This is a specifications document for a Building Management System (BMS) replacement project at Two Rivers Correctional Institution (TRCI) in Umatilla, Oregon, operated by the Oregon Department of Corrections (ODOC). The project involves the complete replacement of the existing Siemens BAS/DDC system with a new Delta Controls system by Ainsworth that will monitor and control HVAC systems, central plant equipment, critical alarms, and energy-management functions. The scope of work includes demolition and removal of existing BMS hardware, software, field controllers, sensors, and network infrastructure; installation of a fully integrated, open-protocol BMS; commissioning and functional testing of all new components; integration with existing facility systems where feasible; development of updated graphics, trend logs, and alarm routing; and provision of training and documentation for facility staff. The work must maintain security requirements and minimize disruption to operations at the facility, which houses approximately 1,900 medium and minimum-security adults in custody. All work shall comply with the State of Oregon General Conditions for Public Improvement Contracts, Supplemental General Conditions, and applicable codes and standards including ASHRAE 135-2010 for BACnet communication protocols.

The specifications require the contractor to furnish all materials, equipment, labor, supervision, permits, and services necessary to deliver a complete and operable BMS. The new system shall utilize BACnet as the industry standard open protocol for interoperability, incorporate a networked architecture with Management Level Networks (MLN), Automation Level Networks (ALN), and Floor Level Networks (FLN), and include web-based operator interfaces accessible through standard browsers. The contractor must provide comprehensive submittals including system configuration, technical data, schematic flow diagrams, wiring diagrams, point lists, and variance letters detailing any deviations from specifications. The BAS contractor must be factory-authorized, maintain a service organization with factory-trained personnel, and provide references for ten similar projects completed within the last five years. Record documents, operation and maintenance manuals, programming manuals, and training documentation must be submitted, with the systems manual provided in both hard copy binder format with fold-out drawings and electronic format on CD at least 30 days prior to the instruction period. Warranty obligations follow manufacturer warranties where they exceed one year, with contractor labor defined by the Supplemental General Conditions, and critical system failures must receive on-site service within 4 hours of notification during normal building occupied hours and within 24 hours otherwise.

View the file

Other files

File Type Posted
16885 ITB TCs.pdf PDF
16885 Plans.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

252107- Building Management System Replacement Facilities Services Two Rivers Correctional Institute

Background and Statement of Work

Background: Two River Correctional Institution is located at 82911 Beach Access Rd, Umatilla OR,97882. The institution houses approximately 1900 medium and minimum-security AICs (Adults in Custody). The institution opened in 1999 and was completed in 2000, making the institution approximately 26 years old.

Project: This project includes the complete replacement of the Building Management System (BMS) at Two Rivers Correctional Institution in Umatilla, Oregon. Work will include demolition and removal of the existing BMS hardware, software, field controllers, sensors, and associated network infrastructure as required; installation of a new, fully integrated, open-protocol BMS capable of monitoring and controlling HVAC systems, central plant equipment, critical alarms, and energy-management functions; commissioning and functional testing of all new components and sequences; integration with existing facility systems where feasible; development of updated graphics, trend logs, and alarm routing; and provision of training and documentation for facility staff. All work will be coordinated to maintain security requirements and minimize disruption to ongoing operations within the correctional facility. The new Direct Digital Controls (DDC) system to be Delta Controls to match ODOC standards for BAS/DDC controls. System to be compatible with ODOC upcoming DDC standardization.

TRCI Controls Upgrade Common HVAC Materials and Methods 3-10-26 23 05 00 - 1

SECTION 23 05 00 - COMMON HVAC MATERIALS AND METHODS

PART 1 - GENERAL

1.1 DESCRIPTION

A. The provisions of the State of Oregon General Conditions for Public Improvement Contracts, i.e. “The General Conditions”, Supplemental General Conditions, i.e. “SGC”, apply to the HVAC work specified in this Division.

B. The requirements of this Section apply to the HVAC systems specified in these

Specifications and in other Division 23 sections.

C. Provide all items, articles, materials, equipment, operations and/or methods listed, mentioned, shown and/or scheduled on the Drawings and/or in these Specifications, including all labor, supervision, services, permits, fees, and incidentals necessary and required to provide a complete and operable facility with complete systems as shown, specified, and required by applicable codes.

D. The work shall include, but not be limited to, the following systems:

1. Replace Siemens BAS/DDC system with Delta Controls by Ainsworth.

2. Advise sub-contractor, suppliers, and vendors involved in the work specified in this Section of the applicable requirements.

1.2 QUALITY ASSURANCE

A. All work and materials shall conform to all applicable local and state codes and all federal, state and other applicable laws and regulations. All clarifications and modifications which have been cleared with appropriate authorities are listed under the applicable sections. All electrical products shall bear the label of a recognized testing laboratory such as UL or CSA.

B. Whenever the requirements of the Specifications or Drawings exceed those of the applicable code or standard, the requirements of the Specifications and Drawings shall govern.

C. Codes and Standards: Comply with the provisions of the following referenced codes, standards and specifications:

1. Federal Specifications (FS)

2. American National Standards Institute (ANSI)

3. National Electrical Manufacturer's Association (NEMA)

4. National Fire Protection Association (NFPA)

5. Underwriters Laboratories, Inc. (UL)

6. Factory Mutual (FM)

7. International Building Code (IBC) with State and Local Amendments

8. International Mechanical Code (IMC) with State and Local Amendments

9. Uniform Plumbing Code (UPC) with State and Local Amendments

10. American Society for Testing and Materials (ASTM)

11. Americans with Disabilities Act (ADA)

12. International Fire Code (IFC) with State and Local Amendments

3-10-26 23 05 00 - 2

13. Energy Policy Act (EPAct)

14. Manufacturers Standardization Society (MSS)

15. American Gas Association (AGA)

D. Each piece of equipment furnished shall meet all detailed requirements of the Drawings and Specifications and shall be suitable for the installation shown.

Equipment not meeting all requirements shall not be acceptable, even though specified by name. Where two or more units of the same class of equipment are furnished, use product of the same manufacturer; component parts of the entire system need not be products of same manufacturer. Furnish all materials and equipment, new and free from defect and of size, make, type and quality herein specified or approved by the Owner. All materials shall be installed in a neat and professional manner.

