About this file
This is a Tree Removal Plan document prepared by Ramboll Americas Engineering Solutions for the New York State Office of Parks, Recreation and Historic Preservation (OPRHP) related to the Lake Welch Infrastructure Improvements project located at 800 Kanawauke Road, Stony Point, New York. The project involves the removal of approximately 108 trees ranging from 3 inches to 32 inches in diameter at breast height (DBH) within a designated 12-foot-wide path near the Lake Welch Wastewater Treatment Plant. Trees must be cut no more than 3 feet above ground surface using hand tools and low ground pressure tracked or rubber-wheeled equipment. All trees greater than 3 inches DBH must be felled between November 1 and March 31 to prevent disturbance to protected bat species, with a final deadline of March 31, 2027. Trees with a DBH of 18 inches or greater must be stockpiled near the WWTP. Site access is provided via a gravel road and temporary access route established by Parks, with access through an underpass measuring 12 feet high and 13 feet wide. A guided site visit was scheduled for October 13, 2026 at 11:00 AM at the Lake Welch Bathhouse.
The contract requires contractors to implement erosion control measures following any soil disturbances and to restore disturbed soils to existing conditions at no expense to the owner. Soil disturbance will be avoided to the extent practical, with root balls to be removed during future soil excavation efforts. Tree felling must be conducted in conformance with a site-specific health and safety plan. The BID price should be inclusive of all necessary materials. Removal of trees and debris off-site is not part of this contract. Prior contractors awarded identical or substantially similar procurements within the past five years include Cedar Pond Enterprises and Decker's Tree Services. The contract is funded through the New York State OPRHP and involves coordination with the Palisades Region office under Regional Director Joshua Laird.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ SA-PI-2026-001 Lake Welch Tree Removal.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0021291
DATE:
CONSTRUCTION
NOT FOR
PRELIMINARY
09/22/2026
RAMBOLL AMERICAS ENGINEERING SOLUTIONS, INC.
CERTIFICATE OF AUTHORIZATION:
333 W WASHINGTON STREET, SYRACUSE, NEW YORK, 13202
315-956-6100
Description Date:
REVISIONS
Rev No
Drawn By:
Design By:
Checked By:
Approved By:
J.MCNAUGHTON
J.MCNAUGHTON
C. HUGHES
SEPTEMBER 2026
P. ROMANO
Sheet:
OPRHP Contract Number:
Sheet Title:
TREE
REMOVAL
COVER
Drawing Number:
EX-0
Project Title:
LAKE WELCH IMPROVEMENTS
TREE REMOVALS
Project Location:
Key Plan
800 KANAWAUKE ROAD, STONY
POINT, NEW YORK 10980
Governor Kathy Hochul Commissioner Kathy Moser
3006 Seven Lakes Dr, PO Box 427 Bear Mountain, NY 10911
(845) 786-2701
NYS OPRHP Palisades Region
Seal and Signature
P. ROMANO
Regional Director: Joshua Laird
IT IS A VIOLATION OF STATE EDUCATION LAW FOR ANY PERSON, UNLESS UNDER THE DIRECTION OF A LICENSED ARCHITECT/ENGINEER TO ALTER THIS DOCUMENT IN ANYWAY. ALTERATIONS MUST HAVE THE SEAL AFFIXED ALONG WITH A DESCRIPTION OF THE ALTERATIONS, DATE AND ARCHITECT'S/ENGINEER'S
SIGNATURE. COPYRIGHT © 2015
THIS DRAWING WAS PREPARED AT THE SCALE INDICATED. INACCURACIES IN THE STATED SCALE MAY BE INTRODUCED WHEN DRAWINGS ARE REPRODUCED BY ANY MEANS. USE THE GRAPHIC SCALE BAR TO
DETERMINE THE ACTUAL SIZE. DRAWING IS NOT SCALABLE IF NO SCALE BAR IS PRESENT.
Date:
89 7 6 5 4 3 2 1
G
H
F
E
D
C
B
A
Initials:
PROJECT AREA
OVERALL
C :\D
C \A
C C
D O
C S\
R
AM
BO
LL
G R
U
PP
EN
A
S\ R
U S-
.0
L
AK
E
W
EL
C H
IM
PR
O
VE
M
EN
TS
P
R O
JE
C
T 2\
PR
O
JE
C
T
FI
LE
S\
D
EL
IV
ER
Y\
C
IV
IL
\E
XH
IB
IT
S\
TR
EE
D
EM
O P
LA
N
\1
7.
