J-1-1_TECHNICAL_SPECIFICATIONS.pdf

PDF 1 MB Posted

Attached to
Rapel Tower Murcielago Federal contract opportunity
Solicitation number
19AQMM19R0314
Issued by
Department of State Office of Acquisition Management

About this file

J-1-1 Technical Specificatins

View the file

Other files for this federal contract opportunity

Other files attached to Rapel Tower Murcielago, newest first.
File Type Posted
19AQMM19R0314_A002.pdf PDF
QA's_19AQMM19R0314.xlsx XLSX spreadsheet
19AQMM19R0314.pptx PPTX presentation
J-1-2_RT_STRUCTURAL_Revised_S-12.pdf PDF
Site_Visit_Sign_in_Sheet_(07AUG2019).pdf PDF
19AQMM19R0314_A001.pdf PDF
J-1-4_RT_ARCHITECTONIC.pdf PDF
J-3-1_Past_Performance_Questionaire_(PPQ).docx DOCX document
J-3-3_Firm_&_Project_Info.docx DOCX document
J-3-2_Past_Performance_&_References.xlsx XLSX spreadsheet
J-1-3_RT_MECANICO.pdf PDF
19AQMM19R0314_Sections_B-M.pdf PDF
19AQMM19R0314.pdf PDF
J-1-5_RTR_ELECTRICAL.pdf PDF
J-1-2_RT_STRUCTURAL.pdf PDF
J-2-1_Bidding_Chart.xlsx XLSX spreadsheet
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL SPECIFICATIONS

RAPPEL TOWER FOR THE

NATIONAL POLICE ACADEMY IN

MURCIELAGO

February 2019

C1. Content

C1. GENERAL DESCRIPTION

C2. SPECIFIC TASK

C2.1 Preliminary work

C2.2 Rappel Tower Access sidewalks and fall protection pits

C2.3 Rappel Tower Construction

C2.4 Electric System

C2.5 Mechanic System

C2.6 Fire detection system

C3. GENERAL SPECIFICATIONS

C3.1 Quantities

C3.2 Trials and Tests

C3.3 Work Execution

C3.4 Cost of the Project

C4. TASK SPECIFICATIONS

C4.1 Preliminary Work

C4.1.1 Land clearing

C4.1.2 Leveling and plotting

C4.1.3 Warning Signs

C4.1.4 Temporary Structures

C4.2 Earthwork, Excavation and Backfilling

C4.2.1 Leveling and land clearing

C4.2.2 Excavation

C4.2.3 Over-excavation

C4.2.4 Conglomerate and rock removal

C4.2.5 Excavation with water presence

C4.2.6 Removal of water and/or excavated Material

C4.2.7 Backfilling

C4.2.8 Compacted backfilling with natural soil

C4.2.9 Compacted backfilling with granular material

C5. CONCRETE

C5.1 General

C5.2 Properties and characteristics of concrete

C5.2.1 Applicable publications

C5.2.2 Cement

C5.2.3 Sand (fine aggregate)

C5.2.4 Gravel (coarse aggregate)

C5.2.5 Water

C5.2.6 Additives

C5.2.7 Hand mixing

C5.2.8 Mechanical concrete mixer

C5.2.9 Mixing while in transit

C5.2.10 Sleeves in concrete

C5.2.11 Anchors and fittings

C5.2.12 Construction Joints

C5.2.13 Concrete casting and vibration

C5.2.14 Concrete strength

C5.2.15 Strength testing

C5.2.16 Test approval

C5.2.17 Concrete curing

C5.2.18 Concrete defects reparation

C5.2.19 Exposed Concrete

C5.2.20 Low retraction concrete

C5.2.21 Permeable Concrete

C5.3 Formwork

C5.3.1 General

C5.3.2 Wood Formwork

C5.3.3 Plywood formwork

C5.3.4 Metal formwork

C5.3.5 Other materials

C5.3.6 Formwork construction

C5.3.7 Non-exposed concrete formwork

C5.3.8 Formwork erection

C5.3.9 Formwork removal

C5.3.10 Formwork reuse

C5.4 Reinforcement Steel

C5.4.1 General

C5.4.2 Reinforcement Steel bars

C5.4.3 Welded Steel mesh

C5.4.4 Annealed wire (tie wire)