E. All apparatus shall be built and installed to deliver its full rated capacity at the efficiency for which it was designed.

F. The Drawings and Specifications are complementary, per The General

Conditions, Section A – General Provisions, A.3 – Interpretation of Contract Documents.

G. Drawings: Do not scale drawings for roughing-in measurements, nor use as shop drawings. Make field measurements and prepare shop drawings as required.

Coordinate work with shop drawings of other specification divisions.

H. Field Wiring: It is the intent of these specifications that all systems shall be complete and operable. Refer to all drawings and specifications, especially the electrical drawings, to determine voltage, phase, circuit ampacity and number of connections provided. Provide all necessary field wiring and devices from the point of connection indicated on the electrical drawings. All equipment shall be installed in compliance with the Electrical Code and the equipment’s UL listing.

Bring to the attention of the Owner’authorized representative in writing, all conflicts, incompatibilities, and/or discrepancies prior to bid per The General Conditions, Section A – General Provisions, A.4 – Examination of Plans, Specifications, & Site.

1.3 WORK OF OTHER DIVISIONS

A. Work under this Division shall be conducted in a manner to cooperate with the installation of such equipment or items as specified in other Divisions.

B. Consult all Drawings and Specifications in this project and become familiar with all equipment to be installed. Coordinate all aspects of the construction with the other trades on the job to ensure that all work and materials required to provide a complete and operational facility are included in the bid.

C. All sections of Division 23 are interrelated and shall be considered in their entirety when interpreting any material, method, or direction listed in any section of Division 23. Individual sections are not written for specific sub-contractors or suppliers but for the General Contractor.

3-10-26 23 05 00 - 3

1.4 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES (SUBMITTALS)

A. See the General Conditions, Section B – Administration of the Contract, B.18 – Submittals, Shop Drawings, Product Data and Samples for detailed requirements of shop drawings. Submittals shall comply with GC B.18 as modified by SGC‑3, including format, completeness, and required tracking within the RFI/Submittal Log.

1.5 PRODUCT SUBSTITUTION

A. Materials other than those specified may be approved for this project in compliance with the General Conditions, Section B – Administration of the Contract, B.19 – Substitutions.

1.6 CHANGE ORDERS

A. All Change Orders shall be in compliance with the General Conditions, Section D

– Changes in the Work.

1.7 RECORD DOCUMENTS

A. Project Record (As-Installed) Drawings: Shall be in compliance with the General Conditions, Section K- Contract Close-Out, K.1 – Record Documents

B. Operating and Maintenance Manuals: Shall be in compliance with the General

Conditions, Section K- Contract Close-Out, K.2 – Operation and Maintenance Manuals.

C. Systems Manual: Submit separate Systems Manual [30] days prior to scheduling the required Instruction Period. The Systems Manual shall be a hard copy binder with fold out full size drawings, and a CD with all data in electronic format. The Document shall contain at minimum the following:

1. Permit/Construction/Design Drawings.

2. Contractor As-Built Drawings.

3. Single line diagrams for all systems or components that require regular owner adjustment.

4. As-Built Sequence of Operations, Control Drawings, and Original Set

Points for all equipment requiring contractor programming or set up, including but not limited to;

a. HVAC DDC systems.

b. HVAC Equipment.

c. Plumbing/Pump systems.

6. Operating instructions for integrated building systems.

5. Programing instructions.

6. Recommended schedule of maintenance requirements and frequency.

7. Recommended schedule for retesting of commissioned systems with blank test forms from the original commissioning plan.

8. Recommended schedule for calibrating sensors and actuators.

9. Emergency measures and procedures for systems failures.

3-10-26 23 05 00 - 4

1.8 WARRANTY

A. Warranty Documents shall be in compliance with the General Conditions, Section I – Corrections of Work, Entire Section Applies. Warranty shall comply with GC I.2 and SGC‑13, including the one‑year warranty period beginning at Substantial Completion of the entire system unless a longer manufacturer warranty applies.

B. Where the manufacturer's guarantee exceeds one year, the longer guarantee shall govern and include the Contractor's labor. Where longer manufacturer warranties apply, the manufacturer’s coverage governs. Contractor labor obligations are defined by SGC‑13 and are not expanded beyond those requirements.

PART 2 - PRODUCTS

2.1 GENERAL

A. General: Provide all new materials and equipment, identical to apparatus or equipment in successful operation for a minimum of two years. Provide materials of comparable quality omitted here but necessary to complete the work.

Maximum allowable variation from stated capacities, minus 5% to plus 10% as approved in each case.

B. Compatibility: Provide products which are compatible with other portions of the work and provide products with the proper or correct power and fuel-burning characteristics, and similar adaptations for the project.

C. Efficiency: Heating and cooling equipment shall comply with ASHRAE

Standard 90.1-2019 and the State Energy Code. Where equipment efficiencies are indicated, the use of alternate or substitute manufacturer’s equipment with lower efficiencies is not permitted.

D. Storage and Handling:

1. Delivery: Deliver to project site with manufacturer's labels intact and legible.

2. Handling: Avoid damage.

3. Storage: Inside protected from weather, dirt and construction dust. Where necessary to store outside, elevate well above grade and enclose with durable, waterproof wrapping.

2.4 EXPANSION JOINTS AND LOOPS

A. Flexible Expansion/Seismic Loop: Factory fabricated assembly consisting of two elbows and return bend or three elbows, and two lengths of flexible hose to allow free movement in three axis. Return bend or elbow shall include a drain/vent fitting. Hose shall be corrugated metal style with metal overbraid compatible with the piping materials. Connections to match piping system except connection 2” and larger shall be flanged style. Metraflex “Metraloop” or Unisource “Uni-loops”.

3-10-26 23 05 00 - 5

2.5 HANGERS AND SUPPORTS

A. General: Provide factory-fabricated horizontal piping hangers, clamps, hanger rod, inserts, supports, etc., of the indicated MSS type and size. The Manufacturers Standardization Society (MSS) of the Valve and Fittings Industry Practice SP-58 and SP-69 are referenced in this section.