5_
C -1
_T
R
EE
D
EM
O P
LA
N
.D W
G
SA
VE
D
: 9 /2
2/
:5
PM
PROJECT LOCATION MAP
SCALE 1" = 4000'
HARRIMAN
STATE PARK
LAKE
WELCH PALISADES PKW
Y
LAKE
TIORATI
LAKE
KANAWAUKE
THIRD
RESERVOIR
SECOND
RESERVOIR
BREAKNECK
POND
PROJECT
LOCATION
SITE LOCATION MAP
SCALE 1" = 1000'
SITE
LOCATION
INDEX OF DRAWINGS
SHEET
NUMBER SHT # SHEET TITLE PROJECT
AREA
CIVIL
EX-0 1 TREE REMOVAL COVER OVERALL
EX-1 2 OVERALL PROJECT TREE DEMOLITION PLAN OVERALL
EX-2 3 OVERALL PROJECT TREE DEMOLITION PLAN OVERALL
TREE REMOVAL
HARRIMAN STATE PARK
800 KANAWAUKE ROAD, STONY POINT, NEW YORK 10980
1940103917- 005
SEPTEMBER 2026
LAKE WELCH
INFRASTRUCTURE
IMPROVEMENTS
10 11
1095 10 90 10
75 10 70 10
65 10
10 11
1095 10 90 10
75 10 70 10
65 10
10 11
1095 10 90 10
75 10 70 10
65 10
TREE REMOVAL TABLE
NORTHING
877,069.5361
877,070.0502
877,037.9505
877,024.3735
877,017.0346
876,996.6757
877,005.8148
876,982.2820
876,944.7975
876,919.0075
876,889.5778
876,878.9942
876,878.4092
876,884.3423
876,873.5293
876,836.6248
876,847.5628
876,836.9198
876,835.2292
876,841.6872
876,836.7085
876,798.2493
876,805.1347
876,780.9917
876,786.4232
876,780.0127
876,740.4003
876,740.0630
876,742.4357
876,717.5729
EASTING
608,155.6884
608,145.4656
608,163.7133
608,157.8964
608,145.9364
608,137.6041
608,157.0578
608,156.5211
608,155.9148
608,154.4476
608,148.9161
608,164.2907
608,173.5624
608,174.2412
608,157.9679
608,163.5079
608,165.7117
608,184.3032
608,180.6234
608,173.4397
608,171.8084
608,150.8367
608,168.6608
608,128.9824
608,132.9125
608,179.6706
608,199.1493
608,191.4636
608,181.3150
608,184.4921
TREE REMOVAL TABLE
NORTHING
876,722.1470
876,730.0758
876,714.0565
876,693.9634
876,676.1196
876,665.9805
876,669.3040
876,642.2902
876,639.7391
876,648.9415
876,632.0449
876,622.7781
876,626.0770
876,589.7730
876,544.5171
876,560.4863
876,554.9502
876,568.4088
876,563.6385
876,524.0208
876,532.2951
876,515.8223
876,510.9171
876,486.0278
876,492.3850
876,462.6508
876,486.4428
876,471.5091
876,466.7394
876,087.8278
EASTING
608,187.5299
608,192.3609
608,174.4059
608,198.2372
608,184.2736
608,207.4823
608,209.4147
608,209.4051
608,192.1870
608,203.7270
608,203.7113
608,191.4111
608,205.0098
608,202.9239
608,212.6295
608,216.0698
608,212.5029
608,221.0941
608,227.0360
608,224.6328
608,234.1508
608,223.0744
608,240.8303
608,217.4898
608,219.4425
608,203.3143
608,201.1788
608,176.9748
608,176.3924
608,169.1779
TREE REMOVAL TABLE
NORTHING
876,056.9870
876,064.6894
876,050.1343
876,054.4099
876,061.2730
876,025.6091
876,026.9004
875,993.2581
875,985.1787
876,007.0261
875,952.0187
875,950.4048
875,933.5584
875,909.8426
875,911.7628
875,888.2235
875,886.8446
875,883.3525
875,890.3761
875,885.6586
875,881.8554
EASTING
608,134.0513
608,144.1041
608,148.8659
608,112.9864
608,123.2797
608,144.6812
608,136.7363
608,143.3029
608,132.8203
608,146.4801
608,139.2114
608,110.9316
608,112.3965
608,108.9926
608,088.6547
608,086.5475
608,080.8381
608,084.8270
608,122.2652
608,122.4119
608,133.5529
RAMBOLL AMERICAS ENGINEERING SOLUTIONS, INC.
