18-304 DWGs Updated E103.pdf
PDF 7 MB Posted
- Attached to
- 6115--Install Emergency Power for HVAC Equipment
- Solicitation number
- 36C24623B0020
About this file
This federal contract solicitation seeks construction services to install emergency power systems for heating, ventilation, and air conditioning equipment at two buildings on the Durham VA Medical Center campus. The project scope includes installing new generators and automatic transfer switches for buildings 1 and 23, with all work to be completed according to design drawings and specifications. The construction cost is estimated between $1 million to $2 million and the contractor will have 20 weeks to complete the project in phases while the healthcare facility remains in operation. Work will take place at the VA Medical Center in Durham, North Carolina and require appropriate safety measures.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24623B0020 0003.docx | DOCX document | |
| 36C24623B0020 0002.docx | DOCX document | |
| 36C24623B0020 0001.docx | DOCX document | |
| 18-304 Specs2.pdf | ||
| 36C24623B0020_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT # 558-18-153
INSTALLATION OF EMERGENCY POWER SYSTEMS FOR HVAC
(BLDGS 1,23)
VA MEDICAL CENTER-DURHAM
CAMPUS LOCATION
SHEET NO. SHEET LIST BUILDING
Previous testing has identified floor and/or wall coverings, floor adhesives, duct mastic, pipe fittings & pipe insulation in this area may contain asbestos. See the 2017 asbestos re-inspection drawings provided by the Durham VAMC.
During the course of the project the contractor shall take any additional precautions that may be necessary to ensure that the flooring and wall coverings in this area are not disturbed any more than they would be during normal daily operation.
These include, but are not limited to, temporary floor and/or wall protection from falling objects during demolition or construction, additional protection of wall coverings along the construction debris route, etc. any possible disruption of these systems shall be reported to the COR immediately.
COR shall determine if additional action is required.
Contractor shall be responsible for any additional cost required if systems are disturbed such that abatement is required.
This facility contains asbestos that will be removed under a separate contract.
This facility contains asbestos that will be removed under this contract.
This facility contains asbestos that will be removed by the
VAMC
This facility contains no known or suspected asbestos.
ASBESTOS CONTAINING MATERIAL (ACM) STATEMENT
(Place an "X" in the appropriate box.)
VA MEDICAL CENTER-DURHAM
CAMPUS LOCATION
DRAWING
NUMBER
G-001
CNJGG
VICINITY MAP
NTS
CAMPUS MAP
NTS
1(PH)
INSTALLATION OF EMERGENCY
POWER SYSTEM FOR HVAC
EQUIPMENT
DURHAM, NC
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
N
O
T
F
R
C
O
N
S
T
R
U
C
T
I
O
N
N
F
R
C
O
N
S
T
R
U
C
T
I
O
N
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
558-18-153
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM, NC 27705
18-304
FULLY SPRINKLERED
CONSTRUCTION DRAWINGS
MAY 12, 2022
COVER
1, 23
DocuSign Envelope ID: 6D7D9F83-F831-477B-8D2A-5E8A7BD19968
5/19/2022
W
W
W
W W
W W
W W
W W
W W
W W
W W
W
W W W W
W W
W
W W W
W
W
W
W
W
W
T
T T T
T T
T T
T T
T T
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
SS
SS
SS
SS
POW
POW
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
SS
SS
SS
UG/E
UG/E
UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E
FW
PIV
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LODLO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
EXISTING GENERATORS
(TO REMAIN)
EXISTING UNDERGROUND POWER LINE
(TO REMAIN, TYP.)
W W
W
FW
FW
FW
FW
FW
FW
W W
W W
W
W
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W W
W
G V
W G
V
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FV
FW
FW
FW
FW
FV
WWW GV
EXISTING STORM PIPE
(TO REMAIN, TYP.)
EXISTING CONCRETE PAVING
(TO BE SAWCUT AND REMOVED FOR
PROPOSED ELECTRICAL CONDUIT)
EXISTING ASPHALT PAVING
(TO BE SAWCUT AND REMOVED FOR
PROPOSED ELECTRICAL CONDUIT)
W
W
W
W W
W W
W W
W W
W W
W W
W W
W
W W W W
W W
W
W W W
W
W
W
W
W
T
T T T
T T
T T
T T
T T
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
SS
SS
SS
SS
POW
POW
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
SS
SS
SS
UG/E
UG/E
UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E
FW
PIV
E
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LODLO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
10'
.8
4'
PROPOSED GENERATOR AND ENCLOSURE
(SEE ELECTRICAL PLANS FOR DETAILS)
PROPOSED LEVEL CONCRETE PAD FOR
GENERATOR. TOP OF PAD TO BE MINIMUM
OF 6" ABOVE EXISTING GRADE
(SEE DETAIL ON SHEET C-501, TYP.)
PROPOSED UNDERGROUND POWER LINE
(SEE ELECTRICAL PLANS FOR DETAILS, TYP.)
W W
W
FW
FW
FW
FW
FW
FW
W W
W W
W
W
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W W
W
G V
W G
V
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FV
FW
FW
FW
FV
WWW GV
PROPOSED NEW JUNCTION
PULL BOX (SEE ELECTRICAL
PLANS FOR DETAILS, TYP.)
C-501UTILITY TRENCH PATCH
(TYP.)
PROPOSED PREFABRICATED METAL PLATFORM
AND STAIRS (TYP.)
ERWIN ROAD (AKA S.R. 1320) VARIABLE RIGHT OF WAY (PUBLICLY DEDICATED)
PRATT STREET
VARIABLE RIGHT OF WAY
(PUBLICLY DEDICATED)
N/F
UNITED STATES OF AMERICA
UNITED STATES ATTORNEY
DB-180 PG-185
N/F
UNITED STATES OF AMERICA
UNITED STATES ATTORNEY
DB-180 PG-185
N/F
UNITED STATES OF AMERICA
UNITED STATES ATTORNEY
DB-180 PG-185
N/F
UNITED STATES OF AMERICA
UNITED STATES ATTORNEY
DB-180 PG-185
ERWIN ROAD(AKA S.R. 1320)VARIABLE RIGHT OF WAY(PUBLICLY DEDICATED)
ERWIN ROAD (AKA S.R. 1320) VARIABLE RIGHT OF WAY (PUBLICLY DEDICATED)
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
Dwg. of
Location
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project Number
Revisions: Date
CONSULTANTS: VA PROJECT NUMBER
Building Number
Drawing Number
A
B C
D E
21 4 5 6 7
LEGEND:
321 4 5 6 7
A B
C D
E
Dwg. of
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848
© COPYRIGHT Apogee Consulting Group, P.A.
558-18-153
MAY 12, 2022
1, 23
INSTALLATION OF
EMERGENCY POWER SYSTEM
FOR HVAC EQUIPMENT
558-18-153
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM NC 27705
DURHAM, NC
18-304
FULLY SPRINKLERED
CONSTRUCTION DRAWINGS
North Carolina Authorization Number: P-2475
ENGINEERING OF PLLCNORTH CAROLINA,
Foresite Group Engineering of North Carolina, PLLC 2128 Moores Mill Rd., Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.foresitegroup.net
1. ALL NEW WORK SHOWN IN THESE SHEETS SHALL COMPLY
WITH APPLICABLE STATE, FEDERAL, AND LOCAL BUILDING AND
UTILITY INSTALLATION CODES.
2. ALL WORK ON-SITE SHALL BE CONSTRUCTED IN STRICT
ACCORDANCE WITH, AND CONFORM TO, THE PROJECT
SPECIFICATIONS.
3. THERE MAY BE ADDITIONAL UTILITIES NOT SHOWN ON THESE
PLANS. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR
LOCATIONS SHOWN, AND IT SHALL BE THE RESPONSIBILITY OF
THE CONTRACTOR TO FIELD VERIFY THE LOCATIONS OF ALL
UTILITIES WITHIN THE LIMITS OF CONSTRUCTION AND TO NOTIFY
THE OWNER IN CASE OF DISCREPANCIES THAT AFFECT THE
CONSTRUCTION PROJECT.
4. CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE THAT MAY
OCCUR TO ANY ADJACENT STRUCTURES OR PROPERTY, OR ANY
EXISTING STRUCTURES WITHIN LIMITS OF CONSTRUCTION THAT
ARE DESIGNATED ON THE PLANS TO REMAIN, AND SHALL REPAIR
OR REPLACE SUCH DAMAGED PROPERTY TO THE PROPERTY
OWNER'S SATISFACTION AT NO COST TO THE OWNER.
5. THE CONTRACTOR SHALL NOT DEVIATE FROM THESE PLANS
AND SPECIFICATIONS WITHOUT THE PRIOR WRITTEN CONSENT
OF THE ENGINEER.
6. CONTRACTOR IS RESPONSIBLE FOR CONTACTING VETERANS
AFFAIRS AND ALL EXISTING UTILITY PROVIDERS BEFORE
REMOVING ANY/ALL UTILITIES FROM THEIR EXISTING LOCATION
ON THE SITE. THE CONTRACTOR SHALL PERFORM ALL UTILITY
DEMOLITION OR RELOCATION ACTIVITIES IN ACCORDANCE WITH
THE EXISTING UTILITIES SPECIFICATIONS, MATERIALS, AND
REQUIREMENTS.
7. THE CONTRACTOR SHALL SEQUENCE THE WORK AND
PROVIDE TEMPORARY MEASURES AS NECESSARY TO MAINTAIN
ACCESS TO THE SITE THROUGH ALL ENTRANCES AT ALL TIMES
DURING CONSTRUCTION. TEMPORARY PROVISIONS MAY
INCLUDE, BUT ARE NOT LIMITED TO: BARRICADES, FLASHING
LIGHTS, FLAGMAN, TEMPORARY PAVEMENT, AND DIRECTIONAL
SIGNAGE AS NECESSARY TO ACCOMPLISH THE WORK.
