194A-_25_General_Aviation_Aircraft__Parts__and_Service.xlsx

XLSX spreadsheet 32 KB Posted

Attached to
Competitive Selection OH|DOT194A25-1
Contract number
DOT194A25-1
Issued by
Ohio

About this file

This document is a state and local contract indefinite delivery vehicle (IDV) for general aviation aircraft parts and services, specifically for the State of Ohio. The contract covers maintenance, inspection, and repair services for multiple aircraft models including Cessna 182S and 182T, Partenavia P68, GippsAero GA8 Airvan, and Cessna 208B Caravan. The document appears to be a comprehensive pricing and service agreement that outlines detailed inspection and maintenance requirements for various aircraft types.

The contract provides standardized hourly labor rates for inspection ($150/hour), maintenance ($150/hour), overtime ($225/hour), and travel time ($150/hour). Specific pricing is established for different inspection phases and intervals for each aircraft model, with parts pricing inclusive of oil costs. Additional fees include a 1.5% charge for hazardous materials and consumables. The document includes extensive details on inspection intervals, from 50-hour to 1600-hour checks, covering various maintenance procedures for different aircraft models and their associated engines. While no specific contract duration is explicitly stated, the pricing is guaranteed to remain firm for the contract period, and the state retains the flexibility to utilize bidders for individual line items as needed.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cessna 182S & T

194-25 Pricing
Vendor Name:
Please quote and insert below, your lowest net delivered prices for the commodities (or services) herein described, guaranteed firm for the contract duration for : Cessna: 182S, 182T, OEM parts, components, accessories, and the inspection and/or maintenance/repair. Please note the "Parts" sections noted with an asterisk as these inspections are to be inclusive of the cost of oil. Bidders may submit pricing for any or all bid items included below.
Each all items below should be bid as independent of one another. The Department may utilize a bidder for any line item below.
Bid ItemItem DescriptionQuote Hourly Labor/Travel Rates
1Inspection$150.00per hour
2Maintenance$150.00per hour
3Overtime$225.00per hour
4Travel Time$150.00per hour
Fee Calculation
5Airport concessions fee$0.00
6Hazardous, Consumables, Hardware, etc1.5% of Parts
7Pickup or drop-off outside our normal business hours7AM-5:30PM
8Total cost of a PHASE 1 inspection for a Cessna 182T utilizing Cessna Model 182T Phasecard Inspection Program, Revision 6 dated 7/31/2015.Total Cost:
a. Parts*$200.00
b. Labor$1,200.00
$1,400.00
9Total cost of a PHASE 2 inspection for a Cessna 182T utilizing Cessna Model 182T Phasecard Inspection Program, Revision 6 dated 7/31/2015.Total Cost:
a. Parts*$250.00
b. Labor$1,950.00
Total Cost Item$2,200.00
10Total cost of a PHASE 3 inspection for a Cessna 182T utilizing Cessna Model 182T Phasecard Inspection Program, Revision 6 dated 7/31/2015.Total Cost:
a. Parts*$250.00
b. Labor$4,200.00
$4,450.00
11Total cost of a PHASE 1 inspection for a Cessna 182S utilizing Cessna Model 182S Phasecard Inspection Program, Revision 8 dated 7/31/2015.Total Cost:
a. Parts*$200.00
b. Labor$1,200.00
Total Cost Item$1,400.00
12Total cost of a PHASE 2 inspection for a Cessna 182S utilizing Cessna Model 182S Phasecard Inspection Program, Revision 8 dated 7/31/2015.Total Cost:
a. Parts*$250.00
b. Labor$1,950.00
Total Cost Item$2,200.00
13Total cost of a PHASE 3 inspection for a Cessna 182S utilizing Cessna Model 182S Phasecard Inspection Program, Revision 8 dated 7/31/2015.Total Cost:
a. Parts*$250.00
b. Labor$4,200.00
Total Cost Item$4,450.00
* Parts pricing shall be inclusive of all oil costs