C5.4.5 Reinforcement fabrication

C5.4.6 Fabrication tolerances

C5.4.7 Placement tolerances

C5.4.8 Samples and testing

C5.4.9 Storage

C5.4.10 Hooks and bends

C5.4.11 Reinforcement cleaning

C5.4.12 Rebar placement

C5.4.13 Supports

C5.4.14 Inspection

C6. MASONRY

C6.1 Applicable publications

C6.2 General

C6.2.1 Handling and storage

C6.3 Materials

C6.3.1 Concrete Masonry Units

C6.3.2 CMU mortar

C6.3.3 Sand

C6.3.4 Water

C6.3.5 Concrete fill

C6.4 CMU walls

C6.4.1 General

C6.5 Mortar preparation and CMU cell filling

C6.5.1 General

C6.5.2 Dosage

C6.5.3 Mortar

C6.5.4 Mixing

C6.5.5 Masonry erection

C7. METALS

C7.1 Applicable publications

C7.2 General

C7.2.1 Approval requests

C7.2.2 Structuration

C7.3 Metal fabrication

C7.3.1 Material handling

C7.3.2 Resistance and specifications

C7.3.3 Materials

C7.3.4 Fabrication and labor

C7.4 Construction and assembly

C7.4.1 Fabrication and mounting

C7.4.2 Reference standards and materials

C7.4.3 Joints

C7.5 Welding

C7.5.1 General

C7.5.2 Welding procedures

C7.6 Metal surface finish

C7.6.1 General

C7.6.2 Work that must be done in shop

C7.6.3 Work that must be done on-site

C7.7 Erection and assembly

C8. Wall Finish

C8.1 General

C8.2 Surface preparation for plastering

C8.2.1 General

C8.3 Fine plaster

C8.3.1 General

C9. Sealants and waterproofing

C9.1 Sealants and water repellants

C10. Floors

C10.1 Broom Finished Concrete

C10.2 Sidewalk floors

C11. Painting

C11.1 General

C11.2 Storage

C11.3 Labour

C11.4 Surface preparation

C11.5 Samples

C11.6 Materials

C11.7 Cleaning

C11.8 Epoxy paint

C12. MECHANICAL INSTALLATIONS

C12.1 Applicable publications

C12.2 General

C12.2.1 Approval requests

C12.2.2 Samples

C12.2.3 Drawings and specifications

C12.2.4 Scope

C12.2.5 Approval

C12.2.6 Brands and models

C12.2.7 As Built drawings

C12.3 Construction

C12.3.1 Equipment and material management

C12.3.2 Materials

C12.3.3 Concrete casting

C12.3.4 Supports

C12.3.5 Installation considerations

C12.3.6 Tests

C12.3.7 Work reception

C12.3.8 System performance guarantee

C12.4 Protection

C12.5 Stormwater

C12.5.1 Approvals

C12.5.2 Pipe installation for external work

C12.5.3 Pipe installation for interior work

C12.5.4 Accessories

C12.5.5 Tests

C13. ELECTRIC SYSTEM

C13.1 Electric Distribution Boards

C13.2 Illumination

C13.3 Power Outlets

C13.4 Ground Net

C13.5 Conduit System

C13.6 Pipes

C13.7 Boxes

C13.8 Conductor

C14. FIRE DETECTION SYSTEM

C14.1 GENERAL

C14.1.1 SECTION SCOPE

C14.1.2 REQUIREMENTS AND REGULATIONS

C14.1.3 DOCUMENTS TO BE PREPARED

C14.1.4 SYSTEM DESCRIPTION

C14.2 PRODUCT

C14.2.1 INITIATION DEVICES

C14.2.2 NOTIFICATION DEVICES

C14.3 EXECUTION

C14.3.1 INSTALLATION

C14.3.2 QUALITY CONTROL

C15. LIGHTING ROD

C15.1 GENERAL

C15.1.1 SECTION SCOPE

C15.1.2 REGULATIONS AND REQUIREMENTS

C15.1.3 DOCUMENTATION TO BE PREPARED

C15.2 PRODUCT

C15.2.1 LIGHTNING ROD

C15.2.2 LIGHTNING ROD PIPES

C15.2.3 GROUNDING SYSTEM

C15.3 EXECUTION

C15.3.1 INSTALLATION

C15.3.2 QUALITY CONTROL

C16. OTHERS

C16.1 Doors

C16.1.1 General

C16.1.2 Fittings

C16.1.3 Wood doors

C16.1.4 Metal doors

C16.2 Window system

C16.3 Climbing wall anchors

C16.4 Roof cover

C1. GENERAL DESCRIPTION

The Embassy of the United States of America, in cooperation with the Costa

Rican “Ministerio de Seguridad Pública” is heading an infrastructure project consisting of building a rappel tower in the National Police Academy located in

Murciélago Guanacaste.

The overall intent of the contractual effort for this project is to build new infrastructure as follows:

1- Preliminary Work

2- Rappel Tower Access sidewalks and fall protection pits

3- Rappel Tower Construction

4- Electric System

5- Mechanic System

6- Fire Detection System

The project will be built using Estruconsult’s design, presented in drawings. The facilities will be located in Santa Elena district, La Cruz canton, Guanacaste province, Costa Rica.

The project shall be conducted in accordance with the drawings and the specifications detailed in this document.

C2. SPECIFIC TASK

C2.1 Preliminary work

Preliminary work includes the implementation of temporary facilities for the workers according to the specifications detailed in C4.1.4.

The preliminary work shall also include a technical review of the designs technical specifications in order to comply with all the established requirements.

The Contractor will also be in charge of obtaining construction permits from the appropriate local authority (La Cruz municipality). The Contractor shall therefore provide all the qualified technical staff in charge of the project’s development in accordance to local regulation, based on provided designs, drawings and this document’s specifications.

C2.2 Rappel Tower Access sidewalks and fall protection pits

The contractor shall build new sidewalks, allowing access to the rappel tower’s entrance. The contractor must also build two fall protection pits under the climbing wall and training overhang, as indicated in the structural and architectural plans. These will be according to architectural sheet T-A-03 and structural sheet T-SG.4.

C2.3 Rappel Tower Construction

The contractor shall build the rappel tower, and perform all works associated to the appropriate delivery of it, such as: earthwork necessary to conform the terrain for construction, roof structure, roofing, risk zones marking, protection metal fences, rappel and climbing metal structures and walls, etc… in accordance with the project’s drawings.

The tower will be built using a concrete beam, column and CMU wall system, with isolated footings for foundations. The tower will have 7 levels, with the bottom one used as storage space and the second floor used as instruction room.

Rappel and climbing walls will be built, for the purpose of training, using adequately waterproofed concrete slabs such as Supa Impermeabilizer or similar.

The work will be done according to architectural drawings from sheet T-A-01 to sheet T-A-11 and from sheet T-SG.1 to T-S.12 of structural drawings.