B. Manufacturers: B-Line, Carpenter & Paterson, Grinnell, Michigan, Superstrut, Tolco, Erico, or approved equal. Grinnell figure numbers in parentheses where applicable (or other manufacturers as noted).

C. Corrosion Protection: Provide materials which are zinc plated or factory painted to prevent corrosion. Prevent electrolysis in the support of copper tubing by the use of hangers and supports which are copper plated, plastic coated, or by other recognized industry methods.

D. Seismic Requirements: Provide seismic restraints in accordance with OSSC

Section 1613. Design restraint systems in accordance with "Seismic Restraint Manual: Guidelines for Mechanical Systems," Second Edition, 1998, SMACNA, or “A Practical Guide to Seismic Restraint” ASHRAE RP-812, 1999.

E. Horizontal Piping Hangers and Supports:

1. Adjustable Clevis Hanger: MSS Type 1 (Fig. 260).

2. Adjustable Band Hanger: MSS Type 7 (Fig. 97), fabricated from steel.

3. Adjustable Swivel-Band Hanger: MSS Type 10 (Fig. 70).

4. Clamp: MSS Type 4 (Fig. 212, 216).

5. Double-Bolt Clamp: MSS Type 3 (Fig. 295A, 295H), including pipe spacers.

6. Adjustable Saddle-Support: MSS Type 36 (Fig. 258) and MSS Type 37

(Fig. 259), including saddle, pipe and reducer. Fabricate base-support from steel pipe and include cast-iron flange or welded-steel plate.

7. Channel Support System: Galvanized, 12 gauge channel and bracket support systems, single or double channel as indicated on the Drawings or as required by piping and equipment weights. Grinnell "Power Strut" channel. Acceptable Manufacturers: Super Strut, Globestrut, Erico, Bee, Kindorf or Unistrut.

8. Rooftop Pipe Stands: MIRO Industries model 24-R, Erico Pipe Pier, PHP, or approved equal.

F. Vertical Pipe Clamps:

1. Two-Bolt Riser Clamp: MSS Type 8 (Fig. 261).

2. Four-Bolt Riser Clamp: MSS Type 42 include pipe spacers at inner bolt-holes.

G. Hanger Attachment:

1. Hanger Rod: Rolled threads, zinc plated. Right hand threaded.

2. Turnbuckles: MSS Type 13 (Fig. 230).

3. Weldless Eye-Nut: MSS Type 17 (Fig. 290).

4. Malleable Eye-Socket: MSS Type 16 (Fig. 110R).

3-10-26 23 05 00 - 6

5. Clevises: MSS Type 14 (Fig. 299).

H. Building Attachments:

1. Concrete Inserts: MSS Type 18 (Fig. 282), steel or Grinnell Power-Strut PS349 continuous channel. Acceptable Manufacturers: Michigan Hanger, Globestrut, Unistrut, Super Strut.

2. Clamps: MSS Type 19 (Fig. 285, 281), Type 20, 21 (Fig. 225, 226, 131), Type 23 (Fig. 86, 87, 88), Type 25 (Fig. 227), Type 27 through 30 where applicable.

2.6 IDENTIFICATION MARKERS

A. Pipe Markers:

1. Adhesive pipe markers of width, letter size and background color conforming to ANSI A13.1.

2. Acceptable Manufacturers: Brady B946 with arrow banding tape or similar Seaton, Zeston, MSI.

B. Nameplates:

1. Engraved nameplates, 1/16" thick, laminated 2-ply plastic, bottom ply white, outer ply black, letters formed by exposing bottom ply.

2. Size: 2" by 4" nameplates with 1/4" high letters.

C. Valve Tags:

1. 2" diameter, 18-gauge polished brass tags with 3/16" chain hole and 1/4" high stamped, black-filled service designation.

2. Acceptable Manufacturers: Seaton, Brady, MSI.

2.7 PENETRATION FIRE STOPPING

A. Through-penetration fire stopping system tested and listed by Underwriters Laboratories. Hilti, 3M, Metacaulk, SpecSeal, or Approved Equal.

B. Select system for proper application based on wall construction, type of penetrating item, wall rating, etc.

PART 3 - EXECUTION

3.1 LAYOUT AND COORDINATION

A. Site Examination: Before starting work, carefully examine site and all contract Drawings in accordance with the General Conditions, Section A – General Provisions, Sub-Section A.4 – Examination of Plans, Specifications, and Site, Entire Section.

3-10-26 23 05 00 - 7

B. Utility Locations: The location of existing utilities, wires, conduits, pipes, ducts, or other service facilities are shown in a general way only on the Drawings and are taken from existing records. Ascertain whether any additional facilities other than those shown on the plans may be present and determine the exact location and elevations of all utilities prior to commencing installation. Ascertain utility locations to the extent feasible within facility security limitations.

C. Sleeves, Inserts, Cast-in-Place Work: Provide sleeves, inserts, anchoring devices, cast-in-place work, etc. which must be set in concrete sequenced at the proper time for the project schedule.

D. Coordination:

1. The drawings are based on equipment of a certain manufacturer and may be identified as such. Where alternate manufacturers or Approved Equals are incorporated into the work, any required design changes are the responsibility of the Contractor in accordance with the General Conditions, Section B – Administration of the Contract, Sub-Section B.1.9

– Substitutions. Such changes may include changes in utility or system connection sizes, location, or orientation, service clearances, structural support or acoustic considerations.

2. Where the work must be sequenced and positioned with precision in order to fit into the available space, prepare accurate scale shop drawings showing the actual physical dimensions required for the installation and submit prior to purchase/fabrication/installation of any of the elements involved in the coordination in accordance with the General Conditions, Section A – General Provisions, Sub-Section A.4 – Examination of Plans, Specifications, and Site, Entire Section.

3. Cooperate with other trades in furnishing material and information for sleeves, bucks, chases, mountings, backing, foundations and wiring required for installation of mechanical items.

