QA's_19AQMM19R0314.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
Rapel Tower Murcielago Federal contract opportunity
Solicitation number
19AQMM19R0314
Issued by
Department of State Office of Acquisition Management

About this file

Solicitation Questions and Answers

View the file

Other files for this federal contract opportunity

Other files attached to Rapel Tower Murcielago, newest first.
File Type Posted
19AQMM19R0314_A002.pdf PDF
19AQMM19R0314.pptx PPTX presentation
Site_Visit_Sign_in_Sheet_(07AUG2019).pdf PDF
J-1-2_RT_STRUCTURAL_Revised_S-12.pdf PDF
J-1-4_RT_ARCHITECTONIC.pdf PDF
19AQMM19R0314_A001.pdf PDF
19AQMM19R0314_Sections_B-M.pdf PDF
19AQMM19R0314.pdf PDF
J-1-2_RT_STRUCTURAL.pdf PDF
J-2-1_Bidding_Chart.xlsx XLSX spreadsheet
J-3-1_Past_Performance_Questionaire_(PPQ).docx DOCX document
J-3-3_Firm_&_Project_Info.docx DOCX document
J-3-2_Past_Performance_&_References.xlsx XLSX spreadsheet
J-1-3_RT_MECANICO.pdf PDF
J-1-1_TECHNICAL_SPECIFICATIONS.pdf PDF
J-1-5_RTR_ELECTRICAL.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A's

Murcielago Rappel Tower Solicitation # 19-AQMM-19-R-0314 Q&A's
#ReferenceQuestionResponse
1We were unable to make yesterday’s site visit – is it possible to request another visit date? Or would you allow us to coordinate a quick directly with someone from the Academy?FAR 15.201(f) states: After release of the soliciation, the contracting officer must be the focal point of any exchange with potential offers. In order to prevent an unfair competitive advantage only one site visit will be held for this requirement.
22. Given that the site is in a very remote location, is it possible to rent barrack space from the Academy for our workforce?No it is not posible to rent an area at the Police Academy, contractor has to take care of his workinng crew renting some space out of the academy or installing a provisional construction camp in the plot beside the site of construction.
33. Will we be given a laydown area on Academy grounds and near the jobsite?Yes the area beside the projects site can be used by the contractor, but it is needed to clarify at at the end of the project the contractor shall return the area as it was before its use.
4Please provide the window and doors details, including information such as materials, accessories to be installed and dimensions to consider.Please refer to specifications section C16.2 and drawings T-A-07, T-A-08 and T-A-09.
5Related with the DBA, on previous solicitations there was a fixed amount to be considered on this item, please clarify if in this project there is a fixed amount to calculate this insurance.Please use a $10,000 fixed amount for CLIN 0002 DBA when preparing proposals. This amount will be adjusted up/down after award as necessary. This is covered in Slide 10 of the powerpoint presentation.
6Please provide the construction detail for the project’s stairs.Please use the corrected drawing S-12.
7In the meeting for this solicitation it was indicated that the floor below had to of a soft(shock absorbend) rubber material, that probably had to be imported.

Do you have any specification on this material?

That is not correct. The anchoars for the climbing wall detailed in drawing T-A-11 will require to buy with anticipation because is not a commun material for construction, so mabe it will need to import some materials from overseas.
8when is the proposal due on this solicitation? I can not find it anywhere.Block 13 of the SF1442 indicates proposals are due by 10 AM Local Time (Eastern Standard Time) on September 10, 2019.