C2.4 Electric System

The contractor must build the necessary electrical system according to the Local

Electric Code, using the drawings designed by Estruconsult.

The internal electrical system shall be completely constructed by the contractor in accordance to the requirements specified in drawings T-E01 through T-E04.

This includes the lighting and electrical outlet systems, detailed in drawings.

The power supply comes from the existing power transformer located alongside the existing road. The final connection between the power line and the main electrical panels will be done by the Contractor in order to supply power to the project.

C2.5 Mechanic System

The contractor shall also build all the mechanical systems necessary for the complete function of building, including the rainwater system. All of these according to mechanical drawings. PVC, aluminum, and any other type of piping and associated connections, must comply with this specification and follow each manufacturer’s manual indications.

The Contractor shall provide, place, connect, fix and test all the pipes, accessories and special items, as well as the required valves, which together will serve to conduct the rainwater.

This includes the construction and installation of a discharge pipe from the project’s construction site to an existing ditch, using Novafort pipe from Amanco, or similar, and a discharge concrete structure, as indicated in drawings T-M-01 and T-M-02.

PVC pipes will be SDR 26, from Amanco or similar, with appropriate concrete inspection chambers and slopes such that allow for appropriate drainage of the stormwater.

C2.6 Fire detection system

The fire protection system includes ABC type extinguishers and a fire alarm system with smoke and heat detectors, strobe lights and manual stations, which will be built and installed in accordance to electrical drawings.

The contractor shall build this system according to the mentioned drawings and shall include the equipment, cabling and canalization for the Fire Protection system according to the specifications, so that at the end of the required work a fully functioning fire protection system is delivered.

Smoke detectors will be NP-100 (A), manual alarm stations NOT-BG12LX, strobe lights SpectrAlert Advance P2RA, and control panel Firewarden-50 (E) of the

NOTIFIER series by Honeywell or superior brand. All systems must be from the same manufacturing house and fully compatible. The system will include a 12V back up battery and a transient voltage suppressor for the main panel.

The fire alarm system will comply with the Manual De Disposiciones Técnicas

Generales Sobre Seguridad Humana y Protección Contra Incendios 2013, as well as the applicable NFPA standards as indicated by the manual.

C3. GENERAL SPECIFICATIONS

All work shall be carried out in strict compliance with all contract clauses and these technical specifications. In the event that the Contractor discovers discrepancies contained in the various design/technical documents, Contractor must immediately notify the Contracting Officer Representative (COR) before taking any other action.

C3.1 Quantities

This contract is based on a lump sum priced solicitation. Any quantities indicated in the specifications and drawings are for reference only and the Contractor is responsible for providing quantities needed to complete the work, without any price adjustment after award.

C3.2 Trials and Tests

Materials, permanent equipment, its accessories and other elements used in the project, shall be subject to tests necessary to verify their compliance with specifications, properties and characteristics, in accordance with the specified requirements and tolerances, in line with the use for which they have been intended.

Materials, equipment, accessories or elements that have not been accepted by the COR (Contracting Officer Representative), shall be withdrawn from the work site or replaced, at Contractor’s cost.

Laboratory tests can be carried out, according to the specific case, at the work site or in laboratories previously authorized by the COR. Materials that bear quality certificates issued by ISO or its equivalent, do not need to be routinely tested. Costs of laboratory trials and tests shall be for the account of Contractor.

The COR shall be able to carry out special trials and tests at any time if it is needed to clarify the quality of any item.

C3.3 Work Execution

The different items in the construction schedule shall be carried out in a gradual and progressive manner, without starting any work that could later be affected by other items that have not been concluded or that lack an adequate support or safety measures, taking care that work that has been finished is not affected by weather or other elements.

The Contractor shall be responsible for maintaining quality of work by following proper operation procedures in construction.

Throughout the different stages of construction work, Contractor shall obtain approval, from the COR, in order to continue with subsequent stages of construction. Before receiving approval to continue through the various stages, samples of completed work shall be tested to verify the quality of the work.

The Contractor shall provide a construction schedule in which all the works shall be detailed with the date of performance and delivery.

C3.4 Cost of the Project

The Contractor shall include all the costs of the materials, labor, transportation, and materials testing that will be needed to complete the project and comply with all the specifications stated in this document.

C4. TASK SPECIFICATIONS

C4.1 Preliminary Work

C4.1.1 Land clearing

This clause includes tree trimming work (any required permissions apply) and any shrub, trunk, root, grass and topsoil layer removal. The aim of this is to clear the area on and around the building’s footprint that is deemed unsuitable for foundation work or terrain leveling works.

The Contractor shall perform any land clearing, root, tree and vegetation removal, and topsoil and organic silt elimination when present. Any elements that interfere with the construction work, such as old foundations, rocks, etc., must be removed by the Contractor. All of the materials removed from the project’s site, such as topsoil and debris, must be transported by the Contractor and disposed of in an appropriate place outside the property, which selection, along with any implicit technical and environmental repercussions, is the

Contractor’s responsibility

C4.1.2 Leveling and plotting

Before construction start, the Contractor shall define the project’s components layout and, if necessary, construction levels in accordance to the provided drawings. During this same phase the Contractor must verify all of the drawings information, and correct them if any discrepancy exists between real, on-site, dimensions and those provided in drawings by the designer.

To comply with these requirements, the Contractor shall provide an expert topographer supported by precision equipment such as: total stations, levels, measuring tape, and any other required equipment for layout, alignment and terrain leveling. The use of this equipment will be performed so that machinery works will not interfere. Any additional alignment or leveling job cost will be the

Contractor’s responsibility.