8. CONTRACTOR SHALL CONSIDER COORDINATION ASPECTS
OF CONSTRUCTION EQUIPMENT OPERATIONS DURING
DEMOLITION ACTIVITY.
9. CONTRACTOR EQUIPMENT SHALL NOT BE PARKED IN
COUNTY, CITY OR STATE RIGHT-OF-WAY, AND MUST BE STORED
WITHIN SITE.
10. THE CONTRACTOR SHALL DISPOSE OF ANY HAZARDOUS
MATERIALS IN STRICT ACCORDANCE WITH ALL APPLICABLE
LOCAL, STATE, AND FEDERAL LAWS.
11. ALL ITEMS DESIGNATED FOR REMOVAL SHALL BE LEGALLY
DISPOSED OF, OFF SITE.
SCALE IN FEET
20'10'5'10' 1" = 10'
1. ALL PROPOSED DIMENSIONS USED TO SHOW THE GEOMETRIC
LAYOUT OF THE PROPOSED STRUCTURE LOCATION ARE GIVEN AT
THE OUTSIDE FACE OF THE STRUCTURE CORNERS. ALL CURB RADII
ARE GIVEN AT THE FACE OF CURB.
2. CONTRACTOR SHALL NOTIFY ENGINEER OF ANY DISCREPANCIES
BETWEEN THE EXISTING CONDITIONS IN THE FIELD AND THE SURVEY
SHOWN ON THE PLANS BEFORE PROCEEDING WITH ANY NEW
CONSTRUCTION.
3. CONTRACTOR IS RESPONSIBLE FOR CORRECT HORIZONTAL AND
VERTICAL ALIGNMENT OF ALL TIES BETWEEN PROPOSED AND
EXISTING PAVEMENTS, CURB AND GUTTER, SIDEWALKS, WALLS, AND
UTILITIES.
4. IN ALL AREAS OF FILL OR OTHERWISE DISTURBANCE OF
EXISTING CONDITIONS, UNLESS OTHERWISE NOTED, THE
CONTRACTOR SHALL FULLY AND COMPLETELY REMOVE AND
LEGALLY DISPOSE OFF-SITE, ALL PLANT MATERIALS INCLUDING BUT
NOT LIMITED TO ROOT SYSTEMS, CONCRETE, REINFORCED
CONCRETE, ASPHALT DEBRIS, UNDERBRUSH, TOPSOIL, AND OTHER
DELETERIOUS MATERIAL. THE SUBGRADE TO REMAIN SHALL BE
COMPACTED TO 95% STANDARD PROCTOR MAXIMUM DRY DENSITY
FOLLOWING FULL REMOVAL OF THESE MATERIALS.
DEMOLITION PLAN
1"=10'
SITE AND UTILITY PLAN
1"=10'
CS101
JFGNSY
DEMOLITION & SITE PLAN
(BUILDING 1)
1 3
CONCRETE GENERATOR PAD
XXXX
EXISTING CONTOURS
KEY PLAN
UG/E UG/E
UG/E UG/E
EXISTING UNDERGROUND
POWER LINE
PROPOSED UNDERGROUND
POWER LINE
PROPOSED ASPHALT
PAVEMENT PATCH
ASPHALT PAVING TO BE
REMOVED
CONCRETE TO BE REMOVED
PROJECT AREA
(BUILDING 1)
SITE PLAN NOTES:
DEMOLITION PLAN NOTES:
SCALE IN FEET
20'10'5'10' 1" = 10'
CONCRETE SIDEWALK/PAVING
W
W
W
W
W
W
W
W
W W
W W
W W
W W
W W
W W
W W
W W
W W W W W W
W
UG/E
UG/E
UG/E
UG/E
UG/E
T
T
T
T
T
T
T
T
T
T
T
T
T
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/EUG/EUG/EUG/E
UG/E UG/E UG/E UG/E UG/E UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
SS
SS
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/
E
UG/
E
W
W
W
W
W
W
FW
FW
FW
FW
FW
FW
FW
FW
FW
W
380377
3 384384
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG
/E
UG
/E
UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E
5'
10.33'
LO
D
LO
D
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
LO
D
LO
DLOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LODLOD
LO
D
LOD LOD
LOD LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LODLODLODLODLODLODLOD
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
LOD
LO
D
LO
D
PROPOSED GENERATOR AND ENCLOSURE
(SEE ELECTRICAL PLANS FOR DETAILS)
PROPOSED LEVEL CONCRETE PAD FOR
GENERATOR. TOP OF PAD TO BE MINIMUM OF
6" ABOVE EXISTING GRADE
(SEE DETAIL ON SHEET C-501, TYP.)
PROPOSED UNDERGROUND POWER LINE
(SEE ELECTRICAL PLANS FOR DETAILS, TYP.)
W W
W W
FWFW
FW
G V
FW
FW
FW
FW
FW
PI
V
PI
V
W
W
W
W
W
W
W
W
W
W
W W W W
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW FW
FW
FW
W
W
W
W
W
W
W W
RP
Z
W
FW
FW
FW
FW
FW
FW
FW
FW FW FW FW FW FW
FUTURE FIRE WATER MAIN
FROM VA PROJECT
#558-18-151 (SHOWN FOR
REFERENCE ONLY, TYP.)
FUTURE DOMESTIC WATER
MAIN FROM VA PROJECT
#558-18-151 (SHOWN FOR
REFERENCE ONLY, TYP.)
PROPOSED PREFABRICATED METAL PLATFORM
AND STAIRS (TYP.)
PROPOSED ELECTRICAL HANDHOLE
(SEE ELECTRICAL PLANS FOR DETAILS, TYP.)
PROPOSED NEW FUEL LINE
(SEE ELECTRICAL PLANS FOR DETAILS, TYP.)
PROPOSED UNDERGROUND
POWER LINE TO FUEL PORT
(SEE ELECTRICAL PLANS FOR
DETAILS, TYP.)
PROPOSED FUEL PORT
(SEE ELECTRICAL PLANS FOR
DETAILS, TYP.)
ERWIN ROAD (AKA S.R. 1320) VARIABLE RIGHT OF WAY (PUBLICLY DEDICATED)
PRATT STREET
VARIABLE RIGHT OF WAY
(PUBLICLY DEDICATED)
N/F
UNITED STATES OF AMERICA
UNITED STATES ATTORNEY
DB-180 PG-185
N/F
UNITED STATES OF AMERICA
UNITED STATES ATTORNEY
DB-180 PG-185
N/F
UNITED STATES OF AMERICA
UNITED STATES ATTORNEY
DB-180 PG-185
N/F
UNITED STATES OF AMERICA
UNITED STATES ATTORNEY
DB-180 PG-185
ERWIN ROAD(AKA S.R. 1320)VARIABLE RIGHT OF WAY(PUBLICLY DEDICATED)
ERWIN ROAD (AKA S.R. 1320) VARIABLE RIGHT OF WAY (PUBLICLY DEDICATED)
W
W
W
W
W
W
W
W
W
W
W W
W W
W W
W W
W W
W W
W W
W W
W W W W W W
W
UG/E
UG/E
UG/E
UG/E
UG/E
T
T
T
T
T
T
T
T
T
T
T
T
T
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/EUG/EUG/EUG/E
UG/E UG/E UG/E UG/E UG/E UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
SS
SS
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/
E
UG/
E
W
W
W
W
W
W
FW
FW
FW
FW
FW
FW
FW
FW
FW
W
380377
3 384384
LO
D
LO
D
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
LO
D
LO
DLOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LODLOD
LO
D
LOD LOD
LOD LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LODLODLODLODLODLODLOD
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
LOD
LO
D
LO
D
EXISTING UNDERGROUND POWER LINES
(TO REMAIN, TYP.)
EXISTING PROPERTY LINE
EXISTING WATERLINE
(TO REMAIN, TYP.)
W W
W W
FWFW
FW
G V
FW
FW
FW
FW
FW
PI
V
PI
V
W
W
W
W
W
W
W
W
W
W
W W W W
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW FW
FW
FW
W
W
W
W
W
W
W W
RP
Z
W
FW
FW
FW
FW
FW
FW
FW
FW FW FW FW FW FW
FUTURE FIRE WATER MAIN
FROM VA PROJECT
#558-18-151 (SHOWN FOR
REFERENCE ONLY, TYP.)FUTURE DOMESTIC WATER
MAIN FROM VA PROJECT
#558-18-151 (SHOWN FOR
REFERENCE ONLY, TYP.)
EXISTING CONCRETE PAVING
(TO BE SAWCUT AND REMOVED
FOR PROPOSED ELECTRICAL
CONDUIT)
EXISTING CONCRETE PAVING
(TO BE SAWCUT AND REMOVED FOR
PROPOSED ELECTRICAL CONDUIT)
EXISTING CONCRETE PAVING
(TO BE SAWCUT AND REMOVED
FOR PROPOSED ELECTRICAL
CONDUIT)
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
Dwg. of
Location
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project Number
Revisions: Date
CONSULTANTS: VA PROJECT NUMBER
Building Number
Drawing Number
A
B C
D E
21 4 5 6 7
LEGEND:
321 4 5 6 7
A B
C D
E
Dwg. of
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848
© COPYRIGHT Apogee Consulting Group, P.A.
558-18-153
MAY 12, 2022
1, 23
INSTALLATION OF
EMERGENCY POWER SYSTEM
FOR HVAC EQUIPMENT
558-18-153
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM NC 27705
DURHAM, NC
18-304
FULLY SPRINKLERED
CONSTRUCTION DRAWINGS
North Carolina Authorization Number: P-2475
ENGINEERING OF PLLCNORTH CAROLINA,
Foresite Group Engineering of North Carolina, PLLC 2128 Moores Mill Rd., Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.foresitegroup.net
SCALE IN FEET
2010510 1" = 10'
SITE PLAN
1"=10'
CS102
JFGNSY
DEMOLITION & SITE PLAN
(BUILDING 23)
2 3
KEY PLAN
DEMOLITION PLAN
1"=10'
PROJECT AREA
(BUILDING 23)
1. ALL NEW WORK SHOWN IN THESE SHEETS SHALL COMPLY
WITH APPLICABLE STATE, FEDERAL, AND LOCAL BUILDING AND
UTILITY INSTALLATION CODES.
