19AQMM19R0314.pptx
PPTX presentation 3 MB Posted
- Attached to
- Rapel Tower Murcielago Federal contract opportunity
- Solicitation number
- 19AQMM19R0314
About this file
Preproposal Conference Slides
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site_Visit_Sign_in_Sheet_(07AUG2019).pdf | ||
| 19AQMM19R0314_A002.pdf | ||
| QA's_19AQMM19R0314.xlsx | XLSX spreadsheet | |
| J-1-2_RT_STRUCTURAL_Revised_S-12.pdf | ||
| J-1-4_RT_ARCHITECTONIC.pdf | ||
| 19AQMM19R0314_A001.pdf | ||
| J-1-2_RT_STRUCTURAL.pdf | ||
| J-2-1_Bidding_Chart.xlsx | XLSX spreadsheet | |
| 19AQMM19R0314_Sections_B-M.pdf | ||
| 19AQMM19R0314.pdf | ||
| J-3-1_Past_Performance_Questionaire_(PPQ).docx | DOCX document | |
| J-3-3_Firm_&_Project_Info.docx | DOCX document | |
| J-3-2_Past_Performance_&_References.xlsx | XLSX spreadsheet | |
| J-1-3_RT_MECANICO.pdf | ||
| J-1-1_TECHNICAL_SPECIFICATIONS.pdf | ||
| J-1-5_RTR_ELECTRICAL.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED
Pre-proposal Conference August 07, 2019
19AQMM19R0314: Murcielago Rappel Tower
The goal of this meeting is to ensure that the Government's requirements are clear to the potential bidders and to allow feedback from bidders with regards to timing, capabilities and how they can best satisfy the requirements of this project.
The Government may respond to questions asked during this meeting, however, be advised that Official government responses to questions regarding this RFP are to be submitted in writing and responses will be posted on FBO.gov.
Each offeror is responsible for knowing and understanding the project requirements regardless of what may or may not be covered at this meeting.
Goal
1.Goal of contracting:
Ensure that all offerors have the opportunity to gather the information needed to give DoS their best proposal
2. Opportunity for Offerors
| Interact with post |
| Investigate local conditions |
| Survey the Site |
3. We are here to help However, what is stated during this site visit is the offeror’s responsibility to verify.
This meeting is advisory.
4. Stay together when we are at post.
If an answer does not come from the Contracting Officer, it is not Official.
All questions asked during the Site Survey must be submitted in writing afterwards for official/final answers.
Answers during the site survey are not final.
Not all questions during the site survey will have immediate answers.
Final questions and answers will be posted on FBO.
The RFP supersedes all information to include the Site Survey.
UNCLASSIFIED
Ground Rules
Contracting Office - Principal Players
| Contracting Officer | Contracting Specialist |
| Larry Pruitt Jr. | Larry Pruitt Jr. |
Authority Only the Contracting Officer (CO) has the authority to issue amendments to this RFP or after award, modifications.
Contractors shall not contact the COR or any other individual for questions regarding this RFP. All questions shall be submitted to the CS and CO. CS and CO will coordinate responses to all questions.
After award a COR will be appointed by the CO with authority as specified in appointment letter.
UNCLASSIFIED
Authority
Single Award, Hybrid (Firm-Fixed Price + Cost Reimbursable) Award in USD Period of Performance: 120 days Prime Contractor Must Self Perform at least 51% of the work
Excusable Delays (Solicitation Section F.7): the Contractor may be allowed time, not money, for excusable delays as defined in FAR 52.249-10, Default (Fixed Price Construction)
UNCLASSIFIED
Contract Basics
Liquidated Damages
Liquidated damages for unexcused delays will be assessed in the amount of: $87.20 per day
UNCLASSIFIED
Liquidated Damages
Prior to issuance of any NTP for Construction, the Baseline Project Execution Schedule (BPES) must be submitted. Following receipt from the Contractor of any bonds or evidence of insurance within the time specified in Section/Paragraph H.3 Insurance of this contract, and following acceptance of these documents by the Contracting Officer, the Contracting Officer will provide to the Notice to Proceed.
Notice to Proceed (NTP)
Progress Payments Section G.4 - MONTHLY PROGRESS PAYMENT REQUESTS The Contractor may submit requests for progress payments at monthly intervals See Section G - CONTRACT ADMINISTRATION DATA for additional information.
Payments and Invoicing
Identified under Section H.3, H.31 Types of insurance include the following:
General Liability Defense Base Act (DBA) Insurance CLIN 002: For purposes of evaluation put $10,000 in this field. We will adjust if needed up/down after award.
Insurance
The Contractor shall erect all temporary facilities (storage sheds, shops, offices, etc.) and utilities (water, sewage, phone, electricity, etc.) as required. The cost of these temporary buildings and utilities is included in the contract FFP.