C4.1.3 Warning Signs

The Contractor shall provide all the necessary signs and announcements to prevent accidents according to the safety plan, which shall have the approval of the COR. Signs shall be made of acrylic or galvanized sheets painted with a yellow background and with red or black letters.

C4.1.4 Temporary Structures

Temporary structures, for the Contractor’s personnel use, will be implemented for use during the project’s duration. It is the Contractor’s responsibility to implement offices, warehouses, provisional bathrooms and the guardhouses required for their own use, with a temporary connection to a potable water and sewage system prior to commencing construction. One sanitary facility shall be implemented for every ten workers, with an additional one for the technical staff.

The Contractor will be responsible for cleaning and maintaining these structures.

The materials used for these provisional facilities can be metal, concrete, or wood, as long as they are secure and provide a private area. The COR can demand changes or improvements of the provisional facilities at any time if he determines that the Contractor is not providing a clean area with sufficient privacy and safety.

C4.2 Earthwork, Excavation and Backfilling

The work described in this chapter includes excavation and backfilling, as well as carrying, piling up and removing excavation material necessary for the construction of the building, piping, and all elements indicated in the project drawings.

C4.2.1 Leveling and land clearing

To determine final levels, theodolites or precision instruments will be used. If there are considerable differences with the specifications in the drawings, the

COR shall be notified and only through a report of mutual agreement will the new levels be determined.

The residual material must be removed and placed outside the construction site in places approved by the local authority.

C4.2.2 Excavation

Generally, excavation is understood as the removal of volumes of land or other materials for the purpose of forming spaces for construction, foundations, structures, buildings, roads, etc. Excavation shall be done according to the heights, limits, elevations, gradients and sections set forth in the structural, architectural, and sanitary drawings, save for different or real conditions of the project.

During excavation, material satisfactory for backfilling shall be stockpiled in an orderly manner at a distance from banks of the trench equal to ½ the depth of the excavation, but in no instance closer than 60 cm. Excavated material not required or not satisfactory for backfill shall be removed from the site, without affecting the adjacent properties. The material produced from excavation will be temporarily disposed of on the sides of excavations, so that it will not impede the execution of other work.

The final excavation that will be performed in the places where specific exterior works made out of concrete will be built, shall be carried out as close to the pouring of concrete to avoid any alterations due to bad weather.

In no case shall excavation be performed to a depth in which the soil is loose. If this happens, it will be considered as an “over excavation” that will be corrected by the contractor according to the project’s specifications.

If, in the Contractor’s or COR’s opinion, the bottom of the ditch is not strong or is unstable, over-excavation will be carried out until solid ground is reached, otherwise another solution shall be jointly agreed upon by the Contractor and the COR.

It is the Contractor’s duty to protect the stability of the adjacent properties while excavation is carried out. This should be done in a way that guarantees the stability of those buildings without causing any damage.

Excavation shall be protected against rain, landslides and other excavations.

The Contractor will protect the personnel excavating in ditches and, if for safety reasons it is deemed necessary, the contractor shall provide timbering and shoring.

This shoring shall be reviewed and approved by the COR, and the Contractor will protect the shoring and will be removed after the excavation has been performed.

For piping placement in excavation, the filling will be laid as a first step to cover a height of at least 20 cm above the highest part of piping and shall be compressed in accordance with the article of this section. Excavation will be done from the ditch in accordance with the gradient slope and required transversal lines for placement of piping as indicated on working drawings.

C4.2.3 Over-excavation

The term over-excavation, for the purposes of the job to be carried out, is understood as excavation outside the lines and levels set forth in the drawings, the specifications and/or the COR’s instructions.

If over-excavation is done, removal should go up to the required level and filling with soil, granular material or concrete or any other material approved by the

COR; compressing will be done with adequate water content, in layers that will not exceed a thickness of 15 cm, using an appropriate mechanical compactor.

The compaction process shall be done according to the regulations established by the standards of the American Association of State Highway and

Transportation Officials (AASHTO T-130). The material to be used shall be selected granular material according AASHTO 145.

The Contractor agrees not to receive any additional payment for over-excavation that may result from the conditions of the land, the action of natural agents, operations that are executed to facilitate the construction, and mistakes made by the Contractor.

C4.2.4 Conglomerate and rock removal

The process of excavation when hard materials are found which cannot be loosened through ordinary methods is understood as conglomerate and rock excavation where the use of shovels, pickaxes, backhoes, or excavators is not sufficient and explosives, mechanical hammers, wedges, or sledge hammers or other similar are absolutely necessary.

If a rock is found in pieces, only fragments greater than 200 cubic decimeters will be considered as rock.

When removing rock or masonry fragments from a ditch is necessary, and if they form clusters that do not have to be totally extracted in order to erect structures, those pieces excavated within the presumed boundaries will be considered as rock, although their volume could be smaller than the one indicated in the above paragraph.

If the bottom of the trench (made to install pipelines) is made up of conglomerate or rock, excavation will be carried out up to 0.15 m below the seat of the pipe and it will be filled later with sand and fine gravel.

When excavation is carried out on fixed rocks, the use of explosives will be allowed, provided that they do not alter the land adjacent to the excavation works and with a prior written authorization from the COR.

C4.2.5 Excavation with water presence

The excavation with presence of water may be caused by water coming from the underground, rainwater, floods, operation of the construction, sewage and others.

Excavation cannot be executed in the presence of water, whatever its origin, and therefore due precautions and protections must be taken, as construction techniques advise in these cases. The presence of water makes work more difficult and the safety of the people and the projects themselves decreases.