2. ALL WORK ON-SITE SHALL BE CONSTRUCTED IN STRICT
ACCORDANCE WITH, AND CONFORM TO, THE PROJECT
SPECIFICATIONS.
3. THERE MAY BE ADDITIONAL UTILITIES NOT SHOWN ON THESE
PLANS. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR
LOCATIONS SHOWN, AND IT SHALL BE THE RESPONSIBILITY OF
THE CONTRACTOR TO FIELD VERIFY THE LOCATIONS OF ALL
UTILITIES WITHIN THE LIMITS OF CONSTRUCTION AND TO NOTIFY
THE OWNER IN CASE OF DISCREPANCIES THAT AFFECT THE
CONSTRUCTION PROJECT.
4. CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE THAT MAY
OCCUR TO ANY ADJACENT STRUCTURES OR PROPERTY, OR ANY
EXISTING STRUCTURES WITHIN LIMITS OF CONSTRUCTION THAT
ARE DESIGNATED ON THE PLANS TO REMAIN, AND SHALL REPAIR
OR REPLACE SUCH DAMAGED PROPERTY TO THE PROPERTY
OWNER'S SATISFACTION AT NO COST TO THE OWNER.
5. THE CONTRACTOR SHALL NOT DEVIATE FROM THESE PLANS
AND SPECIFICATIONS WITHOUT THE PRIOR WRITTEN CONSENT
OF THE ENGINEER.
6. CONTRACTOR IS RESPONSIBLE FOR CONTACTING VETERANS
AFFAIRS AND ALL EXISTING UTILITY PROVIDERS BEFORE
REMOVING ANY/ALL UTILITIES FROM THEIR EXISTING LOCATION
ON THE SITE. THE CONTRACTOR SHALL PERFORM ALL UTILITY
DEMOLITION OR RELOCATION ACTIVITIES IN ACCORDANCE WITH
THE EXISTING UTILITIES SPECIFICATIONS, MATERIALS, AND
REQUIREMENTS.
7. THE CONTRACTOR SHALL SEQUENCE THE WORK AND
PROVIDE TEMPORARY MEASURES AS NECESSARY TO MAINTAIN
ACCESS TO THE SITE THROUGH ALL ENTRANCES AT ALL TIMES
DURING CONSTRUCTION. TEMPORARY PROVISIONS MAY
INCLUDE, BUT ARE NOT LIMITED TO: BARRICADES, FLASHING
LIGHTS, FLAGMAN, TEMPORARY PAVEMENT, AND DIRECTIONAL
SIGNAGE AS NECESSARY TO ACCOMPLISH THE WORK.
8. CONTRACTOR SHALL CONSIDER COORDINATION ASPECTS
OF CONSTRUCTION EQUIPMENT OPERATIONS DURING
DEMOLITION ACTIVITY.
9. CONTRACTOR EQUIPMENT SHALL NOT BE PARKED IN
COUNTY, CITY OR STATE RIGHT-OF-WAY, AND MUST BE STORED
WITHIN SITE.
10. THE CONTRACTOR SHALL DISPOSE OF ANY HAZARDOUS
MATERIALS IN STRICT ACCORDANCE WITH ALL APPLICABLE
LOCAL, STATE, AND FEDERAL LAWS.
11. ALL ITEMS DESIGNATED FOR REMOVAL SHALL BE LEGALLY
DISPOSED OF, OFF SITE.
1. ALL PROPOSED DIMENSIONS USED TO SHOW THE GEOMETRIC
LAYOUT OF THE PROPOSED STRUCTURE LOCATION ARE GIVEN AT
THE OUTSIDE FACE OF THE STRUCTURE CORNERS. ALL CURB RADII
ARE GIVEN AT THE FACE OF CURB.
2. CONTRACTOR SHALL NOTIFY ENGINEER OF ANY DISCREPANCIES
BETWEEN THE EXISTING CONDITIONS IN THE FIELD AND THE SURVEY
SHOWN ON THE PLANS BEFORE PROCEEDING WITH ANY NEW
CONSTRUCTION.
3. CONTRACTOR IS RESPONSIBLE FOR CORRECT HORIZONTAL AND
VERTICAL ALIGNMENT OF ALL TIES BETWEEN PROPOSED AND
EXISTING PAVEMENTS, CURB AND GUTTER, SIDEWALKS, WALLS, AND
UTILITIES.
4. IN ALL AREAS OF FILL OR OTHERWISE DISTURBANCE OF
EXISTING CONDITIONS, UNLESS OTHERWISE NOTED, THE
CONTRACTOR SHALL FULLY AND COMPLETELY REMOVE AND
LEGALLY DISPOSE OFF-SITE, ALL PLANT MATERIALS INCLUDING BUT
NOT LIMITED TO ROOT SYSTEMS, CONCRETE, REINFORCED
CONCRETE, ASPHALT DEBRIS, UNDERBRUSH, TOPSOIL, AND OTHER
DELETERIOUS MATERIAL. THE SUBGRADE TO REMAIN SHALL BE
COMPACTED TO 95% STANDARD PROCTOR MAXIMUM DRY DENSITY
FOLLOWING FULL REMOVAL OF THESE MATERIALS.
SITE PLAN NOTES:
DEMOLITION PLAN NOTES:
SCALE IN FEET
2010510 1" = 10'
CONCRETE GENERATOR PAD
XXXX
EXISTING CONTOURS
UG/E UG/E
UG/E UG/E
EXISTING UNDERGROUND
POWER LINE
PROPOSED UNDERGROUND
POWER LINE
PROPOSED ASPHALT
PAVEMENT PATCH
ASPHALT PAVING TO BE
REMOVED
CONCRETE TO BE REMOVED
CONCRETE SIDEWALK/PAVING
6"
#4 DOWELS @ 12"o.c. ALL
AROUND. DRILL AND
EPOXY W/ 3" EMBED.
NOTE: PAD SHALL EXTEND 4" MIN. PAST
FACE OF EQUIPMENT ALL AROUND
APPLY EPOXY BONDING
AGENT TO ROUGHENED
SURFACE
#4 @ 12"O.C., E.W.
GENERATOR PAD DETAIL
NOT TO SCALEC-501
4,000 PSI CONCRETE
CHAMFER
EXISTING CONCRETE
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
Dwg. of
Location
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project Number
Revisions: Date
CONSULTANTS: VA PROJECT NUMBER
Building Number
Drawing Number
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
LEGEND:
321 4 5 6 7
A B
C D
E
Dwg. of
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848
© COPYRIGHT Apogee Consulting Group, P.A.
558-18-153
MAY 12, 2022
1, 23
INSTALLATION OF
EMERGENCY POWER SYSTEM
FOR HVAC EQUIPMENT
558-18-153
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM NC 27705
DURHAM, NC
18-304
FULLY SPRINKLERED
CONSTRUCTION DRAWINGS
North Carolina Authorization Number: P-2475
ENGINEERING OF PLLCNORTH CAROLINA,
Foresite Group Engineering of North Carolina, PLLC 2128 Moores Mill Rd., Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.foresitegroup.net
5/
/2
5:
:5
PM
C-501
JFGNSY
CIVIL DETAILS
3 3
NEW GENERATOR
750KW, 480Y/277V
3PH,4W,
SEPARATELY
DERIVED SYSTEM
EXISTING GENERATOR
450 kW
EXISTING BUILDING
MOUNTED JUNCTION BOX
EXISTING UNDERGROUND
RACEWAYS, VIF.
EXISTING RACEWAYS
ROUTED THROUGH 2ND FLOOR
INTERSTITIAL SPACE
EXTERIOR
EQUIPMENT YARD AND
PARKING AREA.
BLDG 18
(EX)MAIN SWGR
EXISTING PULL BOX
(VIF)
(2)4"C,(2) 1"C UP
TO ROOF LEVEL
(2)4"C ROUTED
EXTERIOR TO THE
BUILDING. SECURE TO
EXISTING EXTERIOR
AND PAINT TO MATCH
EXISTING.
BASE ELEVATION
(GRADE LEVEL -12.00)
(EX)2-4"C
3-1"C
1-1/2"C
J
EFLS-26,28
EXISTING GENERATOR
450 kW
EXISTING RACEWAYS
TO BE ABANDONED.
2-4"C
3-1"C
1-1/2"C
(NEW)
PROVIDE NEW IN-GRADE
PULL BOX AT LOCATION OF
EXISTING RACEWAYS.
EXTEND EXISTING SPARE
RACEWAYS TO NEW
GENERATOR LOCATION.
PROPOSED NEW
CANCER CENTER
FINISHED GRADE
30° MAX.
EXOTHERMIC WELD CONNECTION TREATED
WITH TWO (2) COATS COLD GALVANIZED PAINT
GROUND ROD SHALL NOT BE ANGLED MORE THAN
30° FROM VERTICAL. ANGLE AWAY FROM SHELTER
OR PAD WHERE POSSIBLE.
3/4" DIAMETER COPPER CLAD STEEL GROUND ROD
10' LONG.
TOP OF GROUND ROD, 30" MIN. OR 6" BELOW
FROSTLINE (WHICHEVER IS DEEPER)
CONDUIT(S) WITH BELL ENDS (TYP). SIZE,
QUANTITY AND WIRING AS INDICATED ON PLANS
CLEAN 3/4" CRUSHED ROCK
GRADE. FEATHER & TAMP BACKFILL TO CREATE FLUSH
INSTALLATION AND POSITIVE DRAINAGE AWAY FROM BOX
VA
R
IE
S
12"
12"
H-20 LOADING
QUAZITE: 24X24 FRP B16242424A
WITH C1642402A COVER.
DUCTBANK NOTES:
A.
B.
C.