4. Coordinate all work with other trades and determine in advance where interfacing of the mechanical work and other work are required to be connected together. Provide all materials and equipment to make those connections. Submit shop drawings showing required connections where special conditions exist.

E. Discrepancies: Report immediately any error, conflict or discrepancy in Plans, Specifications and/or existing conditions per The General Conditions, Section A – General Provisions, A.4 – Examination of Plans, Specifications, & Site. Do not proceed with any questionable items of work until clarification of same has been made. Should rearrangement or re-routing of piping be necessary, provide for approval the simplest layout possible for that particular portion of the work.

3.2 CONTINUITY OF EXISTING SERVICES

A. Existing water, power, heat, ventilation, air conditioning and other services shall remain in service during new construction work. Coordinate any interruption of these services with the Owner's authorized representative a minimum of three (3) business days in advance. Arrange work to minimize number and extent of all interruptions.

3-10-26 23 05 00 - 8

B. Protect from damage active utilities existing and evident by reasonable inspection of the site whether shown or not on the Drawings. Protect, relocate or abandon utilities encountered in the work which are not shown on the Drawings or evident by inspection of the work as directed by the Owner’s authorized representative.

Maintain continuity of all utility services to existing buildings.

C. All necessary service interruptions of utilities shall be scheduled with the Owner’s authorized Representative. Minor interruptions shall require a minimum of three

(3) business days prior notification. Major shut down of any utility is to be scheduled between the hours of 5:30 p.m. and 6:00 a.m. and shall require a minimum of five (5) business days prior notice.

3.3 EQUIPMENT REMOVAL

A. All removed mechanical equipment is the property of the Owner unless indicated otherwise. Disconnect Salvage and return to the owner all such equipment.

B. Disable electrical circuits by disconnection of both ends and make safe with wire nuts or other approved methods. Remove wire and conduit to concealed locations.

C. Reused Equipment: Reconnect piping, wiring and/or controls to restore original equipment functions unless indicated otherwise.

3.4 MECHANICAL EQUIPMENT WIRING

A. Provide all mechanical equipment motors, automatic temperature, limit, float and similar control devices required, with wiring complete from power source indicated on Electrical Drawings.

B. Provide properly rated motor overload and undervoltage protection and all manual or automatic motor operating devices for all mechanical equipment.

C. Equipment and systems shown on the Drawings and/or specified, are based upon requirements of specific manufacturers which are intended as somewhat typical of several makes which may be approved. Provide all field wiring and/or devices necessary for a complete and operable system including controls for the actual selected equipment/system.

D. Provide all starters for mechanical motors. Review Electrical Specifications and

Drawings to determine which mechanical motor starters shall be provided under the Electrical Specification Sections and provide all others.

3.5 GENERAL INSTALLATION

A. Locating and Positioning Equipment: Observe all Codes, Regulations and good common practice in locating and installing mechanical equipment and material so that completed installation presents the least possible hazard. Maintain adequate clearances for repair and service to all equipment and comply with Code requirements.

3-10-26 23 05 00 - 9

B. Arrangement: Arrange piping parallel with primary lines of the building construction, and with a minimum of 7' overhead clearance in all areas where possible. Unless indicated otherwise, conceal all piping. Locate operating and control equipment properly to provide easy access, and arrange entire mechanical work with adequate access for operation and maintenance. Give right-of-way to piping which must slope for drainage. Set all equipment level or as recommended by manufacturer. Under no conditions shall beams, girders, footings or columns be cut for mechanical items. Casting of pipes into concrete is prohibited unless so shown on Drawings.

C. Drip Pans: Provide drip pans under all above ceiling evaporator units and cooling coils. Locate pan immediately below piping and equipment, and extend a minimum of 6" on each side and lengthwise 18" beyond equipment being protected. Fabricate pans 2" deep, of reinforced 20 gauge galvanized sheet metal with watertight seams and rolled or hemmed edges. Provide 3/4" drainage piping, properly discharged to over floor drain or as shown on the Drawings. Comply with Mechanical Code for overflow protection and pipe sizing.

E. Adjusting: Adjust and calibrate all automatic mechanical equipment, temperature controls, float devices, etc. Adjust flow rates at each piece of equipment or fixture.

F. Building Vapor Barrier: Wherever the building insulation vapor barrier is penetrated by piping, hangers, conduits, etc., provide clear self-adhesive tape recommended by the insulation manufacturer around the penetrations.

G. Concrete Work: Coordinate with other work, particularly other concrete work and accessories. Comply with applicable provisions of this Section for mechanical work concrete, including formwork, reinforcement, mix design, materials, admixtures, accessories, (including waterstops), placing of wet concrete, finishing, curing, protecting, testing, submittals and other requirements of the concrete work.

3.6 INSTALLATION OF HANGERS AND SUPPORTS

A. General: Proceed with the installation of hangers, supports and anchors only after the required building structural work has been completed in areas where the work is to be installed. Correct inadequacies including (but not limited to) the proper placement of inserts, anchors and other building structural attachments.

1. Install hangers, supports, clamps, and attachments to support piping and equipment properly from the building structure. Use no wire or perforated metal to support piping, and no supports from other piping or equipment.

For exposed continuous pipe runs, install hangers and supports of the same type and style as installed for adjacent similar piping.

2. Prevent electrolysis in the support of copper tubing by the use of hangers and supports which are copper plated or by other recognized industry methods.

3. Support fire sprinkler piping independently of other piping and in accordance with NFPA Pamphlet 13.

4. Arrange supports to prevent eccentric loading of joists and joist girders.

Locate supports at panel points only.

5. Powder‑actuated tools require prior ODOC authorization per SGC‑18.

3-10-26 23 05 00 - 10

B. Provisions for Movement:

1. Install hangers and supports to allow controlled movement of piping systems and to permit freedom of movement between pipe anchors, and to facilitate the action of expansion joints, expansion loops, expansion bends and similar units. Install specified seismic restraints to restrict excessive movement.

2. Install hangers and supports so that equipment and piping live and dead loading and stresses from movement shall not be transmitted to connected equipment.

3. Install hangers and supports to provide the indicated pipe slopes, and so that maximum pipe deflections allowed by ANSI B31 are not exceeded.

Comply with the following installation requirements:

a. Clamps: Attach clamps, including spacers (if any), to piping outside the insulated piping support. Do not exceed pipe stresses allowed by ANSI B31.

b. Insulated Pipe Supports: Insulated pipe supports shall be supplied and installed on all insulated pipe and tubing.

c. Load Rating: All insulated pipe supports shall be load rated by the manufacturer based upon testing and analysis in conformance with ASME B31.1, MSS SP-58, MSS SP-69 and MSS SP-89.

d. Support Type: Manufacturer's recommendations, hanger style and load shall determine support type.

e. Insulated Piping Supports: Where insulated piping with continuous vapor barrier or where exposed to view in finished areas is specified, install hard maple wood insulation shields (Elcen Fig. 216) or steel pipe covering protection shields (MSS type 39) at each hanger.

C. Adjust hangers and supports to bring piping to proper levels and elevations.

D. Provide all necessary structural attachments such as anchors, beam clamps, hanger flanges and brackets in accordance with MSS SP-69. Attachments to beams wherever possible. Supports suspended from other piping, equipment, metal decking, etc., are not acceptable.

E. Horizontal banks of piping may be supported on common steel channel member spaced not more than the shortest allowable span required on the individual pipe.

Maintain piping at its relative lateral position using clamps or clips. Allow lines subject to thermal expansion to roll axially or slide. Size channel struts for piping weights.

F. Installation of drilled-in concrete anchors shall comply with the manufacturer’s instructions for working load, depth of embedment, and spacing between anchors and from the edge of the slab. Use only wedge-style anchors.

G. Seismic Restraints: Install restraints where recommended in SMACNA "Seismic

Restraint Manual" and as required by code. Show analysis of supporting structure, anchorages, and restraints in accordance with OSSC Section 1613 and reference ASCE standard. Seismic restraint system components shall be approved by the California Office of Statewide Health Planning and Development (OSHPD). Acceptable Manufacturers: Amber/Booth, Mason Industries, Tolco, or Approved Equal.

3-10-26 23 05 00 - 11

3.7 HVAC SYSTEM IDENTIFICATION

A. Piping System: Indicate each pipe system by its generic name (abbreviated) as shown/scheduled/specified. Extend the existing or match Owner's color code and/or identification system. Comply with ANSI A13.1 for marker locations, letter sizes, and colors. Include arrows to show direction of flow and "Electric Traced" signs to identify heat cable wrapped piping. Locate pipe labels in accessible areas as follows:

1. Near each valve, meter, gauge, or control device.

2. Near equipment such as pumps, heat exchangers, water heaters, etc.

3. At piping branch connections.

4. At penetrations (each side) of walls, ceilings, and floors.

5. At access panels and doors.

6. At 25 foot maximum intervals. Provide a minimum of one label above each room where lift-out ceiling is installed. Reduce intervals in congested areas such as mechanical rooms.

B. Valve Identification: Tag all valves with brass disc and chain. Prepare valve charts indicating valve number, size, location, function and normal position. Use no duplicate numbers in Plumbing and Heating systems. Mount glazed frames containing one set of valve charts in the building mechanical room.

C. Equipment: Provide engraved plastic-laminate signs at locations of major equipment such as heat exchangers, pumps, etc. Identify equipment in field same as on drawings. Permanently mount in an appropriate and effective location.

D. Operation Tags: Where needed for proper and adequate information on operation and maintenance of mechanical systems, provide tags of plasticized card stock, either pre-printed or hand printed to convey the message; example: "DO NOT

CLOSE THIS VALVE EXCEPT WHEN THE PUMP IS OFF."

3.8 EQUIPMENT CONNECTIONS

A. Provide complete connections for all items of equipment requiring such connections, including incidental piping, fittings, trim and labor necessary for a finished working installation.

B. Verify the rough-in and finish requirements for all equipment provided under other Divisions of the work and requiring HVAC piping or duct connections with equipment supplier and installer prior to rough-in.

3.9 PROTECTION

A. Protect all work and materials against loss or damage in compliance with the General Conditions, Section F – Job Site Conditions, F.2 – Protection of Workers, Property, and the Public.

3.10 CUTTING AND PATCHING

A. General: Comply with the General Conditions, Section F – Job Site Conditions, F.3 – Cutting and Patching.

3-10-26 23 05 00 - 12

3.11 PIPE PENETRATION FIRE STOPPING

A. Install as recommended by manufacturer and in accordance with the product’s UL listing. Below are the minimum installation requirements.

1. Install specified penetrating item(s) with required annular spacing in proper size wall or floor opening. Support penetrating item(s) adequately on both sides of construction.

2. Clean all opening and penetrating item surfaces in penetration area to remove loose debris, dirt, oil, wax, grease, old caulking, etc.

3. If needed or required for gypsum or concrete block walls, install specified galvanized steel wire mesh or sleeve recessed and centered inside wall around penetrating item(s) so that it is snug against perimeter of opening.

4. When required, install specified type and depth of backing material in annular space, recessed to required fill depth of fire stopping caulking.

5. Gun, trowel, and/or pump fire stopping sealant to specified depth in annular space around penetrating item(s). Trowel sealant surfaces flush with wall or floor surfaces to a smooth, defect-free finish. Where required, apply specified size caulking bead around penetrating item(s) at zero annular contact areas and tool smooth.

3.12 HVAC WORK CLOSEOUT

A. General: Refer to the General Conditions, Section K – Contract Close Out for general closeout requirements. Calibrate all equipment requiring same. Complete each system as shown or specified herein and place in operation except where only roughing-in or partial systems are called for. Each system shall be tested and left in proper operation free of leaks, obstructions, or contamination.

B. Record Drawings: Submit record set of drawings as previously specified in this

Section.

C. Closeout Equipment/Systems Operations: Sequence operations properly so that work of project shall not be damaged or endangered. Coordinate with seasonal requirements. Operate each item of equipment and each system in a test run of appropriate duration with the Owner’s authorized representative present, and with the Owner's operating personnel present, to demonstrate sustained, satisfactory performance. Adjust and correct operations as required for proper performance.