Temporary facilities and utilities shall be disassembled and removed by the Contractor at its own expense when the project is completed.
The Contractor shall make necessary arrangements to provide adequate bathroom facilities for workers, and for the appropriate removal and disposal of garbage/refuse.
The Contractor shall be responsible for obtaining any building permits if required for the project, including utility connection permits.
Temporary Facilities & Services
Equipment, materials, and fixtures used in construction shall meet or exceed the standards established in the contract, drawings, and specifications.
Any substitutions of specified materials must receive the prior approval of the COR.
The Contractor shall be responsible for the custody of all materials received for incorporation into the project, and shall take appropriate measures to store and safeguard materials and equipment delivered to the site.
Surplus materials remaining at the end of construction shall become the property of the Contractor, except for any items that may have been Government furnished.
Materials & Equipment
Questions Due
| Questions Due |
| 10:00 PM EST August 16, 2019 |
Volume I
Shall be in accordance to RFP Section L.17 and include:
Completed SF1442 Signed SF-30s (as applicable) Price Proposal (Bidding charts, Section B) Section K, Representations and Certifications Company Financial Statement Evidence of Insurance Capability JV Agreement if applicable Certification regarding trafficking in persons compliance
UNCLASSIFIED
Volume 1 – Business/Price/Contractor Information
Volume I
Proposal Currency: United States Dollar (USD)
Proposal Validity: 120 Calendar Days
Proposal Must be in English
Volume 1 – Business/Price/Contractor Information (Cont.)
Volume II - Business Management / Technical
This volume shall be in accordance to Section L of the RFP. Proposals must address all technical factors as instructed on the RFP.
Pages exceeding the limit will not be reviewed by the technical evaluators.
Volume 2 – Technical/Management
Experience- Refers to whether the firms have done similar work before.
Past Performance- Describes how well the Contractor has done the work.
Volume 2 – Technical/Management (Cont.)
Past performance sources (Not all inclusive listing)
Key Personnel (Section H.32) Project Manager Site Superintendent
UNCLASSIFIED
Volume 2 – Technical/Management (Cont.)
Provide resumes for all contractor management positions, and for key personnel (Factor 4, Subfactor 2).
Resume
Volume 2 – Technical/Management (Cont.)
Factor 4, Subfactor 4 The Offeror shall provide current copy of held license/certificate/accreditation which demonstrates that the Offeror is licensed/certified/accredited or otherwise authorized by the government of Colombia or its agent to provide construction services within Colombia.
Offeror shall provide written assurance that all sub-contractors identified in the proposal have obtained all necessary licenses AND will ensure all sub-contractors or others not currently identified in the proposal have necessary authorization before performing work.
Basis for Award
The Government will employ the Lowest Price Technically Acceptable (LPTA) evaluation method for this requirement.
Award shall be made to the contractor offering the lowest price for the project, subject to a positive responsibility determination. Only proposals determined to be technically acceptable will be considered for award.
UNCLASSIFIED
Award
The Government reserves the right to conduct discussions if determined by the Contracting Officer to be necessary.
Each initial offer should contain the offeror's best terms from a cost or price and technical standpoint.
Alternate proposals will not be accepted.
UNCLASSIFIED
Award (Cont.)
Must have a DUNS Number Must be Registered and in “active” status in the SAMS All Volumes of the Proposal must be in English
Proposal Submissions
Proposals
The proposal will consist of two volumes: (1) Cost/Price Volume, and (2) Business Management. Proposals shall be submitted as follows:
Volume I - Cost / Price (Original + 1 copy) Volume II - Technical (Original + 1 copy) CD-ROM- Two (2) total:
- Volume I (One CD)
- Volume II (One CD)
UNCLASSIFIED
Proposal Submissions (Cont.)
Hardcopy Proposal Submittal 19AQMM19R0314 If you need to submit paper proposals, complete packages must arrive to the appropriate address below by 10:00:00 AM EDT on September 10, 2019
| FEDEX/UPS/Courier: | By First Class U.S. Mail: | ||
| U.S. Department of State | U.S. Department of State | ||
| A/OPE/AQM/IP | A/OPE/AQM/IP | ||
| Attn: Larry Pruitt Jr. | Attn: Larry Pruitt Jr. | ||
| 2009 Dyess Ave Suite 3F310 | 2009 Dyess Ave Suite 3F310 | ||
| North Charleston, SC 20405 | North Charleston, SC 20405 |
Electronic Proposal Submittal 19AQMM19R0314 Email both Volume I and Volume II to the one of the following:
IP_Contracting_Team@state.gov and pruittla@state.gov
UNCLASSIFIED
Proposal Submissions (Cont.)
Questions image2.png image3.png image4.png image5.png image6.png image7.png image8.jpeg image1.jpeg
File details come from the government source that posted it.