CERTIFICATE OF AUTHORIZATION:
Description Date:
REVISIONS
Rev No
Drawn By:
Design By:
Checked By:
Approved By:
Sheet:
Sheet Title: Drawing Number:
Project Title:
Project Location:
Key Plan
Governor Kathy Houchul Commissioner Kathy Moser
3006 Seven Lakes Dr, PO Box 427 Bear Mountain, NY 10911
(845) 786-2701
NYS OPRHP Palisades Region
Seal and Signature
Regional Director: Joshua Laird
IT IS A VIOLATION OF STATE EDUCATION LAW FOR ANY PERSON, UNLESS UNDER THE DIRECTION OF A LICENSED ARCHITECT/ENGINEER TO ALTER THIS DOCUMENT IN ANYWAY. ALTERATIONS MUST HAVE THE SEAL AFFIXED ALONG WITH A DESCRIPTION OF THE ALTERATIONS, DATE AND ARCHITECT'S/ENGINEER'S
SIGNATURE. COPYRIGHT © 2015
THIS DRAWING WAS PREPARED AT THE SCALE INDICATED. INACCURACIES IN THE STATED SCALE MAY BE INTRODUCED WHEN DRAWINGS ARE REPRODUCED BY ANY MEANS. USE THE GRAPHIC SCALE BAR TO
DETERMINE THE ACTUAL SIZE. DRAWING IS NOT SCALABLE IF NO SCALE BAR IS PRESENT.
Date:
Initials:
PROJECT AREA
SCALE IN FEET
1206060
N
SA
VE
D : 9
/2 2/
:5
PM
C. HUGHES
OVERALL
PROJECT TREE
DEMO PLAN EX-1
LAKE WELCH IMPROVEMENTS
TREE REMOVALS
800 KANAWAUKE ROAD, STONY
POINT, NEW YORK 10980
DEMOLITION & EROSION
CONTROL LEGEND
FUTURE PROJECT LOD BOUNDARY
TEMPORARY ACCESS ROUTE BY OWNER
APPROXIMATE STOCKPILE LOCATION
EXISTING UTILITY
UNDERGROUND WATER
UNDERGROUND STORM LINE
UNDERGROUND SEWER LINE
EXISTING WATER
OVERHEAD WIRES
EXISTING ELECTRICAL
EXISTING TELECOMMUNICATIONS
CATCH BASINS & CURB INLET
WATER VALVE
SEWER MANHOLE
HYDRANT
TREE
E E
T
W
DATE:
CONSTRUCTION
NOT FOR
PRELIMINARY
09/22/2026
C :\D
C \A
C C
D O
C S\
R
AM
BO
LL
G R
U
PP
EN
A
S\ R
U S-
.0
L
AK
E
W
EL
C H
IM
PR
O
VE
M
EN
TS
P
R O
JE
C
T 2\
PR
O
JE
C
T
FI
LE
S\
D
EL
IV
ER
Y\
C
IV
IL
\E
XH
IB
IT
S\
TR
EE
D
EM
O P
LA
N
\1
7.
5_
C -1
_T
R
EE
D
EM
O P
LA
N
.D W
G
J. EISENSTADT
S. KRAMER
A. HOCHHALTER
SEPTEMBER 2026
89 7 6 5 4 3 2
G
H
F
E
D
C
B
NOTES:
1. TREES GREATER THAN 3-INCH DIAMETER AT BREAST HEIGHT (DBH) WITHIN THE LIMITS OF DISTURBANCE SHALL BE FELLED
BETWEEN NOVEMBER 1 AND MARCH 31 TO PREVENT DISTURBANCE TO PROTECTED BAT SPECIES.