Therefore, the Contractor is required to take due precautions to eliminate water in excavation sites by using stake boards, cofferdams, pumping, drainage, curbs, etc.

When placing stone masonries, concrete structures, or any structure, the

Contractor will insure that water is not present in excavations, and that it will remain so until mortar and concrete have set.

None of the excavations should have water present before placing the pipes, and under no circumstance will they be placed under water. The trenches shall remain dry until the pipes have been totally coupled and the welded junctions are completely dry.

C4.2.6 Removal of water and/or excavated Material

Waste removal is defined as the method of transportation of the materials produced by excavation, which should have a specifically determined place for disposal approved by the local authority.

When there is an excess material, the Contractor shall remove it and place it outside the area of construction where such material will not obstruct watercourses or cause detriment to the neighboring areas.

Excess or waste material should not be located in properties adjacent to the construction site unless the Contractor receives written authorization from the owners of such properties.

The material produced by excavation that will not be used for the construction of the project shall be removed from the site using heavy mechanical equipment in good condition, without causing vehicle transit interruption or neighbors’ annoyance.

C4.2.7 Backfilling

Backfilling is defined at the sections indicated by the project, the existing gaps between structures and excavations, or between the structures and the natural soil in such a way that any point of the finished section will remain at a distance greater than 10 centimeters from the corresponding section of the project. The backfilling process will be carried out using earth, gravel, sand or rock with approval from the COR.

Prior to backfilling, the land shall be free of debris, trunks, branches, etc., and in general of all organic material and all the material that is not appropriate for backfilling. The COR will approve the material that will be used for backfilling in advance and the material will come from the excavation itself or other extraction sites.

The backfilling will be done according to the project specifications and according to the lines, levels and gradients described in the architectonic and structural drawings. The Contractor is required to obtain, transport and maintain the necessary material for backfilling, either from the excavation site or from qualified quarries.

Special care will be given by not using the mechanical compactor in areas close to buildings or existing construction inside or outside of the property. If any damage occurs, this shall be repaired and costs assumed by the Contractor.

The refill and/or cover of any excavation that contains lines or pipes installations and other services will not proceed until they have been placed and tested as well as approved and accepted by the COR.

The backfilling for subflooring will be placed and mechanically compacted in beds of 0.20m thick according to the D698-64T specifications of the American Society for testing and Materials (ASTM).

Backfilling with gravel, sand or ground stone for formation of drains or filters shall be consistent with the grain grading specified in the working drawings;

materials will be sieved and washed if required. For filter formation, the materials will be placed in such a way that the higher grade particles remain in contact with the structure and the ones with lesser diameters in contact with the natural terrain, unless otherwise indicated.

C4.2.8 Compacted backfilling with natural soil

Compacted backfilling with natural soil is defined as placing horizontal layers of the existing soil, with a thickness of 20 cm, with the humidity that the material requires to get a mechanical compression to 95% minimum of the density of the

Proctor Standard measure. Each layer shall be evenly compacted on the entire surface by pneumatic rammers or other construction equipment until obtaining the maximum compression possible with the use of these tools. The material to be used in this backfilling shall be free of organic residues and waste. Prior to backfilling, the land shall be free of debris. The COR will approve in advance the material that will be used in the backfilling process. The compaction process shall be done according to the standards of the American Association of State

Highway and Transportation Officials (AASHTO T-130).

If the approved material for this backfilling is not enough to reach the levels specified in the project design, the Contractor shall complete the volume needed, with granular material according to the specification for “Compacted backfilling with granular material.”

The Contractor shall carry out laboratory tests to guarantee the compliance with the aforementioned specifications and the cost of these tests will be assumed by the Contractor.

C4.2.9 Compacted backfilling with granular material

Compacted backfilling with granular material is defined as placing horizontal layers of sub-base to a maximum thickness of 20 cm. Each layer will be compacted evenly on its entire surface by pneumatic rammers or heavy construction equipment until obtaining the maximum compression possible with the use of these tools. Compaction shall be carried out using sheep foot rollers, pneumatic-tried rollers, steel-wheeled rollers, vibratory compactors, or other approved equipment. The thickness of the backfilling shall be in accordance with the structural and architectonic detailed drawings. Prior to backfilling, the land shall be free of debris. The COR will approve in advance the material that will be used in the backfilling process. The compaction process shall be done according to the standards of the American Association of State Highway and

Transportation Officials (AASHTO). Compacting shall be have a 95% of the maximum density (Proctor Test). The material to be used shall be granular selected material according AASHTO 145 (A1, A2, and A3).

C5. CONCRETE

C5.1 General

The production, transportation and placing of concrete used to build the rapel tower must be comply with the recommendations of the American Concrete

Institute (ACI), which are found in the “Specifications for Structural Concrete For

Building” ACI 301 Committee report, last revision. For all of the other processes involved with reinforced concrete, all of the recommendations of the ACI 318

“Building Code Requirements for Reinforced Concrete”, last revision, must be followed. Compliance with the standards and specifications of the American

Society for Testing and Materials (ASTM), mentioned in this document and related to reinforced concrete, is mandatory.

C5.2 Properties and characteristics of concrete

C5.2.1 Applicable publications

Concrete building, be it onsite or ready mix, must follow the technical and constructive standards presented in the following publications, in its current versions:

● ACI

● CRSI

● Applicable ASTM standards

C5.2.2 Cement

Cement used in any work execution, must be Portland Type 71-Normal cement, compliant with the ASTM C-150 standard. It must arrive the project´s warehouse in its original packing, without any sign of tears or material hardening. If the COR detects any anomalies, he will be able to request a partial or complete product lot substitution.

