15B40119B00000004_ABSTRACT_OF_BIDS_INSTALL_GLYCOL_CONDENSING_LOOP_MCC_CCC.pdf
PDF 12 KB Posted
- Attached to
- Install Glycol Condensing Loop
- Solicitation number
- 15B40119B00000004
About this file
15B40119B00000004 ABSTRACT OF BIDS INSTALL GLYCOL CONDENSING LOOP METROPOLITAN CORRECTIONAL CENTER CHICAGO ILLINOIS
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID ABSTRACT
Solicitation #15B40119B00000004
Install Glycol Condensing Loop at MCC Chicago, Illinois
Bid Opening Date 08/13/19
# BIDDER PRICE
1 Brock Construction, Inc. $675,000.00 2 Ideal Heating, Co. $782,555.00 3 Voris Mechanical, Inc. $1,296,000.00 4 Master Design Build, LLC $1,675,000.00
NOTE: A bid abstract is not an automatic indicator of contract award. Once the final award is made, an award synopsis will be posted to www.fbo.gov.
http://www.fbo.gov/
File details come from the government source that posted it.