Partenavia P68

194-25 Pricing
Vendor Name:
Please quote and insert below, your lowest net delivered prices for the commodities (or services) herein described, guaranteed firm for the contract duration for : Partenavia P68C & P68-OBS, OEM parts, components, accessories, and the inspection and/or maintenance/repair. Please note the "Parts" sections noted with an asterisk as these inspections are to be inclusive of the cost of oil. Bidders may submit pricing for any or all bid items included below.
Each all items below should be bid as independent of one another. The Department may utilize a bidder for any line item below.
Bid ItemItem DescriptionQuote Hourly Labor/Travel Rates
1Inspection$150.00per hour
2Maintenance$150.00per hour
3Overtime$225.00per hour
4Travel Time$150.00per hour
Fee Calculation
5Airport concessions fee$0.00
6Hazardous, Consumables, Hardware, etc1.5% of Parts
7Pickup or drop-off outside our normal business hours7AM-5:30PM
8Total cost of a 50-hour inspection on a Partenavia P68 Utilizing State of Ohio Partenavia 50 hour inspection formTotal Cost:
a. Parts*$400.00
b. Labor$825.00
Total Cost Item$1,225.00
9Total cost of a 100/200 hour inspection on a Partenavia P68 Utilizing State of Ohio Partenavia Annual/100/200 hour inspection formTotal Cost:
a. Parts*$475.00
b. Labor$4,800.00
Total Cost Item$5,275.00
10Total cost of a ANNUAL inspection on a Partenavia P68 Utilizing State of Ohio Partenavia Annual/100/200 hour inspection formTotal Cost:
a. Parts*$475.00
b. Labor$5,700.00
Total Cost Item$6,175.00
* Parts pricing shall be inclusive of all oil costs

GA8 Airvan

194-25 Pricing
Vendor Name:
Please quote and insert below, your lowest net delivered prices for the commodities (or services) herein described, guaranteed firm for the contract duration for : GippsAero GA8-TC 320, OEM parts, components, accessories, and the inspection and/or maintenance/repair. Please note the "Parts" sections noted with an asterisk as these inspections are to be inclusive of the cost of oil. Bidders may submit pricing for any or all bid items included below.
Each all items below should be bid as independent of one another. The Department may utilize a bidder for any line item below.
Bid ItemItem DescriptionQuote Hourly Labor/Travel Rates
1Inspection$150.00per hour
2Maintenance$150.00per hour
3Overtime$225.00per hour
4Travel Time$150.00per hour
Fee Calculation
5Airport concessions fee$0.00
6Hazardous, Consumables, Hardware, etc1.5% of Parts
7Pickup or drop-off outside our normal business hours7AM-5:30PM
Total cost of Inspections on a GA8 Airvan per GA8-TC 320 Airplane Service Manual C01-00-06 Initial issue 20 Mar 2009 & amendment date 20 Jan 2023.
8Total cost of a 50-hour inspection on a GA8-TC 320, Utilizing State of Ohio GA8-TC 320, 50 Hour/Annual Inspection Form.Total Cost:
a. Parts*$250.00
b. Labor$2,400.00
Total Cost Item$2,650.00
9Total cost of a 100-hour inspection on a GA8-TC 320 Utilizing State of Ohio GA8-TC 320, 100 Hour/Annual Inspection Form.Total Cost:
a. Parts*$500.00
b. Labor$5,250.00
Total Cost Item$5,750.00
10Total cost of a Annual inspection on a GA8-TC 320 Utilizing State of Ohio GA8-TC 320 , 100 Hour/Annual Inspection Form.Total Cost:
a. Parts*$500.00
b. Labor$6,000.00
Total Cost Item$6,500.00
* Parts pricing shall be inclusive of all oil costs