Cement must be kept in a fresh place and covered in a way that it isn’t exposed to rain or affected by humidity. The product is allowed to be stowed in 10 cm tall wooden pallets in ten bag stows as maximum.

C5.2.3 Sand (fine aggregate)

The sand used for concrete producing must be river sand, except in special cases. To verify its quality, samples must be approved by the COR, especially when using quarry sand. In any case, sand must have a siliceous-calcareous origin, free from any deleterious substance such as, clay, silt, lignite or alkali. It must be free of any dirt, and kept dry so that its humidity levels are according to the mix design and therefore the volumetric or by weight dose used to make concrete. Sand used for concrete elements shall comply with the ASTM C33 standard, in its current version.

The used sand must have grain sizes within the following limits:

3/8” Sieve --------------------------- Percentage passing: 100.

# 4 Sieve --------------------------- Percentage passing: 95 a 100.

# 8 Sieve --------------------------- Percentage passing: 80 a 100.

#16 Sieve ---------------------------- Percentage passing: 80 a 100.

# 30 Sieve --------------------------- Percentage passing: 25 a 60.

# 50 Sieve --------------------------- Percentage passing: 10 a 30.

# 100 Sieve -------------------------- Percentage passing: 2 a 10.

C5.2.4 Gravel (coarse aggregate)

Coarse aggregate consists of materials which main content is gravel or broken stone. These materials must be clean and free of any substances such as soil, clay, silt and other organic materials which could produce fake adherence in the concrete mix.

The required measures for coarse aggregates used for concrete, are:

● For thin, reinforced concrete elements, less than a fifth of the mold’s lesser dimension and less than three fourths of the space between rebar.

● For elements having, approximately, a 6 cm thickness, the use of aggregates bigger than 25 mm is prohibited.

● For elements such as beams, columns and any reinforced concrete element, aggregate with a diameter less than 38 mm must be used.

● For non-reinforced concrete elements, aggregate with a diameter between

38 mm and 50 mm can be used.

● For massive concrete elements, aggregate with a diameter up to 150 mm can be used, prior to the COR approval.

● Coarse aggregate storage must be done in a way that different sized products don’t mix, for which wooden board enclosures, forming quadrants, with enough height for stocking more material. Each enclosure must have a sign that indicates the diameter of the aggregate. Cone shaped piles are forbidden, and a flat surface must be maintained while in storage, so that any debris can be easily removed and won’t easily mix with the clean aggregate.

C5.2.5 Water

All of the water used in the mixing, curing and mortar production, must be clean, potable water. The water quantity to be used in each concrete pouring, must be according to the specific dosage presented in the following table:

WATER/CEMENT RATIO BY

WEIGHT

PROBABLE COMPRESSIVE STRENGTH

AT 28 DAYS

0.45 350 Kg/cm2

0.53 280 Kg/ cm2

0.62 225 Kg/ cm2

0.71 175 Kg/ cm2

C5.2.6 Additives

The use of any concrete additives, i.e. setting accelerants, retardants, or hardeners, must be done after the COR request or approval. In case that the requested additives aren’t commercially available, any similar products must be submitted for approval with its respective manufacturer’s technical manual. Any approved additive must arrive to the construction site in its original package.

C5.2.7 Hand mixing

Concrete production using any manual methods is not allowed. In especial cases in which, for example, small volumes are required, excessive travel distances or difficult access circumstances are present, the COR can eventually allow, without any responsibility, the use of hand mixed concrete.

C5.2.8 Mechanical concrete mixer

The mechanical mixing of concrete is the only type of process allowed. The COR has the authority to inspect and approve all of the equipment used for mixing concrete. The requisites that need to be met, are:

All of the equipment employed must be in good mechanical and operation conditions. A water weight or water level controller for the mixer is desirable.

The mixer´s barrel size must be according to the concrete volume to be poured.

Concrete mixers with a capacity of less than a cement bag are not allowed to be used on-site.

All of the necessary equipment for any given pouring job to be continuous, free of any interruptions, must be available in the project. The COR can request, according to the volume of any pouring job, the addition of mixers and other equipment.

When placing any concrete, the concrete mixer and any other equipment used during the process must be clean. When the job is finished, or a pause larger than two hours happens, the mixers and any equipment involved must be washed.

All materials must be introduced at the same time in the mixer, so that the mix can be as homogenous as possible

The mixing duration cannot be less than two minutes after pouring all the materials inside the drum.

The time for the concrete to be cast in place, after pouring all the materials in the mixer, cannot be higher than thirty minutes.

C5.2.9 Mixing while in transit

Dry, on-plant dosed, concrete and mixed in transit to the Project can be used.

The truck used must be a drum mixer. Each concrete shipment must complete at least fifty revolutions. The mixing speed will be higher than four drum revolutions per minute and no larger than 225 ft. of drum circumference per minute. The revolutions must be continuous once all of the materials are introduced. The maximum time between concrete deliveries shall not be longer than twenty minutes.

C5.2.10 Sleeves in concrete

The use of sleeves inside reinforced concrete is considered as a non-desired practice. Only special cases, authorized by the COR and indicated in redline drawings, will be allowed with previous presentation of workshop drawings and diagrams. In the case that sleeves are allowed, they shall be located in the central third of the beam’s longitude and the central third of its height. When using pipes smaller than 25 mm in diameter, the separation between each sleeve must be of 25 cm. If the sleeve uses pipe with a diameter between 64 mm to

100 mm, their separation must be at least 50 cm. Additionally, two #3 bars, 50 cm long, frames will be placed, or what the COR indicates.