2. TREES SHALL BE CUT NO MORE THAN 3 FEET ABOVE GROUND SURFACE USING HAND TOOLS AND EQUIPMENT AND VEHICLES
WITH LOW GROUND PRESSURE TRACKED OR RUBBER WHEELS.
3. TREE FELLING SHALL BE CONDUCTED IN CONFORMANCE WITH A SITE-SPECIFIC HEALTH AND SAFETY PLAN.
4. SOIL DISTURBANCE WILL BE AVOIDED TO THE EXTENT PRACTICAL. BECAUSE ONLY THE MAIN STEM OF THE TREE NEEDS TO BE FELLED AT THIS TIME, THE ROOT BALL SHALL BE REMOVED AS PART OF THE FUTURE SOIL EXCAVATION EFFORTS. SOILS DISTURBED DURING FELLING WILL BE REPAIRED AND STABILIZED WITH SEED AND/OR MULCH TO MINIMIZE EROSION POTENTIAL.
ANY SITE DISTURBANCE SHALL BE RESTORED TO EXISTING CONDITION WITH NO EXPENSE TO OWNER.
5. THE CONTRACTOR SHALL CONTACT OWNER'S REPRESENTATIVE IMMEDIATELY IF
CLARIFICATION OR INTERPRETATION OF THE CONTRACT DOCUMENTS, OR ANY OTHER ASPECTS OF THE PROJECT, IS REQUIRED.
6. LEGEND REPRESENTS STANDARD LINE TYPES AND HATCHING UNLESS INDICATED ON SPECIFIC DRAWINGS.
7. THE ABBREVIATIONS AND SYMBOLS HEREIN ARE STANDARD OF THIS OFFICE AND APPLY
TO A VARIETY OF PROJECTS. ONLY A PORTION OF THEM WILL NECESSARILY APPLY TO
ANY GIVEN PROJECT. SEE THE LISTINGS IN OTHER SECTIONS OF THIS PROJECT FOR ADDITIONAL SYMBOLS AND ABBREVIATIONS.
8. RAMBOLL IS NOT RESPONSIBLE FOR SITE SECURITY AND SAFETY, OR CONSTRUCTION MEANS AND METHODS.
9. CONTRACTOR IS RESPONSIBLE FOR THE SEQUENCING OF CONSTRUCTION UNLESS A
SEQUENCE OF CONSTRUCTION IS PROVIDED IN THE CONTRACT DOCUMENTS.
10. FINAL TREE REMOVAL LOCATIONS TO BE MARKED AND CONFIRMED BY OWNER PRIOR TO START OF DEMOLITION.
11. INSTALLATION OF TEMPORARY ACCESS ROADS AND ASSOCIATED EROSION BY OWNER; CONTRACTOR RESPONSIBLE FOR ACCESS
AND EROSION CONTROL MAINTENANCE DURING CONSTRUCTION PERIOD.
12. CONTRACTOR TO STOCKPILE TRUNKS 18" OR GREATER DBH IN THE VICINITY OF THE WWTP, IN AREA SPECIFIED.
9" DBH
6" DBH
6" DBH
10" DBH
6" DBH
13" DBH
4" DBH
11" DBH 5" DBH
10" DBH
16" DBH
17" DBH
4" DBH
11" DBH
13" DBH
14" DBH
11" DBH
10" DBH
5" DBH
23" DBH
23" DBH
13" DBH
11" DBH
17" DBH5" DBH
9" DBH
18" DBH
14" DBH
28" DBH
32" DBH
15" DBH
17" DBH
6" DBH
6" DBH
14" DBH
7" DBH
9" DBH
10" DBH
13" DBH
13" DBH
9" DBH
3" DBH
4" DBH
23" DBH
11" DBH
3" DBH
7" DBH
4" DBH
6" DBH
4" DBH
15" DBH
4" DBH
5" DBH
15" DBH
29" DBH
8" DBH
14" DBH
5" DBH
8" DBH
10" DBH
18" DBH
18" DBH
13" DBH
13" DBH
24" DBH
16" DBH
8" DBH
18" DBH
21" DBH
11" DBH
22" DBH
10" DBH
21" DBH
19" DBH
16" DBH
15" DBH
29" DBH
CHAIN LINK FENCE
ACCESS PROVIDED
BY OWNER
ADD UNDER PASS
DIMENSIONS: 12' H X 13' W
TEMPORARY ACCESS
ROUTE BY OWNER
TEMPORARY ACCESS
ROUTE BY OWNER
APPROXIMATE
STOCKPILE LOCATION
BOULDER (TYP.)
