About this file
This is a Technical Specification document issued by JEA (Jacksonville Electric Authority) for the N03 Replacement Condenser Valve Purchase project located at the JEA Northside Generating Station in Jacksonville, Florida. The solicitation seeks the purchase, testing, and delivery of sixteen (16) new 60-inch rubber-lined butterfly valves to replace existing Henry Pratt Triton XR-70 valves in the Northside Unit 3 condenser water system. The scope includes furnishing sixteen new Limitorque actuators, sixteen new Limitorque gearboxes, and all necessary fasteners, gaskets, supporting components, and soft goods required for installation. These valves are critical for controlling condenser cooling water flow, enabling reverse-flow backwashing, and preventing leakage that can cause pump reverse rotation. The bid due date for this solicitation is July 21, 2026.
The technical specifications require that all valves conform to AWWA Standard C504-06 with a precise face-to-face dimension of 15.00 inches ± 0.06 inches and feature a ductile iron body fully lined with neoprene, EPDM, or approved elastomers rated for brackish water exposure. The condenser valves must be paired with Limitorque MXB20 electric actuators operating at 3-phase, 60 Hz, 480 VAC power and WG751SDB gearboxes configured to provide a 105-second valve stroke time with 10 percent maximum deviation. Each valve shall include a 5-year warranty against defects and lining failure, with contractor installation warranty of a minimum of one year. The vendor is fully responsible for safe shipment, storage, handling, and all associated shipping costs, and must provide factory testing documentation including hydrostatic, leakage, and operational testing per AWWA C504-06 standards, along with certified drawings, material certifications, and a detailed resource-loaded project schedule within two weeks of award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1412188280 Appendix B - Response Forms.pdf | ||
| 1412188280 Appendix C - Drawings.pdf | ||
| 1412188280 Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix A: Technical Specification N03 Replacement Condenser Valve Purchase
1.0 Location of Property
The property on which the work is required by this Specification is at the JEA Northside Generating Station located at 4377 Heckscher Drive, Jacksonville, Florida 32226.
2.0 Scope of Work
2.1 This specification covers the purchase, testing, and delivery of sixteen (16) new 60-inch rubber-lined butterfly valves for the Northside Unit 3 condenser water system. These valves replace the existing Henry Pratt Triton XR-70 valves. The valves are critical to controlling condenser cooling water flow, enabling reverse-flow backwashing, and preventing leakage that causes pump reverse rotation.
2.2 The work includes purchasing the following components:
• Sixteen new 60-inch rubber-lined butterfly valves
• Sixteen new Limitorque actuators
• Sixteen new Limitorque gearboxes
• All necessary fasteners, gaskets, supporting components, and other soft goods required
3.0 Condenser Valves Specification
3.1 All valves shall conform to AWWA Standard C504-06. Manufacturers must have experience producing 60-inch Class 150 valves suitable for condenser water service.
3.2 The takeout (face-to-face) dimension shall be exactly 15.00 inches ± 0.06 inches. Deviation outside this range is not permitted.
3.3 Valve body shall be ductile iron or equivalent and fully rubber lined. Disc shall be rubber-lined to ensure durability in brackish river water with high chloride content and suspended solids. Rubber lining shall be neoprene, EPDM, or approved elastomers rated for brackish water exposure. Lining must be defect-free and abrasion-resistant.
3.4 Valves must support high-volume condenser flow and reverse-flow backwashing. Valves must maintain tight shutoff to prevent leakage that impairs condenser cleaning and causes reverse pump rotation.
3.5 Each valve shall include a heavy-duty gearbox and compatible electric actuator providing remote open/close control and position feedback to the
DCS.
3.6 External surfaces shall have an epoxy industrial coating suitable for coastal environments. All fasteners must be stainless steel or corrosion protected.
3.7 Valves shall include a 5-year warranty against defects and lining failure.
Contractor installation warranty shall be a minimum of 1 year.
4.0 Actuator and Gearbox Specification
The equipment covered under this specification is an electric motor‑operated actuator assembly consisting of a Limitorque MXB‑20 actuator coupled to a Limitorque WG‑75‑1SD‑B gearbox. The assembly shall provide rotary motion suitable for operating large butterfly valves or other quarter‑turn valve types requiring high torque and controlled operating speed.
4.1 Electric Actuator
• Manufacturer: Limitorque
• Model: MXB‑20
• Type: Weatherproof electric actuator (WP rated)
• Power Supply: 3‑phase, 60 Hz, 480 VAC
• Motor Speed: 155 RPM
4.2 Gearbox Model
• Manufacturer: Limitorque
• Model: WG‑75‑1SD‑B
• Type: Worm‑gear reduction gearbox designed for high‑torque valve operation
• Mounting: Direct‑coupled to MXB‑20 actuator
• Output: Quarter‑turn rotary output to valve shaft
• Sealing: Weatherproof, grease‑lubricated gear housing
4.3 The actuator‑gearbox assembly shall have a total valve stroke time of105 seconds (from full open to full close or vice‑versa). Output speed must be regulated by the gearbox ratio and input motor speed to ensure ±10% maximum deviation from the required operating time. Output torque rating shall meet or exceed the torque requirements of the connected valve. The WG‑75 gearbox must provide sufficient gear reduction to support full‑load torque at the specified 105‑second stroke time.
4.4 Capable of full operation under rated voltage conditions without overheating. Actuator shall provide smooth, controlled motion with no excessive vibration or backlash
4.5 It is the Vendor responsibility to ensure the gearboxes can operate the new valves.
5.0 Functional Testing
5.1 In the factory the Vendor shall hydrostatic, leakage, and operational testing per AWWA C504-06 as required. FAT documentation shall include dimensional verification of the 15-inch face-to-face requirement.
6.0 Shipment
6.1 The Vendor shall be fully responsible for the safe shipment, storage and handling of the components, and shall be fully responsible for the material on the job site until the system is turned over to the Plant. The contractor is responsible for all shipping costs and for all truck loading and unloading of material at the job site.
6.2 Miscellaneous parts shall be packed in suitable boxes for storage at the job site.
7.0 Documentation
7.1 Manufacturers shall provide certified drawings, material certifications, and FAT documentation. Contractors shall supply installation procedures, as-built documentation, and test results to the JEA Project Manager
7.2 Vendor shall provide the JEA Project Manager with a detailed resource loaded project schedule within 2 weeks of award.
File details come from the government source that posted it. Updated .