CONCRETE SHALL BE 2000 P.S.I. @ 28 DAYS, OR AS SPECIFIED.
PROVIDE REINFORCING RODS ON TOP AND BOTTOM OF DUCTS WHEN
CROSSING OR PLACED IN PARKING AREAS OR ROADWAYS.
MINIMUM COVER TOP OF ENVELOPE SHALL BE 30" BELOW ROADS AND
OTHER PAVED SURFACES.
6-WAY DUCTBANK
TIE WIRE
PLASTIC
SPACER
DUCT (SIZE
AND QTY AS
INDICATED
ON DWGS)
3" 3"
3"
3"
PARTIAL SITE ELECTRICAL PLAN (BUILDING 1)
1/16" = 1'-0"
A. SEE SHEET E601 FOR CONDUCTOR AND
RACEWAYS SIZING.
B. ALL WORK IS TO BE SCHEDULED WITH COR.
WORK SCHEDULES WILL BE AT THE
DISCRETION OF THE HOSPITAL AND COR.
C. PROVIDE TEMPORARY CONNECTION FOR AN
ALTERNATE POWER SOURCE FOR THE
GENERATOR SET.
D. PROVIDE EMERGENCY STOP BUTTON FOR
GENERATOR, LOCATION COORDINATED WITH
COR.
INSTALLATION OF EMERGENCY
POWER SYSTEM FOR HVAC
EQUIPMENT
DURHAM, NC
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
558-18-153
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM, NC 27705
18-304
FULLY SPRINKLERED
CONSTRUCTION DRAWINGS
MAY 12, 2022
BOOTH
A
D
C
B
E
F
M
R
I
I
C
U
F
U
L
T
N
S
R
E
E
T
E
R
W
I
R
A
D
KEY PLAN:
AREA OF WORK
PARTIAL SITE ELECTRICAL PLAN
BUILDING (1)
E-101
CNJGG
ELECTRICAL LEGEND
DUAL-TECHNOLOGY, CEILING MOUNTED, LOW VOLTAGE
OCCUPANCY SENSOR
OCCUPANCY SENSOR SWITCHPACK, WIRE PER
MANUFACTURER'S RECOMMENDATIONS.
3 = THREE WAY
GFI = GROUND FAULT CIRCUIT INTERRUPTER
WIRING SYSTEM-BRANCH OR FEEDER CIRCUIT
120V QUAD RECEPTACLE, MOUNTED 18" AFF UNO
4 = FOUR WAY
JUNCTION BOX
SINGLE POLE SWITCH, MOUNTED 44" AFF UNO.
MODIFIERS FOR SWITCHES:
HOMERUN - 120V OR 277V
HOMERUN - 208V OR 480V
BRANCH OR FEEDER CIRCUIT HOMERUN TO
PANELBOARD, SWITCHBOARD, MOTOR CONTROL
CENTER, OR OTHER POWER DISTRIBUTION DEVICE (PDD).
SUBSCRIPT DENOTES PANELBOARD, SWITCHBOARD,
MOTOR CONTROL CENTER, OR PDD. AND OVERCURRENT
PROTECTION DEVICE NUMBER.
120V DUPLEX RECEPTACLE, MOUNTED 18" AFF UNO
MODIFIERS FOR RECEPTACLES:
TELCO OUTLET MOUNTED 18" AFF UNO
WP = WEATHERPROOF
DM = DIMMER SWITCH
FUSED DISCONNECT
UNFUSED DISCONNECT
PHOTOELECTRIC CELL
DATA/TELCO OUTLET MOUNTED 18" AFF UNO
120V SIMPLEX RECEPTACLE, MOUNTED 18" AFF UNO
220V DUPLEX RECEPTACLE, MOUNTED 18" AFF UNO
WIRING SYSTEM-SWITCHED BRANCH OR FEEDER CIRCUIT
OC = OCCUPANT SENSOR
PC
S
A AMPERE
AFC ABOVE FINISHED CEILING
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AIC AMPS INTERRUPTING CAPACITY
ATS AUTOMATIC TRANSFER SWITCH
AWG AMERICAN WIRE GAUGE
BFF BELOW FINISHED FLOOR
BFG BELOW FINISHED GRADE
C CONDUIT
cd CANDELA
CKT CIRCUIT
CU COPPER
D DEEP
DACT DIGITAL ALARM COMMUNICATOR TERMINAL
DED DEDICATED CIRCUIT
EG EQUIPMENT GROUND
EMT ELECTRICAL METALLIC TUBING
EX EXISTING
EXT EXTERIOR
FACP FIRE ALARM CONTROL PANEL
FAA FIRE ALARM REMOTE ANNUNCIATOR
FLA FULL LOAD AMPS
FMC FLEXIBLE METAL CONDUIT
GEC GROUNDING ELECTRODE CONDUCTOR
GFI GROUND FAULT CIRCUIT INTERRUPTER
GRS GALVANIZED RIGID STEEL
H HIGH
HP HORSEPOWER
IBC INTERNATIONAL BUILDING CODE
IG ISOLATED GROUND
KW KILOWATT
MBJ MAIN BONDING JUMPER
MCA MINIMUM CIRCUIT AMPACITY
MCB MAIN CIRCUIT BREAKER
MCCB MOLDED-CASE CIRCUIT BREAKER
MCS MOLDED-CASE SWITCH
MDP MAIN DISTRIBUTION PANEL
MLO MAIN LUGS ONLY
MOCP MAXIMUM OVERCURRENT PROTECTION
N NEUTRAL
NEC NATIONAL ELECTRICAL CODE
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NTS NOT TO SCALE
OC ON CENTER
R RELOCATED
SPD SURGE PROTECTION DEVICE
TCL TOTAL CONNECTED LOAD
TDL TOTAL DEMAND LOAD
TYP TYPICAL
UL UNDERWRITERS LABORATORIES
UNO UNLESS NOTED OTHERWISE
UPS UNINTERRUPTIBLE POWER SUPPLY
WP WEATHERPROOF
TXF TRANSFORMER
VIF VERIFY IN FIELD
3/PH THREE CONDUCTORS PER PHASE (TYP)
4/PH FOUR CONDUCTORS PER PHASE (TYP)
ABBREVIATIONS GENERAL NOTES
1. ALL ELECTRICAL DEVICES, FIXTURES, EQUIPMENT AND FEEDERS SHALL BE INSTALLED IN
ACCORDANCE WITH THE PROJECT SPECIFICATIONS, THE MANUFACTURER'S
RECOMMENDED INSTALLATION PROCEDURES, ALL APPLICABLE LOCAL AND STATE CODES,
AMERICANS WITH DISABILITIES ACT AND WITH THE LATEST EDITION OF THE NATIONAL
ELECTRICAL CODE.
2. PROVIDE ADDITIONAL SUPPORT FOR DEVICES, FIXTURES, EQUIPMENT AND FEEDERS
WHERE THE BUILDING CONSTRUCTION IS NOT SUITABLE FOR DIRECT MOUNTING.
3. FIRESTOP, DRAFTSTOP, SMOKESTOP AND/OR PROTECT THE ANNULAR SPACE AROUND ALL
PENETRATIONS THROUGH WALLS, PARTITIONS, FLOORS, CEILING, AND ROOFS IN
ACCORDANCE WITH THE REQUIREMENTS OF THE NATIONAL ELECTRICAL CODE, UL LISTING
REQUIREMENT AND THE APPLICABLE BUILDING CODES. REFER TO THE ARCHITECTURAL
DRAWINGS AND THE OWNER'S EXISTING AS-BUILT/RECORD DRAWINGS, VERIFY
CONSTRUCTION RATINGS AND PROVIDE PENETRATION ASSEMBLIES SUITABLE FOR THE
PARTICULAR CONSTRUCTION.
4. VERIFY CEILING SYSTEMS AND PROVIDE MOUNTING ACCESSORIES, TRIMS AND ALL
REQUIRED MOUNTING HARDWARE TO SUIT THE PARTICULAR INSTALLATION.
5. PROTECT EXISTING UNDERGROUND AND BUILDING INTERIOR UTILITIES DURING
CONSTRUCTION.
6. BRANCH CIRCUIT CONDUCTORS SHALL BE 12 AWG MINIMUM.
7. COORDINATE ANY AND ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION SO AS
TO AVOID CONFLICT DURING CONSTRUCTION.
8. ALL PANELS SHALL HAVE TYPED, COMPLETED DIRECTORIES INDICATING EQUIPMENT
SERVED AND ROOM NUMBER (AS INDICATED ON FINAL BUILDING ROOM SIGNAGE) OF
EQUIPMENT LOCATION, OR SPARE, OR SPACE.
9. MANUFACTURER'S NAME AND MODEL NUMBER ARE GIVEN FOR DESCRIPTIVE PURPOSES TO
INDICATE A QUALITY STANDARD AND ARE NOT INTENDED TO LIMIT PRODUCTS TO A
PARTICULAR MANUFACTURER. PRODUCTS DEEMED EQUAL AND APPROVED BY THE
DESIGNER WILL BE ACCEPTED.
10. ALL FEEDERS AND CIRCUITRY SHALL BE TORQUED PER THE PANEL, BREAKER, AND/OR
PARTICULAR EQUIPMENT MANUFACTURER'S SPECIFICATIONS.
11. CIRCUITRY TO SWITCHES, RECEPTACLES, AND ALL OTHER DEVICES SHALL BE TERMINATED
ON THE DEVICE'S SCREW TERMINALS.
12. MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, OUTLET, FIXTURE, OR
EQUIPMENT UNLESS NOTED OTHERWISE.
13. ALL WIRE TERMINATIONS SHALL BE RATED FOR 75 DEGREES C.
14. ALL CONDUCTORS SHALL HAVE THHN/THWN INSULATION, UNLESS OTHERWISE NOTED.
15. ALL CONDUIT SHALL BE GRS OR EMT UNLESS OTHERWISE NOTED.
16. ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT SHALL BE LABEL
LISTED BY AN APPROVED THIRD PARTY TESTING AGENCY.