Cessna 208B Caravan

194-25 Pricing
Vendor Name:
Please quote and insert below, your lowest net delivered prices for the commodities (or services) herein described, guaranteed firm for the contract duration for : Cessna: 208B Caravan, OEM parts, components, accessories, and the inspection and/or maintenance/repair. Please note the "Parts" sections noted with an asterisk as these inspections are to be inclusive of the cost of oil. Bidders may submit pricing for any or all bid items included below.
Each all items below should be bid as independent of one another. The Department may utilize a bidder for any line item below.
Bid ItemItem DescriptionQuote Hourly Labor/Travel Rates
1Inspectionper hour
2Maintenanceper hour
3Overtimeper hour
4Travel Timeper hour
Fee Calculation
5Airport concessions fee
6Hazardous, Consumables, Hardware, etc
7Pickup or drop-off outside our normal business hours
Total cost of Inspections on a Cessna Caravan 208B (s/n: 208B1061 & 208B5833) per Cessna Maintenance Manual 05-10-01, D2078-13: Revision - 42, Revision Date - Jun 1,, 2024
8Cost of 5-15-0A Inspection Document (every Annual Inspection)Total Cost:
a. Parts*
b. Labor
Total Cost Item
9Cost of 5-15-01 Inspection Document Interval (every 12 months)Total Cost:
a. Parts*
b. Labor
Total Cost Item
9aCost of 5-15-01 Inspection Document Interval (every 12 months) with TKSTotal Cost:
a. Parts*
b. Labor
Total Cost Item
10Cost of 5-15-02 Inspection Document (every 24 months) with Pneumatic De-IcingTotal Cost:
a. Parts*
b. Labor
Total Cost Item
10aCost of 5-15-02 Inspection Document (every 24 months) with TKSTotal Cost:
a. Parts*
b. Labor
Total Cost Item
11Cost of 5-15-03 Inspection Document (every 48 months)Total Cost:
a. Parts*
b. Labor
Total Cost Item
12Cost of 5-15-04 Inspection Document (every 72 months)Total Cost:
a. Parts*
b. Labor
Total Cost Item
12aCost of 5-15-04 Inspection Document (every 72 months) with Cargo PodTotal Cost:
a. Parts*
b. Labor
Total Cost Item
13Cost of 5-15-05 Inspection Document Interval 12C item(s) (every 144 months)Total Cost:
a. Parts*
b. Labor
Total Cost Item
14Cost of 5-15-06 Inspection Document (every 200 hours or 12 months) Main Battery Lead AcidTotal Cost:
a. Parts*
b. Labor
Total Cost Item
15Cost of 5-15-07 Inspection Document (every 400 hours or 12 months) with McCauley Propeller & de-ice bootsTotal Cost:
a. Parts*
b. Labor
Total Cost Item
15aCost of 5-15-07 Inspection Document (every 400 hours or 12 months) with TKS, Cargo Pod & McCauley PropellerTotal Cost:
a. Parts*
b. Labor
Total Cost Item
16Cost of 5-15-08 Inspection Document (every 400 hours or 24 months)Total Cost:
a. Parts*
b. Labor
Total Cost Item
17Cost of 5-15-09 Inspection Document (every 800 hours or 12 months)Total Cost:
a. Parts*
b. Labor
Total Cost Item
18Cost of 5-15-10 Inspection Document (every 800 hours or 24 months)Total Cost:
a. Parts*
b. Labor
Total Cost Item
19Cost of 5-15-11 Inspection Document (every 1600 hours or 24 months)Total Cost:
a. Parts*
b. Labor
Total Cost Item
20Cost of 5-15-12 Inspection Document (every 1600 hours or 60 months)Total Cost:
a. Parts*
b. Labor
Total Cost Item
21Cost of 5-15-20 Required 14CFR 91.207 interval item(s), which are completed every 12 calendar months (No grace period). (N717HP ARTEX C406-N) & (N850H ARTEX C406-2)Total Cost:
a. Parts*
b. Labor
Total Cost Item
22Cost of 5-15-26 Interval AN item(s), which are completed at the at 800 Flight Hours/12 Months, whichever occurs first. Main Battery Lead AcidTotal Cost:
a. Parts*
b. Labor
Total Cost Item
Pratt & Whitney Canada PT6-114A Engine Maintenance Manual 72-00-00 Revision: 48.0 (Jul 08/2024) Table 601 Periodic Inspection items.
24Cost of Table 601 Periodic Inspection; Interval MINOR item(s)Total Cost:
a. Parts*
b. Labor
Total Cost Item
25Cost of Table 601 Periodic Inspection; Interval ROUTINE item(s)Total Cost:
a. Parts*
b. Labor
Total Cost Item
26Cost of Table 601 Periodic Inspection; Interval 100 Hour item(s)Total Cost:
a. Parts*
b. Labor
Total Cost Item
27Cost of Table 601 Periodic Inspection; Interval 200 Hour item(s)Total Cost:
a. Parts*
b. Labor
Total Cost Item
28Cost of Table 601 Periodic Inspection; Interval 200 Hour or 6 months item(s)Total Cost:
a. Parts*
b. Labor
Total Cost Item
29Cost of Table 601 Periodic Inspection; Interval 300 Hours Item(s)Total Cost:
a. Parts*
b. Labor
Total Cost Item
30Cost of Table 601 Periodic Inspection; Interval 600 Hours Item(s)Total Cost:
a. Parts*
b. Labor
Total Cost Item
31Cost of Table 601 Periodic Inspection; Interval 600 Hours or 12 months Item(s)Total Cost:
a. Parts*
b. Labor
Total Cost Item
32Cost of Table 601 Periodic Inspection; Interval 1000 Hours Item(s)Total Cost:
a. Parts*
b. Labor
Total Cost Item
33Cost of Table 601 Periodic Inspection; Interval 1500 Hours Item(s)Total Cost:
a. Parts*
b. Labor
Total Cost Item
34Cost of Table 601 Periodic Inspection; Interval 1800 Hours Item(s)Total Cost:
a. Parts*
b. Labor
Total Cost Item
Pratt & Whitney Canada PT6-140 Engine Maintenance Manual 72-00-00 Revision: 22.0 (Nov. 18, 2024) 025.20.00 SCHEDULED MAINTENANCE CHECKS 1. B. Periodic Inspection Table 2 Scheduled Inspection Maintenance Tasks (Task 05-20-00-210-801)
24Cost of Table 2. Periodic Inspection; Interval MINOR item(s)Total Cost:
a. Parts*
b. Labor
Total Cost Item
25Cost of Table 2. Periodic Inspection; Interval ROUTINE item(s)Total Cost:
a. Parts*
b. Labor
Total Cost Item
26Cost of Table 2. Periodic Inspection; Interval 100 Hour item(s)Total Cost:
a. Parts*
b. Labor
Total Cost Item
27Cost of Table 2. Periodic Inspection; Interval 200 Hour item(s)Total Cost:
a. Parts*
b. Labor
Total Cost Item
28Cost of Table 2. Periodic Inspection; Interval 200 Hour or 6 months item(s)Total Cost:
a. Parts*
b. Labor
Total Cost Item
29Cost of Table 2. Periodic Inspection; Interval 400 Hours Item(s)Total Cost:
a. Parts*
b. Labor
Total Cost Item
30Cost of Table 2. Periodic Inspection; Interval 600 Hours Item(s)Total Cost:
a. Parts*
b. Labor
Total Cost Item
31Cost of Table 2. Periodic Inspection; Interval 600 Hours or 12 months Item(s)Total Cost:
a. Parts*
b. Labor
Total Cost Item
32Cost of Table 2. Periodic Inspection; Interval 1000 Hours Item(s)Total Cost:
a. Parts*
b. Labor
Total Cost Item
33Cost of Table 2. Periodic Inspection; Interval 1500 Hours Item(s)Total Cost:
a. Parts*
b. Labor
Total Cost Item
34Cost of Table 2. Periodic Inspection; Interval 1800 Hours Item(s)Total Cost:
a. Parts*
b. Labor
Total Cost Item