If the sleeves are placed with one or both of its ends in contact with the ground, plastic covers must be placed at the ends. If the pipes go through a tank’s walls, instead of sleeves a pipe with the same characteristics as the rest of the piping will be placed, with a flange in the walls mid-section.

C5.2.11 Anchors and fittings

Any anchors and fittings necessary to join concrete elements to metal or wood elements are shown in the project’s drawings. The plates or steel sections used to produce them must meet the established criteria in the chapter “Steel

Structure” of this document. Rebar must comply with the requirements established in the steel chapter of this document, having a yield strength equal to fy = 2800 kg/cm2, unless otherwise specified. In any other case, experimental and documental evidence of the element’s weldability must be provided.

The joining element’s size and shape will be indicated in the corresponding drawing, but alternative designs, that facilitates the element’s placement while retaining its structural integrity, can be accepted by the COR. The placement must be done so that formwork removal doesn’t become complicated. During this procedure, the specified opening tolerances must be observed.

C5.2.12 Construction Joints

All construction, vertical or horizontal, joints must be approved by the COR, who will determine where and how it will be built, using the necessary elements (key joints, butt-dowel joint, butt-tie bar joint, etc…). Before the concrete casting, any joint must be moistened and the concrete surface covered with a thick concrete grout.

Contact or isolation joints must be built every time a slab comes in contact with columns, concrete walls, CMU walls or reinforced concrete rigid frames. Isolation joints must be built using expanded polystyrene foam with a 13 mm thickness, or a similar material, adhered with special glue or nails, and the same width of the concrete slab.

C5.2.13 Concrete casting and vibration

The COR shall approve the formwork, molds, temporary structures, and the placement and cover of rebar. He must be notified, five business days in advance, the date and time at which any concrete element will be casted.

All of the necessary equipment for any given pouring job to be continuous, free of any interruptions, must be available in the project. The COR can request, according to the volume of any pouring job, the addition of mixers and other equipment.

Next to the concrete casting place, at least two vibrators in good conditions, with a 65 mm maximum diameter head, will be present. Another smaller vibrator with a 25 mm diameter head, will be available in the project, in the case that thin or densely reinforced concrete elements are needed to be casted.

Casting shall proceed in a continuous manner between the previously approved construction joints, and is only allowed to be interrupted in case that rain can wash the concrete’s surface.

Concrete more than forty-five minutes old is not allowed to be used, nor remixed with water or more cement.

Concrete casting shall be performed with the utmost care, avoiding any separation of the mixed materials, cold joints formation or the creation of layers.

Casting height cannot exceed 2 m from the concrete’s final level.

C5.2.14 Concrete strength

All structural concrete must have the minimum compressive strength, 28 days after being casted, that the drawings specify. The concrete for post-stressed concrete will possess a minimum compressive strength of 350 kg/cm2 28 days after being casted, with a compressive strength according to specifications in structural drawings while performing the post-stressing. For filled CMU (concrete blocks) the minimum compressive strength will be 175 kg/cm2.

C5.2.15 Strength testing

Concrete’s compressive strength will be determined according to ASTM C-39 standard, last revision, in test cylinders with 150 mm Ø x 300 mm dimensions.

The cylinders will be prepared under the COR’s supervision. When taking fresh concrete samples the ASTM C-31 standard, latest revision, will be followed.

Six steel molds will be available on site, taking at least one sample per 20m3 of casted concrete. Each sample will consist, at least, of four test cylinders having the dimensions specified above.

The casting date, casted elements, number and designation of the cylinders, and obtained strength values will be indicated in the project’s logbook.

C5.2.16 Test approval

If compressive strength tests results are not approved, written permission shall be obtained from the COR to procure samples of the rejected concrete section or element and subsequently test them, according to the ASTM C-42 standard.

C5.2.17 Concrete curing

All built reinforced concrete elements shall be appropriately cured. This process must begin once the element’s surface has acquired enough hardness so that its integrity isn’t affected by the force of the water jet. The curing must start four hours after the concrete casting, at the latest.

In extensive concrete elements, with large surface areas, such as walls or slabs, prone to damage caused by the sun or wind, the COR shall indicate the appropriate curing procedure, without this justifying the contractor for charging any additional costs.

All curing process will have a 7-day minimum duration, even if the formwork has not yet been removed.

C5.2.18 Concrete defects reparation

After every concrete casting, any defects indicated by the COR will be repaired.

The defective section will be scarified or cut, forming clean tooth, removing any loose material by using compressed air in the produced cavities. The sections being repaired will be filled with epoxy mortar, following the manufacturer’s instructions. The specific product to be used shall be indicated by the COR. The sand used to help in the reparation will be dried in an oven, so that any moisture is removed.

C5.2.19 Exposed Concrete

Any reinforced concrete element with an exposed finish, for architectural reasons, will be built using special formwork and following every necessary instruction that allow the surface’s finish to meet its structural and architectonic specifications.

C5.2.20 Low retraction concrete

All concrete mixed with setting retardant water reducers must have a slump lower than 7.5 cm, a 25 mm (1”) maximum sized aggregate that comply with the ASTM C-33 standard. A 14 day curing period must be observed, using a curing membrane in foundations, walls or slabs, maintaining a temperature lower than 28°C. A plastic cover must be placed after the initial setting begins, so that a homogeneous curing is guaranteed.

C5.2.21 Permeable Concrete

When permeable concrete is used as part of the runoff attenuation and discharge time increment system, it must comply with the drawing’s specifications, or meeting a minimum void content of 15% and a flux capacity of 34 cm/s. Its minimum strength must be of 210 kg/cm2, while its density must be in the range of 1800 to 2000 kg/m3.