SPECIAL RECEPTACLE, MOUNTED 18" AFF UNO
GROUND ROD DETAIL
N.T.S.
1. NEW DIESEL GENERATOR WITH 96-HOUR
SUB-BASE FUEL TANK, SOUND-ATTENUATED
ENCLOSURE AND ACCESS PLATFORMS WITH
STAIRS AND RAILINGS. PROVIDE NEW
CONCRETE PAD PER DETAIL ON CIVIL SHEET
C-501.
2 PROVIDE GENERATOR CONTROL POWER FROM
EXISTING PANEL EFLS AT EMERGENCY
SWITCHGEAR ROOM (480V 1PH, 2#8,#10G) TO
NEW GENERATOR ENCLOSURE (WITH INTEGRAL
DISTRIBUTION SYSTEM). UTILIZE EXISTING
RACEWAYS, PROVIDE NEW 40A-2P BREAKER AT
PANEL EFLS. COORDINATE WITH FIELD
CONDITIONS.
3. PROVIDE CONTROL AND MONITORING CABLES
BETWEEN THE EMERGENCY SWITCHGEAR ROOM
AND THE GENERATOR, COORDINATE WITH
EXISTING CONTROLS/CONTROL SYSTEM.
4. EM FEEDER (2) 4"C TO NEW ATS AT
ROOF/PENTHOUSE LEVEL FOR POWER TO
MCC-N, SEE E-601. PROVIDE CONTROL AND
MONITORING CABLING IN 1"C FROM ATS-EM
HVAC TO GENERATOR CONTROLS AT
EMERGENCY SWITCHGEAR ROOM.
5. PROVIDE CONNECTION CABINET WITH
CAM-LOCKS FOR GENERATOR LOAD BANK
TESTING OR FOR CONNECTING A TEMPORARY
GENERATOR DURING GENERATOR
MAINTENANCE. SEE SHEET E-601.
6. PROVIDE KEY INTERLOCK TRANSFER BLOCK IN
CONNECTION CABINET. COORDINATE EXACT
LOCATION WITH COR. SEE SEQUENCE OF
OPERATION DETAIL ON E-601.
J
IN GRADE ELECTRICAL JUNCTION BOX/HANDHOLE
E
0 8' 16' 32'
PULL BOX DETAIL
N.T.S.
DUCTBANK DETAIL
SCALE: N.T.S.
SGCP-1
ACCH-2
(PGCP-2)
SGCP-2
PGCP-2
PGCP-1
(EX) MCCN
(EX) AHU
(EX) AHU
(EX) FEEDER TO MCCN (VIF)
(EX)
(EX)
(EX)
(EX)
(EX)
GENERATOR FEEDER
AND CONTROLS
TO ATS EM-HVAC
SECURE TO INSIDE SURFACE
OF PARAPET WALL AT ROOF
LEVEL
(2)4"C, (2) 1"C UP
FROM GRADE LEVEL
ELEVATION
(PENTHOUSE LEVEL)
123.00
ATS EM-HVAC
CONDUIT CLAMP.
SIZE AS
REQUIRED
THREADED ANCHOR
ROD, ZINC-PLATED
CARBON STEEL
CHANNEL STEEL SUPPORT,
ZINC PLATED CARBON STEEL
CONDUIT, QUANTITY AS
INDICATED ON PLANS
LOCKING AND SQUARE
WASHER AND LOCKNUT
NOTES:
1. INSTALL THREADED ANCHOR ROD IN MASONRY WALL WITH INJECTABLE
ADHESIVE ANCHOR, SUCH AS HILTI HIT INJECTABLE ADHESIVE MORTARS.
2. PAINT ASSEMBLY AFTER INSTALLATION TO MATCH BRICK COLOR
PARTIAL ROOF PLAN ELECTRICAL (BUILDING 1)
1/8" = 1'-0"
INSTALLATION OF EMERGENCY
POWER SYSTEM FOR HVAC
EQUIPMENT
DURHAM, NC
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
558-18-153
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM, NC 27705
18-304
FULLY SPRINKLERED
CONSTRUCTION DRAWINGS
MAY 12, 2022
BOOTH
A
D
C
B
E
F
M
R
I
I
C
U
F
U
L
T
R
E
E
T
E
R
W
A
D
KEY PLAN:
AREA OF WORK
PARTIAL ROOF PLAN
ELECTRICAL BUILDING (1)
E-102
CNJGG
0 8' 16' 32'
1. (2) 4"C TO NEW ATS AT ROOF/PENTHOUSE LEVEL
FOR POWER TO MCC-N. PROVIDE CONTROL AND
MONITORING CABLING IN 1"C FROM ATS-EM
HVAC TO GENERATOR CONTROLS AT
EMERGENCY SWITCHGEAR ROOM. SEE E-601.
2. NEW ATS-EM HVAC AT PENTHOUSE. VERIFY
DIMENSIONS WITH SHOP DRAWINGS AND FIELD
CONDITIONS. SEE ATS DETAIL AND SINGLE-LINE
DIAGRAM ON SHEET E-601.
3. EXISTING FEEDER TO MCC-N IS TO BE
REROUTED INTO ATS-EM HVAC, COORDINATE
SHUTDOWN OF MCC-N WITH COR . SEE SHEET
E-601.
CONDUIT SUPPORT DETAIL
No Scale
W W
W
W
W
W
W
W
W
W
W
W W W W W W W W W W W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W W W W W W
W W
W W
W
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/
E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E
UG/E UG/E UG/E UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E
UG/
E
UG/
E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
T
T
T T T T T T T T T T T T
T
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG/E UG/E UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E
UG/E
UG/E
UG/E UG/E UG/E UG/E UG/E
UG
/E
UG/E
UG/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/
E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E
UG/E UG/E UG/E UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E
UG/
E
UG/
E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
T
T
T T T T T T T T T T T T
T
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG/E UG/E UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E
UG/E
UG/E
UG/E UG/E UG/E UG/E UG/E
UG
/E
UG/E
UG/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/
E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E
UG/E UG/E UG/E UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E
UG/
E
UG/
E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
T
T
T T T T T T T T T T T T
T
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG/E UG/E UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E
UG/E
UG/E
UG/E UG/E UG/E UG/E UG/E
UG
/E
UG/E
UG/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG/E
UG/E
FW
FW
FW
FW
FW
W P
I V
P I V
W W W W W W W W
W W
W
W W
W
W W
W W
W
W W
W W
W
FW
FW
FW FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW FW FW FW FW FW FW FW FW FW FW FW FW FW FW FW FW FW FW FW FW
FW
FW
FW
FW
FW
FW
W
FW FW FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW FW FW FW FW
FW
FW
FW
FW
FW
W W
G V
W W
W W
W W
W W
W W
G V
W W
GV
G
V
W W W W W W W W W W W W W W W W W W W W W
T25
XFMR
"S-B23"
S&C SW
SWITCHGEAR
LOADING DOCK
BUILDING 5
BUILDING 23
EQAC-14
BUILDING 6
BUILDING 20
CONDUIT(S) WITH BELL ENDS (TYP). SIZE,
QUANTITY AND WIRING AS INDICATED ON PLANS
CLEAN 3/4" CRUSHED ROCK
GRADE. FEATHER & TAMP BACKFILL TO CREATE FLUSH
INSTALLATION AND POSITIVE DRAINAGE AWAY FROM BOX
VA
R
IE
S
12"
12"
H-20 LOADING
QUAZITE: 24X24 FRP B16242424A
WITH C1642402A COVER.
FINISHED GRADE
30° MAX.
EXOTHERMIC WELD CONNECTION TREATED
WITH TWO (2) COATS COLD GALVANIZED PAINT
GROUND ROD SHALL NOT BE ANGLED MORE THAN
30° FROM VERTICAL. ANGLE AWAY FROM SHELTER
OR PAD WHERE POSSIBLE.
3/4" DIAMETER COPPER CLAD STEEL GROUND ROD
10' LONG.
TOP OF GROUND ROD, 30" MIN. OR 6" BELOW
FROSTLINE (WHICHEVER IS DEEPER)
DUCTBANK NOTES:
A.
B.
C.
CONCRETE SHALL BE 4000 P.S.I. @ 28 DAYS, OR AS SPECIFIED.
PROVIDE REINFORCING RODS ON TOP AND BOTTOM OF DUCTS WHEN
CROSSING OR PLACED IN PARKING AREAS OR ROADWAYS.
MINIMUM COVER TOP OF ENVELOPE SHALL BE 30" BELOW ROADS AND
OTHER PAVED SURFACES.
6-WAY DUCTBANK
TIE WIRE
PLASTIC
SPACER
DUCT (SIZE
AND QTY AS
INDICATED
ON DWGS)
3" 3"
3"
3"
PARTIAL SITE ELECTRICAL PLAN (BUILDING 23)
1/16" = 1'-0"
INSTALLATION OF EMERGENCY
POWER SYSTEM FOR HVAC
EQUIPMENT
DURHAM, NC
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
558-18-153
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM, NC 27705
18-304
FULLY SPRINKLERED
CONSTRUCTION DRAWINGS
JUNE 23, 2022
BOOTH
A
D
C
B
E
F
M
R
I
I
C
U
F
U
L
T
R
E
E
T
E
R
W
A
D
KEY PLAN:
AREA OF WORK
PARTIAL SITE ELECTRICAL PLAN
BUILDING (23)
1. NEW DIESEL GENERATOR WITH 96-HOUR SUB-BASE
FUEL TANK, SOUND-ATTENUATED ENCLOSURE AND
ACCESS PLATFORMS WITH STAIRS AND RAILINGS.
PROVIDE NEW CONCRETE PAD PER DETAIL ON CIVIL
SHEET C-501. GENERATOR TO BE ORIENTATED FOR
EXHAUST TO FACE THIS SIDE. EXHAUST TO BE NO
LESS THAN 19' 6" ABOVE GENERATOR CONCRETE PAD.