* Parts pricing shall be inclusive of all oil costs

References

194-25 VENDOR REFERENCES
Vendor Name:
References
Each bidder must submit below, the names, addresses and telephone numbers of three references of recurrent customers for Airbus AS350 maintenance/repairs. The references must be positive and address the overall ability of the vendor and its employees to perform Airbus AS350 maintenance/repair services in order to be considered a responsible bidder. It is a requirement of the contract that the vendor must have performed like services. References shall only be accepted from the companies for whom Airbus AS350 maintenance/repair services were performed.
Reference 1:
Dates Service Performed (From/to)
Company Name
Company Address
CityStateTXZip77253
Contact Name
TelephonePager NumberNA
Reference 2:
Dates Service Performed (From/to)
Company Name
Company Address
CityStateTXZip75067
Contact Name
TelephonePager NumberNA
Reference 3:
Dates Service Performed (From/to)
Company Name
Company Address
CityStateLAZip71107
Contact Name
TelephonePager NumberNA

Insurance

194-25 Vendor Insurance
Vendor Name:Tiffin Aire
Bidder must furnish proof of insurance coverage for the Department’s aircraft while it is in their possession and shall include coverage during the test flights that they may perform with qualified staff upon completion of services rendered. The minimum coverage per occurrence that will be accepted by the Department is four million dollars ($4,000,000.00).
Bidder must also indicate the following coverage’s:Dollars ($)
1Possess products, premises, and complete operations insurance limits in the minimum amount of:Premises $5,000,000 Products and Complete Operations $25,000,000
2Show ground hangar keepers liability insurance limit minimum amount of:$25,000,000.00
3Show in flight hangar keepers liability insurance minimum limit each occurrence of:

File details come from the government source that posted it. Updated .