Contraction fissures can be tolerated by permeable concrete due to its natural finish, but if they are unwanted, joints can be constructed while the concrete is still fresh, using a roller with the desired joint shape and with a 9 m spacing between them. Joints shall not be constructed after the concrete has set, due to the risk of damaging the slab’s absorption capacity.

Like any other concrete, once it is casted a plastic cover must be placed on its surface to protect it from the damaged caused by the wind and sun, and allow it to retain the water used in the mix. Any other indication given by the manufacturer must be followed, so that better finishing, functionality and durability results are obtained.

C5.3 Formwork

C5.3.1 General

The reinforced concrete casting process must be performed using any COR approved formwork, using the specified measures for every element according to the drawings.

Formwork must be rigid and its reinforcing temporary structures must be designed and built with enough strength to resist: its own weight, the formwork’s weight, the concrete’s weight and any imposed load during the construction process, so that the formwork and temporary structures won’t suffer any distortions which could affect the final product. The materials used must be in good conditions, and the surfaces that will be in contact with the concrete must be free of any leftover concrete from previous castings, nails, or any other object not part of the specified concrete mix, such as hooks, black steel wire, staples, etc….

To compensate any deformations and distortions in elements with excessive weight, a precamber can be given to the formwork or temporary structures, given the COR’s approval.

To facilitate formwork removal, a release agent can be used after being approved by the COR. The aim of any formwork job is to obtain the final finish once it is released, except when the drawings indicate other finish type. Before any casting job, the formworks must be submitted for the COR’s approval, who will accept, reject or request changes to the formwork.

C5.3.2 Wood Formwork

Formwork built using wood need special care due to its short lifespan. Because of this reason, this type of formwork shall be used a maximum of three times.

In special cases reuses can be allowed, but only if the following conditions are met:

● Wood used in formwork will be sufficiently dry and of top quality, so that no excessive deformations will occur during the casting and curing process.

● Wooden plank thickness shall not be less than 25 mm.

● Planks must be reinforced with wooden beams having dimensions of 2.5 cm x 7.5 cm at 60 cm, to avoid deformations.

● The formwork’s surface in contact with the concrete shall present a smooth, brushed, crack and defect-free surface, so that it won interfere with the concrete casting process.

● Any rectangular shaped wood element used for formwork reinforcing must have a minimum thickness of 5 cm in any side, and it must be clear of any deformation or twists that may compromise the formwork.

● Wood employed as formwork can be treated with a COR approved formwork releasing agent.

● A wide variety of wood types can be used as formwork, such as: Pilón, Gallinazo, Amarillón, Lagarto and others.

C5.3.3 Plywood formwork

Formwork built using plywood must be used when excessive surface areas are encountered in a casting job, and in those cases that, due to design requirements, they must remain exposed or the COR has requested so. Plywood used as formwork must be at least of second hand quality, which shall be indicated with an appropriate manufacturer’s certified seal.

The formwork side which faces concrete, while working with plywood, will be in good conditions, which means that no deformations, splintering or any other defect that can compromise the final product shall be allowed.

The minimum allowed thickness for plywood used as formwork shall be of 12 mm, with 40 cm x 40 cm traverse wooden beams, with a minimum 5 cm x 5 cm section.

C5.3.4 Metal formwork

Formwork built using metal are considered as a desirable system for use in reinforced concrete casting (especially those systems which are widely recognized), as long as all materials are in good shape.

Molds used in the mentioned system shall be free of any deformations, rust, holes or welding burr. Additionally, any temporary structure used to support formwork can be metal or wooden, or a combination of both. The number of allowed uses are dictated by the formwork condition and quality prior to each use, with the COR’s approval.

C5.3.5 Other materials

The COR shall indicate or authorize the use of special materials for formwork in those cases that design and constructive drawings require it, or when reinforced concrete is built in places where formwork removal is too complicated and/or expensive. Particle boards will not be accepted for use as formwork or support.

C5.3.6 Formwork construction

All constructed formwork must follow a process such that the next phases are completed:

Formwork design and shop drawings elaboration.

Shop drawings approval by the COR.

Material selection.

Built up, assembly and reinforcement.

Constructed formwork COR approval.

Formwork releasing after COR approval.

Work area cleaning, formwork cleaning and equipment storage.

The COR shall approve or request partial or total substitution of formwork which he considers that don’t meet the required criteria for work execution. The COR will be able to request, at any time, the detailed formwork drawings and calculation report.

C5.3.7 Non-exposed concrete formwork

Formwork used for concrete that will not be visible, will not exempt the

Contractor from using quality and in good shape formwork for the work execution. The final product from each concrete casting shall be free of burrs, bulges, or any other defects that can affect the product’s final quality, complying with the constructive process described previously.

C5.3.8 Formwork erection

Previous to formwork erection, a conditioning of the project’s soil will be performed, so that any loose material, rubble, or soil that can represent an obstacle for formwork placing, a collapsing hazard, or offer low strength for anchors and struts. The plumb and leveling of molds will be done taking into account the formwork’s internal measures

Formwork and falsework will be adequately stiffened so that they are able to resist any lateral or gravity loads produced during the concrete’s casting. For this purpose, the use of hardwood or semi-hardwood with a 5 cm by 5 cm minimum section will be used for posts. A minimum section of 2.5 cm by 7.5 cm will be used for lateral reinforcement, but always using low deformation tubular sections or wood sections with larger measurements.

When the temporary structure used to support formwork is a modular system, the manufacturer’s technical specifications will be closely followed. It is the

COR’s criteria to approve the use of this type of system, which will be given only when…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.