Clean and lubricate each system and replace dirty filters, excessively worn parts and similar expendable items of the work.

D. Operating Instructions: Conduct a walk-through instruction seminar for the

Owner's personnel who are to be involved in the continued operation and maintenance of the HVAC equipment and systems per The General Conditions, Section K – Contract Close Out, Sub-Section K.5 - Training. Provide written instructions outlining and explaining the identification system, operational diagrams, emergency and alarm provisions, sequencing requirements, seasonal provisions, security, safety, efficiency and similar features of the systems per The General Conditions, Section K – Contract Close Out, Sub-Section K.2 – Operation & Maintenance Manuals.

END OF SECTION

TRCI Controls Upgrade Testing, Adjusting and Balancing 3-10-26 23 05 90 - 1

SECTION 23 05 90 - TESTING, ADJUSTING AND BALANCING

PART 1 - GENERAL

1.1 DESCRIPTION

A. Work Included: After completion of the work of installation, test and regulate all components of the new heating, air conditioning and ventilating systems to verify air volumes and heating-cooling flow rates indicated on the Drawings and compliance with the State of Oregon General Conditions for Public Improvement Contracts, and Supplemental General Conditions (SGC).

B. Related Work: General Scope of work shown on sheet M0.1

1. The intent of the TAB scope is only to require balancing items/equipment that have been modified or need re-calibration as a result of the controls upgrade – items that should be balanced are listed as noted above on sheet M0.1

2. Diffusers or similar distribution devices are not required to be balanced, as these devices will not be modified. Likewise water flows are not required to be balanced, unless balancing valves or fluid control valves are modified during the controls upgrade.

3. Items where the controls upgrade is simply open/close or on/off (such as make up air units or exhaust fans) do not require air balancing, as airflow should not be affected by the addition of controls.

C. Balancing Organization:

1. Balancing of the Heating and Air Conditioning Systems: Performed by a firm providing this service licensed in the State of Oregon.

2. Balancing Organization: Approval by Owner’s authorized representative.

Air Balancing Specialties, Air Introduction & Regulation, Northwest Engineering Services, Neudorfer Engineers, Pacific Coast Air Balancing, or approved.

3. Provide all necessary personnel, equipment, and services.

1.2 QUALITY ASSURANCE

A. Balancing of the Heating and Air Conditioning Systems: Agency shall be a current member of NEBB or AABC specializing in the adjusting and balancing of systems specified with a minimum of 10 years documented experience.

B. Testing, adjusting, and balancing shall be performed under direct field supervision of a Certified NEBB Supervisor or a Certified AABC Supervisor.

1.3 SUBMITTALS

A. Balancing Data: Include the following minimum information in the Operation and Maintenance Data, as specified in Section 23 05 00. Submit TAB reports in compliance with GC B.18 and SGC-16 – Record Documents, including format, electronic editable copies, and required monthly log updates.

3-10-26 23 05 90 - 2

1. Names or initials of personnel performing the balancing.

2. Dates balancing was performed.

3. List of balancing instruments utilized.

4. Weather conditions at the time of the test.

5. Mechanical system descriptions.

6. All motor rated voltages, amps, starter and overload protective device sizes.

7. All motor operating data.

8. Fan cfm, rpm, operating static pressures, driven and motor sheave data, and all drive changes necessitated to obtain design capacities. List actual minimum outside air volumes measured for each system.

9. Type and size of filters installed in each filter bank.

10. All supply, return and exhaust air outlet cfm readings.

11. Terminal unit cfm and static pressures on full cooling and heating, and final settings.

12. Coil steam pressure and entering and leaving air temperatures.

13. Coil chilled water supply and return temperatures and entering and leaving air temperatures.

14. Coil heating water entering and leaving temperatures and entering and leaving air temperatures.

15. Condensing water supply and return temperatures.

16. Pump gpm, rpm, pressure, horsepower and service.

17. Electric heating elements voltage and amperage for each stage of heat.

18. Power Exhaust fan settings – cfm or % of supply airflow and power exhaust fan start point (% of outside air damper position).

19. CO2 controller set points – minimum CO2 setpoint (ppm), maximum CO2 setpoint (ppm)(setting for min OSA at full occupancy).

20. OSA intake damper settings at min occupancy and max occupancy (cfm or damper %)

1.4 DETAILED REQUIREMENTS

A. Adjusting and Balancing:

1. Prior to beginning the balancing work, obtain from the general contractor the latest version of the mechanical drawings including addenda, revisions, change orders, etc.

2. Adjust and balance all portions of the mechanical systems to produce indicated results within limits of minus 5 or plus 10 percent or as subsequently directed by the Owner’s authorized representative. Any deviation outside these tolerances must be documented and submitted through the SGC‑3 RFI process prior to acceptance.

3. Balancing data may be spot checked with instruments similar to that used by the balancing firm.

4. If, in the judgment of the Owner’s authorized representative, the discrepancies warrant additional adjustment, readjust and rebalance the systems at no additional project cost. Corrective TAB work required due to Contractor‑caused deviations remains at no additional cost; corrective work due solely to Owner‑directed changes or security‑related access restrictions shall follow GC D (Changes in the Work).

5. Where power exhaust fans are specified, set power exhaust fans to operate as shown on drawings and set power exhaust fan cfm percentage as shown on drawing.

3-10-26 23 05 90 - 3

6. Set outside air intake dampers to modulate between min occupancy setting and max occupancy setting (as specified on drawings) as CO2 levels rise from minimum set point to maximum set point (as specified on drawings).

TRCI Controls Upgrade HVAC Insulation 3-10-26 23 07 00 - 1

SECTION 23 07 00 - HVAC INSULATION

PART 1 - GENERAL

1.1 DESCRIPTION

A. The requirements of this section apply to the insulation of mechanical equipment specified elsewhere in these specifications.

B. Related Work: The requirements of Section 23 05 00, Common HVAC Materials and Methods, also apply to this section.

1.2 QUALITY ASSURANCE

A. Insulation Thickness and Thermal Performance: Comply with the provisions of the State of Oregon Energy Efficiency Specialty Code (OSEEC).

B. Composite (Insulation, Jacket or Facing and Adhesives) Fire and Smoke Hazard

Ratings: Not to exceed a flame spread of 25 or smoke development of 50 and containing less than 0.1% by weight deca-PDE fire retardant.

C. Component Ratings of Accessories (Adhesives, Mastics, Cements, Tapes, Finishing Cloth for Fittings): Same as "B" requirements above and permanently treated. No water soluble treatments.

1.3 PRODUCT DELIVERY, STORAGE AND HANDLING

A. General: In addition to the requirements specified in Section 23 05 00, the following apply:

1. Deliver insulation, coverings, cements, adhesives and coatings to the site in factory-fabricated containers with the manufacturer's stamp or label affixed showing fire hazard ratings of the products. Store insulation in original wrappings and protect from weather and construction traffic.

2. Storage locations, containers, and tool/material access must comply with SGC-18, including tool-control requirements and prohibition of certain items (e.g., blades over allowed limits, prohibited adhesives, or unapproved containers).

3.

2. Protect insulation against dirt, water, chemical and mechanical damage. Do not install damaged insulation. Remove such insulation from project

1.4 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES (SUBMITTALS)

A. See the State of Oregon General Conditions, Section B – Administration of the Contract, B.18 – Submittals, Shop Drawings, Product Data and Samples for detailed requirements of shop drawings.

1.5 PRODUCT SUBSTITUTION

3-10-26 23 07 00 - 2

A. Materials other than those specified may be approved for this project in compliance with the General Conditions, Section B – Administration of the Contract, B.19 – Substitutions.

1.6 CHANGE ORDERS

A. All Change Orders shall be in compliance with the General Conditions, Section D

– Changes in the Work.

PART 2 – PRODUCTS

2.1 ACCEPTABLE MANUFACTURERS

A. Insulating Manufacturers: Johns Manville, Knauf, Armstrong, Owens-Corning, Pittsburgh Corning, Pabco, Imcoa, Nomaco, or Certain Teed. Johns Manville, or approved equal products are listed unless indicated otherwise.

B. Adhesive Manufacturers: Foster, 3M, Insul-Coustic, Borden, Kingco, Armstrong or approved equal.

2.2 PIPING INSULATION

A. Interior and Exterior Piping Systems 50 to 850 Deg. F, ASTM C 547: Glass fiber preformed pipe insulation with a minimum K-value of 0.23 at 75 Deg. F, a minimum density of 3.5 pounds per cubic foot within all-service vapor barrier jacket containing less than 0.1% by weight deca-PDE fire retardant, vinyl or pre-sized finish and pressure sensitive seal.

B. Exterior Installations: Closed cell Elastomeric with 0.016" aluminum finish jacket.

C. Pipe Temperatures Minus 30 to 180 Deg. F: Flexible, preformed, pre-slit, self-sealing elastomeric pipe insulation, thermal conductivity of 0.27 BTU/hr. sq.

ft./in. at 75 deg. F and vapor transmission rating of 0.2 perms/inch. Armacell AP ArmaFlex.

D. Flexible Elastomeric: Closed-Cell, or expanded-rubber materials. Comply with

ASTM C534, (Type I for tubular materials OR Type II for sheet materials).

Subject to compliance with requirements, provide Armacell ArmaFlex Ultima for Plenum Applications or AP ArmaFlex or a comparable product by one of the following:

1. Aeroflex

2. K-Flex

3. approved equal

E. Pipe Temperatures up to 1200 Deg. F: High temperature molded calcium silicate insulation with aluminum metal jacket. Furnish with aluminum snap straps.

Apply in thickness required for a maximum surface temperature of 120 deg. F at 80 deg. F ambient and for the flow media temperatures. Johns Manville Thermo- 12/Gold.

3-10-26 23 07 00 - 3

2.3 DUCT INSULATION

A. Insulation Materials will be listed and labeled per UL723, in Plenum Spaces as required by code.

Subject to compliance with requirements, provide Armacell ArmaFlex Ultima or

AP ArmaFlex or a comparable product by one of the following:

1. Aeroflex

2. K-Flex

3. approved equal

B. Interior Above Grade Ductwork: Glass fiber formaldehyde-free blanket with "FSK" facing containing less than 0.1% by weight deca-PDE fire retardant, k value = 0.31 at 75 deg. F, 0.2 perms, and UL 25/50 surface burning rating. Johns Manville "Microlite."

C. Below Grade Ductwork: Insulate with foamed-in-place urethane insulation.

D. Exterior Above Grade Ductwork: Glass fiber board with “FSK” facing containing less than 0.1% by weight deca-PDE fire retardant, 3 pound density, k value of 0.23 at 75 deg. F and 0.2 perms. Install with 0.016" aluminum jacket.

[0.01” stainless steel jacket.] Johns Manville 800 Series Spin-Glas.

2.4 EQUIPMENT INSULATION

A. Equipment Temperatures Below 70 Deg. F: Flexible, closed cell, elastomeric sheet insulation of 5.5 #/cubic feet density and 0.27 thermal conductivity at 75 deg. F. Armstrong "Armaflex."

B. Equipment Temperatures From 70 to 450 Deg. F: Glass fiber 3 pound density insulation with a 0.23 thermal conductivity at 75 deg. F. Johns Manville "814 Spin-Glas" with "FSK" jacket containing less than 0.1% by weight deca-PDE fire retardant or finished as recommended by manufacturer.

C. Equipment Temperatures From 350 to 1200 Deg. F: Molded high temperature calcium silicate minimum 12.5 pound density and 0.4 thermal conductivity at 200 deg. F mean temperature. Glass cloth finish, Claremont Diplag or finished as recommended by insulation manufacturer.

D. Exterior Tanks and Equipment Insulation Covering: Same as interior insulation with weatherproof metal or finished as recommended by insulation manufacturer.

2.5 INSULATION ACCESSORIES

A. Insulation Compounds and Materials: Provide rivets, staples, bands, adhesives, cements, coatings, sealers, welded studs, etc., as recommended by the manufacturers for the insulation and conditions specified except staples not permitted on chilled water lines.

B. Interior Tanks and Equipment Insulation Covering: Finished metal jacket or as recommended by the manufacturer for insulation material specified.

3-10-26 23 07 00 - 4

C. PVC Protective Jacketing and Valve and Pipe Fitting Covers: Johns Manville Zeston 2000, Proto LoSmoke, Speedline Smoke Safe, or Ceel-Co Ceel-Tite 100 Series with precut fitting fiberglass insulation or approved equal.

D. Jacket Lap Sealing Adhesives: Foster Drion 85-75 contact cement or approved equal.

E. Saddles and Shields: Install to prevent crushing of insulation at support points.

1. Protection Saddles: MSS Type 39. Armacell Insuguard Multi.

2. Protection Shields: MSS Type 40. Armacell ArmaFix Ecolight.

3. Preinsulated Pipe Supports: Calcium silicate load bearing metal jacketed inserts. Pipe Shields Inc. or accepted substitute.

a. Pipe supported on rods - Models A1000, A2000, A3000, A4000.

b. Pipe supported on flat surfaces - Models A1000, A2000, A3000, A4000.

c. Pipe supported on pipe rolls - Models A3000, A4000, A5000.

d. Vertical riser clamp – Models E1000, E1100, E1200.

PART 3 - EXECUTION

3.1 PIPING INSULATION

A. General: Do not insulate underground piping except at joints and fittings on preinsulated piping unless indicated otherwise.

B. Steam Piping: Insulate above ground steam piping with glass fiber pipe covering;

thickness as follows:

Under 15 psig: Size Thickness 1-1/2” or smaller 1-1/2” 2” or larger 3”

Above 15 psig: Size Thickness 1-1/2" or smaller 2" 2” thru 4" 3" 5" or larger 3-1/2"

1. Wire insulation in place with 16 gauge stainless steel wire on 12" centers in half-round, split tile or other underground conduit.

C. Condensate Return: Insulate same as steam supply.

D. Heating Water Piping: Insulate with glass fiber pipe covering:

Size Thickness 1/2" to 1-1/2" 1-1/2" 2" to 3" 2" 4" and larger 2-1/2"

E. Runout piping not exceeding 4 feet in length and 1” diameter between the control valve and the HVAC coil connections shall be insulated with minimum 1/2” thick glass fiber pipe covering.

3-10-26 23 07 00 - 5

G. Refrigerant Piping Insulation: Insulate suction piping with minimum 1" thick foamed plastic or of thickness necessary to prevent condensation at 85 deg. F and 70% RH. Where possible, slip insulation over the piping as it is installed. Seal all joint and seams.

H. Pipe Fittings:

1. Insulate and finish all fittings including valve bodies, bonnets, unions, flanges and expansion joints with precut fiberglass insulation and preformed PVC covers sealed to adjacent insulation jacket for continuous vapor barrier covering over all fittings.

2. Use 1/2" thick Armaflex or Aerotube foamed plastic at flexible pipe connections on chilled cold water lines. No insulation on other flexible pipe connections.]

3. Provide removable/reusable insulation covers on 4" and larger valves, unions, flanges, pump casings, strainers and similar fittings or equipment requiring periodic service.

I. Protective Covering: Install continuous protective PVC or metal covering on all piping and fittings in mechanical rooms, accessible tunnels, attic spaces, accessible ceilings, etc., where insulation may be subject to damage. Install with rivets or cement seams and joints.

J. Insulated Piping Supports: Where insulated piping with continuous vapor barrier or where exposed to view in finished areas is specified, install hard maple wood insulation shields, insulation inserts, or steel pipe covering protection shields at each hanger.

K. Piping Insulation Lap Seams and Butt Joints: Install insulation jacket in accordance with manufacturer's recommendation. Where jacket joint and lap seams have not adhered, remove affected section of insulation and reinstall or apply lap sealing adhesive in accordance with manufacturer's instructions.

3.2 DUCTWORK INSULATION

A. Ductwork: Insulate the following:

1. All supply ductwork.

2. All supply and return ductwork in systems routed in unconditioned spaces or exposed to the outside conditions.

3. All outside air intake ducts.

4. All ductwork required to be insulated by code.

B. Flexible Elastomeric Insulation: Closed-cell, sponge- or expanded-rubber materials. Comply with ASTM C 534, Grade 1, Type II for sheet materials. UL Classified per UL 723 at 25/50.

1. Basis-of-Design Product: Subject to compliance with requirements, provide Armacell LLC; or a comparable product by one of the following:

a. Aeroflex USA, Inc.

b. K-Flex USA.

3-10-26 23 07 00 - 6

C. Insulation Thickness: Select board and blanket insulation of thickness required to provide the following installed R-value.

1. All heating or cooling system supply and return ducts located on the exterior of the insulated building envelope, including ventilated attics, and all outside air intake ducts, R-8.

2. All heating and cooling system supply and return ducts located in unconditioned spaces within the building insulation envelope, R-5.

3. All heating and cooling system supply ducts located in conditioned spaces and where exposed in unfinished spaces or concealed from view in finished spaces, R-3.

4 Exposed ductwork in finished spaces shall not be externally insulated.

5. Ducts located within or below concrete slabs on grade, R-4.

D. Fittings: Install with wire, straps, and duct adhesive as required. To prevent sagging on all rectangular or square ducts over 24" wide, install Gramweld or equal welding pins on the bottom. Maximum spacing 18" on center in both directions.

E. Installation: Applied with butt joints, all seams sealed with vapor seal mastic or taped with 2" wide vapor-proof, pressure-sensitive tape. Seal all penetrations with vapor barrier adhesive.

F. Internally Lined Ductwork: Where internally lined ductwork is indicated on the

Drawings and/or specified, no exterior insulation is required. Select duct lining to provide the required R-value. Carefully lap the ends of the exterior insulation a minimum of 6" past the interior insulation unless otherwise shown. Seal the end of vapor barrier jacket to the duct with mastic where the vapor barrier is required.

Duct lining is specified in Section 23 30 00.

3.3 EXPANSION JOINTS

A. Insulation: Insulate expansion joints on heating…