1015 1015
1025 1030
8"CMP
8"INV=1032.32
8"INV=1034.26
TREE REMOVAL TABLE
NORTHING
875,266.6959
875,439.7400
874,219.1380
875,262.3220
875,288.6920
874,618.7600
874,224.1120
874,260.0350
875,390.1910
875,433.3030
875,449.5190
875,389.1730
875,281.0330
874,340.0010
875,288.1950
874,226.7260
874,340.2460
874,334.2660
874,309.1180
874,512.0010
874,604.5540
874,930.3900
874,963.7790
874,975.1020
874,992.5530
874,578.1430
874,704.5910
874,699.6830
874,758.4020
EASTING
609,801.1795
609,608.3970
610,750.8028
609,483.1630
609,516.9810
610,145.3510
610,285.3760
610,791.2866
609,552.5350
609,552.2560
609,569.5280
609,760.9114
610,314.0390
610,291.1760
610,313.8050
610,287.9850
610,287.5250
610,286.0550
610,287.6500
610,287.0710
610,279.6640
610,501.6950
610,497.7190
610,495.8630
610,488.4980
610,668.4420
610,570.2530
610,579.1230
610,545.3980
RAMBOLL AMERICAS ENGINEERING SOLUTIONS, INC.
CERTIFICATE OF AUTHORIZATION:
Description Date:
REVISIONS
Rev No
Drawn By:
Design By:
Checked By:
Approved By:
Sheet:
Sheet Title: Drawing Number:
Project Title:
Project Location:
Key Plan
Governor Kathy Houchul Commissioner Kathy Moser
3006 Seven Lakes Dr, PO Box 427 Bear Mountain, NY 10911
(845) 786-2701
NYS OPRHP Palisades Region
Seal and Signature
Regional Director: Joshua Laird
IT IS A VIOLATION OF STATE EDUCATION LAW FOR ANY PERSON, UNLESS UNDER THE DIRECTION OF A LICENSED ARCHITECT/ENGINEER TO ALTER THIS DOCUMENT IN ANYWAY. ALTERATIONS MUST HAVE THE SEAL AFFIXED ALONG WITH A DESCRIPTION OF THE ALTERATIONS, DATE AND ARCHITECT'S/ENGINEER'S
SIGNATURE. COPYRIGHT © 2015
THIS DRAWING WAS PREPARED AT THE SCALE INDICATED. INACCURACIES IN THE STATED SCALE MAY BE INTRODUCED WHEN DRAWINGS ARE REPRODUCED BY ANY MEANS. USE THE GRAPHIC SCALE BAR TO
DETERMINE THE ACTUAL SIZE. DRAWING IS NOT SCALABLE IF NO SCALE BAR IS PRESENT.
Date:
Initials:
PROJECT AREA
SCALE IN FEET
1608080
N
SA
VE
D : 9
/2 2/
:5
PM
C. HUGHES
OVERALL
PROJECT TREE
DEMO PLAN EX-2
LAKE WELCH IMPROVEMENTS
TREE REMOVALS
800 KANAWAUKE ROAD, STONY
POINT, NEW YORK 10980
DATE:
CONSTRUCTION
NOT FOR
PRELIMINARY
09/22/2026
C :\D
C \A
C C
D O
C S\
R
AM
BO
LL
G R
U
PP
EN
A
S\ R
U S-
.0
L
AK
E
W
EL
C H
IM
PR
O
VE
M
EN
TS
P
R O
JE
C
T 2\
PR
O
JE
C
T
FI
LE
S\
D
EL
IV
ER
Y\
C
IV
IL
\E
XH
IB
IT
S\
TR
EE
D
EM
O P
LA
N
\1
7.
5_
C -1
_T
R
EE
D
EM
O P
LA
N
.D W
G
J. EISENSTADT
S. KRAMER
A. HOCHHALTER
SEPTEMBER 2026
89 7 6 5 4 3 2
G
H
F
E
D
C
B
10" DBH
10" DBH
8" DBH
20" DBH
24" DBH
20" DBH
24" DBH
20" DBH
20" DBH
24" DBH
8" DBH
8" DBH
30" DBH
12" DBH
8" DBH
8" DBH
8" DBH
10" DBH
10" DBH
16" DBH
4" DBH
24" DBH
12" DBH
24" DBH
8" DBH
8" DBH
10" DBH
12" DBH
24" DBH
EXISTING UTILITY
UNDERGROUND WATER
UNDERGROUND STORM LINE
UNDERGROUND SEWER LINE
EXISTING WATER
OVERHEAD WIRES
EXISTING ELECTRICAL
EXISTING TELECOMMUNICATIONS
CATCH BASINS & CURB INLET
WATER VALVE
SEWER MANHOLE
HYDRANT
TREE
E E
T
W
DEMOLITION & EROSION
CONTROL LEGEND
FUTURE PROJECT LOD BOUNDARY
24" DBH
20" DBH
NOTES:
1. TREES GREATER THAN 3-INCH DIAMETER AT BREAST HEIGHT (DBH) WITHIN THE LIMITS OF DISTURBANCE SHALL BE FELLED
BETWEEN NOVEMBER 1 AND MARCH 31 TO PREVENT DISTURBANCE TO PROTECTED BAT SPECIES.
2. TREES SHALL BE CUT NO MORE THAN 3 FEET ABOVE GROUND SURFACE USING HAND TOOLS AND EQUIPMENT AND VEHICLES
WITH LOW GROUND PRESSURE TRACKED OR RUBBER WHEELS.
3. TREE FELLING SHALL BE CONDUCTED IN CONFORMANCE WITH A SITE-SPECIFIC HEALTH AND SAFETY PLAN.
4. SOIL DISTURBANCE WILL BE AVOIDED TO THE EXTENT PRACTICAL. BECAUSE ONLY THE MAIN STEM OF THE TREE NEEDS TO BE FELLED AT THIS TIME, THE ROOT BALL SHALL BE REMOVED AS PART OF THE FUTURE SOIL EXCAVATION EFFORTS. SOILS DISTURBED DURING FELLING WILL BE REPAIRED AND STABILIZED WITH SEED AND/OR MULCH TO MINIMIZE EROSION POTENTIAL.
ANY SITE DISTURBANCE SHALL BE RESTORED TO EXISTING CONDITION WITH NO EXPENSE TO OWNER.
5. THE CONTRACTOR SHALL CONTACT OWNER'S REPRESENTATIVE IMMEDIATELY IF
CLARIFICATION OR INTERPRETATION OF THE CONTRACT DOCUMENTS, OR ANY OTHER ASPECTS OF THE PROJECT, IS REQUIRED.
6. LEGEND REPRESENTS STANDARD LINE TYPES AND HATCHING UNLESS INDICATED ON SPECIFIC DRAWINGS.
7. THE ABBREVIATIONS AND SYMBOLS HEREIN ARE STANDARD OF THIS OFFICE AND APPLY
TO A VARIETY OF PROJECTS. ONLY A PORTION OF THEM WILL NECESSARILY APPLY TO
ANY GIVEN PROJECT. SEE THE LISTINGS IN OTHER SECTIONS OF THIS PROJECT FOR ADDITIONAL SYMBOLS AND ABBREVIATIONS.
8. RAMBOLL IS NOT RESPONSIBLE FOR SITE SECURITY AND SAFETY, OR CONSTRUCTION MEANS AND METHODS.
9. CONTRACTOR IS RESPONSIBLE FOR THE SEQUENCING OF CONSTRUCTION UNLESS A
SEQUENCE OF CONSTRUCTION IS PROVIDED IN THE CONTRACT DOCUMENTS.
10. FINAL TREE REMOVAL LOCATIONS TO BE MARKED AND CONFIRMED BY OWNER PRIOR TO START OF DEMOLITION.
| Sheets and Views |
| EX-0 TREE REMOVAL COVER |
| EX-01 OVERALL PROJECT TREE DEMOLITION PLAN |
| EX-02 OVERALL PROJECT TREE DEMOLITION PLAN |
File details come from the government source that posted it. Updated .