2. NEW RACEWAYS AND FEEDER TO ATS-E1. SEE SHEET
E-601. COORDINATE ROUTING WITH EXISTING
UTILITIES. PROVIDE FLUSH (AT GRADE) PULL BOXES
AS SHOWN. CONTRACTOR IS RESPONSIBLE FOR ALL
EXCAVATION AND REMOVAL OF WALKWAYS AS
REQUIRED. CONTRACTOR SHALL REPLACE IN KIND TO
ORIGINAL CONDITION.
3. EXISTING BUILDING 23 MAIN ELECTRICAL ROOM. SEE
SHEET E-104.
4. NEW PULL BOXES FLUSH AT GRADE. MINIMUM
24X24X12 WITH COVER.
5. PROVIDE CONNECTION FOR REMOTE ANNUNCIATOR.
COORDINATE LOCATION WITH COR.
6. CONNECTION CABINET. PROVIDE CONNECTION
CABINET WITH CAM-LOCKS FOR GENERATOR LOAD
BANK TESTING OR FOR CONNECTING A TEMPORARY
GENERATOR DURING GENERATOR MAINTENANCE.
SEE SHEET E-601.
7. PROVIDE NEW AXI 1FP 1300 SERIES FUEL PORT OR
APPROVED EQUIVALENT.
8. PROVIDE POWER TO NEW FUEL PORT. CIRCUIT TO BE
RUN UNDERGROUND IN 3/4" CONDUIT TO BUILDING 23
MAIN ELECTRICAL ROOM. COORDINATE ROUTING
WITH EXISTING UTILITIES. CONTRACTOR IS
RESPONSIBLE FOR ALL EXCAVATION AND REMOVAL
OF WALKWAYS AS REQUIRED. CONTRACTOR SHALL
REPLACE IN KIND TO ORIGINAL CONDITION.
9. PROVIDE NEW DIRECT-BURIED 3" FUEL OIL PIPING
FROM NEW DIESEL GENERATOR TO NEW FUEL PORT.
BURY PIPING AT A NOMINAL 3' DEPTH BELOW GRADE
(+/-). FUEL OIL PIPING SHALL BE SCHEDULE 40 BLACK
STEEL ASTM A53, GRADE A OR B SEAMLESS. PROVIDE
PIPE RUNS IN A COMMON LEAK-TIGHT STEAL
CONTAINMENT PIPE WITH FIBERGLASS JACKET
SYSTEM FOR 3" FUEL OIL SUPPLY COMPLETE WITH
LEAKAGE TRACE CABLING IN PIPE LINE. LEAK
DETECTION SHALL BE INTEGRATED WITH THE
EXISTING BUILDING AUTOMATION SYSTEM TO ALERT
VA STAFF IN THE ENGINEERING CONTROL CENTER
(ECC) IN BUILDING 6. COORDINATE WITH COR.
COORDINATE ROUTING WITH EXISTING UTILITIES,
USING MANUAL TRENCHING METHODS WITHIN 6 FEET
OF CROSSINGS. CONTRACTOR IS RESPONSIBLE FOR
ALL EXCAVATION AND REMOVAL OF WALKWAYS AS
REQUIRED. CONTRACTOR SHALL REPLACE IN KIND TO
ORIGINAL CONDITION.
PULL BOX DETAIL
N.T.S.
E-103
CNJGG
ELECTRICAL LEGEND
DUAL-TECHNOLOGY, CEILING MOUNTED, LOW VOLTAGE
OCCUPANCY SENSOR
OCCUPANCY SENSOR SWITCHPACK, WIRE PER
MANUFACTURER'S RECOMMENDATIONS.
3 = THREE WAY
GFI = GROUND FAULT CIRCUIT INTERRUPTER
WIRING SYSTEM-BRANCH OR FEEDER CIRCUIT
120V QUAD RECEPTACLE, MOUNTED 18" AFF UNO
4 = FOUR WAY
JUNCTION BOX
SINGLE POLE SWITCH, MOUNTED 44" AFF UNO.
MODIFIERS FOR SWITCHES:
HOMERUN - 120V OR 277V
HOMERUN - 208V OR 480V
BRANCH OR FEEDER CIRCUIT HOMERUN TO
PANELBOARD, SWITCHBOARD, MOTOR CONTROL
CENTER, OR OTHER POWER DISTRIBUTION DEVICE (PDD).
SUBSCRIPT DENOTES PANELBOARD, SWITCHBOARD,
MOTOR CONTROL CENTER, OR PDD. AND OVERCURRENT
PROTECTION DEVICE NUMBER.
120V DUPLEX RECEPTACLE, MOUNTED 18" AFF UNO
MODIFIERS FOR RECEPTACLES:
TELCO OUTLET MOUNTED 18" AFF UNO
WP = WEATHERPROOF
DM = DIMMER SWITCH
FUSED DISCONNECT
UNFUSED DISCONNECT
PHOTOELECTRIC CELL
DATA/TELCO OUTLET MOUNTED 18" AFF UNO
120V SIMPLEX RECEPTACLE, MOUNTED 18" AFF UNO
220V DUPLEX RECEPTACLE, MOUNTED 18" AFF UNO
WIRING SYSTEM-SWITCHED BRANCH OR FEEDER CIRCUIT
OC = OCCUPANT SENSOR
PC
S
A AMPERE
AFC ABOVE FINISHED CEILING
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AIC AMPS INTERRUPTING CAPACITY
ATS AUTOMATIC TRANSFER SWITCH
AWG AMERICAN WIRE GAUGE
BFF BELOW FINISHED FLOOR
BFG BELOW FINISHED GRADE
C CONDUIT
cd CANDELA
CKT CIRCUIT
CU COPPER
D DEEP
DACT DIGITAL ALARM COMMUNICATOR TERMINAL
DED DEDICATED CIRCUIT
EG EQUIPMENT GROUND
EMT ELECTRICAL METALLIC TUBING
EX EXISTING
EXT EXTERIOR
FACP FIRE ALARM CONTROL PANEL
FAA FIRE ALARM REMOTE ANNUNCIATOR
FLA FULL LOAD AMPS
FMC FLEXIBLE METAL CONDUIT
GEC GROUNDING ELECTRODE CONDUCTOR
GFI GROUND FAULT CIRCUIT INTERRUPTER
GRS GALVANIZED RIGID STEEL
H HIGH
HP HORSEPOWER
IBC INTERNATIONAL BUILDING CODE
IG ISOLATED GROUND
KW KILOWATT
MBJ MAIN BONDING JUMPER
MCA MINIMUM CIRCUIT AMPACITY
MCB MAIN CIRCUIT BREAKER
MCCB MOLDED-CASE CIRCUIT BREAKER
MCS MOLDED-CASE SWITCH
MDP MAIN DISTRIBUTION PANEL
MLO MAIN LUGS ONLY
MOCP MAXIMUM OVERCURRENT PROTECTION
N NEUTRAL
NEC NATIONAL ELECTRICAL CODE
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NTS NOT TO SCALE
OC ON CENTER
R RELOCATED
SPD SURGE PROTECTION DEVICE
TCL TOTAL CONNECTED LOAD
TDL TOTAL DEMAND LOAD
TYP TYPICAL
UL UNDERWRITERS LABORATORIES
UNO UNLESS NOTED OTHERWISE
UPS UNINTERRUPTIBLE POWER SUPPLY
WP WEATHERPROOF
TXF TRANSFORMER
VIF VERIFY IN FIELD
3/PH THREE CONDUCTORS PER PHASE (TYP)
4/PH FOUR CONDUCTORS PER PHASE (TYP)
ABBREVIATIONS GENERAL NOTES
1. ALL ELECTRICAL DEVICES, FIXTURES, EQUIPMENT AND FEEDERS SHALL BE INSTALLED IN
ACCORDANCE WITH THE PROJECT SPECIFICATIONS, THE MANUFACTURER'S
RECOMMENDED INSTALLATION PROCEDURES, ALL APPLICABLE LOCAL AND STATE CODES,
AMERICANS WITH DISABILITIES ACT AND WITH THE LATEST EDITION OF THE NATIONAL
ELECTRICAL CODE.
2. PROVIDE ADDITIONAL SUPPORT FOR DEVICES, FIXTURES, EQUIPMENT AND FEEDERS
WHERE THE BUILDING CONSTRUCTION IS NOT SUITABLE FOR DIRECT MOUNTING.
3. FIRESTOP, DRAFTSTOP, SMOKESTOP AND/OR PROTECT THE ANNULAR SPACE AROUND ALL
PENETRATIONS THROUGH WALLS, PARTITIONS, FLOORS, CEILING, AND ROOFS IN
ACCORDANCE WITH THE REQUIREMENTS OF THE NATIONAL ELECTRICAL CODE, UL LISTING
REQUIREMENT AND THE APPLICABLE BUILDING CODES. REFER TO THE ARCHITECTURAL
DRAWINGS AND THE OWNER'S EXISTING AS-BUILT/RECORD DRAWINGS, VERIFY
CONSTRUCTION RATINGS AND PROVIDE PENETRATION ASSEMBLIES SUITABLE FOR THE
PARTICULAR CONSTRUCTION.
4. VERIFY CEILING SYSTEMS AND PROVIDE MOUNTING ACCESSORIES, TRIMS AND ALL
REQUIRED MOUNTING HARDWARE TO SUIT THE PARTICULAR INSTALLATION.
5. PROTECT EXISTING UNDERGROUND AND BUILDING INTERIOR UTILITIES DURING
CONSTRUCTION.
6. BRANCH CIRCUIT CONDUCTORS SHALL BE 12 AWG MINIMUM.
7. COORDINATE ANY AND ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION SO AS
TO AVOID CONFLICT DURING CONSTRUCTION.
8. ALL PANELS SHALL HAVE TYPED, COMPLETED DIRECTORIES INDICATING EQUIPMENT
SERVED AND ROOM NUMBER (AS INDICATED ON FINAL BUILDING ROOM SIGNAGE) OF
EQUIPMENT LOCATION, OR SPARE, OR SPACE.
9. MANUFACTURER'S NAME AND MODEL NUMBER ARE GIVEN FOR DESCRIPTIVE PURPOSES TO
INDICATE A QUALITY STANDARD AND ARE NOT INTENDED TO LIMIT PRODUCTS TO A
PARTICULAR MANUFACTURER. PRODUCTS DEEMED EQUAL AND APPROVED BY THE
DESIGNER WILL BE ACCEPTED.
10. ALL FEEDERS AND CIRCUITRY SHALL BE TORQUED PER THE PANEL, BREAKER, AND/OR
PARTICULAR EQUIPMENT MANUFACTURER'S SPECIFICATIONS.
11. CIRCUITRY TO SWITCHES, RECEPTACLES, AND ALL OTHER DEVICES SHALL BE TERMINATED
ON THE DEVICE'S SCREW TERMINALS.
12. MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, OUTLET, FIXTURE, OR
EQUIPMENT UNLESS NOTED OTHERWISE.
13. ALL WIRE TERMINATIONS SHALL BE RATED FOR 75 DEGREES C.
14. ALL CONDUCTORS SHALL HAVE THHN/THWN INSULATION, UNLESS OTHERWISE NOTED.
15. ALL CONDUIT SHALL BE GRS OR EMT UNLESS OTHERWISE NOTED.
16. ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT SHALL BE LABEL
LISTED BY AN APPROVED THIRD PARTY TESTING AGENCY.
SPECIAL RECEPTACLE, MOUNTED 18" AFF UNO
GROUND ROD DETAIL
N.T.S.
E ELECTRICAL MANHOLE (SEE CIVIL/SITE)
A. SEE SHEET E601 FOR CONDUCTOR AND
RACEWAYS SIZING.
B. ALL WORK IS TO BE SCHEDULED WITH COR.
WORK SCHEDULES WILL BE AT THE
DISCRETION OF THE HOSPITAL AND COR.
C. PROVIDE TEMPORARY CONNECTION FOR AN
ALTERNATE POWER SOURCE FOR THE
GENERATOR SET.
0 8' 16' 32'
J
IN GRADE ELECTRICAL JUNCTION BOX/HANDHOLE
E
DUCTBANK DETAIL
SCALE: N.T.S.
DocuSign Envelope ID: 08250FA6-BD86-4F84-A319-FCBC5EB4E900
6/23/2022
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
CONCRETE WALL
AutoCAD SHX Text
BRICK WALL
AutoCAD SHX Text
POWER VAULT
AutoCAD SHX Text
APPROXIMATE LOCATION OF UNDERGROUND COMMUNICATION LINE PER UTILITY LOCATOR
AutoCAD SHX Text
APPROXIMATE LOCATION OF UNDERGROUND ELECTRIC LINE PER UTILITY LOCATOR
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text
JB
AutoCAD SHX Text
JB
AutoCAD SHX Text
JB
AutoCAD SHX Text
TRANSFORMER
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
CONCRETE WALL
AutoCAD SHX Text
BRICK WALL
AutoCAD SHX Text
POWER VAULT
AutoCAD SHX Text
APPROXIMATE LOCATION OF UNDERGROUND COMMUNICATION LINE PER UTILITY LOCATOR
AutoCAD SHX Text
APPROXIMATE LOCATION OF UNDERGROUND ELECTRIC LINE PER UTILITY LOCATOR
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text
JB
AutoCAD SHX Text
JB
AutoCAD SHX Text
JB
AutoCAD SHX Text
TRANSFORMER
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
CONCRETE WALL
AutoCAD SHX Text
BRICK WALL
AutoCAD SHX Text
POWER VAULT
AutoCAD SHX Text
APPROXIMATE LOCATION OF UNDERGROUND COMMUNICATION LINE PER UTILITY LOCATOR
AutoCAD SHX Text
APPROXIMATE LOCATION OF UNDERGROUND ELECTRIC LINE PER UTILITY LOCATOR
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text
JB
AutoCAD SHX Text
JB
AutoCAD SHX Text
JB
AutoCAD SHX Text
PRIMARY SWGR
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text X
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
UP
OFFICE
NG051
REST RM
NG053
OFFICE
NG052
MAIN
ELEC
COMPUTER
LAB
NEW
ATS-
EQAC
NEW
EQAC
E
X
P G
B
E
X
E Q
P G
E
X
P G
B
(EX)
EQPG
E
X
E D
P
(EX)
MSBD
600NG
400NG
(EX)
CU-90
'EQPG'-7,9,11
(EX)
VRF-23D
'PG'-37,39,41
(EX)
100A/3P
NEMA 3R
3-8AWG,1-8AWG
EG IN 1"C
EQAC-2,4,6
EQAC-1,3,5
MECH
NG150
(EX) DPG
(EX) PG
(EX)
AHU-90
3-1/0AWG,1-6AWG EG
IN 2"C
EQAC-8,10,12
J
8-10AWG, 1-10AWG EG
IN 1-1/2"C
EQAC-7,9,11,13
(2)
2-1/2"C
LIBRARY
OFFICES
STORAGE
NG020E
NEW
PULLBOX
FROM NEW
GENERATOR,
SEE E-103
ELEC
N2036
TELECOM
N2038
STAIR
N2018
(EX) PC2
(EX) LC2
(EX) EC2
(NEW) MCC-EQ3AC
400NG
(EX) MCC-A3
(EX) EMCC-A3
(EX)
LA3A
(EX)
PA3A
(EX)
EA3
(EX)
VFD-23-RF-083
MECH
N3024
STOR.
N3024B
ELEC
N3024C
(EX)
VFD-AHU-083
(EX) 23-RF-083
25 HP (VIF)
(EX) AHU-083
75 HP (VIF)
J
3-350kcmil, 1-3AWG EG
IN 2-1/2"C
MCC-EQ3AC
J
3-1/0AWG,
1-6AWG EG
IN 1-1/2"C
MCC-EQ3AC
ELEC
N1036
TELECOM
N1038
STAIR
(EX) PC1
(EX) LC1
(EX) EC1
PARTIAL GROUND FLOOR PLAN (BUILDING 23)
1/8" = 1'-0"
INSTALLATION OF EMERGENCY
POWER SYSTEM FOR HVAC
EQUIPMENT
DURHAM, NC
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
558-18-153
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM, NC 27705
18-304
FULLY SPRINKLERED
CONSTRUCTION DRAWINGS
MAY 12, 2022
BOOTH
A
D
C
B
E
F
M
R
I
I
C
U
F
U
L
T
R
E
E
T
E
R
W
A
D
KEY PLAN:
AREA OF WORK
PARTIAL ELECTRICAL PLANS
BUILDING (23)
PARTIALTHIRD FLOOR PLAN (BUILDING 23)
1/4" = 1'-0"
PARTIAL SECOND FLOOR PLAN (BUILDING 23)
1/4" = 1'-0"
PARTIAL FIRST FLOOR PLAN (BUILDING 23)
1/4" = 1'-0"
E-104
CNJGG
0 4' 8' 16'0 2' 4' 8'
1. PROVIDE NEW ATS-EQAC FED FROM NEW
EMERGENCY FEEDER FROM NEW GENERATOR
AND FROM NEW NORMAL FEEDER FROM MSBD.
PROVIDE EQUIPMENT PAD AT ATS LOCATION.
SEE GENERATOR GROUNDING DETAIL ON SHEET
E-601 FOR ATS CONNECTION REQUIREMENTS.
2. PROVIDE NEW NORMAL FEEDER TO ATS-EQAC
FROM NEW BREAKER IN MSBD. PROVIDE NEW
BREAKER COMPATIBLE WITH EXISTING
SWITCHBOARD. BREAKER RATING ON E-601.
3. PROVIDE NEW (2) 2-1/2" C. UP TO THIRD FLOOR
ELECTRICAL ROOM (N3024C) FOR FEEDER FROM
PANEL EQAC TO MCC-EQ3AC.
4. NEW MCC-EQ3AC FOR AHU-083 AND 23-RF-083.
5. ROUTE OF CONDUIT RISERS TO MCC-EQ3AC IS
APPROXIMATE. FINAL ROUTE SHALL BE
COORDINATED WITH EXISTING CONDITIONS
WITH APPROVAL BY EOR AND COR.
6. KEY INTERLOCK TRANSFER BLOCK.
COORDINATE EXACT LOCATION WITH COR. SEE
SEQUENCE OF OPERATION DETAIL ON E-601.
7. EXISTING (CU-90), PROVIDE NEW CIRCUIT FROM
PANEL EQAC. DISCONNECT TO REMAIN, PROVIDE
NEW CONDUCTORS AS NOTED. NEW CONDUIT
PATH TO GENERALLY FOLLOW THE ROUTE OF
EXISTING FEEDERS BETWEEN THE MAIN
ELECTRICAL ROOM AND MECH ROOM (NG150).
8. REVISE CIRCUIT FOR VRF-23D FROM PANEL
EQPG TO EQAC. SPLICE AND EXTEND
CONDUCTORS, MATCHING EXISTING SIZE &
QUANTITY.
9. PROVIDE FOUR (4) NEW CIRCUITS FOR EXISTING
HVAC CONTROLS FROM PANEL EQAC. PROVIDE
CONDUIT AND WIRE TO EXTEND EXISTING
CIRCUITS TO EQAC.
10. EXISTING AHU-90. PROVIDE NEW CIRCUIT FROM
PANEL EQAC WITH NEW CONDUCTORS AS
NOTED, AND NEW CONDUIT ROUTED WITH
EXISTING FEEDERS TO THE MAIN ELECTRICAL
ROOM.
11. APPROXIMATE ROUTING OF EXISTING
ELECTRICAL FEEDERS BETWEEN THE MAIN
ELECTRICAL ROOM AND MECH RM (NG150).
VERIFY IN FIELD.
0 2' 4' 8'
0 2' 4' 8'
A. PROVIDE EMERGENCY STOP BUTTON FOR
GENERATOR. LOCATION SHALL BE
COORDINATED WITH COR.
B. REFER TO SHEET E-601 FOR PARTIAL
SINGLE-LINE DIAGRAM (BUILDING No. 23) AND
FEEDER SCHEDULE.
C. REFER TO SHEET E-601 FOR PANEL EQAC
SCHEDULE.
MCCN-ACCH1
350A
STR-ACCH1
MCCN-ACCH1
460V
1-25 hp
MCCN-ACCH2
350A
STR-ACCH2
MCCN-ACCH1
460V
1-25 hp
MCCN-AHU4SF
250A
VFD-AHU4SF
M-AHU4SF
460V
1-150 hp
MCCN-AHU1SF
175A
VFD-AHU1SF
M-AHU1SF
460V
1-100 hp
MCCN-AHU2SF
M-AHU2SF
460V
1-85 hp
VFD-AHU2SF
MCCN-AHU1RF
M-AHU1RF
460V
1-10 hp
VFD-AHU1RF
MCCN-AHU2RF
M-AHU2RF
460V
1-10 hp
VFD-AHU2RF
MCCN-HWP1
15A
VFD-HWP1
MCCN-HWP2
15A
VFD-HWP2
MCCN-EF2
M-EF2
460V
1-50 hp
FS-EF2
MCCN-MAIN
1200A
A/C-
MCCN
1200A
MCCN-CHWP
50A
VFD-CHWP3
VFD-CHWP4
VFD-CHWP5
VFD-CHWP6
P
S
XF-T11-A/C
1500kVA
12470 / 480V
8.43 %Z
ATS-EM-HVAC
1600A/ 4P
22Kaic
WITH ISOLATED
BYPASS
MCC-N MAIN
1200A 480V 3PH,3W
A/C-
MCC-B
1600A
A/C-
MDP
400A
(EX)(EX)
(EX)
(EX)
(EX)
ELECTRICAL EQUIPMENT FEEDER SCHEDULE
ALL CONDUCTORS ARE COPPER (CU) UNLESS NOTED OTHERWISE.
600NG
400NG
SWGR A/C-
2000A 480V
NEW 750KW
480Y/277V 3PH,4W
GENERATOR IN OUTDOOR,
SOUND-ATTENUATING
ENCLOSURE
"LB-TG"
900A
MCCB
900NG
1200NG
PARALLEL SETS OF 2-1/2"C, WITH 4-350
KCMIL AND 1-1/0G AWG IN EACH
PARALLEL SETS OF 2-1/2"C, WITH 4-4/0
AWG AND 1-2G AWG IN EACH
PARALLEL SETS OF 4"C, WITH 4-750 KCMIL
AND 1-2/0G AWG IN EACH
PARALLEL SETS OF 4"C, WITH 4-750 KCMIL
AND 1-2/0G AWG IN EACH
TAG
# OF
SETS
CONDUIT & CONDUCTOR SIZES
J
900NG
1200NG
1200NG
G
J
900A
100%
RATED
NEW CONDUCTORS IN
NEW UNDERGROUND
DUCTBANK
NEW CONDUCTORS IN
EXISTING UNDERGROUND
CONDUIT
NEW CONDUCTORS IN
EXISTING CONDUIT
THROUGH 2ND FLOOR
INTERSTITIAL SPACE
NEW GENERATOR
START/STOP
NEW CONDUIT
RISER TO ROOF
PENTHOUSE
NEW HANDHOLE/
PULLBOX
EXISTING
BUILDING
MOUNTED
PULLBOX
EXISTING
PULLBOX (VIF)
NEW
NEW
NEW
"G"
900A
MCS
CAM-LOCKS
FOR LOAD
BANK OR
TEMP GEN
NEW PAD-MOUNTED,
NEMA-3R CONNECTION
CABINET FOR LOAD
BANK TESTING OR FOR
A TEMPORARY
GENERATOR DURING
GENERATOR
MAINTENANCE.
(EX) 3000A
SWITCHBOARD
120/208V
EXISTING
15KV GEAR
(52-1)
PREFERRED
(52-2)
ALTERNATE
(EX) SWITCH
(EX) T25
12.47KV / 208V
(EX)
PANEL
'EDP'
120/208V
(ELEC NG021)
GROUND FLOOR
(EX) PANEL 'EQPG'
120/208V 250A
MCB 100% RATED
(ELEC NG021)
EXTERIOR
SECOND FLOOR
PANEL 'EQAC'
120/208V 600A MLO
(NG021)
PROVIDE 60A-2P BKR
AT EQPG
1"C 3-8 AWG, 10 AWG EG, IN 1" C
(SW T-18)
750KVA
600NG
(EX)
TO BLDG 18
ATS-5
(EX)
VIF
(3-500MCM, #1/0 N, #3/0 G)
400A
400NG
NEW
THIRD FLOOR
(EX)
MCC-A3
NEW
MCC-EQ3AC
400A MLO,22Kaic
TO VFD-AHU-083
TO VFD-23-RF-083
NEW
NEW
(30.0 Kaic)
(16.4 Kaic)
600A
J
ATS-EQAC
600A/4P
(NEW)
(31.2 Kaic)
FIRST FLOOR
NEW GENERATOR
START/STOP
HTR
(208V)
"LB-TG"
600A
MCCB
CHARGER
(120V)
CAM-LOCKS
FOR LOAD
BANK OR
TEMP GEN
600NG
NEW
WITH
ISOLATED
BYPASS
G
J
600A
100%
RATED
NEW 175KW
208Y/120V 3PH,4W
GENERATOR IN OUTDOOR,
SOUND-ATTENUATING
ENCLOSURE
NEW PAD-MOUNTED,
NEMA-3R CONNECTION
CABINET FOR LOAD
BANK TESTING OR FOR
A TEMPORARY
GENERATOR DURING
GENERATOR
MAINTENANCE.
600NG
NEW
800A
3000A
"G"
600A
MCS
GENERATOR
4 POLE
TRANSFER
SWITCH
NEUTRAL BAR
XXXA
GROUND BAR
FEEDER WITH EG
BOND
BUSHING-
TYPICAL
GROUNDING ELECTRODE
3/4"X10' COPPER CLAD
STEEL DRIVEN GROUND
ROD
GROUND BAR
TO DOWNSTREAM
DISTRIBUTION
EQUIPMENT
FROM NORMAL
POWER SOURCE
B
C
N
N
C
B
A
A
EG
B
CC
N
C
B
A
EG
C
C
A
A
B
B
EG
EG
BONDING
JUMPER
N
N
MAIN
BONDING
JUMBER
3/0 AWG
SIZED PER
TABLE
250.102(C)
(1)
GROUNDING ELECTRODE
CONDUCTOR, SIZED PER
NEC T250.66.
LOAD BANK TEST SEQUENCE:
1. OPEN BREAKER "G". TURN KEY TO EXTEND
BOLT AND LOCK BREAKER OPEN.
2. REMOVE KEY AND INSERT INTO LOAD BANK
TEST TRANSFER BLOCK. TURN KEY,
RELEASING TWO KEYS.
3. INSERT ONE AT BREAKER "G", TURN TO
RETRACT BOLT, AND CLOSE BREAKER "G".
4. INSERT OTHER KEY AT BREAKER "LB-TG",
TURN TO RETRACT BOLT, AND CLOSE
BREAKER "LB-TG".
*START SIGNAL FROM ATS SHALL SHUNT-TRIP
(OPEN) BKR "LB-TG" AND GENERATOR, IF NOT
RUNNING, SHALL START.
- PERFORM LOAD BANK TESTS -
5. OPEN BREAKER "LB-TG". TURN KEY TO
EXTEND BOLT, REMOVE KEY AND RETURN TO
LOAD BANK TEST TRANSFER BLOCK.
6. OPEN BREAKER "G". TURN KEY TO EXTEND
BOLT, REMOVE KEY AND RETURN TO LOAD
BANK TEST TRANSFER BLOCK.
7. TURN CYLINDER TO RETAIN TWO KEYS.
8. REMOVE ORIGINAL KEY, INSERT AT BREAKER
"G". TURN TO RETRACT BOLT AND CLOSE
BREAKER "G".
GENERATOR MAINTENANCE SEQUENCE:
1. OPEN BREAKER "G". TURN KEY TO EXTEND BOLT
AND LOCK BREAKER OPEN.
2. REMOVE KEY AND INSERT AT BREAKER "LB-TG".
TURN KEY TO RETRACT BOLT. CLOSE BREAKER
"LB-TG".
*SHUNT-TRIP FUNCTION ON BKR "LB-TG" DISABLED.
START SIGNAL FROM ATS SHALL START THE TEMPORARY
GENERATOR, IF NOT RUNNING.
- PERFORM MAINTENANCE TASKS -
3. OPEN BREAKER "LB-TG". TURN KEY TO EXTEND
BOLT AND LOCK BREAKER OPEN.
4. REMOVE KEY AND INSERT AT BREAKER "G". TURN
KEY TO RETRACT BOLT. CLOSE BREAKER "G".
LOAD BANK TEST
TRANSFER BLOCK
A 1
LEGEND:
NORMALLY TRAPPED KEY
A 1
NORMALLY EMPTY CYLINDER
G
ATS
"G"
N.C.
"LB-TG"
N.O.
A 1 A 1 A 1
A 1 A 1
T
START
STOP
ST
TO ATS
TO TEMP
GEN
NORMALLY CLOSED CONTACT
NORMALLY OPEN CONTACT
SHUNT TRIP COIL
ST
NOTE: COORDINATE CONTROLS TERMINATIONS WITH THE GENERATOR
AND AUTOMATIC TRANSFER SWITCH MANUFACTURERS.
INSTALLATION OF EMERGENCY
POWER SYSTEM FOR HVAC
EQUIPMENT
DURHAM, NC
VA PROJECT NUMBER
Building…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .