TAB 2 - Amendment 2 Att 2 - Addendum to Specifications.pdf
PDF 63 KB Posted
- Attached to
- Boiler Replacement - FCC Florence Federal contract opportunity
- Solicitation number
- 15BFA022B00000018
About this file
This document contains a federal contract opportunity solicitation and related amendment for boiler replacement services. The Federal Bureau of Prisons is seeking a firm-fixed-price construction contract to remove and replace three high-temperature hot water boilers at the Federal Correctional Complex in Florence, Colorado. The project includes removing the existing boilers and installing new water tube dual-fuel boilers with flue gas recirculation, along with associated piping and replacement of the burner management system and boiler controls with new electronic controls integrated into the existing building management system. The solicitation is distributed through SAM.gov and amendments will also be posted there, with a deadline of January 15, 2023 for responses. The work is set aside exclusively for small businesses with a NAICS code of 238220 and size standard of $16.5 million.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| TAB 1 - Abstract of Offers - FINAL.pdf | ||
| TAB 2 - Amendment 0002 - SF30.pdf | ||
| TAB 2 - Amendment 2 Att 1 - Questions and Answers.pdf | ||
| TAB 2 - Amendment 0001 - SF30.pdf | ||
| TAB 2 - Amendment 1 Att 2 - Wage Determination - CO20220001 - 11-4-22.pdf | ||
| TAB 2 - Amendment 1 Att 1 - Pre-Bid Site Visit Meeting Minutes.pdf | ||
| TAB 1 - Attachment 5 - Bid Bond.pdf | ||
| TAB 1 - Attachment 3 - Wage Determination - CO20220001.pdf | ||
| TAB 1 - Instruction to Offerors FINAL.pdf | ||
| TAB 1 - Attachment 4 - Criminal History Check Form.pdf | ||
| TAB 1 - Solicitation FINAL.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FCC FLORENCE
PROJECT 22Z4AF9
REPLACE BOILERS
ADDENDUM TO SPECIFICATIONS
The following changes are made to the specifications:
1. PAGE 235233 – 3-4; SECTION 235233 – WATER-TUBE BOILERS, PART 2 –
PRODUCTS, 2.1 PERFORMANCE REQUIREMENTS is changed to remove “2. NOx” and read as follows:
B. Gas-Fired Boiler Emissions: Not to exceed allowable ambient-air quality standards in governing jurisdiction and indicated values.
1. Carbon monoxide: 100 parts per million at 3 percent oxygen at any point from 100 percent to low fire.
C. Oil-Fired Boiler Emissions: Not to exceed allowable ambient-air quality standards in governing jurisdiction and indicated values.
1. Carbon monoxide: 100 parts per million at 3 percent oxygen at any point from 100 percent to low fire.
2.1 A, D, E, F, G, H, I remain unchanged.
2. PAGE 235233 – 10; SECTION 235233 – WATER-TUBE BOILERS, PART 2 – PRODUCTS,
2.4 CAPACITIES AND CHARACTERISTICS is changed to read:
F. Leaving-Water Temperature: 240 deg F.
N. NOx Emission Level: Not to exceed allowable ambient-air quality standards in governing jurisdiction and indicated values.
2.4 A, B, C, D, E, G, H, I, J, K, L, M, O, P, Q, R, S, T, U, V, W, X, Y
File details come from the government source that posted it. Updated .