159443 Attachments J-V.pdf

PDF 2 MB Posted

Attached to
IFB159443-Communications Network Support Services
Solicitation number
88280
Issued by
Lee County, Virginia

About this file

This is a comprehensive document package containing attachments J through V for IFB 159443 issued by the Virginia Department of Transportation (VDOT) NOVA District Traffic Operations for communications network support services. Attachment J contains NOVA District Lane Closure Guidelines which establish procedures and requirements for lane closures and traffic management during construction and maintenance work. Attachments K through V contain various required federal and state forms including FHWA-1273 Required Contract Provisions, DBE/SWaM participation requirements, Title VI compliance documents, Critical Infrastructure Information (CII) handling procedures, and non-discrimination assurances.

The documents outline a 4% DBE participation goal and include detailed requirements for handling sensitive security information (SSI) and critical infrastructure information. Contractors must submit various compliance forms including the Title VI Evaluation Form within 10 days of selection. The package includes specific guidelines for lane closures based on location, time of day, and roadway type, with detailed tables showing allowable closure hours. Forms C-48 and C-49 must be submitted to document DBE good faith efforts and participation. The documents emphasize non-discrimination requirements and include standard federal contract provisions as well as state-specific requirements for contractors working on VDOT projects.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

- Northern Virginia -

3rd Release

Virginia Department of Transportation

NOVA District

Traf�ic Operations

February 2024

IFB 159443

Attachment J

Jenise.Howard Pencil

Jenise.Howard Pencil

Lane Closure Guidelines – 2/29/2024 VDOT – NOVA

3 | P a g e

Table of Contents

1. Purpose and Need

2. Background

3. Effec�ve Date

4. Restric�on of Opera�ons

4.1. Peak Period Lane Closures

4.2. Complete Roadway Closures

4.3. General Restrictions

4.4. Construction in Residential Subdivisions

4.5. Express Lanes (I-66 OTB, I-95, I-395 and I-495)

4.6. Interstate Ramps

4.7. Non-Interstate Ramps

4.8. Non-VDOT Maintained Roadways

4.9. Holidays

5. Exception Process

6. Lane Closure Hour Tables

6.1. I-66 Outside the Beltway

6.2. I-66 Outside the Beltway – Express Lanes

6.3. I-66 Inside the Beltway

6.4. I-395 & I-95

6.5. I-395 & I-95 – Express Lanes

6.6. I-495 (Capital Beltway)

6.7. I-495 (Capital Beltway) – Express Lanes

6.8. Route 267 Dulles Connector Road

6.9. Route 28 (Limited Access Section)

6.10. Major Primary Arterials

6.11. Primary & Major Secondary Arterials

6.12. Secondary Roadways

Abbreviations

AADT – Average Annual Daily Traffic

ADA / ADE – Assistant District Administrator / Assistant District Engineer

DCE – District Construc?on Engineer

DTOD – District Traffic Opera?ons Director

ITB / OTB – Inside the Beltway / Outside the Beltway

LCAMS – Lane Closure Advisory Management System

MOT / TMP – Maintenance of Traffic / Traffic Management Plan

NOVA – Northern Virginia

Lane Closure Guidelines – 2/29/2024 VDOT – NOVA

4 | P a g e

1. Purpose and Need

This memorandum presents guidelines for pre-determined allowable lane closure hours along any VDOT maintained roadway associated with all construction, maintenance, permits, and special events throughout Northern Virginia.

2. Background

The initial version of the lane closure guidelines was issued in April 2012 with a subsequent update issued in September 2016. Over the past eight years, in addition to new roadways and traffic signals accepted into the system, increased volumes and changes to traffic patterns, several significant roadway construction projects have been completed throughout the NOVA

District including, but not limited to, extensions of the I-95, I-395 and I-495 express lanes, I-66

ITB tolling program and the addition of new express lanes along I-66 OTB. As the guidelines are applied and implemented, modifications and updates to these guidelines become necessary.

Similar to previous versions, the modifications have been made based on available current daily traffic volumes; roadway characteristics; application on previous projects; and consideration of the effect to the traveling public for the lane closure(s) during certain time periods of the day.

These guidelines shall be used as a starting point for discussion at the project level. On large scale projects with robust community outreach and a Traffic Management Plan, these hours could be adjusted and extended. If project staff would like to modify the hours for interstates, primaries, major arterials or high-volume secondary roadways they must work with NOVA District Traffic

Operations staff for recommendations and obtain final approval from their functional ADA/ADE.

3. Effective Date

The guidelines are effective upon release. Please review existing project contracts and special limitation of operations and discuss the deviations from these hours with your functional

ADA/ADE.

4. Restriction of Operations:

In addition to the allowable lane closure hours specified in the tables, the restrictions listed below shall be followed.

4.1. Peak Period Lane Closures

Peak periods for all roadways shall universally be defined as the following hours:

• Monday through Thursday o 5:00 AM to 9:30 AM and o 3:00 PM to 7:30 PM

• Friday o 5:00 AM to 9:30 AM and o 2:00 PM to 7:30 PM

Any lane reductions (temporary or permanent) during those peak periods on roadways with an AADT equal to or above 5,000 vehicles require consultation with NOVA District

Traffic Operations, notification of NOVA Public Affairs and final approval from the functional

ADA/ADE.

Lane Closure Guidelines – 2/29/2024 VDOT – NOVA

5 | P a g e

4.2. Complete Roadway Closures

All complete road closures of any roadway and/or ramp for construction, maintenance or permit work requires consultation with NOVA District Traffic Operations and notification of

NOVA Public Affairs.

Allowable complete roadway closures shall be limited to no more than 20 minutes of intermittent stoppage for some specific work activities.

In addition to consultation with NOVA District Traffic Operations and Public Affairs notification, all complete roadway closures exceeding 20 minutes shall require coordination and final approval from the Functional ADA/ADE and proper advance notification for the traveling public.

If the complete closure duration exceeds 30 minutes, a signed detour route may also be required and approved separately by Traffic Engineering with an MOT and TMP.

4.3. General Restrictions

Lane closures of any kind will not be permitted during inclement weather or emergency situations.

Lane and/or shoulder closures shall not begin if heavy traffic or significant queuing and backups are already present along the roadway(s).

All lane and/or shoulder closures shall be completely removed on a daily and/or nightly basis with lanes being fully open to traffic at all times beyond the allowable and/or approved lane closure hours.

The applicant/contractor shall be properly trained and responsible for maintaining all project lane closure information or any work within VDOT right-of-way on LCAMS and

VaTraffic / 511 throughout the duration of the project in accordance with IIM-OD-16-03, dated December 16, 2016.

All requests for deviation from the allowable lane closure hours must be submitted to

VDOT NOVA District Traffic Operations for review a minimum of fourteen (14) days in advance of work for consideration.

4.4. Construction in Residential Subdivisions

Road work within residential subdivisions and/or cul-de-sac streets should be conducted during daytime hours to avoid nighttime noise issues.

Extended daytime and all nighttime work shall adhere to any applicable local noise ordinances and require sufficient advance public notifications.

4.5. Express Lanes (I-66 OTB, I-95, I-395 and I-495)

All I-66 OTB, I-95, I-395 and I-495 Express Lane closures shall be coordinated with and require separate approvals from the applicable Express Lanes Operator. While this approval process may run concurrently with VDOT approval, advance notification with the

Lane Closure Guidelines – 2/29/2024 VDOT – NOVA

6 | P a g e specific operator is needed. Closures impacting access points to and from the Express

Lanes from other roadways shall also require coordination with the operator.

Complete road closures of I-66 OTB, I-95, I-395 and I-495 Express Lanes will be limited to 30 minutes or less.

4.6. Interstate Ramps

All interstate ramps shall be limited to the same daytime and/or nighttime allowable lane closure hours as the adjacent interstate. For single lane ramps requiring a full closure to safely conduct work, hours will be restricted to the same nighttime full roadway closure hours of the adjacent interstate and require an approved signed detour route.

4.7. All Other Ramps

All other ramps not connected to an interstate shall be restricted to the same single lane closure hours as the adjacent roadway. Single lane ramps requiring a full closure to safely conduct work, hours will be limited to nighttime hours only and require an approved signed detour route.

4.8. Non-VDOT Maintained Roadways

All roadways not maintained by VDOT shall be required to notify and coordinate with the respective jurisdiction and/or entity overseeing the maintenance and operation of the respective roadway for approval. Non-VDOT maintained roadway include, but are not limited to, the following:

- George Washington Memorial Parkway the entire length of roadway between

Route 235 (Mount Vernon Memorial Highway) and I-495 o Maintained and operated by National Park Service/NPS

- Route 267 between I-495 and Route 28 / Dulles International Airport [aka Dulles

Access Road / DAR and Dulles Toll Road / DTR] o maintained and operated by Metropolitan Washington Airports

Authority/MWAA

- Route 267 between Route 28 and Route 7 / Route 15 By-pass [aka Dulles

Greenway] o Toll facility maintained and operated TRIP II

- Roadways located within the following jurisdictions:

o Arlington County (with the exception of most primary roadways) o City of Alexandria o Town of Dumfries (with the exception of primary roadways) o City of Fairfax o City of Falls Church o Town of Herndon o Town of Leesburg o City of Manassas o City of Manassas Park o Town of Purcellville (with the exception of primary roadways) o Town of Vienna

Lane Closure Guidelines – 2/29/2024 VDOT – NOVA

7 | P a g e

4.9. Holidays

In addition to the Sunday and Holiday work limitations as stated in Section 108.02 –

Limitations of Operations section of the VDOT 2020 Standard Specifications, Special

Provisions, mobile, short duration, short-term stationary or intermediate-term stationary temporary traffic control zone lane closures on mainline lanes, shoulders or ramps shall not be performed during the following Holiday time periods without the written permission of the functional ADA/ADE. Additionally, long-term stationary temporary traffic control zones shall not be initially put in place, adjusted, or removed during the following Holiday time periods without the written permission of the functional ADA/ADE (VDOT 2020

Standard Specifications, updated 7/2016).

General holiday guidance:

If the Holiday occurs on a Friday or Saturday: From Noon on the preceding Thursday to Noon on the following Monday.

If the Holiday occurs on a Sunday or Monday: From Noon on the preceding Friday to

Noon on the following Tuesday.

Holidays in grey represent those that are listed in the VDOT 2020 Standard Specifications.

• January 1st: From Noon on the preceding weekday until Noon on the following weekday.

• *Martin Luther King, Jr. Day: From Noon on the preceding weekday until Noon on the following weekday.

• *Inauguration Day: From Noon on the preceding weekday until Noon on the following weekday.

• *Presidents Day: From Noon on the preceding weekday until Noon on the following weekday.

• *Easter: From Noon on the preceding weekday until Noon on the following weekday.

• Memorial Day: From Noon on the preceding weekday until Noon on the following weekday.

• *Juneteenth: From Noon on the preceding weekday until Noon on the following weekday.

• July 4th: From Noon on the preceding weekday until Noon on the following weekday.

• Labor Day: From Noon on the preceding weekday until Noon on the following weekday.

• *Columbus Day: From Noon on the preceding weekday until Noon on the following weekday.

• Election Day: Day of only from 5:00 AM to 9:00 PM.

• *Veterans Day: From Noon on the preceding weekday until Noon on the following weekday.

• Thanksgiving Day: From Noon on the Wednesday preceding Thanksgiving Day until Noon on the

Monday following Thanksgiving Day.

• Christmas Day: From Noon on the preceding day until Noon on the following day.

Notes:

* For lower volume roadways (secondary minor arterials and less) with AADT below 5,000 vpd, lane closures will not be allowed during the holidays; however, there will be no restriction to the preceding day and the following day.

Typically, there are special events on September 11th. As will be the case for any day, lane closure requests will not be allowed to interfere or conflict with any special events or activities that may occur on that day.

Lane Closure Guidelines – 2/29/2024 VDOT – NOVA

8 | P a g e

5. Exception Process:

When the need for extended lane closures beyond the limits of the applicable allowable hours becomes necessary, an email shall be submitted to the following email address for review and consideration:

NOVAlaneclosureexceptions@VDOT.Virginia.gov

All requests for extended lane closure hours require the following information for a thorough and timely response:

• Location

• Specific lanes to be closed

• Type of work

• Date(s)

• Time(s)

• Overall duration

Depending on the initial review, further discussion, analysis, reviews and/or coordination may be necessary. The process may also include the DTOD and other ADA/ADE’s as applicable. Once extended lane closure hours have been agreed upon and supported by NOVA District Traffic

Operations, a formal response will be provided. Depending on the type of closure and the roadway(s) impacted, a final approval may be required from the functional ADA/ADE or an authorized designee.

Additionally, all approved extended lane closures should be coordinated through NOVA District

Public Affairs and the applicable Land Use and Transportation Director’s office for situational awareness.

Once the exception process has been completed and it was determined that NOVA District Traffic

Operations was unable to support nor recommend the closure for approval, the applicant can then discuss directly with their functional ADA/ADE. The functional ADA/ADE can choose to override

NOVA District Traffic Operations recommendation and approve the closure taking full ownership and responsibility for the direction.

Lane Closure Guidelines – 2/29/2024 VDOT - NOVA

9 | P a g e

6. Lane Closure Hour Tables

6.1. INTERSTATE 66 Outside the Beltway

WEEKDAY

Eastbound

Single-Lane or Shoulder Closures Two-Lane Closures1* Complete Road Closure

Segment 1 Fauquier / Prince William County Line to 10:00AM to 4:00PM n/a 12:00AM to 4:00AM Route 15 9:00PM to 4:30AM

Segment 2 Route 15 to Route 28 10:00AM to 3:00PM

11:00PM to 4:00AM 12:00AM to 4:00AM 10:00PM to 4:30AM

Segment 3 Route 28 to I-495 / Capital Beltway 11:00AM to 3:00PM

11:00PM to 4:00AM 12:00AM to 4:00AM 10:00PM to 4:30AM

All lanes open at 12:00 noon on Friday

WEEKDAY

Westbound

Single-Lane or Shoulder Closures Two-Lane Closures1* Complete Road Closure

Segment 3 I-495 / Capital Beltway to Route 28 9:00AM to 2:00PM

11:00PM to 5:00AM 12:00AM to 4:00AM 10:00PM to 6:00AM

Segment 2 Route 28 to Route 15 9:00AM to 2:00PM

11:00PM to 5:00AM 12:00AM to 4:00AM 10:00PM to 6:00AM

Segment 1 Route 15 to 9:00AM to 2:30PM n/a 12:00AM to 4:00AM Fauquier / Prince William County Line 10:00PM to 6:00AM

All lanes open at 12:00 noon on Friday

WEEKEND (All Segments)

Eastbound / Westbound

Single-Lane or Shoulder Closures Two-Lane Closures1* Complete Road Closure

Friday to Saturday 9:00PM to 9:00AM 10:00PM to 6:00AM 12:00AM to 4:00AM

Saturday to Sunday 9:00PM to 9:00AM 10:00PM to 6:00AM 12:00AM to 4:00AM

Sunday to Monday 9:00PM to 4:30AM 10:00PM to 4:00AM 12:00AM to 4:00AM

1 Only be considered in three lane segments.

* Consider opening shoulder lane, where applicable, after verifying structural integrity of the pavement.

Lane Closure Guidelines – 2/29/2024 VDOT - NOVA

10 | P a g e

6.2. INTERSTATE 66 Outside the Beltway - Express Lanes1

WEEKDAY

HOV & Toll

Shoulder Closures Single-Lane Closures Complete Road Closure*

Eastbound 10:00AM to 3:00PM 10:00AM to 3:00PM

11:00PM to 4:00AM 7:30PM to 5:00AM 10:00PM to 5:00AM

Westbound 9:00AM to 2:00PM 9:00AM to 2:00PM

11:00PM to 4:00AM 7:30PM to 5:00AM 10:00PM to 5:00AM

All lanes open at 12:00 noon on Friday

WEEKEND

Eastbound / Westbound (HOV & Toll)

Shoulder Closures Single-Lane Closures Complete Road Closure*

Friday to Saturday 10:00PM to 11:00AM 10:00PM to 5:00AM 11:00PM to 4:00AM

Saturday to Sunday 8:00PM to 11:00AM 10:00PM to 5:00AM 11:00PM to 4:00AM

Sunday to Monday 8:00PM to 5:00AM 10:00PM to 5:00AM 11:00PM to 4:00AM

1 In addition to VDOT, all lane closures along the I-66 OTB Express Lanes shall require separate coordination and approval through the toll lane operator Express Mobility Partners / EMP.

* Complete Road Closure on Express Lanes limited to 30 minutes or less.

Lane Closure Guidelines – 2/29/2024 VDOT - NOVA

11 | P a g e

6.3. INTERSTATE 66 Inside the Beltway

Eastbound

Single-Lane of Shoulder Closures Two-Lane Closures1* Complete Road Closure

Segment 1 I-495 / Capital Beltway to 10:00AM to 3:00PM1

10:00PM to 4:00AM 12:00AM to 4:00AM Exit 71 (Fairfax Dr) 9:30PM to 4:30AM

Segment 2 Exit 71 (Fairfax Dr) to

10:00PM to 4:30AM n/a 12:00AM to 4:00AM T. R. Bridge / D.C. Line

All lanes open at 12:00 noon on Friday

WEEKDAY

Westbound

Single-Lane or Shoulder Closures Two-Lane Closures1* Complete Road Closure

Segment 2 T. R. Bridge / D.C. Line to

10:30PM to 5:00AM n/a 12:00AM to 4:00AM Exit 71 (Fairfax Dr)

Segment 1 Exit 71 (Fairfax Dr) to 9:00AM to 2:00PM1

10:00PM to 5:00AM 12:00AM to 4:00AM I-495 / Capital Beltway 10:00PM to 5:00AM

WEEKEND (All Segments) Eastbound / Westbound

Single-Lane or Shoulder Closures Two-Lane Closures1* Complete Road Closure

Friday to Saturday 9:00PM to 9:00AM 10:00PM to 6:00AM 12:00AM to 5:00AM

Saturday to Sunday 9:00PM to 9:00AM 10:00PM to 6:00AM 12:00AM to 5:00AM

Sunday to Monday 9:00PM to 4:30AM 9:00PM to 4:00AM 12:00AM to 4:00AM

1 Only be considered in three lane segments.

* Consider opening shoulder lane, where applicable, after verifying structural integrity of the pavement.

Standard weekday tolling hours of 5:30 AM - 9:30 AM Eastbound and 3:00 PM - 7:00 PM Westbound are in effect Monday through Friday and lane closures will not be allowed to interfere with traffic flow immediately before, during or directly after those hours.

Lane Closure Guidelines – 2/29/2024 VDOT - NOVA

12 | P a g e

6.4. INTERSTATE 95 & INTERSTATE 395

Southbound

Single-Lane or Shoulder Closures

Two-Lane Closures* Multiple-Lane

Closures1* Complete Road Closure

Segment 1 14th St. Bridge to 10:00AM to 2:00PM

10:00PM to 5:00AM 11:00PM to 5:00AM 12:00AM to 4:00AM Springfield Interchange 9:30PM to 5:00AM

Segment 2 Springfield Interchange to 9:00AM to 2:00PM

10:00PM to 5:00AM 11:00PM to 5:00AM 12:00AM to 4:00AM Route 123 9:30PM to 5:00AM

Segment 3 Route 123 to Prince William / 9:00AM to 2:00PM

10:00PM to 5:00AM n/a 12:00AM to 4:00AM Stafford County Line 9:30PM to 6:00AM

All lanes open at 12:00 noon on Friday

WEEKDAY

Northbound

Single-Lane or Shoulder Closures

Two-Lane Closures* Multiple-Lane

Closures1* Complete Road Closure

Segment 3 Prince William / Stafford 9:30AM to 3:30PM

10:00PM to 4:30AM n/a 12:00AM to 4:00AM County Line to Route 123 9:00PM to 5:00AM

Segment 2 Route 123 to 9:30AM to 3:30PM

10:00PM to 5:00AM 11:00PM to 5:00AM 12:00AM to 4:00AM Springfield Interchange 9:00PM to 5:00AM

Segment 1 Springfield Interchange to 10:00AM to 3:00PM

10:00PM to 5:00AM 11:00PM to 4:00AM 12:00AM to 4:00AM 14th St. Bridge 9:00PM to 5:00AM

Southbound / Northbound

Single-Lane or Shoulder Closures

Multiple-Lane Closures*

Complete Road Closure

Friday to Saturday 10:00PM to 7:00AM 11:00PM to 6:00AM 12:00AM to 5:00AM

Saturday to Sunday 10:00PM to 7:00AM 11:00PM to 6:00AM 12:00AM to 5:00AM

Sunday to Monday 10:00PM to 5:00AM 11:00PM to 4:00AM 12:00AM to 4:00AM

1 Only considered in four lane segments.

* Consider opening shoulder lane, where applicable, after verifying structural integrity of the pavement.

Lane Closure Guidelines – 2/29/2024 VDOT - NOVA

13 | P a g e

6.5. INTERSTATE 95 & INTERSTATE 395 - Express Lanes1

Southbound / Northbound Reversible Lanes (HOV & Toll)*

Single-Lane or Shoulder Closures Two-Lane Closures Complete Road Closure**

Segment 1 14th St. Bridge to

Route 123

9:30AM to 3:00PM 10:00PM to 4:00AM 11:00PM to 4:00AM

9:30PM to 4:00AM

Segment 2 Route 123 to 11:00AM to 1:00PM n/a 11:00PM to 4:00AM Route 3 [Fredericksburg] 10:00PM to 4:00AM

Southbound / Northbound Reversible Lanes (HOV & Toll)*

Single-Lane Closures or Shoulder Two Lane Closure

Complete Road Closure** (Segment 1 Only)

Friday to Saturday 10:00PM to 9:00AM 10:00PM to 7:00AM 11:00PM to 7:00AM

Saturday to Sunday 10:00PM to 9:00AM 10:00PM to 7:00AM 11:00PM to 7:00AM

Sunday to Monday 10:00PM to 4:00AM 10:00PM to 4:00AM 11:00PM to 4:00AM

1 In addition to VDOT, all lane closures along the I-95 & I-395 Express Lanes shall require separate coordination and approval through the toll lane operator Transurban.

* Direction of traffic control for all lane closures in reversible lanes will need to be adjusted as necessary to face direction of traffic.

** Complete Road Closure on Express Lanes limited to 30 minutes or less.

Lane Closure Guidelines – 2/29/2024 VDOT - NOVA

14 | P a g e

6.6. INTERSTATE 495 (CAPTIAL BELTWAY)

Outer Loop

Single-Lane or Shoulder Closures

Two-Lane Closures* Multiple-Lane Closures* Complete Road Closure**

Segment 1 American Legion Bridge to 9:30AM to 2:30PM

10:00PM to 5:00AM 11:00PM to 5:00AM 12:00AM to 4:00AM I-66 Interchange 9:30PM to 5:00AM

Segment 2 I-66 Interchange to 9:30AM to 2:30PM

10:00PM to 5:00AM 11:00PM to 5:00AM 12:00AM to 4:00AM Springfield Interchange 9:30PM to 5:00AM

Segment 3 Springfield Interchange to 10:00AM to 3:00PM

10:00PM to 5:00AM 11:00PM to 5:00AM 12:00AM to 4:00AM Woodrow Wilson Bridge 9:30PM to 5:00AM

All lanes open at 12:00 noon on Friday

WEEKDAY

Inner Loop

Single-Lane or Shoulder Closures

Two-Lane Closures* Multiple-Lane Closures* Complete Road Closure**

Segment 3 Woodrow Wilson Bridge to 10:00AM to 3:00PM

10:00PM to 5:00AM 11:00PM to 5:00AM 12:00AM to 4:00AM Springfield Interchange 9:30PM to 5:00AM

Segment 2 Springfield Interchange to 10:00AM to 3:00PM

10:00PM to 5:00AM 11:00PM to 5:00AM 12:00AM to 4:00AM I-66 Interchange 9:30PM to 5:00AM

Segment 1 I-66 Interchange to 10:00AM to 2:00PM

10:00PM to 5:00AM 11:00PM to 5:00AM 12:00AM to 4:00AM American Legion Bridge 9:30PM to 5:00AM

Outer Loop / Inner Loop

Single-Lane or Shoulder Closures

Multiple-Lane Closures* Complete Road Closure**

Friday to Saturday 10:00PM to 8:00AM 11:00PM to 7:00AM 12:00AM to 5:00AM

Saturday to Sunday 10:00PM to 9:00AM 11:00PM to 8:00AM 12:00AM to 5:00AM

Sunday to Monday 9:30PM to 5:00AM 11:00PM to 5:00AM 12:00AM to 5:00AM

* Consider opening shoulder lane, where applicable, after verifying structural integrity of the pavement.

** Complete Road Closure limited to 30 minutes or less.

Lane Closure Guidelines – 2/29/2024 VDOT - NOVA

15 | P a g e

6.7. INTERSTATE 495 (CAPITAL BELTWAY) - Express Lanes1

Outer Loop / Inner Loop (HOV & Toll)*

Single-Lane or Shoulder Closures Complete Road Closure**

American Legion Bridge to Springfield Interchange

9:30AM to 3:00PM 12:00PM to 4:00AM

9:30PM to 4:00AM

Outer Loop / Inner Loop (HOV & Toll)*

Single-Lane Closures or Shoulder Complete Road Closure**

Friday to Saturday 10:00PM to 9:00AM 11:00PM to 5:00AM

Saturday to Sunday 10:00PM to 9:00AM 11:00PM to 5:00AM

Sunday to Monday 10:00PM to 4:00AM 11:00PM to 4:00AM

1 In addition to VDOT, all lane closures along the I-395 & I-95 Express Lanes shall require separate coordination and approval through the toll lane operator Transurban.

* Complete Road Closure on Express Lanes limited to 30 minutes or less.

Lane Closure Guidelines – 2/29/2024 VDOT - NOVA

16 | P a g e

6.8. ROUTE 267 (DULLES CONNECTOR ROAD)

Monday through Friday

Single-Lane or Shoulder Closures* Complete Road Closure

Eastbound 11:00AM to 3:00PM

12:00AM to 4:00AM 9:30PM to 5:00AM

Westbound 9:30AM to 2:00PM

12:00AM to 4:00AM 9:00PM to 5:00AM

Eastbound / Westbound

Single-Lane or Shoulder Closures* Complete Road Closure

Friday to Saturday 10:00PM to 8:00AM 12:00AM to 5:00AM

Saturday to Sunday 11:00PM to 8:00AM 12:00AM to 5:00AM

Sunday to Monday 9:00PM to 5:00AM 12:00AM to 4:00AM

* Consider opening shoulder lane, where applicable, after verifying structural integrity of the pavement.

Lane Closure Guidelines – 2/29/2024 VDOT - NOVA

17 | P a g e

6.9. ROUTE 28 (Limited Access Section)

Southbound

Single-Lane or Shoulder Closures

Two-Lane Closures* Multiple-Lane Closures1* Complete Road Closure**

Segment 1 Route 7 to 9:30AM to 2:30PM

10:00PM to 5:00AM n/a 12:00AM to 4:00AM Sterling Blvd (Rte 846) 9:30PM to 5:00AM

Segment 2

Sterling Blvd (Rte 846) [Loudoun County] to

9:30AM to 2:30PM 10:00PM to 5:00AM 11:00PM to 5:00AM 12:00AM to 4:00AM

Route 50 [Fairfax County] 9:30PM to 5:00AM

Segment 3 Route 50 to 10:00AM to 2:30PM

10:00PM to 5:00AM n/a 12:00AM to 4:00AM Route 29 9:30PM to 5:00AM

All lanes open at 12:00 noon on Friday

WEEKDAY

Northbound

Single-Lane or Shoulder Closures

Two-Lane Closures* Multiple-Lane Closures1* Complete Road Closure**

Segment 3 Route 29 to 10:00AM to 2:30PM

10:00PM to 5:00AM n/a 12:00AM to 4:00AM Route 50 9:30PM to 5:00AM

Segment 2 Route 50 [Fairfax County] to 10:00AM to 2:30PM

10:00PM to 5:00AM 11:00PM to 5:00AM 12:00AM to 4:00AM Sterling Blvd (Rte 846) [Loudoun County]

9:30PM to 5:00AM

Segment 1 Sterling Blvd (Rte 846) to 9:30AM to 2:30PM

10:00PM to 5:00AM n/a 12:00AM to 4:00AM Route 7 9:30PM to 5:00AM

Southbound / Northbound

Single-Lane or Shoulder Closures

Multiple-Lane Closures1* Complete Road Closure**

Friday to Saturday 10:00PM to 8:00AM 11:00PM to 7:00AM 12:00AM to 5:00AM

Saturday to Sunday 10:00PM to 9:00AM 11:00PM to 8:00AM 12:00AM to 5:00AM

Sunday to Monday 9:30PM to 5:00AM 11:00PM to 5:00AM 12:00AM to 4:00AM

1 Only considered for four lane segments.

* Consider opening shoulder lane, where applicable, after verifying structural integrity of the pavement.

** Complete Road Closure limited to 30 minutes or less.

Lane Closure Guidelines – 2/29/2024 VDOT - NOVA

18 | P a g e

6.10. MAJOR PRIMARY ARTERIALS

Various Sections of Weekday

Route 7, 15, 27, 110, 123, 234, 286 Single-Lane or Shoulder

Closures Two-Lane Closures1* Complete Road Closure

AM Peak / PM Off-Peak 10:00AM to 3:30PM 11:00PM to 4:00AM 12:00AM to 4:00AM

Direction 9:00PM to 4:00AM

PM Peak / AM Off-Peak 9:30AM to 3:00PM 11:00PM to 4:00AM 12:00AM to 4:00AM

Direction 10:00PM to 5:00AM

All lanes open at 2:00 PM on Friday

Weekend

Single-Lane or Shoulder Closures

Two-Lane Closures1* Complete Road Closure

Friday to Saturday 10:00PM to 8:00AM 11:00PM to 6:00AM 12:00AM to 5:00AM

Saturday to Sunday 10:00PM to 9:00AM 11:00PM to 6:00AM 12:00AM to 5:00AM

Sunday to Monday 9:00PM to 5:00AM 10:00PM to 4:00AM 12:00AM to 4:00AM

6.11. PRIMARY & MAJOR SECONDARY ARTERIALS (ADT >10,000 vpd)**

Weekday

Closures

Two-Lane Closures1* Complete Road Closure

All Directions 9:30AM to 3:00PM

10:00PM to 4:00AM 12:00AM to 4:00AM 10:00PM to 5:00AM

All lanes open at 2:00 PM on Friday

Weekend

Closures

Two-Lane Closures1* Complete Road Closure

Friday to Saturday 9:00PM to 9:00AM 10:00PM to 6:00AM 12:00AM to 5:00AM

Saturday to Sunday 9:00PM to 9:00AM 10:00PM to 6:00AM 12:00AM to 5:00AM

Sunday to Monday 8:00PM to 5:00AM 9:00PM to 4:00AM 12:00AM to 4:00AM

1 Only considered for three lane segments.

* Consider opening shoulder lane, where applicable, after verifying structural integrity of the pavement.

** Nighttime noise ordinances shall remain in effect and will require separate review and approvals from the local jurisdiction, where applicable.

Lane Closure Guidelines – 2/29/2024 VDOT - NOVA

19 | P a g e

6.12. SECONDARY ROADWAYS*

Average Daily Traffic

(ADT)

Weekday

Single-Lane or Shoulder Closures Multiple-Lane Closures

(if available) Complete Road Closure

3,000 – 9,999 vpd 9:00AM to 3:30PM

10:00PM to 4:00AM 11:00PM to 4:00AM 9:00PM to 5:00AM

1,000 – 2,999 vpd 9:00AM to 3:30PM

9:00PM to 5:00AM 10:00PM to 4:00AM 8:00PM to 5:00AM

1 – 999 vpd 8:00AM to 5:00PM

9:00PM to 5:00AM 10:00AM to 2:00PM

8:00PM to 5:00AM 10:00PM to 4:00AM

All lanes open at 2:00 PM on Friday

Weekend

Single-Lane or Shoulder Closures Multiple-Lane Closures

(if available) Complete Road Closure

Friday to Saturday 9:00PM to 9:00AM 10:00PM to 7:00AM 10:00AM to 6:00AM

Saturday to Sunday 9:00PM to 9:00AM 10:00PM to 7:00AM 10:00AM to 6:00AM

Sunday to Monday 8:00PM to 5:00AM 9:00PM to 5:00AM 10:00AM to 4:00AM

* Nighttime noise ordinances shall remain in effect and will require separate review and approvals from the local jurisdiction, where applicable.

FHWA-1273 -- Revised July 5, 2022

REQUIRED CONTRACT PROVISIONS

FEDERAL-AID CONSTRUCTION CONTRACTS

I. General II. Nondiscrimination III. Non-segregated Facilities IV. Davis-Bacon and Related Act Provisions V. Contract Work Hours and Safety Standards Act

Provisions VI. Subletting or Assigning the Contract VII. Safety: Accident Prevention VIII. False Statements Concerning Highway Projects IX. Implementation of Clean Air Act and Federal Water

Pollution Control Act X. Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion XI. Certification Regarding Use of Contract Funds for

Lobbying XII. Use of United States-Flag Vessels:

ATTACHMENTS

A. Employment and Materials Preference for Appalachian Development Highway System or Appalachian Local Access Road Contracts (included in Appalachian contracts only)

I. GENERAL

1. Form FHWA-1273 must be physically incorporated in each construction contract funded under title 23, United States Code, as required in 23 CFR 633.102(b) (excluding emergency contracts solely intended for debris removal). The contractor (or subcontractor) must insert this form in each subcontract and further require its inclusion in all lower tier subcontracts (excluding purchase orders, rental agreements and other agreements for supplies or services). 23 CFR 633.102(e).

The applicable requirements of Form FHWA-1273 are incorporated by reference for work done under any purchase order, rental agreement or agreement for other services. The prime contractor shall be responsible for compliance by any subcontractor, lower-tier subcontractor or service provider. 23 CFR 633.102(e).

Form FHWA-1273 must be included in all Federal-aid design-build contracts, in all subcontracts and in lower tier subcontracts (excluding subcontracts for design services, purchase orders, rental agreements and other agreements for supplies or services) in accordance with 23 CFR 633.102. The design-builder shall be responsible for compliance by any subcontractor, lower-tier subcontractor or service provider.

Contracting agencies may reference Form FHWA-1273 in solicitation-for-bids or request-for-proposals documents, however, the Form FHWA-1273 must be physically incorporated (not referenced) in all contracts, subcontracts and lower-tier subcontracts (excluding purchase orders, rental agreements and other agreements for supplies or services related to a construction contract). 23 CFR 633.102(b).

2. Subject to the applicability criteria noted in the following sections, these contract provisions shall apply to all work performed on the contract by the contractor's own organization and with the assistance of workers under the contractor's immediate superintendence and to all work performed on the contract by piecework, station work, or by subcontract. 23 CFR 633.102(d).

3. A breach of any of the stipulations contained in these Required Contract Provisions may be sufficient grounds for withholding of progress payments, withholding of final payment, termination of the contract, suspension / debarment or any other action determined to be appropriate by the contracting agency and FHWA.

4. Selection of Labor: During the performance of this contract, the contractor shall not use convict labor for any purpose within the limits of a construction project on a Federal-aid highway unless it is labor performed by convicts who are on parole, supervised release, or probation. 23 U.S.C. 114(b).

The term Federal-aid highway does not include roadways functionally classified as local roads or rural minor collectors.

23 U.S.C. 101(a).

II. NONDISCRIMINATION (23 CFR 230.107(a); 23 CFR Part 230, Subpart A, Appendix A; EO 11246)

The provisions of this section related to 23 CFR Part 230, Subpart A, Appendix A are applicable to all Federal-aid construction contracts and to all related construction subcontracts of $10,000 or more. The provisions of 23 CFR Part 230 are not applicable to material supply, engineering, or architectural service contracts.

In addition, the contractor and all subcontractors must comply with the following policies: Executive Order 11246, 41 CFR Part 60, 29 CFR Parts 1625-1627, 23 U.S.C. 140, Section 504 of the Rehabilitation Act of 1973, as amended (29 U.S.C. 794), Title VI of the Civil Rights Act of 1964, as amended (42 U.S.C.

2000d et seq.), and related regulations including 49 CFR Parts 21, 26, and 27; and 23 CFR Parts 200, 230, and 633.

The contractor and all subcontractors must comply with: the requirements of the Equal Opportunity Clause in 41 CFR 60- 1.4(b) and, for all construction contracts exceeding $10,000, the Standard Federal Equal Employment Opportunity Construction Contract Specifications in 41 CFR 60-4.3.

Note: The U.S. Department of Labor has exclusive authority to determine compliance with Executive Order 11246 and the policies of the Secretary of Labor including 41 CFR Part 60, and 29 CFR Parts 1625-1627. The contracting agency and the FHWA have the authority and the responsibility to ensure compliance with 23 U.S.C. 140, Section 504 of the Rehabilitation Act of 1973, as amended (29 U.S.C. 794), and Title VI of the Civil Rights Act of 1964, as amended (42 U.S.C.

2000d et seq.), and related regulations including 49 CFR Parts 21, 26, and 27; and 23 CFR Parts 200, 230, and 633.

The following provision is adopted from 23 CFR Part 230, Subpart A, Appendix A, with appropriate revisions to conform to the U.S. Department of Labor (US DOL) and FHWA requirements.

ATTACHMENT K

FHWA-1273

1. Equal Employment Opportunity: Equal Employment Opportunity (EEO) requirements not to discriminate and to take affirmative action to assure equal opportunity as set forth under laws, executive orders, rules, regulations (see 28 CFR Part 35, 29 CFR Part 1630, 29 CFR Parts 1625-1627, 41 CFR Part 60 and 49 CFR Part 27) and orders of the Secretary of Labor as modified by the provisions prescribed herein, and imposed pursuant to 23 U.S.C. 140, shall constitute the EEO and specific affirmative action standards for the contractor's project activities under this contract. The provisions of the Americans with Disabilities Act of 1990 (42 U.S.C. 12101 et seq.) set forth under 28 CFR Part 35 and 29 CFR Part 1630 are incorporated by reference in this contract. In the execution of this contract, the contractor agrees to comply with the following minimum specific requirement activities of EEO:

a. The contractor will work with the contracting agency and the Federal Government to ensure that it has made every good faith effort to provide equal opportunity with respect to all of its terms and conditions of employment and in their review of activities under the contract. 23 CFR 230.409 (g)(4) & (5).

b. The contractor will accept as its operating policy the following statement:

"It is the policy of this Company to assure that applicants are employed, and that employees are treated during employment, without regard to their race, religion, sex, sexual orientation, gender identity, color, national origin, age or disability. Such action shall include: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship, pre-apprenticeship, and/or on-the-job training."

2. EEO Officer: The contractor will designate and make known to the contracting officers an EEO Officer who will have the responsibility for and must be capable of effectively administering and promoting an active EEO program and who must be assigned adequate authority and responsibility to do so.

3. Dissemination of Policy: All members of the contractor's staff who are authorized to hire, supervise, promote, and discharge employees, or who recommend such action or are substantially involved in such action, will be made fully cognizant of and will implement the contractor's EEO policy and contractual responsibilities to provide EEO in each grade and classification of employment. To ensure that the above agreement will be met, the following actions will be taken as a minimum:

a. Periodic meetings of supervisory and personnel office employees will be conducted before the start of work and then not less often than once every six months, at which time the contractor's EEO policy and its implementation will be reviewed and explained. The meetings will be conducted by the EEO Officer or other knowledgeable company official.

b. All new supervisory or personnel office employees will be given a thorough indoctrination by the EEO Officer, covering all major aspects of the contractor's EEO obligations within thirty days following their reporting for duty with the contractor.

c. All personnel who are engaged in direct recruitment for the project will be instructed by the EEO Officer in the contractor's procedures for locating and hiring minorities and women.

d. Notices and posters setting forth the contractor's EEO policy will be placed in areas readily accessible to employees, applicants for employment and potential employees.

e. The contractor's EEO policy and the procedures to implement such policy will be brought to the attention of employees by means of meetings, employee handbooks, or other appropriate means.

4. Recruitment: When advertising for employees, the contractor will include in all advertisements for employees the notation: "An Equal Opportunity Employer." All such advertisements will be placed in publications having a large circulation among minorities and women in the area from which the project work force would normally be derived.

a. The contractor will, unless precluded by a valid bargaining agreement, conduct systematic and direct recruitment through public and private employee referral sources likely to yield qualified minorities and women. To meet this requirement, the contractor will identify sources of potential minority group employees and establish with such identified sources procedures whereby minority and women applicants may be referred to the contractor for employment consideration.

b. In the event the contractor has a valid bargaining agreement providing for exclusive hiring hall referrals, the contractor is expected to observe the provisions of that agreement to the extent that the system meets the contractor's compliance with EEO contract provisions. Where implementation of such an agreement has the effect of discriminating against minorities or women, or obligates the contractor to do the same, such implementation violates Federal nondiscrimination provisions.

c. The contractor will encourage its present employees to refer minorities and women as applicants for employment.

Information and procedures with regard to referring such applicants will be discussed with employees.

5. Personnel Actions: Wages, working conditions, and employee benefits shall be established and administered, and personnel actions of every type, including hiring, upgrading, promotion, transfer, demotion, layoff, and termination, shall be taken without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age or disability.

The following procedures shall be followed:

a. The contractor will conduct periodic inspections of project sites to ensure that working conditions and employee facilities do not indicate discriminatory treatment of project site personnel.

b. The contractor will periodically evaluate the spread of wages paid within each classification to determine any evidence of discriminatory wage practices.

c. The contractor will periodically review selected personnel actions in depth to determine whether there is evidence of discrimination. Where evidence is found, the contractor will promptly take corrective action. If the review indicates that the discrimination may extend beyond the actions reviewed, such corrective action shall include all affected persons.

d. The contractor will promptly investigate all complaints of alleged discrimination made to the contractor in connection with its obligations under this contract, will attempt to resolve such complaints, and will take appropriate corrective action within a reasonable time. If the investigation indicates that the discrimination may affect persons other than the complainant, such corrective action shall include such other persons. Upon completion of each investigation, the contractor will inform every complainant of all of their avenues of appeal.

6. Training and Promotion:

a. The contractor will assist in locating, qualifying, and increasing the skills of minorities and women who are applicants for employment or current employees. Such efforts should be aimed at developing full journey level status employees in the type of trade or job classification involved.

b. Consistent with the contractor's work force requirements and as permissible under Federal and State regulations, the contractor shall make full use of training programs (i.e., apprenticeship and on-the-job training programs for the geographical area of contract performance). In the event a special provision for training is provided under this contract, this subparagraph will be superseded as indicated in the special provision. The contracting agency may reserve training positions for persons who receive welfare assistance in accordance with 23 U.S.C. 140(a).

c. The contractor will advise employees and applicants for employment of available training programs and entrance requirements for each.

d. The contractor will periodically review the training and promotion potential of employees who are minorities and women and will encourage eligible employees to apply for such training and promotion.

7. Unions: If the contractor relies in whole or in part upon unions as a source of employees, the contractor will use good faith efforts to obtain the cooperation of such unions to increase opportunities for minorities and women. 23 CFR

230.409. Actions by the contractor, either directly or through a contractor's association acting as agent, will include the procedures set forth below:

a. The contractor will use good faith efforts to develop, in cooperation with the unions, joint training programs aimed toward qualifying more minorities and women for membership in the unions and increasing the skills of minorities and women so that they may qualify for higher paying employment.

b. The contractor will use good faith efforts to incorporate an EEO clause into each union agreement to the end that such union will be contractually bound to refer applicants without regard to their race, color, religion, sex, sexual orientation, gender identity, national origin, age, or disability.

c. The contractor is to obtain information as to the referral practices and policies of the labor union except that to the extent such information is within the exclusive possession of the labor union and such labor union refuses to furnish such information to the contractor, the contractor shall so certify to the contracting agency and shall set forth what efforts have been made to obtain such information.

d. In the event the union is unable to provide the contractor with a reasonable flow of referrals within the time limit set forth in the collective bargaining agreement, the contractor will, through independent recruitment efforts, fill the employment vacancies without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age, or disability;

making full efforts to obtain qualified and/or qualifiable minorities and women. The failure of a union to provide sufficient referrals (even though it is obligated to provide exclusive referrals under the terms of a collective bargaining agreement) does not relieve the contractor from the requirements of this paragraph. In the event the union referral practice prevents the contractor from meeting the obligations pursuant to Executive Order 11246, as amended, and these special provisions, such contractor shall immediately notify the contracting agency.

8. Reasonable Accommodation for Applicants / Employees with Disabilities: The contractor must be familiar with the requirements for and comply with the Americans with Disabilities Act and all rules and regulations established thereunder. Employers must provide reasonable accommodation in all employment activities unless to do so would cause an undue hardship.

9. Selection of Subcontractors, Procurement of Materials and Leasing of Equipment: The contractor shall not discriminate on the grounds of race, color, religion, sex, sexual orientation, gender identity, national origin, age, or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

a. The contractor shall notify all potential subcontractors, suppliers, and lessors of their EEO obligations under this contract.

b. The contractor will use good faith efforts to ensure subcontractor compliance with their EEO obligations.

10. Assurances Required:

a. The requirements of 49 CFR Part 26 and the State DOT’s FHWA-approved Disadvantaged Business Enterprise (DBE) program are incorporated by reference.

b. The contractor, subrecipient or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR part 26 in the award and administration of DOT-assisted contracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the recipient deems appropriate, which may include, but is not limited to:

(1) Withholding monthly progress payments;

(2) Assessing sanctions;

(3) Liquidated damages; and/or

(4) Disqualifying the contractor from future bidding as non-responsible.

c. The Title VI and nondiscrimination provisions of U.S.

DOT Order 1050.2A at Appendixes A and E are incorporated by reference. 49 CFR Part 21.

11. Records and Reports: The contractor shall keep such records as necessary to document compliance with the EEO requirements. Such records shall be retained for a period of three years following the date of the final payment to the contractor for all contract work and shall be available at reasonable times and places for inspection by authorized representatives of the contracting agency and the FHWA.

a. The records kept by the contractor shall document the following:

(1) The number and work hours of minority and non-minority group members and women employed in each work classification on the project;

(2) The progress and efforts being made in cooperation with unions, when applicable, to increase employment opportunities for minorities and women; and

(3) The progress and efforts being made in locating, hiring, training, qualifying, and upgrading minorities and women.

b. The contractors and subcontractors will submit an annual report to the contracting agency each July for the duration of the project indicating the number of minority, women, and non-minority group employees currently engaged in each work classification required by the contract work. This information is to be reported on Form FHWA-1391. The staffing data should represent the project work force on board in all or any part of the last payroll period preceding the end of July. If on-the-job training is being required by special provision, the contractor will be required to collect and report training data. The employment data should reflect the work force on board during all or any part of the last payroll period preceding the end of July.

III. NONSEGREGATED FACILITIES

This provision is applicable to all Federal-aid construction contracts and to all related construction subcontracts of more than $10,000. 41 CFR 60-1.5.

As prescribed by 41 CFR 60-1.8, the contractor must ensure that facilities provided for employees are provided in such a manner that segregation on the basis of race, color, religion, sex, sexual orientation, gender identity, or national origin cannot result. The contractor may neither require such segregated use by written or oral policies nor tolerate such use by employee custom. The contractor's obligation extends further to ensure that its employees are not assigned to perform their services at any location under the contractor's control where the facilities are segregated. The term "facilities" includes waiting rooms, work areas, restaurants and other eating areas, time clocks, restrooms, washrooms, locker rooms and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing provided for employees. The contractor shall provide separate or single-user restrooms and necessary dressing or sleeping areas to assure privacy between sexes.

IV. DAVIS-BACON AND RELATED ACT PROVISIONS

This section is applicable to all Federal-aid construction projects exceeding $2,000 and to all related subcontracts and lower-tier subcontracts (regardless of subcontract size), in accordance with 29 CFR 5.5. The requirements apply to all projects located within the right-of-way of a roadway that is functionally classified as Federal-aid highway. 23 U.S.C. 113.

This excludes roadways functionally classified as local roads or rural minor collectors, which are exempt. 23 U.S.C. 101.

Where applicable law requires that projects be treated as a project on a Federal-aid highway, the provisions of this subpart will apply regardless of the location of the project. Examples include: Surface Transportation Block Grant Program projects funded under 23 U.S.C. 133 [excluding recreational trails projects], the Nationally Significant Freight and Highway

Projects funded under 23 U.S.C. 117, and National Highway Freight Program projects funded under 23 U.S.C. 167.

The following provisions are from the U.S. Department of Labor regulations in 29 CFR 5.5 “Contract provisions and related matters” with minor revisions to conform to the FHWA- 1273 format and FHWA program requirements.

1. Minimum wages (29 CFR 5.5)

a. All laborers and mechanics employed or working upon the site of the work, will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual…