SF 30 Continuation Sheet- Questions and answers

View the file

Other files

File Type Posted
Amendment_1-_RFP_Continuation_Sheet.docx DOCX document
17-100-SOL-00016-000001.pdf PDF
Amendment_1-_Attachment_1-SOW-Tracked_changes.docx DOCX document
Attachment_2-_pricing_Schedule.xlsx XLSX spreadsheet
Attachment_5-_Past_Perf_Questionnaire.doc DOC document
Attachment_1-SOW_DisasterRecoveryOperationsSupport.docx DOCX document
17-100-SOL-00016.pdf PDF
Attachment_4-_508_4192017vpatinstructions.docx DOCX document
RFP_Continuation_Sheet.docx DOCX document
Attachment_3-_KTR_OCI_&_NDA_.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SF 30- Continuation Sheet- Questions and Answers for Solicitation 17-100-SOL-00016 ASPR Disaster Recovery & Logistics Operations

Document
Section
Page
Question
1
RFP Continuation Sheet
Type of Contract
3, 18
Please provide additional information to clarify the structure of the IDIQ which is described as firm fixed price (FFP). The current language implies that the IDIQ will be awarded regardless of any task orders that may be issued. However, the pricing sheets and CLINS do not include proposing a price for the FFP base. Similarly, the technical requirements do not mention what activities are within the scope of this base task. Clarification on what scope is included in the FFP IDIQ base would be helpful.

Answer: This is an IDIQ contract, meaning there are no requirements at this time. When requirements are needed, a task order will be issues off of the FFP IDIQ. Each task order will be FFP, T&M or LH. When task orders are issued, a SOW will be attached defining the requirement. Attachment 2- pricing schedule is for the base IDIQ FFP pricing. The scope of the requirements is listed under each task.

2
RFP Continuation Sheet
Task Order (TO) Placement procedures
3
Please confirm that “disaster recovery technical assistance requirements” refers to activities under all seven tasks in the scope of work (Attachment 1).

Answer: Confirmed. This is correct.

3
RFP Continuation Sheet
Section F: Deliveries or Performance
4, 18
Can task order periods of performance (POP) extend beyond the IDIQ POP? If so, what is the maximum POP for a task order?

Answer: Yes the task orders can extend past the basic IDIQ POP, not to exceed the last day of the IDIQ basic award. The maximum POP for each task order is 12 months. For example: The base IDIQ, on the base year, the POP is from 1 Jan 2017 to 31 Dec 2017, a task order can be written from 1 June 2017 to 31 May 2018.

4
RFP Continuation Sheet
52.212-1 Instructions to offerors a.
7
The instructions specify that one copy of each proposal section must be submitted as well as a reference to “single sided” formatting. Please confirm that this refers to electronic submission of each section and hard copies are not required for any section.

Answer: Yes electronic submission is required. No hard copies.

5
RFP Continuation Sheet
Section IV, Factor 3: Price/Cost Factor

Attachment 2: Pricing Schedule

8
The Type of Contract sections on pages 3 and 18 refer to an FFP base IDIQ. However, there are no provisions in Factor 3 instructions for proposing cost for the FFP portion of the contract. Please clarify if and how the cost proposal for the FFP portion should be scoped and prepared.

Answer: Attachment 2-pricing schedule is to be filled out and submitted with the proposal for the base IDIQ FFP pricing. This is addressed in provisions 52.212-1 and 52.212-2.

6
RFP Continuation Sheet
Section V, Factor 4: Past Performance
8
Please confirm whether offerors may include subcontractor past performance in the required five contract references.

Answer: Past performance is for the prime only.

7
RFP Continuation Sheet
Factor 2: Management Plan
10
The Factor 2: Management Plan section does not provide details on how the management plan will be evaluated similar to the descriptions in the other evaluation factors. Request that the Government provide additional guidance regarding the key elements to be included in this section to facilitate evaluation.

Answer: Please see provision 52.212-1 and 52.212-2. The management plan section states the key elements needed to address in your plan as subfactors 1 through 3. These three subfactors need to be addressed in your management plan on how you will ensure these subfactors are met. Each factor/subfactor’s are evaluated differently and separately.

8
RFP Continuation Sheet
352.237-75 Key Personnel
23
Please confirm that key personnel will be designated at the Task Order level. If this is not the case, please identify which positions, if any, shall be made key personnel for the IDIQ.

Answer: Key personnel will be designated at the Task Order level.

9
Attachment 1
4. Contract type
4
The SOW specifies that the IDIQ has a FFP base, but there is not scope of work for this base task. Can the government please clarify the scope of the FFP base or clarify the IDIQ structure?

Answer: This is an IDIQ. Therefore the SOW is written for the base IDIQ award, stating what will be required for the task orders. When requirements are forthcoming then a task order will be awarded with a SOW stating the requirements for the task.

10
Attachment 1
4. Contract Type
4
Is the intent of the FFP base IDIQ that the contractor will maintain a program management effort and/or complete other activities during “non-disaster” periods? If so, what is the anticipated level of effort?

Answer: There will be no work during a non-disaster. The purpose of the IDIQ is to respond to disasters.

11
Attachment 1
6. Technical Requirements / Tasks
4
The RFP states: “The contractor(s) shall participate in a Government-scheduled, kick-off meeting after award.” Please clarify whether an initial task order will be awarded for this activity, as well as the location and duration of the meeting and requested contractor participants.

If no task order will be awarded, are offerors to assume that time and materials related to preparation for and participation in this kickoff meeting will not be funded by the government, or is part of the base IDIQ funding?

Answer: Base IDIQ’s do not have funding. The individual task orders will be funded. There will be a kick off meeting after award for the basic IDIQ as a meet and greet and to answer any questions the successful offeror may have. The location is TBD. It is dependent on the successful offeror’s location. It may be conducted via teleconference. The Government do not fund the kick off meetings. There are no requirements at this time; therefore no task order will be issued directly after award of the IDIQ.

12
Attachment 1
Task 1
4-5
Please clarify the deployment time frame for Task 1. The task description references both 2 to 12 months (page 4) and 30 to 90 days (page 5).

Answer: For this activity: Post-Disaster Impact Assessments deployment generally occurs between 30 and 90 days following an incident. The duration of the deployment may vary, depending on the extent, severity, and complexity of the assessment required. Generally, the expected deployment period should be between 2-6 months.

13
Attachment 1
Task 1
5
Please clarify whether the responsibility for preparing OMB packages (if required for PRA compliance) is the responsibility of the contractor or the Government.

Answer: The responsibility for preparing OMB packages (if required for PRA compliance) is the responsibility of the Government.

14
Attachment 1
Task 1
5
Please clarify whether generic OMB PRA clearances are in place to facilitate expedite approvals to enable surveys to be completed within required timeframes.

Answer: There are no pre-approved OMB PRA surveys.

15
Attachment 1
Task 1 Deliverables
6
It is our understanding that, since this is an IDIQ, there are no associated deliverables at the IDIQ level. Individual task orders will specify deliverables related to the TO scope of work. Assuming this correct, are the items listed as “Deliverables” in the IDIQ SOW intended as notional or expected deliverables for each task?

Answer: “Deliverables” in the IDIQ SOW are expected deliverables for each task.

16
Attachment 1
Task 2
6
Please clarify: “The contract shall provide a deployable Subject Matter Expertise (SME).” Was it intended that the “Contractor”, not the “contract”, will provide the SME?

Answer: Yes, this was an error. The SOW has been corrected to state contractor not contract will provide the SME.

17
Attachment 1

Attachment 2

Task 2
6
Although the RFP states, “The contract shall provide a deployable Subject Matter Expertise (SME),” and the task description refers to a single “expert” or “contractor”, the Pricing Schedule includes multiple labor categories. Please clarify whether the Government is seeking a single SME or whether offerors may propose a multiple-SME solution.

Answer: The SOW on page 4 states, “Note: See the pricing schedule for the required labor categories for each task. “ All of the labor categories required for each task is listed.

18
Attachment 1
Task 2 Deliverables
7
The first bullet in this list reads as if it is a requirement for the IDIQ proposal or a subsequent task order RFP/RFQ while the others read as if they are anticipated deliverables on a TO requiring SME support. Please clarify the intent of the items on this bullet list, including which ones offerors are expected to respond to as part of their proposals.

Answer: The deliverables on the tasks in the SOW are due at task order level.

20
Attachment 1
Task 4
8
Task 4 appears to include both pre-event and post-event recovery planning. Please confirm or clarify.

Answer: The pre-dominant expectation is that the contractor will be conducting post-event recovery planning. However, there are situations where HHS may determine it is necessary to utilize this IDIQ to support pre-event recovery planning.

21
Attachment 1
Task 4
9
Please clarify the deployment / delivery schedule for Task 4. The current requirement appears identical to Task 1, including reference to an “Impact Assessment” that is not referenced elsewhere in the task description.

Answer: In the context of the planning process, the impact assessment is one of many steps required in any post-incident recovery planning process. The emphasis for Task 4 is to provide the level of post-incident planning support determined necessary by the impacts of a given incident. The manner in which the impact assessment may be conducted to support the planning process may emulate the methods used in Task 1.

22
Attachment 1
Task 4
9
The RFP states, “The Contractor will have the capacity to perform Impact Assessment anywhere in the United States and its territories when required by HHS/ASPR.” Please clarify the meaning of “Impact Assessment” in the context of Task 4. The term does not occur elsewhere in the Task 4 description.

Answer: In the context of the planning process, the impact assessment is one of many steps required in any post-incident recovery planning process. The emphasis for Task 4 is to provide the level of post-incident planning support determined necessary by the impacts of a given incident. The manner in which the impact assessment may be conducted to support the planning process may emulate the methods used in Task 1.

23
Attachment 1

Attachment 2

Task 6
10
The task description refers to an individual SME, however the Pricing Schedule includes multiple labor categories. Please clarify whether ASPR anticipates utilizing a single SME or multiple logistics SMEs to support an event.

Answer: The SOW on page 4 states, “Note: See the pricing schedule for the required labor categories for each task. “ All of the labor categories required for each task is listed.

24
Attachment 1
Task 6, Task 7
10, 12
Please clarify whether the government intends to provide readiness funding for on-going training (e.g., ICS 100/200) and/or establishment of a PMO.

Answer: The individual should have ICS 100 and 200 upon starting and funding will not be provided.

25
Attachment 1
Task 7
12
The task description refers to an individual SME, however the Pricing Schedule includes multiple labor categories. Please clarify whether ASPR anticipates utilizing a single SME or multiple information technology SMEs to support an event.

Answer: The SOW on page 4 states, “Note: See the pricing schedule for the required labor categories for each task. “ All of the labor categories required for each task is listed.

26
Attachment 1
Task 7
12
Please clarify (i.e., provide examples of) the primary types of computer systems, software, and hardware the contractor SME will need to support.

Answer: laptops, iPhones, printers, filemaker software, basic understanding of Microsoft office, working collaboratively in a sharepoint environment.

27
Attachment 1
List of labor categories and qualifications
12 – 15
Please clarify whether additional years of experience may be substituted for degree requirements. This would allow more flexibility to provide the most qualified personnel to support recovery operations.

Answer: Yes, but this will be evaluated on a case-by-case basis.

28
Attachment 1
List of labor categories and qualifications
14 – 15
Six of the total 15 labor categories refer to information technology positions although a requirement for only one SME is defined in Task 7. Please clarify the roles of the various IT labor categories and how they will be applied to the task.

Answer: Labor categories described are for the whole SOW; this description is not for the IT engagement only.

29
Attachment 1
List of labor categories and qualifications, 11. Helpdesk technician
15
Based on the wording of this requirement – “Helpdesk technician (CompTIA A+, Network+ & Security+Cisco Certified Network Associate (CCNA) professional certificate, or associate degree and 3 years’ experience)” – are we correct in understanding that any ONE of these certifications or degrees would suffice for this position? If not, please clarify.

Answer: The position requires only one of the three certifications.

30
Attachment 1
List of labor categories and qualifications, 15. Senior IT Coordinator
15
Please clarify the responsibility to “act as the Program Manager … in managing contract performance.” No labor category for program manager is included and the program manager referenced on page 16 appears to be a government employee.

Answer: The Program Manager will work as a Senior Logistics representative in the field with a government COR support from HQ.

31
Attachment 1
Reporting Requirements
16
Please clarify whether the monthly status report is required at the IDIQ level or task order level.

Answer: Task order level.

32
Attachment 1
12. Government-furnished Resources
18
Please confirm that the Government will furnish all necessary supplies, including personal protective equipment (if required) for contractors deployed to disaster field offices, on-site SMEs, and those assigned to ASPR field offices.

Answer: The Contractor shall furnish all supplies, materials and equipment necessary for the successful performance of the work under this contract.

33
Attachment 1
14. Performance Meetings
19
Please clarify whether the performance meeting is conducted at the IDIQ level or task order level. If at the IDIQ level, will a task order be issued to cover the costs of preparing for and attending this meeting, as well as other program management requirements that are not specific to a given task order.

Answer: Meetings are not reimbursed by the Government. There will be a kick off meeting after award of the IDIQ. Meetings may be required at the task order level.

34
Attachment 2
Pricing

Please confirm that costs for pre-deployment and/or post-deployment medical clearance, if needed, will be covered under the ODC CLIN(s).

Answer: Pre- and post-deployment readiness and reconstitution activities for deployed personnel are the responsibility of the vendor.

35
Attachment 2
Pricing

Please confirm that any needed personal protective equipment (PPE) will be covered under the ODC CLIN(s).

Answer: Requirements for PPE are generally not expected for this requirement. However, if conditions require based on the direction of the HHS Chief Medical Officer, then PPE expenditures under ODCs will be considered on a case-by-case basis.

36
General

Please clarify whether disasters as anticipated under this IDIQ include both Stafford Act and non-Stafford Act events.

Answer: Yes both Stafford and non-Stafford Act events.

37
RFP Continuation Sheet
Type of Contract
3
Please clarify the reference to a FFP base IDIQ. What tasks/activities are expected to be performed as part of the base IDIQ requirement?

Answer: There are no tasks with the base IDIQ. Task orders are awarded off of the base IDIQ. Pricing will be used from the base IDIQ for the task orders.

38
RFP Continuation Sheet
Type of Contract
3
Does the Government anticipate issuing a task order for PMO support (e.g., a base task) upon award of the IDIQ? If so, what tasks, activities, and labor categories will be required?

Answer: No.

Is there an expectation that any staff provided by the contractor will be assigned full-time status under the contract? If so, would any contractor have to permanently relocate to Washington D.C. or any other location? Or could they work virtually and travel as needed?

Answer: The SOW clearly states the contractor assigned is expected to deploy where the need is i.e. where disaster strike and HSS RSF is activated. The period of performance will be different for each task order. Most task orders will be for a short time period after an emergency.

What is the expectation of the anticipated work load and use of contractors under Task 5?

Answer: It depends on the disaster and needs the anticipated workload under Task #5 which can be significant. Each task order will have a SOW defining the work needed.

41&42

Question 41 & 42: Paragraph 1 of the synopsis for the subject requirement states that “The vendor will be expected to be capable of deploying staff experts in public health, environmental health, behavioral health, social services (including expertise in the post-disaster impacts to children and youth), conduct necessary analysis, planning support, workshop facilitation, and research anywhere in the United States for several weeks to months at a time.”

Question 41: Is there more specific information available relating to the actual functions, positions, or roles within these broad categories. For example, there are many types of service providers within the public health, environment health and behavioral health industry – please specify the expertise for which you seek.

Question 42: Please provide an example of the amount of time an individual might be deployed in the field; is there a minimum or maximum number of days for which the service providers should be prepared?

Answer: 41: Expertise that we need is the public health emergency, preparedness, response and recovery, as well as disaster behavioral health services. Public health preparedness activities include: regulating environmental conditions and food and water safety to minimize disease threats, planning for emergency medical and public health response capabilities, and remediating environmental conditions.

Answer: 42: It is exactly like it is written in the SOW, between 3-4 weeks to several months.

Is there an incumbent currently providing this service?

Answer: No there is no incumbent. The solicitation stated this is a new requirement.

What percentage of the work (workshare) must be performed by the prime contractor?

Answer: Please see clause 52.219-29 – Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns.

Is there a maximum number or percentage of personnel that can be provided by subcontractors?

Answer: Please see clause 52.219-29 – Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns.

Will past performances from subcontractors be evaluated?

Answer: No. Only the prime will be evaluated.

How many past performances can a subcontractor submit?

Answer: This is addressed in the solicitation. See clause 52.212-1 of the RFP continuation sheet. It states, “The offeror shall provide no more than five past performance references.”

If the prime contractor does not have past performance, will the Government consider its subcontractor(s) past performance?

Answer: The past performance will be evaluated only with the Prime.

How many contract awards are anticipated?

Answer: One

Please identify what software and cybersecurity certifications are required if we were to propose a fully digital and handheld accessible disaster event response and resource planning and execution tool that would be capable of helping HHS in deploying the public health, environmental health, behavioral health, social services subject matter experts, and help HHS conduct the necessary analysis, planning support, reporting, workshops facilitation, and research anywhere in the United States for several weeks to months at a time, and keep a digital archive of all lessons learned.

Answer: All vendor-provided software is expected to remain isolated from government systems until such a time that they have completed the cybersecurity requirements enumerated on the HHS.GOV website. In the absence if that certification, the vendor will render all data and content collected through proprietary methods accessible and functional to the government through existing MS Office software (e.g. excel, access, word).

