Attachment_J.6__Attachment_B__Shelter_Wrap_Around_Support_Service_Area_SOW.pdf

PDF 109 KB Posted

Attached to
Shelter Care for Unaccompanied Children Federal contract opportunity
Solicitation number
15-233-SOL-00103
Issued by
Department of Health and Human Services Program Support Center

About this file

Attachment J.6 Attachment B Shelter Wrap Around Support Service Area

View the file

Other files for this federal contract opportunity

Other files attached to Shelter Care for Unaccompanied Children, newest first.
File Type Posted
Amendment_03.pdf PDF
Amendment_02.pdf PDF
Amendment_01_Cover_Sheet.pdf PDF
Amendment_01.pdf PDF
DOLWDs2015.zip ZIP file
Attachment_J.5_-_Section_I_Clauses.pdf PDF
Attachment_C__Training_and_Technical_Assistance_Service_Area_(FINAL).pdf PDF
Attachment_B__Shelter_Wrap_Around_Support_Service_Area_(FINAL).pdf PDF
Attachment_J.1_-_SF-LLL _Disclosure_of_Lobbying_Activities.pdf PDF
Attachment_D__Transportation_Service_Area_(FINAL).pdf PDF
Attachment_E__Medical_and_Clinical_Staffing_and_Equipment_Service_Area_(FINAL).pdf PDF
FINAL_SOLICITATION_15-233-SOL-00103.pdf PDF
Attachment_J.2_-_Past_Performance_Questionnaire.doc DOC document
Attachment_J.4_-_Pricing_Scenario_(FINAL).pdf PDF
DOLWDs2015.zip ZIP file
Attachment_J.1_-_SF-LLL _Disclosure_of_Lobbying_Activities.pdf PDF
Attachment_J.6_-_Attachment_A_-_Shelter_Staffing_Service_Area_SOW.pdf PDF
Attachment_J.6__Attachment_C__Training_and_Technical_Assistance_Service_Area_SOW.pdf PDF
J.5_Section_I_Clauses.pdf PDF
Attachment_J.2_-_Past_Performance_Questionnaire.doc DOC document
DRAFT_SOLICITATION_-_Shelter_Care_for_Unaccompanied_Children.pdf PDF
Attachment_J.6__Attachment_E__Temporary_Medical_and_Clinical_Staffing_and_Equipment_SOW.pdf PDF
Attachment_J.6__Attachment_D__Transportation_Service_Area_SOW.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Shelter Care for Unaccompanied Children Draft Solicitation Language Attachment J.6 – Attachment B – Shelter Wrap Around Support Service Area

Section C – Description/Specification/Work Statement

Statement of Work Department of Health and Human Services (HHS) Administration for Children and Families (ACF)

Office of Refugee Resettlement – Division of Children’s Services Temporary Shelter Wrap Around Support Services

General Information

The Office of Refugee Resettlement (ORR) Division of Children's Services/Unaccompanied Children's program provides unaccompanied children with a safe and appropriate environment until they are released to an appropriate sponsor while their immigration cases proceed. ORR is an office within the Administration for Children and Families (ACF) which is a division of the U.S. Department of Health & Human Services (HHS). The ORR- Unaccompanied Children’s program seeks wrap-around support services to support unaccompanied children in HHS temporary shelters.

Purpose

The purpose of this performance of work is to secure options for providing wrap-around support services at identified temporary shelter locations to provide the management, supervision, and required services to unaccompanied children (UC) in the custody of HHS. The mission includes feeding, cleaning, maintenance and facility preparation, clothing, linens and laundry, transportation, recreational equipment, security, hygiene kits, medical supplies, and custodial services. Depending on the needs of the facility, wrap-around services may include portable toilets and hand washing stations, mobile trailers for offices. Security services will include unarmed security guards and any equipment, such as closed-circuit television networks and communication devices as directed by the government.

Maintenance and facility preparation services may include fencing for the property, painting and building repairs, industrial cleaning, addressing non-ADA compliance factors, and other preparations needed to accommodate the sheltering of children in the facilities. Wrap-around services could be used to support facilities at temporary federally-owned or leased sites, including facilities operating with temporary structures. The place of performance will be primarily within ACF Regions 2, 6, and 9 however the Government reserves the right to assign the Contractor to a location outside of those regions.

Background

In 2014, the Administration responded to a significant increase in the number of unaccompanied children who were apprehended on the southwest border, with an aggressive, coordinated Federal response focused on providing humanitarian care for the children as well as heightened deterrence, enhanced enforcement, stronger foreign cooperation, and greater capacity for Federal agencies to ensure that our border remains secure. As a result of these efforts, the number of unaccompanied children attempting to cross the southwest border has declined precipitously, and the Administration continues to focus its resources to prevent a similar situation from developing in the future.

ACF is continuing to develop efficient, cost-effective strategies to address the historical variations in border crossings by unaccompanied children. Every effort is being made to avoid a future increase in border crossings by children. At the same time, it is important for the Federal government to be prepared to provide humanitarian care when necessary.

During FY 2014, ACF operated temporary facilities at camps and on Department of Defense military bases. ACF worked with existing grantees that were able to expand their capacity to operate the temporary shelters while continuing to maintain services at the standard shelters they operated. .

Contracting for services related to temporary shelters would allow ACF, where appropriate, to use a competitive process to identify temporary facility providers, instead of expanding existing grant agreements, to provide care to children. The competitive contracting process could also provide more cost effective options for temporary sheltering. ACF is exploring contract vehicles that could provide flexible options for services on a regional basis throughout the United States.

Cadre and Infrastructure Task:

The contractor shall provide all labor, supervision, and materials to support all recruiting, screening, credentialing, training, and data tracking systems to establish and maintain a cadre of assets to ensure the rapid availability of scalable staff assets based on local capacity and need for temporary shelter services. Based on the size and nature of the increase of UC crossings the U.S. border, the ORR will surge to meet the needs of the children. The contractor is responsible for obtaining the resources and a cadre of trained personnel that includes, but is not limited to a Contract Administrator, Recruitment Coordinator, a Procurement Specialist and two IT Specialists. The contractor is expected to maintain the level of effort required to establish the necessary service infrastructure to implement and maintain the required services if/when needed by ORR. The contract will specify the minimum quantities that ORR may order under each task or delivery order and the maximum that it may order during a specific period of time. Accordingly the contractor will be assessed penalties every month in which the contractor fails to identify the five cadre of trained personnel and other minimum quantities specified on the contract available for deployment during that month. The qualified personnel identified shall provide the initial triage, and follow the initial task order to hire additional staff, and provide the required services.

Asset Deployment Tasks:

The prioritized delivery of commodities and the wrap-around of services are subject to the timeline as stated below or as directed by the COR in response to the needs of the mission:

Services and Commodities Required

Item Description Area or Mode Delivery Timeline

Start Finish Normal Cleaning All Buildings including

Barracks

Repairs / Prepping for residential use Buildings identified Feeding Services for UCs Existing kitchen facilities will be used for on- site food preparation, storage and serving. Use existing dining area. Hand-washing stations must be provided.

Portable Restroom facilities Standard / ADA ADA Compliance All buildings including

Barracks

Clothing Qty, type and sizes – See below under Clothing Section

Linens To include pillow, sheets, towels and blankets

Laundry Service Off-Site or on-site location Transportation - UCs Four vans on site with drivers and 48-72 hrs on call if needed to mobilize large groups (up to 100).

Transportation for Staff

At the discretion of the contractor, provide transportation services for staff

Computers, Printers, office supplies

UCs ID Identification must be worn by UC at all times.

Cable, Broadband internet, telephones, Wi-Fi, and IT services See Section Below

Recreational Equipment To include, but not limited to, soccer balls, board games, TVs, Age-appropriate Movies (Spanish)

Custodial Services For all serviced buildings Security TBD Operations and Maintenance Services For all serviced buildings

The Contractor shall be prepared to scale operations to meet fluctuations in mission requirements. The Contractor shall commence scale-down activities with the direction, coordination, and approval of the COR. The Contractor shall make a good-faith effort to return any non-damaged, unused, and unopened supplies, materials or other purchased goods, including any goods that are defective, damaged or unfit for use, at no cost to the Government. The Contractor shall issue the Government a full credit for such returned goods against the amount charged to the Government account by the Contractor. The Contractor shall consider any non-returnable items procured by the Contractor and charged to the Government to be Government property. The Contractor shall dispose of non-returnable items as directed by the COR.

FEEDING

The Contractor shall provide feeding support for approximately an initial 138 and planned expansion to up to 2,500 Unaccompanied Children (UC) per established ESF-6 guidelines. Feeding support may include any labor, equipment, materials, and storage for a feeding operation using existing kitchen facilities and equipment. Services provided by the Contractor must be scalable to accommodate shelter population fluctuations.

The Contractor shall be capable of providing up to three different hot meals each day (breakfast, lunch, dinner), two snacks, and shall include cultural-specific items. Each hot meal will consist of a protein, starch, vegetable, snack, bread, fruit or dessert, and a beverage. The meals shall be culturally appropriate and consistent with typical Central American (El Salvadorian, Honduran and Guatemalan) foods. The Contractor shall provide snack foods and beverages per the established ESF-6 guidelines to recipients and staff. Beverage options shall include water, juice, hot/cold tea, lemonade, coffee and milk.

The Contractor shall make provisions to provide alternative options in response to special dietary needs. The Contractor shall rotate/update the menu on a bi-weekly basis consistent with all applicable USDA standards and approved by a nutritionist. The Contractor shall provide the COR the menu for the upcoming week by 7am every Monday or as specified by the COR.

Feeding operations shall be designed to distribute meals served in a cafeteria type-setting to UC only at the food preparation site(s). The Contractor shall make any necessary provision to feed up to 100 UCs at a time. The Contractor shall provide safe storage for kitchen utensils, tables, chairs, trash cans, and hand-washing stations if an adequate supply is not available on site or provided from other sources or as directed by the COR. Eating areas should be clearly marked and kept clean and sanitary.

The Contractor shall ensure food is kept within established food-safety temperature ranges. The Contractor shall provide clamshells and disposable eating utensils.

The Contractor shall keep a daily record of meals prepared and served, per meal cycle (breakfast, lunch, dinner), and provide to COR by 7am (or as specified by the COR) the following day.

The Contractor is responsible for the proper disposal of any excess leftovers, and trash. The Contractor shall make a good-faith effort to return any non-damaged, unused, and unopened goods, as well as any goods that are defective, damaged, or unfit for use, at no cost to Federal Government. The Contractor shall issue FEDERAL GOVERNMENT a full credit for such returned goods against the amount charged to FEDERAL GOVERNMENT’s account by the Contractor. Any non-returnable items procured by the Contractor and charged to FEDERAL GOVERNMENT, shall be considered Government property, and disposed of as directed by the COR.

The contractor shall provide supplies and personnel to maintain a clean kitchen and dining areas and provide trash removal.

FACILITIES SERVICES

Support to be provided may include cleaning of specific facilities, set up of sleeping, feeding, classrooms, and offices areas, custodial services, operation and maintenance of facilities, general and medical waste disposal, supplies, equipment. Services provided by the Contractor must be scalable to accommodate shelter population fluctuations. Once the shelter(s) is operational, the Contractor shall provide daily reports to the COR on the status of the shelter(s) to include: daily feeding counts and other similar information as specified by the COR. If requested by the COR, the Contractor shall be prepared to furnish this information multiple times a day. The Contractor may also be required to report daily shelter population information using a standard reporting system or tool provided by the Government, such as the National Shelter System (NSS).

Cleaning and Environmental The contractor shall provide cleaning services of the assigned barracks, kitchen, cafeteria and serving areas, bathroom facilities and other areas, including office space and staff areas, as directed by the COR prior to UCs and Staff occupancy. Said cleaning shall render the specified facilities suitable for occupancy by the UCs and staff. This includes, but not limited to, asbestos, mold, lead and other environmental hazards.

Repairs and Preparing for Shelters

The Contractor shall repair and clean buildings identified in the NTP.

Supplies and equipment The Contractor shall provide supplies and equipment to support sheltering, feeding and recreational services to include but are not limited tables, chairs, partitions, computers, printers, office supplies, phones (desk and cells), routers, wireless, servers, repeaters, TVs, and recreational gear.

The Contractor shall provide eighty (80) portable computers, sixteen (16) printers, two (2) Copier/Scanner Machines and one (1) fax machine to be installed among eight (8) buildings. The contractor shall be ready to initially provide two (2) 60” TVs, two (2) DVDs Players, ten (10) secure lines and twenty (20) non-secure lines in the Admin Buildings. The Contractor shall be prepared to purchase any additional supplies and equipment not specified in the performance work statementas directed by the COR.

UCs ID The Contractor shall provide identification to be worn by all UCs and a method to track incoming, outgoing and periodic accountability as per directed by the COR.

Clothing The Contractor shall provide age appropriate clothing items and shoes for children between 13 – 17 years old. Clothing types and quantities per child are below.

T-shirts: 5 Basketball shorts: 2 Sweatpants: 2 Sweatshirts: 1 Jackets: 1 Undergarments: 5 Socks: 5 House shoes or flip flops: 1 Athletic shoes: 1

The Contractor shall be prepared to purchase any additional size of Clothing items not specified in the performance work statement.

Hygiene kits The contractor shall provide a gender-appropriate Hygiene Kits for every UC. See Attachment A for the list of items that shall be included in the kits. NOTE: The contractor shall purchase razors and shall NOT include it inside the kits. The razors will be distributed and collected as required.

Medical Supplies The contractor shall procure and maintain medical supplies as specified on Attachment B.

LOGISTICS

Children Transportation The Contractor shall provide transportation services to children and other authorized personnel, as directed by the COR not to exceed four (4) vans on-site. This may include intra-community transportation for non-emergency transport, such as shuttle service/vans to and from local hospitals, medical and dental appointments, court, airport, or other locations. The Contractor shall receive 48 hours notification from COR regarding large scale transportation services (up to100 UCs).

Transportation services may require trips across state lines.

Phone Service, Computer, Cable & Internet

The Contractor shall provide voice and data communication systems for approximately 200 users and the ability to make international calls. This includes but is not limited to: Internet connectivity, Cable, Wi-Fi, and VoIP.

Laundry The Contractor shall provide either on or off-site laundry services to recipients, for up to 60 lbs.

of laundry, per person, per week, or as directed by the COR. The contractor shall provide all supplies and personnel to manage the laundry operation to include but not limited to linen bags and identification processes to ensure efficient exchange.

Existing Showers The Contractor shall provide a shower ratio of 1:12 or more at the request of the government.

The Contractor shall divide the group (open) showers on each building for privacy. The contractor shall divide it by utilizing shower curtains.

Portable Restrooms (regular and accessible) and Hand Washing Stations The Contractor shall provide portable restrooms near office spaces and dining facilities, as needed and as directed by the COR. A mixture of regular and ADA-compliant units shall be provided based on the needs of the population. Hand-washing stations shall be provided as needed, and shall be located adjacent to restroom facilities unless otherwise specified in the RFP. Additional hand-washing stations may be needed in proximity to eating areas or other locations as directed by the COR. The Contractor shall monitor usage, and shall service, clean, and replenish hand-washing stations and infant changing stations as needed. .

Custodial Services The Contractor shall provide custodial services, supplies, and equipment, including replacement items expended within the facility being serviced. Services to be provided may include cleaning & sanitizing restrooms; replacing restroom supplies; sweeping floors; mopping floors;

vacuuming floors and carpets; emptying trash containers; cleaning windows; cleaning & sanitizing surface areas (counters, desks). For showers: The Contractor shall regularly clean and sanitize showers on a daily basis. Heavy use shall require more frequent cleaning and sanitizing per COR direction. For restrooms: The Contractor shall empty, clean, and sanitize units on a minimum daily basis. As heavy use will require more frequent cleaning and sanitizing, the Contractor shall monitor usage and shall empty, clean, and sanitize units as needed and at a minimum of once a day or per the CORs direction. The Contractor shall maintain a log of work completed and provide it to the COR upon request.

Operations and Maintenance The contractor shall provide ongoing operations and maintenance (O&M) services for the designated facility. The O&M service will include providing the appropriate mix of qualified labor, supplies and equipment and include the replacement of items and commodities expended during regular facility operation. Require services may include but not limited to routine mechanical equipment and utilities maintenance, minor construction and demolition services, plumbing, structural and electrical repairs, grounds maintenance and emergency repairs as needed. Prior to providing major service or repairs the contractor will be required to coordinate with DOD as needed. The Contractor shall maintain a log of work completed and provide it to the COR upon request.

Recreation Services Implement HHS age-appropriate UC recreation programs, activities, and special events as directed by the COR. Examples include: group sports equipment (basketball hoops & balls, footballs, soccer balls, etc.), televisions (to include basic cable - Spanish) in recreation area, DVD players and a selection of age-appropriate movies (“G” & “PG” rated only - Spanish), and family-oriented board games.

Security Services

The Contractor shall provide 24/7 unarmed security guards. The guards shall patrol and monitor the facility, respond to disturbances and ensure the safety and security of UCs and staff. Security staff shall be posted at each building. Security staff shall be equipped with communication devices to respond to emergencies as needed.

Security staff shall be licensed and bonded by the State in which they are working.

Unless specifically stated otherwise in the Task Order, the Contractor shall determine the adequate number of security staff needed to ensure that all areas of the facility are patrolled, monitored and secured 24 hours a day. In addition, the Contractor shall ensure that all entry and exit points to the facility are staffed at all times.

Background Check The Contractor shall require all staff to provide the following documentation: Child Protective Services background investigations, Criminal background checks, and any other security check required by the host State for staff in a child care residential setting.

General and Medical Waste Removal

The Contractor shall provide for all waste removal, including medical and sharps equipment, from the location. The Contractor shall ensure sanitary conditions for proper waste storage and removal.

Program Management

The Contactor shall provide a Program Coordinator (or alternative), responsible for all work performed under this contract. The Program Coordinator will be the primary point of contact for the Contracting Officer and designated Contracting Officer Representative (COR). The Program Coordinator will have resources and authority to ensure efficient and timely program execution and shall be the Contractor’s focal point for all required program tasks. The Contractor’s Program Coordinator will be prepared at all times to present and discuss the status of contract activities, requirements, and issues. The name of this person and the name of any alternate who shall act for the Contractor when the Program Coordinator is absent shall be submitted in writing to the Contracting Officer five (5) working days prior to the contract start date. During any absence of the Program Coordinator, only one (1) alternate shall serve as the Government contact point. The Program Coordinator, and any designated alternates(s), shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The Program Coordinator shall keep the Contracting Officer (CO) and Contracting Officer’s Representative (COR) informed of any performance issues, cost or financial concerns and potential problems that, if unresolved, will adversely affect the Contractor’s performance, schedule or costs. The Program Coordinator shall take all appropriate measures to mitigate adverse impact to the contract and subsequently to the ACF.

Program Management Plan

The Contractor shall provide a Program Management Plan (PMP) during task order proposal submission that fully documents its management approach for this contract. The Contractor shall update its PMP when changes to the required information change. At a minimum, the PMP shall:

a. Provide information on the Contractor’s management organization, internal management policies and procedures;

b. Summarize how the Contractor will maintain relationships and conduct regular meetings and reviews with Government personnel related to the activities and deliverables of the Contract;

c. Provide an organization chart of the contractor’s organization to be used in performance of the contract and narrative describing how the Contractor will fully integrate the management of the elements of this contract and if the plan includes subcontractors, other than individual subcontractors, provide organizational information about the subcontractor and include subcontractor organizational elements in the project organizational chart;

d. Describe how activities of subcontracts will be managed and organizational relationship will be maintained between the prime and subcontractors and methods of requirement flow-down and activity progress reporting back to the prime Contractor;

e. Describe the: Contractor’s approach to selecting subcontractor(s) and maintaining the quality of products produced by subcontractors(s); subcontractor’s role under the contract, its relationship to the contractor, and its experience (over the past three (3) years at a minimum); and any subcontractor independent verification and validation process;

f. Identify key technical and management personnel who will be assigned to the contract;

g. Describe internal policies and procedures to be used in managing the contract and resources associated with the contract;

h. Describe management and process for addressing work increases (spikes) and lulls as work priorities and schedules shift;

i. Describe the approach and method for the identification, assessment, and mitigation of program risks including provisions for identifying risk areas, assessing risk factors, assigning appropriate resources to reduce risk factors, identifying and analyzing alternative actions available, identifying the most promising alternatives, and planning for implementation of risk reduction.

Project Management and Project Schedules

The Contractor shall establish and maintain a “project management System” using its own tools and methodologies subject to review by the ACF/ORR COR team. This project management tool should employ a highly successful set of program control, tools, techniques, and procedures, to include risk management, quality assurance, work breakdown structuring, contractor cadre database, and security management.

The Contractor’s project management system shall include, but not limited to the following areas:

1. Financial database to include invoicing, budgets, timesheets, cost control and procedures.

2. Contractors Task Management, to include deployments, schedules, locations, etc.

For work performed under the contract, the Contractor shall be required to develop and maintain a schedule. The Contractor shall provide sufficient detail to demonstrate that all sections of the work are appropriately resourced, thoroughly planned, and proceeding according to requirements.

Schedule(s) shall identify subordinate-tier activities, dependencies between activities, and milestones required to demonstrate successful completion of projects. The schedule(s) shall identify the exit criteria required to satisfy milestone requirements that enable the Contractor to proceed with follow-on activities. The schedule(s) shall be base-lined. Schedule updates shall be made frequently, or as designated by the COR. Changes to scheduled baseline milestones must be documented by the Contractor and formally authorized by HHS or its designee.

Personnel

The individuals/positions cited below are considered to be essential to the work being performed hereunder. Prior to diverting any of the specified individuals to other programs, the Contractor shall notify the Contracting Officer reasonably in advance and shall submit justification (including proposed substitutions) in sufficient detail to permit evaluation of the impact on the program. No diversion shall be made by the Contractor without prior written consent of the Contracting Officer, provided, that the Contracting Officer may ratify in writing such diversion and such ratification shall constitute the consent of the Contracting Officer. The Contract may be modified from time to time during the course of the contract to either add or delete personnel, as appropriate.

The Contractor shall issue photo identification to all staff mobilized under the Task Order(s). The Contractor shall ensure that all deployed Contractor staff clearly display a Contractor issued photo identification badge on the front of their outer garment, between the neck and waist, at all times while on duty.

Travel

The Contractor shall provide local staff to fill the requirements of the Task Order(s). If there is insufficient local staff to satisfy the Task Order(s), the Contractor shall deploy qualified staff from other locations. The Contractor shall make every effort to replace staff on travel status with local hires within three (3) weeks of the beginning of the period of performance.

The Contractor shall provide all logistical support for staff on travel status, including but not limited to:

Travel Transportation Lodging Meals and incidentals Equipment needed to fulfill the requirements of the Task Order(s) Supplies needed to fulfill the requirements of the Task Order(s) An organization chart clearly delineating their chain of command, reflecting integration with HHS management facility structure Additional information, tools, and resources to ensure that staff are appropriately prepared to successfully complete their assigned duties

The Contractor shall provide all required travel arrangements and maintenance for staff on travel status, in accordance with Federal Travel Regulations, including but not limited to:

Transportation from/to point of origin to/from assigned location(s) Lodging near staging area(s), training site(s), duty station(s) and/or other assigned location(s) Transportation, including but not limited to, from/to:

• Lodging and/or staging area(s)

• Training site(s)

• Duty station(s)

• Meal site(s)

Provision of meals and incidental expenses

Standards of Conduct

The Contractor shall ensure that all its personnel conduct their work in a professional and responsible manner. All Contractor personnel working on the Government’s site shall abide by the rules and regulations as set forth by HHS.

The Contractor shall ensure that all personnel mobilized under the Task Order sign statements, before employment, acknowledging that they are mandated to report suspected child abuse and neglect. The form must include the following statement: “Failure to report these incidents could be grounds for termination.”

Government Liability

The Government shall not be liable for any injury to the Contractor’s personnel or damage to the Contractor’s property unless such injury or damage is due to negligence on the part of the Government and is recoverable under the Federal Torts Claims Act, or pursuant to other Federal statutory authority.

MEETINGS AND REPORTS

The Contractor shall prepare agendas for all meetings concerning the project unless otherwise stated by the individual support task order COR/business owner. Agendas shall be submitted to the COR/business owner (unless otherwise directed) at least one business day prior to the meeting. When meeting with the COR, the Contractor is responsible for recording meeting minutes and submitting those minutes to the COR within two (2) business days after the meeting for review and approval.

POST AWARD CONFERENCE

A post-award conference shall be conducted within (7) seven business days after contract awarded with representatives of the Contractor, Contracting Officer and COR. The Contracting Officer, or designated representative, initiating the conference will designate, or act as the chairperson. The requirement for a post-award conference shall in no event constitute grounds for excusable delay by the Contractor in performance of any provisions in the contract.

BI-WEEKLY MEETINGS

The Contractor shall attend bi-weekly meetings with the COR to discuss project status and other technical items that support the performance of work. The COR may cancel the meetings if not needed.

MONTHLY STATUS REPORT

The contractor shall submit to the COR a Monthly Status Report that includes the following:

a. Activities completed

b. Activities in process

c. Activities planned for the next period

d. Status report of all reviewed deliverables

e. Issues and concerns

Reports will consist of charts, a brief written document plus discussions for elaboration, explanations, and to ensure a common understanding of efforts. All activities, as identified within the individual support task order SOW, shall be reported by tasks, hours, and show start and stop dates. The contractor shall provide a status of each project in regard to original baseline. At the activity level, the contractor shall provide both current reporting period and cumulative figures for the hours worked by labor category and individuals within that category. The contractor shall schedule and conduct a face-to-face with the COR on at least a bi-weekly basis to discuss project status. The COR may determine that a meeting is not necessary and cancel a meeting when it is determined unnecessary. In addition, the contractor shall brief and discuss progress to each individual task order. All tasks shall be included in the monthly report. The monthly report shall be used to validate invoices. The monthly invoice and the monthly report should be reflective of one another. The contractor shall develop a format and submit for review by the Government. Once approved, the contractor shall submit in the approved format. If there is a need to change the format, the contractor shall use the same submittal and approval process.

DAILY REPORT

Once a Task Order is activated, the Contractor will provide a daily report of activities related to that TO, including schedule and deliverables tracking and any new or pressing issues.

AD HOC REPORT

The contractor shall submit an ad hoc report with activities performed as requested by, and at the direction of the COR. The ad hoc report shall be an abbreviated version of the monthly status report.

The ad hoc report is required only as requested by the COR.

AFTER ACTION REPORT

The Contractor shall submit to the Government, electronically, a final, after-action report summarizing all of the above information for the entire period of performance. The report shall be submitted within two (2) weeks before the period of performance expire. The Contractor’s report shall include observations of best practices and recommendations for overall operational improvement.

REPORTING REQUIREMENTS

All written documents for this project shall be delivered via a single hard copy plus an electronic version via E-mail attachment. The COR may request additional hard copies as necessary. All electronic files shall be submitted in a format that is compatible with Microsoft Office 2007. This requirement is subject to change and the Contractor shall be prepared to submit deliverables in any new HHS/ACF standard format.

The Contractor shall participate in daily conference calls with the COR at a time that will be decided by the COR.

The IDCM Contractor shall document and provide a final progress and expense (invoice) report sixty

(60) business days after each deployment has ended outlining a full recording of all expenses incurred in the process of carrying out the mission assignment and relating the costs against the total budget.

The final progress and expense report shall also include the participant roster.

The Contractor shall monitor and track their expenditures to not exceed obligated amount for this task order. Weekly financial reports, including cumulative expenditures, shall be provided by the data and time specified by the COR. Once obligations reach 75% of awarded funds, the Contractor shall immediately notify the COR. Regular updates to the COR may be requested.

Government Furnished Equipment, Information, Property

The Contractor shall provide all required equipment, services, supplies, materials, logistics support, training, staffing, and/or other resources, unless otherwise specified in the Task Order(s).

The Contractor shall not rely on the Government to provide Government Furnished Information, unless otherwise specified in the Task Order(s).

The Contractor shall not rely on the Government to provide any Government Furnished Property, such as land, buildings or facilities, unless otherwise specified in the Task Order(s).

The Contractor shall not deem any Contractor-developed system, software, designs, plans, products, and/or other materials, analyses or reports paid for in full or in part under this contract to be property of the Contractor. Ownership and use of the system(s) and data shall be vested in the Government. The Contractor shall develop and provide user manuals for the system to the Program Management Office or designee and Contracting Officer (or designated representative). The Contractor system(s) shall operate independent of Government systems. The Contractor shall be responsible for informational accuracy and for updating their system information with, and for, all systems.

Delivery Schedule

Pending authorization to do so, the Contractor shall begin preparing the site for shelter operations, as specified in the Task Order.

Demobilization Order: Upon receipt and acknowledgement of a Demobilization Order, the Contractor shall cease all operations identified by the Government within 72 hours and make preparations to discontinue their contribution shelter operations.

Area of Operation The Area of Operation is: Designated facilities at SHELTER SITE.

Place of Performance:

Contractors will be expected to primarily work on site at SHELTER SITE identified at the task order level.

Insurance, Bonding, and Licensing (Company):

The Contractor(s) shall be fully licensed, insured, and bonded per the terms of the base contract. No additional costs or indemnities will be borne by the government.

RESTRICTIONS ON DISCLOSURE OF INFORMATION AND RIGHTS IN DATA

ADVANCE REVIEW FOR DISSEMINATION OF PROJECT INFORMATION PRIOR TO

CONTRACT COMPLETION

The Contractor agrees not to release or disclose, verbally or in writing, information pertaining to the results or findings of work (including data collection, analyses, draft or final papers and reports) for the period of this contract without prior review by the COR. The Contractor must notify the COR in advance (minimum 21 days prior to release) and in writing, specifying: who or what is generating the request for advance information; when and how project results/information would be released; and what information would be released.

The Government reserves the right to transfer copyright of the any data, analysis, or product developed under this contract to the entity best equipped to ensure the sustainability of the program to include intellectual property. In transferring copyright, the Government requires that the entity that acquires the copyright will provide the measure to Government agencies and programs at cost (i.e., for the cost of reproduction of the materials and cost of training).

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

The Government intends to utilize a Quality Assurance Surveillance Plan (QASP) to monitor the quality of the Contractor’s performance for the life of the contract. The oversight provided for in the task order and in the QASP will help to ensure that service levels reach and maintain the required levels throughout the contract term. Further, the QASP provides the TO with a proactive way to avoid unacceptable or deficient performance, and provides verifiable input for the required Past Performance Information Assessments. The QASP will be developed by the Government in conjunction with the performance work statement. It will be finalized upon award and a copy provided to the Contractor after award. The QASP is a living document and may be updated by the Government as necessary for the life of the contract or until all funds are disbursed.

Quality Assurance Surveillance Plan (QASP)

To be determined.

METHODS OF SURVEILLANCE

The Government may use a variety of surveillance methods to evaluate the contractor’s performance.

These include, but are not limited to, random sampling of recurring services, periodic surveillance of the contractor’s quality control program, test calls, and validated customer complaints.

Applicable Documents

1. “ADA Checklist for Emergency Sheltering,” available at http://www.justice.gov/publications/publications_a.html

2. “Mega-Shelter Planning Guide: A Resource and Best Practices Reference Guide,” October 1, 2010, available at http://www.iavm.org/cvms/pdf/MSPG-11’15’2010.pdf

3. Food Service Sanitation Ordinance and Code, Part V of the Food Service Sanitation Manual, U.S.

Public Health Service Publication 934 (1965), 29 CFR 1910.142(i)(3)

4. National Electric Code (current edition)

5. HUD Housing Quality Standards

6. Uniform Federal Accessibility Standards

7. Homeland Security Presidential Directive 12

8. Uniform Plumbing Code

9. International Residential Code

10. Guidance on Planning for Integration of Functional Needs Support Services in General Population

Shelters - November, 2010

Upon Issuance of a Task Order for Asset Deployment - Schedule of Deliverables:

ITEM DELIVERABLE / EVENT DUE BY:

1. Status Reports Once daily while shelter is operating and Contractor personnel are on site.

2. After Action Reports Provided within two weeks after the Task Order period of performance.

3. Additional deliverables may be specified at the task order level.

TBD

SPECIAL CONTRACT REQUIREMENTS

PRIVACY PROVISIONS

SAFEGUARDING THE PRIVACY OF INFORMATION COLLECTION

The Contractor shall have established procedures prior to beginning an assessment or evaluation to ensure that persons who collect or have access to raw data are trained on privacy act and confidentiality issues and shall provide assurances of nondisclosure of confidential information through any means including the publication of tabulated data in such a way that confidential information will not accidentally be revealed. The Contractor must ensure that respondent information obtained in the course of this contract either by primary data collection or from other sources that would permit identification of any individual or establishment will be held in strict confidence and will be used only for the purposes stated in this study, and will not be disclosed or released to anyone without prior approval from both the respondent and the PO, except as required by law. Confidential information in the possession of the contractor shall be safeguarded by maintaining this information in locked locations not accessible to those without a need to know and limiting access to only those contractor or subcontractor staff with a need to know. The Contractor shall take appropriate steps to ensure the confidentiality and security of electronic materials as well. The disposition of the data files created during the course of the study will be determined by ACF prior to the end of the contract.

COMPLIANCE WITH FEDERAL STATUTES CONCERNING THE COLLECTION OF

INFORMATION CONTAINING PERSONAL IDENTIFIERS, SYSTEMS OF RECORDS

REQUIREMENT

The Contractor shall comply with all requirements imposed by federal statutes concerning the collection and maintenance of data that includes personal identifiers, in order to satisfy the privacy and confidentiality provisions of the Privacy Act, Social Security Act, and the Health Insurance Portability and Accountability Act (HIPAA).

MAINTENANCE OF DATA FILES CONCERNING PERSONAL IDENTIFIERS

In preparing and providing data files and documentation, the Contractor shall ensure compliance with all requirements imposed by federal statutes concerning the collection and maintenance of data which includes personal identifiers, in order to satisfy the privacy and confidentiality provisions of the Privacy Act, Social Security Act, and the Health Insurance Portability and Accountability Act

(HIPAA).

Notwithstanding any other clause concerning data, data rights and computer software and hardware under this contract, all data and source code produced, recorded, transferred or manipulated under this contract shall remain the exclusive property of the Government irrespective of the manner or method of recording or storage no matter what form of computer mechanism is used in the processing of said information or data. The Government shall retain exclusive right and domain over any by-product produced under this contract, or any other use of the data produced under this contract by either plan or accident.

CONTRACT FINANCIAL REPORT

1. The Financial Report of Individual Project/Contract shall be submitted to the Contracting Officer by the Contractor in accordance with the instructions which accompany the form, in an original and two copies, not later than thirty (30) working days after the close of the reporting period. The line entries for subdivisions of work and elements of cost (expenditure categories) to be reported within the total contract shall be as stated in paragraph 4 below. Subsequent changes and/or additions in the line entries shall be in writing.

2. The first financial report shall cover the period consisting of the first quarter following the date of the contract, in addition to any fractional part of the initial month.

3. If the final payment of this contract is to be made on the basis of desk audit, the Contracting Officer may require the Contractor to submit detailed support for costs contained in one or more interim financial reports.

4. The Contractor shall furnish the following minimum information in support of the costs submitted, in total cost by category only:

a. Period of performance for which costs are claimed;

b. Labor segregated by category;

d. Material costs (to include travel, other direct costs, direct materials, subcontracts);

f. Material indirect rate(s) and costs as applicable;

h. Any other supporting data that will clarify unusual expenditures.

5. The Contractor shall include the costs for the current period and the cumulative costs for the total contract according to the categories shown above.

The Contractor shall provide 24/7 unarmed security guards. The guards shall patrol and monitor the facility, respond to disturbances and ensure the safety and security of UCs and staff. Security staff shall be posted at each building. Security staff...
Security staff shall be licensed and bonded by the State in which they are working.
Unless specifically stated otherwise in the Task Order, the Contractor shall determine the adequate number of security staff needed to ensure that all areas of the facility are patrolled, monitored and secured 24 hours a day. In addition, the Contract...
Background Check
Lodging and/or staging area(s)
Training site(s)
Duty station(s)
Meal site(s)
1. “ADA Checklist for Emergency Sheltering,” available at http://www.justice.gov/publications/publications_a.html
2. “Mega-Shelter Planning Guide: A Resource and Best Practices Reference Guide,” October 1, 2010, available at http://www.iavm.org/cvms/pdf/MSPG-11’15’2010.pdf
3. Food Service Sanitation Ordinance and Code, Part V of the Food Service Sanitation Manual, U.S. Public Health Service Publication 934 (1965), 29 CFR 1910.142(i)(3)
4. National Electric Code (current edition)
5. HUD Housing Quality Standards
6. Uniform Federal Accessibility Standards
7. Homeland Security Presidential Directive 12
8. Uniform Plumbing Code
9. International Residential Code

File details come from the government source that posted it. Updated .