicable:

North America (2):

United States Mexico

Central America (6):

Guatemala

El Salvador Honduras Belize Panama Costa Rica

South America (3):

Colombia Peru Ecuador

Caribbean (7):

Jamaica Barbados Bahamas Haiti Dominican Republic Trinidad & Tobago Guyana

OBJECTIVES:

Objective 1: Support the Creation of Effective Implementer Reporting – INL/WHP endeavors to design, monitor, and evaluate foreign assistance projects implemented by a wide range of partners that use a logical framework, customized DCTs, and standardized measures. INL/WHP is exploring the use of a standardized training output and outcome tracking system, standardized feedback sur-veys, and other M&E tools. Through this contract both in-country and DC-based M&E Specialists will become experts in these pro-cesses and assist INL/WHP to ensure that all M&E projects are designed, monitored, and evaluated in accordance with INL/WHP re-quirements.

Activity 1.1: Training and Technical Assistance – Upon request, new implementing partners or INL staff may require training and technical assistance on these new M&E processes. Both in-country and DC-based M&E Specialists may be called upon to conduct these training and technical assistance sessions.

Activity 1.2: Compliance Reviews – Both in-country and DC-based M&E Specialists will review INL implementing agreement work plans, DCTs, and completed progress reports to ensure compliance with INL/WHP requirements. This may include suggesting new or standard measures, assisting in the building of the DCT, providing significant recommendations for edits to the logical frame-work/activity map, or working with implementers to ensure compliance with INL/WHP requirements.

Activity 1.3: Manage the Implementing Partner Reporting Cycle – Once implementing agreements are incorporated in to the new INL/WHP M&E reporting structure, in-country and DC-based M&E Specialists will closely track the reporting. This will include pre-paring DCTs, notifying implementers of due dates, following up on late reporting, ensuring all reports are saved in a centralized, searchable location, and coordinating with posts and program officers to ensure the reports meet INL/WHP requirements and needs.

Upon request, contractor will ensure data is transferred and/or submitted in a data management system.

Objective 2: Identify and develop indicators that support strategic programmatic decision making - To make informed pro-grammatic decisions, INL/WHP program officers, senior leaders, and other stakeholders shall be equipped with information regarding how their programs are contributing towards the success of INL/WHP’s strategic goals as well as country-specific goals. The con-tractor shall work in conjunction with INL/WHP to identify indicators linked to INL/WHP’s Strategic Goals and INL country plans that are informative, specific, measurable, achievable, realistic, results-based, collectable, and time-bound. This will include indicat-ors that relate to INL/WHP’s Strategic Framework, INL Country Plans, reporting requirements, as well as ad hoc requests. All key personnel will meet with the COR monthly to ensure measures are being developed in accordance to INL/WHP guidance.

Activity 2.1: Development of INL Country Plan Measures: The contractor will develop indicators and performance measures for each INL country plan under their purview that directly link, to the extent possible, to current measures under collection. The con-tractor will review country plans and provide recommendations to ensure clear objectives to enable the identification of clearly defined indicators of success. The contractor will identify and define measures that correspond to each indicator, conduct a Data Feas-ibility Assessment (DFA) to determine collectability of those measures and, once deemed collectable, will provide INL/WHP with each measure’s scope, definition, and methodology recorded in a VDF and PMDF. All proposed indicators will be approved by the

COR and the respective INL/WHP program team before they are implemented. D.C. and field M&E Specialists will work together to ensure standardization across the hemisphere of these INL Country Plan indicators.

Activity 2.2: Development of Hemispheric Strategic Measures: Contractor will identify and define strategic hemisphere-wide measures as requested by INL/WHP. Once the measures are identified, the contractor will conduct a DFA to determine collectability of those measures. Once deemed collectable and approved, each measure’s scope, definition, and methodology must be recorded in a VDF and PMDF. All proposed indicators will be approved by the COR before they are implemented. D.C. and field M&E Specialists will work together across countries to ensure standardization of these indicators. This also includes the development of required meas-ures and other ad hoc measure development requests.