Is there a possibility for an extension of the response due date?

Answer: No, we will not be able to extend the response due date.

Can you elaborate on the structure/type of the contract and which elements will be Fixed Firm Price (FFP) or Time & Materials (T&M)?

Answer: Provision 52.216-1 is changed:

From:

52.216-1 Type of Contract (Apr 1984) The Government contemplates award of a It will consist of a Firm Fixed Price (FFP) base IDIQ with FFP, Labor Hour (LH) and/or Time and Materials (T&M) Task Orders resulting from this solicitation.

(End of provision) To :

52.216-1 Type of Contract (Apr 1984) The Government contemplates award of a single IDIQ. It will consist of a Firm Fixed Price (FFP) base IDIQ with FFP, Labor Hour (LH) and/or Time and Materials (T&M) Task Orders resulting from this solicitation.

(End of provision)

If a WOSB decides to partner with another non-WOSB firm, is there a percentage that has to be fulfilled by the WOSB?

Answer: Please see clause 52.219-29 – Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns.

Do all labor categories/positions have to be filled immediately, or can the positions be filled as needed?

Answer: This is an IDIQ contract. When requirements arise task orders will be awarded for the requirement. There are no positions until the task orders are awarded.

Do we include resumes for the key personnel? If so, what section of the response do we include that in?

Answer: There are no resumes needed, since there are presently no requirements/positions.

Does ASPR anticipate that personnel and services under this contract could be used to support any HHS response activities?

Answer: It is possible that this contract could be used to support HHS response activities insofar as they are reflective of the activities identified in the SOW.

57
Attachment 1
Task 3
Page 7
Will the contractor be responsible for securing venues, identifying participants, arranging travel, etc. for meetings and workshops?

Answer: Yes, in consultation with COR. The contractor will not expend ODC funding without prior approval by the COR.

58
Attachment 1
Task 6
Pages 10-11
Attachment 1, pages 10-11, task 6.

0. Can the government provide estimates as to the amount of inventory to be managed? Are controlled substances included in the medical supplies? If so, does ASPR have the necessary storage equipment and DEA credentials to transport and store these materials?

Answer: The inventory consist of a broad range of medical and pharmaceutical products (well over one thousand different line items). Controlled substances (classes II-V) are included in the inventory of controlled substances and all of the regulatory storage requirements are in place as well as DEA licenses.

0. Can further definition be provided about the surface and air transportation activities? Does ASPR have existing contracts for these services or are these additional requirements?

Answer: OEM Logistics has contracts and agreements in place to move resources via ground transportation and air transportation. All the resources are packaged in configuration for air movement as well as all the required documentation.

0. Will ASPR provide the protective equipment mentioned as being required in this Task?

Answer: Logistics will provide when needed the following items for protection: gloves, safety vest, ear plugs, goggles, and hard hat. We will not provide the safety shoes/boots needed for warehouse operations.

Answers are listed above.

The RFP says that HHS anticipates a Firm Fixed Price Base IDIQ, with task orders awarded for specific work. What tasks & labor categories, if any, will be included in the FFP base? Beyond the Attachment 2 Pricing Worksheet with hourly labor rates, is additional price information needed for the FFP Base IDIQ?

Answer: The price sheet has all of the labor categories that will be used on the task orders. The prices submitted will be FFP for the Base IDIQ and these prices will be used when awarding the task orders. No other pricing information is needed except for attachment 2 pricing schedule.

60
Attachment 1
Page 14
Attachment 1, page 14, Labor Categories. The description for #9, Senior Logistics Coordinator, is very focused on event planning, rather than supply chain and operational logistics as discussed in Task 6 Deployable Supply Chain Management SME. Will the Government please confirm this labor category, as described, reflects the anticipated type of work?

Answer: Logistics has a requirement for Senior Logistics Coordinators with the ability to support ongoing response events which involves strategic decision making on issues regarding supply chain management and operational logistics. The labor category is appropriate.

Will government credentials be provided to person deploying to perform impact assessments?

Answer: Access credentials will be secured for personnel who are expected to be deployed for at least three months or longer.

On the Pricing SCHEDULE XLS - The tab named SHEET 2 there are 7 additional pricing components for the following tasks:

The Development of Training Develop Web Based Training Conduct Training Assessment Exercise Development and Facilitation Simulation Development Corrective Action Development CAP Tool Management

We wanted to confirm and verify that this is not a part of the current contract requirement as outlined

Answer: Please disregard tab named sheet 2. Only sheet 1 is for this requirement.