Activity 2.3: Data Collection and Analysis: Contractor will collect, manage, and oversee the data reporting for all strategic and Country Plan measures, ensure all data is collected using INL/WHP-approved data collection tools, validate and clean all data, and en-sure it is stored in a centralized, searchable data management platform. This may include consolidating data from previous reporting periods and providing analysis to INL/WHP upon request.

(Optional) Activity 2.4: Partner National Capability Assessment Checklist: Upon request, the contractor may support INL/ WHP’s administration of a Partner National Capability Assessment Checklist. This may include refining checklists, facilitating admin-istration, and collecting and displaying the information.

Objective 3: Store, display, and report performance data - The contractor shall ensure that all required performance data is effect-ively collected, stored, and displayed in a way that facilitates data-driven decision making, analysis, and data calls.

Activity 3.1: Region-Specific Measure Pages: The contractor will build measure pages in the INL/WHP data management system that accurately depict and display all data collected under the contract from a region-wide perspective. The contractor will ensure the data is stored and accessible to INL/WHP stakeholders at all times and will perform data inquires, analysis, and retrievals upon re-quest.

Activity 3.2: Country-Specific Measure Pages: The contractor will build measure pages in the INL/WHP data management system that accurately depict and display all data collected under the contract from a country-specific perspective. The contractor will ensure the data is stored and accessible to INL/WHP stakeholders at all times and will perform data inquires, analysis, and retrievals upon re-quest.

Activity 3.3: Report Specific Measure Pages: The contractor will build measure pages in the INL/WHP data management system that accurately depict and display all data collected under the contract that corresponds to INL/WHP required reports. The contractor will ensure the data is stored and accessible to INL/WHP stakeholders at all times and will perform data inquires, analysis, and retriev-als upon request.

Activity 3.4: Systematic Data Updates: The contractor ensure the INL/WHP data management system is constantly updated with the most recent annual and quarterly data available.

Activity 3.5: Additional Reporting Requirements and Ad Hoc Requests: Upon request the contractor may be involved in the col-lection and reporting of Department reporting requirements. These measures may or may not have PMDFs, VDFs, and DCTs associ-ated with them. M&E Specialists will collect and report these measures in accordance with post or INL/WHP guidelines. The con-tractor shall make use of previously developed INL/WHP indicators (both scheduled routine reports and ad hoc or situational reports) and assist in designing reporting and dashboard structures, timelines, and data visualizations to ensure decision-makers are provided with easy to understand and up-to-date information upon request.

Objective 4: Support the Institutionalization of Effective Performance Management - The contractor shall ensure that all measure development, collection, and reporting processes are institutionalized at all posts in the Western Hemisphere.

Activity 4.1: Training Development: When required, the contractor will develop training curriculum, tools, guides, and manuals that encompass all measure development, collection, and reporting aspects under the preview of this contract.

Activity 4.2: Training and Technical Assistance: When required, the contractor will conduct trainings and technical assistance to ensure all required stakeholders understand all monitoring and evaluation processes under the purview of this contract, can effectively report required data, and can fully utilize collected data.

DELIVERABLES:

1. Strategic and Country Plan Measure Deliverables

Deliverable 1.1: Measure Clearance Packages: For each thematic group of measures the contractor will conduct a DFA in order to determine the collectability and applicability of variables and measures. This DFA will serve as a tool INL/WHP can use to either ap-prove or disapprove the development of the measures identified by the contractor and must quantify the collectability and applicability of each measure and individual variable. In addition, this package will include VDFs for each variable and PMDFs for each measure.

All strategic and country plan measures must complete this process.

Deliverable 1.2: Data Management System Measure Pages – All data collected under this contract must be stored and visualized on INL/WHP’s iResults system. This will include all region-wide, country-specific, and required reporting pages.

(Optional) Deliverable 1.3: Partner Nation Capability Checklist Reports – Upon request the contractor may be asked to prepare an annual report after each Capability Checklist administration. This report will offer stakeholders an overall view of the health of INL-specified program areas in each country, any trends occurring in specific regions or countries, as well as identifying any areas for concerns. These reports will include data visualizations, narrative, and analysis in addition to collected data.

2. Implementing Mechanism Related Deliverables

Deliverable 2.1: Data Collection Templates (DCT) – The contractor shall prepare, upon request, DCTs. This process may include advising on activity map or performance measure development as well as the formatting of DCTs.

Deliverable 2.2: Implementer Data Collection Tracker – The contractor shall create and maintain a tracker to indicate the status of all reporting that aligns with the new INL/WHP format. This tracker must always be accessible to INL staff and may also include the ability to track targets and results.

3. Presentation, Training, and Sustainability Related Deliverables

Deliverable 3.1: Annual Training – Contractor, in conjunction with INL/WHP, will organize and host an annual week-long M&E training for all M&E staff to ensure all key personnel stay up to date on INL/WHP requirements. Most of this training will be de-signed and delivered by the contractor. If new key personnel are hired during the life of the contract the contractor will be responsible for organizing and delivering ad hoc training. Trainings may be held CONUS or OCONUS.

Deliverable 3.2: Briefing and Training Material – As needed, the contractor shall brief INL/WHP, Posts, and INL Partners, as ap-propriate, on the progress and findings of the WHP performance measures and indicators. When requested, the contractor shall design and deliver technical assistance to Posts and INL/WHP program officers on the use of the data management system. This may include distance learning videos, a user manual, and quick guides. The contractor may also be asked to produce tools to enable program of-ficers at Post and in INL/WHP learn and understand the performance management process from inception to collection to analysis.

To support training and technical assistance, the contractor may be required to develop user guides, SOPs, slide decks, or other re-quired materials.

Deliverable 3.3: Weekly Reports – Contractor will provide COR with weekly progress reports tracking project implementation and success, as well as any challenges and how those are being addressed.

Deliverable 3.4: Tasking Tracker – Contractor will design and update a weekly tracker that summarizes the key tasks and deadlines of all key personnel.

Deliverable 3.5: Measure Tracker – Contractor will design and update a weekly tracker that summarizes the status of all measures by country.

Deliverable 3.5: Written Transition Plan – Four months before the end of the contract, the contractor shall provide, as a deliverable, recommendations for activities i.e. training, mentoring, development of manuals, and other support) necessary to ensure a seamless transfer of the effort to INL/WHP and Posts.

Deliverable 3.6: Work Plan – Within the first sixty days of the contract, contractor shall provide a comprehensive work plan detail-ing how all deliverables will be met.

Deliverable 3.7: Performance Indicators – Contractor will provide COR with regular updated on all performance indicators enumer-ated in the M&E Section of the Statement of Work (SOW).

WORKPLAN:

The offeror shall describe in the proposal how the offeror intends to accomplish the goals of this solicitation. The successful contract-or shall submit a work plan to INL/WHP, similar to the example below, as a deliverable, within 30 days after contract award. INL/ WHP will then have 30 days to review and comment on the work plan before it is finalized and accepted by the COR.

The work plan may be amended by mutual agreement by the offeror and INL/WHP during the period of performance of the contract.

NOTIONAL DELIVERABLES SCHEDULE:

Deliverable Suggested Due Date Transition kick-off meeting from previous contract Within the first seven (7) business days after award Work Plan The first business day of the following week sixty (60) days after award Weekly reports By the first business day of the following week Tasking Tracker Updated by the first day of the following week Measure Tracker Updated by the first day of the following week Implementer reporting Tracker Within 30 days of start of the contract and then updated weekly Measure Clearance Packages Continuous Data Management System Measure Pages Continuous Implementing Mechanism DCTs Continuous Data management System Pages Continuous Performance Indicator Report Quarterly Implementer DCTs Quarterly Additional briefing or reporting materials Upon Request Training and Briefing Materials Upon request Partner Nation Capability Checklist Report Upon Request Written Transition plan Three (3) months before the end of the contract

KICK-OFF MEETING:

The Contractor shall attend a Kick-Off meeting with the Contracting Officer, the COR and other agency staff, as required. The date and time will be determined by the Contracting Officer and Offeror selected for contract award. The Kick-Off meeting shall be held at an INL office location in Washington, D.C. The Government does not cover travel cost of the kick-off meeting.

TARGET POPULATION AND RELATIONSHIPS:

The main consumer of the indicators design, information derived from the indicators, and analytical products will be INL/WHP and Posts.

The contractor shall be responsible for project assessment, design, development, implementation, and evaluation. The D.C.-based Program Manager (PM) and M&E Specialist(s) shall report to the INL/WHP M&E Coordinator and COR. The in-country M&E Spe-cialists shall coordinate directly to the designated M&E Coordinator at Post as well as the functional D.C.-based contractor employees and PM. Other Contractor personnel, if any, engaged to support the program requirements shall report to the PM and M&E Special-ist(s), unless otherwise requested by INL/WHP. Activity design and budget information shall be made available to INL/WHP upon request.

MONITORING AND EVALUATION:

The contractor shall use systematic monitoring and evaluation methodology.

The contractor shall:

• Participate in weekly progress meetings and provide regular updates on taskings and measure development.

• The DC-based team shall meet with the INL/WHP M&E Coordinator and COR at a pre-determined time to provide updates on program activities and outcomes, as well as opportunities and/or obstacles that need to be addressed by INL/WHP. Contractor will also provide the COR with a tasking tracker and measure development tracker, updated weekly, to ensure COR has oversight of the activities of all key personnel and measure status by country.

Report on Performance Indicators

The contractor will collect and report on all indicators indicated below in a quarterly report. Contractor may change some of the measures upon agreement with COR based on applicability and/or collectability.

Objective 1: Support the Creation of Effective Implementer Reporting

1.1 Percent of implementing mechanisms with activity map

1.2 Percent of implementing mechanisms reporting in DCT

1.3 Percent of agreements reported on time in new system

Objective 2: Identify and develop indicators that support strategic programmatic decision making

2.1 Percent of respondents satisfied with the quality of strategic and country plan measures

2.2 Percent of country plan goals, objectives, and sub-objectives that have performance measures

2.3 Percent of measures assigned to contractor that have been developed

2.4 Number of measures being collected disaggregated by country

2.5 Percent of respondents satisfied with the results of the Partner Nation Capability Checklist (optional)

Objective 3: Store, display, and report performance data

3.1 Percent of respondents satisfied with data management system

3.2 Percent of completed measure data available to stakeholders

Objective 4: Support the Institutionalization of Effective Performance Management

4.1 Percent of tasks completed by deadline

4.2 Percent of identified stakeholders trained prior to end of contract

The recipient may propose additional outputs, indicators, and/or targets as appropriate.

LIMTED USE OF DATA:

Performance of this effort may require the Contractor to access and use data and information proprietary to a government agency or government contractor which is of such a nature that its dissemination or use, other than in performance of this effort, would be ad-verse to the interests of the Government and/or others.

Contractor and/or Contractor personnel shall not divulge or release data or information developed or obtained in performance of this effort, until made public by the Government, except to Authorized Government Personnel or upon written approval of the Con-tracting Officer. The Contractor shall not use, disclose, or reproduce proprietary data that bears a restrictive legend, other than as re-quired in the performance of this effort. Nothing herein shall preclude the use of any data independently acquired by the Contractor without such limitations or prohibit an agreement at no cost to the Government between the Contractor and the data owner which provides for greater rights to the Contractor.

Any work products and/or artifacts created or produced in the performance of, or delivered under, this contract shall become the prop-erty of the Department of State. This includes, but is not limited to, source code, algorithms, processes, formulas, flow charts, and other deliverables that have been generated by the Contractor.

GENERAL:

Travel:

a) Travel under this contract is defined as Contractor air and ground transportation, lodging, meals and incidental expenses, and pass-port/visa costs.

b) Except as otherwise provided herein, the offeror shall be paid allowable travel costs in accordance with FAR 31.205-46 (Travel Costs).

c) Travel costs are authorized for travel beyond a 50-miles’ radius of the offeror employee’s local place of performance (official duty station) whenever work is required to be accomplished at a remote work site.

d) Local travel shall be processed as follows:

1. If the Government requires a offeror employee to work an entire normal work day at a site other than the employee’s local place of performance (official duty station) and the radius between the two locations is within 50 miles, travel costs are generally allowable, but only for any difference in costs between the employee’s normal daily commuting expense and commuting expense resulting from the most economical means of transportation available to the employee after considering: any physical or medical needs of the em-ployee; and mission requirements. Payment for time associated with such travel is unallowable.

2. If the Government requires a offeror employee to work part of a normal work day at a site other than the offeror employee’s local place of performance (official duty station) and the radius between the two locations is within 50 miles, all travel costs are generally allowable, but only for those costs resulting from the most economical means of transportation available to the employee after consid-ering: any physical or medical needs of the employee; and mission requirements. For this section, “part of a normal work day” is one in which the employee arrives at the start of his normal work day to his local place of performance (official duty station) and departs at the end of his normal work day from his local place of performance (official duty station). An example is an employee having to at-tend a meeting at a Department of State site in the middle of the workday. Payment for time associated with such travel is generally allowable if such time is counted as part of the employee’s normal workday.

3. If the Government requires a offeror employee to work part of a normal work day at a site other than the employee’s local place of performance (official duty station) and the radius between the two locations is within 50 miles, travel costs are generally allowable, but only for any difference in costs between the employee’s normal daily commuting expense and commuting expense resulting from the most economical means of transportation available to the employee, after considering: any physical or medical needs of the em-ployee; and mission requirements. For this section, “part of a normal workday” is only one of the following:

a. one in which the employee arrives at the start of his normal workday to his local place of performance (official duty station); or

b. one in which the employee departs at the end of his normal workday from his local place of performance (official duty station).

An example is an employee having to attend an all-morning local meeting and returning afterwards to his local place of performance (official duty station). Payment for time associated with going from the employee’s local place of performance (official duty station) to a site other than the employee’s local place of performance (official duty station) is generally allowable as long as such time is counted as part of the employee’s normal workday. Payment for time associated with returning from a site other than the employee’s local place of performance (official duty station) to the employee’s local place of performance (official duty station) is generally al-lowable as long as such time is counted as part of the employee’s normal workday.

e) No travel costs (or associated labor time during travel) shall be allowable for regular commuting or telecommuting beyond (or within) a 50-miles’ radius of the offeror’s local place of performance (official duty station).

f) Costs when using a privately-owned vehicle (POV) for official travel are allowable provided that such costs do not exceed costs that would have resulted from use of other reasonable transportation methods (e.g., taxi, airplane, train). Reasonable associated costs, such as tolls and parking fees, are generally allowable. POV travel must be approved by the COR, in writing, in advance.

g) When traveling in a POV for official travel, the offeror shall be paid mileage costs at a rate that does not exceed the POV mileage rate established by the Internal Revenue Service.

h) Costs for car rentals for official travel are allowable pursuant to the following:

1. such rentals are consistent with good business practice;

2. such costs do not exceed costs that would have resulted from use of other reasonable transportation methods (e.g., taxi, airplane, train); and

3. costs do not exceed the actual cost of renting a compact automobile (maximum of one automobile for four offeror personnel), unless extenuating circumstances (e.g., excess baggage) require other arrangements and Contracting Officer approval is obtained.

Reasonable associated costs, such as tolls and parking fees, are generally allowable.

i) The Government will pay the offeror, under the applicable labor category CLIN(s), for each offeror employee’s travel time to or from authorized work locations if the following are met:

1. Payment of travel time described herein is in accordance with the offeror’s established travel policy.

2. Travel time begins no earlier than two (2) hours prior to the scheduled departure time and concludes upon arrival to the initial destination point (e.g., airport) at the place of performance.

3. The Government will not pay for an offeror employee’s time spent in layovers that are for the convenience of the offeror employee or offeror.

4. The Government will not pay more than eight (8) hours per day per Contractor employee for travel time.

5. The Government will not pay for a Contractor employee’s travel time that is outside the employee’s regular working hours.

6. The Government will not pay for a Contractor employee more than the number of hours in the employee’s normal workweek. “Number of hours” includes productive time hours, travel time hours, and paid time off hours (e.g., sick, vacation, holiday).

7. “Productive time hours” consist of hours that, other than travel time hours, directly benefit the contract.

8. Exceptions must be authorized in advance and in writing by the Contracting Officer.

j) The following items concern passports and visas:

1. The offeror shall be responsible for ensuring that all personnel who will be required to travel outside the United States have a current and valid U. S. passport.

2. The offeror shall be responsible for obtaining any visas required for travel to foreign countries under this contract.

3. The offeror’s costs for obtaining and maintaining passports and/or visas will be generally allowable, but the offeror shall pro-rate equitably such costs if they will benefit cost objectives (e.g., contracts) other than this cost objective.

4. The Government will not reimburse the offeror for travel expenses when travel is cancelled or modified as a result of the offeror’s failure to obtain a visa, and where the Government has determined that such failure is due to the action or inaction of the offeror.

5. The Government will not reimburse the offeror for the use of private visa procurement services provided by a third party.

k) Costs for travel that has been modified or cancelled are not allowable unless such modification or cancellation was caused by the Government or otherwise beyond the control of the offeror.

l) Pursuant to FAR 47.402, 47.403, and the Fly America Act, the offeror shall use a U. S.-flag air carrier service unless an exception exists. If such conditions exist under a fixed-price arrangement (i.e., task order or line item in a task order), the offeror shall submit with its task order proposal a memorandum explaining why it does not intend to use a U. S.-flag air carrier service. Inclusion of such costs in the awarded fixed price is contingent upon Government acceptance of such explanation. If such conditions exist under ar-rangements when payment is made based on actual costs incurred (e.g., cost-reimbursement arrangements, materials portion of time-and-materials arrangements, and progress payments based on costs under fixed-price arrangements), the offeror shall submit with its voucher a memorandum explaining why it did not use a U. S.-flag air carrier service. Reimbursement is contingent upon Government acceptance of such explanation.

Leave Notifications of Key Personnel:

The Contractor will inform the COR of all scheduled and unscheduled leave of key personnel in weekly reports.

Overtime

Overtime is NOT authorized under this contract.

Security Requirement

a) This contract shall be at the SECRET level.

(b) Access to classified information shall only be to those contract employees designated as requiring a security clearance in the re-quirements section of the respective position description. Most employees will require a DOS Moderate Risk Public Trust (MRPT) certification for U. S. Citizens and Third Country Nationals (TCNs), or an RSO clearance for local nationals.

(c) Additional Requirements: Subsequent to award, the Government will conduct a formal briefing for the Contractor. The purpose of the briefing will be to bring to the Contractor’s attention the governing documents and directives regarding all security considerations in the staffing of the project, site access, software and hardware functions, document control, and Diplomatic Security procedures.

The DOS will provide assistance to Contractor personnel supporting this requirement in obtaining Annex and workplace access during the period of support. All access documentation shall be returned to the DOS COR at the completion of the support services. All per-sonnel who resign, transfer, terminated, or otherwise removed from the contract shall be debriefed by the Information System Security Officer (ISSO) on the last day of work on site and shall turn in their DOS badge to the ISSO. Each employee under this contract is in-dividually responsible for the protection of information and shall be required to sign an agreement regarding the confidentiality of the work performed under this delivery order.

In accordance with DOS policies, the Contractor shall ensure that all personnel meet the approved criteria and satisfactorily complete all screening and selection process requirements. The Contractor needs to follow their own internal vetting process to ensure there is a reasonable expectation that their employees can obtain the required security clearance, MRPT certification, a local embassy Regional Security Office (RSO) background check, or other vetting approval necessary for contract performance. The Contractor shall ensure that all personnel assigned in support of task orders issued under this contract are trained and indoctrinated in the absolute requirement to maintain and be sensitive to operational security at all times.

Employee Training

The Government shall not be charged any costs incurred by the Contractor as a result of providing training to its personnel to meet or maintain the technical qualifications specified in this SOW. This includes any training required by the Contractor to meet the tech-nical skills, education, language, certifications, etc. This includes but is not limited to courses, books, and enrollment fees or staff hours.

Department of State mandated training will be addressed on an as-needed basis and determination on reimbursement will be made per request. Training shall not commence without PRIOR written approval by the Contracting Officer.

U. S. Government Furnished Equipment and Information

The Government anticipates providing furnished workspace and other appropriate computer hardware and software, telephones and other material appropriate to the performance of tasks for all on-site positions identified in the SOW. All computer resources in use at the U. S. Government facility will be Government furnished.

The Government expects an estimate for obtaining and maintaining all supplies required during the entire period of performance. The Offeror may be required to furnish the following:

Temporary or permanent office space Laptop computer Mobile phone Microsoft Office Suite Adobe Sharepoint PowerBi

Government Ownership — Any Government furnished materials, data, or property shall remain the property of the Government and will be returned upon completion of the support services. Government furnished equipment shall be tracked through applicable pro-cedures that will be provided by the Contracting Officer in accordance with the Federal Acquisition Regulation (FAR). Any and all materials, data or property generated/obtained as a requirement under this contract shall remain the property of the Government.

Staffing

The contractor shall propose all staffing necessary to accomplish this requirement, complete and provide costs breakdown per Ap-pendix One. If the contractor intends to hire local personnel as overseas M&E specialists, no housing or per diem will be authorized.

If the offeror intends to hire U. S. personnel and have them travel and work OCONUS, then the offeror shall propose the associated costs for these positions in their cost proposal.

The contractor shall provide in their technical proposals an organization chart clearly showing lines of authority and reporting chain of command.

The contractor shall provide resumes for all proposed Key Personnel positions for approval by the COR. See Appendix Two for re-sume format template. The COR will review the resumes before indicating acceptance through the Contracting Officer. In addition, if Key Personnel leave the contract, the contractor shall submit the replacement Key Personnel resumes to the COR for review and ap-proval in accordance with the Key Personnel Clause and backfill any and all positions within thirty (30) days. The COR reserves the right to interview potential key personnel in order to verify language skills.

The contractor shall provide domestic personnel and in-country M&E specialists with a local cellular telephone, laptop computer, and workspace. INL/WHP may provide in-country M&E Specialists office space at the Embassy, contingent upon space availability, local access policies regarding third-party contactors, potential ICASS costs, and other Post-specific issues.

NOTE: For in-country M&E Specialists the requirement for laptop and necessary IT equipment is only required during the period the M&E Specialist is unable to transition to Embassy facilities (awaiting appropriate MRPT certification, RSO security clearance or the availability of space in Embassy facilities). All domestic M&E Specialists must be furnished with laptops during the contract's entire period of performance.

All in-country M&E Specialists shall be assigned an INL employee at that Embassy who will serve as the M&E Coordinator.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .