This document outlines the scope of work for an elevator modernization project at Kortes Dam. The project involves upgrading one existing passenger elevator and includes replacing the controller, hoist machine, doors, signals, and other system components to comply with safety codes. Key requirements include installing a permanent magnet AC gearless hoist machine, new car and hoistway doors made of stainless steel, a solid-state VVVF drive system, and ensuring compliance with ADA standards. Bids are due on May 19, 2023 with award anticipated in January 2023. The scope of work provides detailed product and installation specifications and approved manufacturers for all elevator system elements.

View the file

Other files for this federal contract opportunity

Other files attached to Kortes Elevator Modernization BUILD, newest first.
File Type Posted
Amendment_0004_For_Kortes_Elevator_Build_0004.pdf PDF
Sol_140R6023R0002_Amd_0004.pdf PDF
Sol_140R6023R0002_Amd_0003.pdf PDF
SF30_0002.pdf PDF
Sol_140R6023R0002_Amd_0002.pdf PDF
Sol_140R6023R0002_Amd_0001.pdf PDF
Amendment_0001_0001.pdf PDF
R2_Solicitation_140R6023R0002_Kortes_Elevator_Modernization_SITE_VIST__.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140R6023R0002 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

R60

03/20/20230003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

Bureau of Reclamation Great Plains Region Regional Office PO Box 36900 Billings MT 59107

Linda Melnick: Lmelnick@usbr.gov

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

03/20/2023

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Kortes Elevator Modernization BUILD Pick Sloan Project, WY

See attached for changes incorporated by this amendment.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Linda Melnick

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Solicitation No. 140R6023R0002 Amendment No. 00002

Description of Changes: The following changes are hereby incorporated into and made a part of this solicitation:

1) Remove the SF1442 in its entirety and substitute therefor the revised SF1442, to remove Contracting Officer signature on the form.

2) Remove Specification section 14 21 00 – Vertical Conveyance in its entirety and substitute therefor the revised section 14 21 00 – Vertical Conveyance.

3) Add in Information only Drawings AD101 and E101.

Receipt of Proposals: The hour and date for receipt of the proposals has changed from May 12, 2023, to May 19, 2023, at 1300 Mountain Time.

Acknowledgement: See Block 11 above regarding how to acknowledge this amendment. The Government must receive the acknowledgement at the place designated for receipt of bids (See Block 10 of the Standard Form 1442).

Third Party: If you have given a copy of the solicitation to someone else, please forward this amendment accordingly.

Informational Only:

Attendees to the Kortes On-Site Visit held on April 27, 2023.

Hass Construction John Haass Jhaass@haassconstruction.com 307-265-9064 Hass Construction John Haass

Sr.

Adam@Haassconstruction.com 307-265-9064

Modern Electric David Walker dwalker@modern-electric.com 307-266-1711

Elevated Technologies (ETI) Ben Lehnerer benlehnerer@elevatedinc.com 989-488-8649

Elevator Repair Service

(ERS)

Derrick Clark jay@elevatorrus.com 281-808-2513

Amendment No. 00003

Questions and Answers from the Kortes On-Site Visit on April 27, 2023

1. Is the BOR open to using an aluminum storefront frame system to infill the existing louver in the machine room? This fame could have glass or an insulated panel that could utilized, if the concern is that it could be vandalized by someone shooting at it ballistic panels or glazing are both available to be used as well. We are proposing this due to the safety of infilling with concrete would require a form to be placed and removed on the outside of the structure and presents a major safety issue to have someone working at that elevation.

A: Refer to Amendment 0003 Drawing AD101-Existing Louver and Opening will be left as is. Requirement to demo and infill has been excluded from the scope of this contract.

2. Is it possible to utilize the parking area next to the miracle mile bride as a staging area for helicopter hoisting all the components to the top of the dam?

A: Refer to RSN 01 14 10-1, Contractor Use Areas: The Miracle Mile Recreation Area is managed directly by Reclamation and does not involve Wyoming State Parks. Reclamation can permit/allow aviation flights over or at our facilities.

3. Will the contractor be able to use the BOR’s phones at the dam during the project?

A: Refer to 1.02 TELEPHONES.

4. Does the BOR have space available for the contractor to utilize for daily pre task planning and safety meetings?

A: Yes, we can provide parking area space and space in the truck bay.

5. If required for hoisting all the items to the top of that dam are the power lines able to be de-energized? If so, what is the required notification that is required? This would be for both the main transmission lines and the line that leaves the machine room that runs towards the spillway and up to Kortes reservoir.

A: Refer to 1.04 SUBMITTALS We would need 45 days for notification to WAPA and Clearance. Due to loss of generation, we would want to minimize the amount of time the 115KV lines would be placed on clearance.

6. Is the water available at the top of the dam for use during concrete cutting?

A: Refer to 1.01 TEMPORARY WATER.

7. Will the contractor be allowed to use the BOR’s restrooms during the project?

A: Refer to 1.03 SANITARY FACILITIES.

8. The traveling cable to fit the specs of this elevator does not come cat5 cable. The closest we can get is combining shielded pairs. Would this suffice?

A: Yes, this would be equivalent. Refer to 14 12 00 Vertical Conveyance 203.E.1.6.

Amendment No. 00003

9. The traveling cable to fit the specs of this elevator does not come with cat5 cable. The closest we can get is combining shielded pairs. Would this suffice?

A: 14 24 00 2.03 E.6 Combining twisted shielded pairs, fiber optic, or CAT7 cables are equivalent if two cables are constructed per 14 24 00 2.03 E.6.

Equivalent cables must include terminations.

Note: NEC requires traveling cable conductors to be a minimum of 20 AWG and typical CAT5 cable is 24AWG.

10. Are both types of door closers required/needed?

A: Provide new reel type closer and remove spring loaded closer. Dose not need both. Modification to Spec 14 21 00 Section 2.03 Hoistway Equipment L.1

11. How would you like us to account for winter weather in our schedule? Will our proposal be rejected if our proposed schedule is beyond the requested 266-day period of performance due to including winter weather shutdowns?

A: Refer to Spec section: 1.05 Construction Program Schedule Per evaluation Factor 2: Construction Schedule – you will be evaluated on the 266-day period.

However, during the construction period, time may be added to the end of the contract. If there is a condition outside of control such as weather.

THE FOLLOWING QUESTIONS REFER TO THE ATTACHED DIAGRAM, WHICH

WAS SUBMITTED WITH THESE QUESTIONS

12. Refer to B4: This light switch is not in the location shown and was not able to be located during the site walk. Will a new light switch be required in this location and if so, what lights should it control?

A: Refer to Amendment 0003 Drawing E101 -Hail Light switch does not currently exist on Level 1 and requirements to add one have been removed from the scope of this contract.

13. Refer to A2: These 2 notes reference the replacement of panel LDF. I assume that panel PDC needs to be replaced as well. Can the same language be applied to panel PDC?

A: Panel PDC is to be replaced; reference drawing E-601 and E-602. PDC can be replaced in a similar method as describe in the note 2 on drawing E-102 if space allows

14. Based on field observation, I have modified this one-line to represent what appears to be the existing condition. My initial assumption is that the 2 pole 100A disconnect is not needed and that 2 new disconnects are needed on the secondary side of the transformer to feed LDF and LY1A. (I did not open either of these disconnects so the above statement has not been verified)

A: The existing circuit breaker (LDG) and feeder to LY1A remain, as described in note 3 on E-601. A one new circuit breaker and panel LDF is to be installed near LDE and feed panel LDF; Reference note 2 on E-601. The existing 2 pole 100A disconnect LDD is not needed and removed with the replacement of panel PDC and transformer LDE: Reference drawing E601.

ELEV LEVEL

B1 B1

EEX1

RE2

VS

ELEVATOR

HOISTWAY

ELEV LEVEL

ELEC RM

B1 B1

B1 B1

EEX1

3(TYP)

ELEVATOR

HOISTWAY

ELEC RM

RE1

VS

ELEV LEVEL

B1 B1

EEX

B1

VS

ELEVATOR

HOISTWAY

STORAGE

LADDER

LANDING

ELEV LEVEL

B1 B1

B1

EEX

VS

ELEVATOR

HOISTWAY

(TYP)

B1

B1

WP

ELEVATOR

HOISTWAY

LADDER

ACCESS

TUNNEL

5(TYP)

ELEVATOR

PIT

RE2 RE2 RE2

A1 A1 A1 A1

ELEVATOR

HOISTWAY

ELEV LEVEL

5 55

EEX3

5 5

(TYPICAL)

VS

J

SHEET KEY NOTES: 1 THIS SHEET ONLY

1. REMOVE LUMINAIRE AND PROVIDE EXTENSION RING ON DEVICE BOX. PROVIDE

SURFACE MOUNTED CONDUIT FROM EXTENSION BOX TO

LUMINAIRE/EMERGENCY LUMINAIRE. REINSTALL LUMINAIRE ON DEVICE BOX

EXTENSION RING.

2. LUMINARIES IN ELEVATOR HOISTWAY SHALL BE SPACED 10'-0" (TYPICAL).

3. EXISTING ELEVATOR LOBBY 3-WAY LIGHT SWITCH TO BE REPLACED WITH 3-WAY

VACANCY SENSOR. THE EXISTING MULTI-LEVEL ELEVATOR LOBBY 4-WAY

SWITCHING ARRANGEMENTS SHALL CONTINUE TO OPERATE WITH THE ADDITION

OF AUTOMATIC-ON AND AUTOMATICS-OFF OCCUPANCY SENSING FROM THE

LOCATIONS INDICATED. FOR ADDITIONAL INFORMATION SEE DETAIL B2 ON DWG.

E501. FOR INFORMATION ON WIRING OF EXISTING 4-WAY SWITCHING

ARRANGEMENTS, SEE RECORD DWG INFO INCLUDED ON DWG. E701.

4. REMOVE AND REPLACE EXISTING LAMP WITH NEW SCREW-IN TYPE LED LAMP

FOR THE EXISTING LIGHTING FIXTURE. REFER TO LUMINAIRE SCHEDULE ON

SHEET E501 FOR MORE INFORMATION.

5. PROVIDE NEW LED LIGHT FIXTURE AS SHOWN. CONNECT FIXTURES TO CIRCUIT

15 IN PANEL LDF. REUSE EXISITNG CONDUIT AS REASONABLE AND PROVIDE NEW

20A BRANCH CIRCUIT WIRING. REFER TO LUMINAIRE SCHEDULE ON SHEET E501

FOR MORE INFORMATION.

6. REMOVE LUMINAIRE AND PROVIDE DEVICE BOX EXTENSION RING FOR

EXTENDING CIRCUITRY AS INDICATED. ALL NEW WIRING SHALL BE #12AWG.

7. NEW VACANCY SENSOR FOR CONTROL OF MACHINE ROOM LIGHT FIXTURES.

SEE DETAIL B2 ON E501.

8. EXISTING HOISTWAY LIGHT SWITCH TO BE REPLACED WITH 3-WAY SWITCH. NEW

HOISTWAY 3-WAY LIGHTING CIRCUIT SHALL ORIGINATE AT PANEL LDF ON LEVEL

4. REPLACE EXISTING LIGHTING CONDUCTORS WITH #10 CONDUCTORS

INCLUDING RUNNERS BETWEEN SWITCHES. UTILIZE EXISTING CONDUITS AS

PRACTICAL.

9. REMOVE EXISTING ELEVATOR HOISTWAY FIXTURES AND REPLACE WITH NEW

FIXTURES INDICATED (TYPICAL).

ELEVATOR PIT

EL 5968.50'

LEVEL 1.

EL 5977.50'

LEVEL 2

EL 6140.38'

LEVEL 3

EL 6150.17'

LEVEL 4

EL 6159.96'

LEVEL 5

EL 6169.75'

MACHINE ROOM

EL 6188.50'

ROOF

EL 6197.00'

A2E

A2

A2E

A2

A2E

A2

A2E

A2

A2

A2E

A2

A2E

A2

A2E

A2

A2E

A2

A2

A2E

A2

A2E

A2

9 2

A

B

C

D

A

B

C

D

5 4 3 2 1

5 4 3 2 1

FILENAME DATE AND TIME PLOTTEDCADD SYSTEM

REVIT

UNITED STATES

DEPARTMENT OF THE INTERIOR

BUREAU OF RECLAMATION

DESIGNED

DRAWN

CHECKED

TECH. APPR.

SUBMITTED

APPROVED

ALWAYS THINK SAFETY

MARK DESCRIPTION DATE

2/13/2023 2:25:08 PM60690540_ACM_R21_KO DAM ELEVATOR_E.RVT

KORTES DAM, WY E-101

KORTES DAM ELEVATOR MODERNIZATION DESIGN

LIGHTING PLANS - ELEVATOR

LOBBIES

N. VIJAYARAGHAVAN

A. TRAN

D. ENGEL

R. MEADOR

R. MEADOR

E. JACOBS

E-101 Scale: 1/4" = 1'-0"

B2 LIGHTING PLAN - 6169.75' ELEV LEVEL 5

E-101 Scale: 1/4" = 1'-0"

A2 LIGHTING PLAN - 6159.96' ELEV LEVEL 4

E-101 Scale: 1/4" = 1'-0"

D4 LIGHTING PLAN - 6150.17' ELEV LEVEL 3

E-101 Scale: 1/4" = 1'-0"

C4 LIGHTING PLAN - 6140.38' ELEV LEVEL 2

E-101 Scale: 1/4" = 1'-0"

B4 LIGHTING PLAN - 5977.50' ELEV LEVEL 1

E-101 Scale: 1/4" = 1'-0"

A4 LIGHTING PLAN - 5968.50' ELEVATOR PIT

E-101 Scale: 1/4" = 1'-0"

C2 LIGHTING PLAN - 6188.50' MACHINE ROOM

E-101 Scale: 1/16" = 1'-0"

A5 SECTION - ELEVATOR HOISTWAY LIGHTING

A ISSUED FOR CONSTRUCTION 1/13/2023

0 4' 8' 12'2'1'

SCALE: 1/4" = 1'-0"

1/13/2023 dwalker Callout This light switch is not in the location shown and was not able to be located during the site walk.

Will a new light switch be required in this location and if so, what lights should it control?

S

F

S

F

F

S

F

S

F

S

F

ELEV LEVEL

ELEVATOR

HOISTWAY

ELEV LEVEL

ELEC RM

LDE

PDC

ELEC RM

ELEVATOR

HOISTWAY

NEW PANEL LDF

EXISTING PANEL LDF

EXISTING CONTACTOR

PANEL TO REMAIN

ELEV LEVEL

ELEVATOR

HOISTWAY

STORAGE

LADDER

LANDING

ELEV LEVEL

ELEVATOR

HOISTWAY

LDC

ELEVATOR

HOISTWAY

LADDER

ACCESS

TUNNEL

(ETR)

SHEET KEY NOTES: 1 THIS SHEET ONLY

1. REPLACE EXISTING SMOKE DETECTOR MOUNTED IN ELEVATOR LOBBY

ABOVE POSITION INDICATOR. EXTEND NEW CONDUIT AND WIRING FROM

EXISTING DEVICE BOX AND MOUNT NEW DETECTOR 12" FROM BOTTOM OF

BEAM AT CEILING. UTILIZE ALL NEW WIRING TO COMMUNICATE WITH NEW

FIRE ALARM CONTROL PANEL IN MACHINE RM.

2. PROVIDE NEW PANEL LDF PER PANELBOARD SCHEDULE ON SHEET E602.

REMOVE INTERIOR OF EXISTING PANEL LDF AND UTILIZE PANEL BOX AND

COVER FOR JUNCTION BOX. REWORK EXISTING CONDUITS AS NECESSARY

TO ENTER NEW PANEL LDF. ALL NEW CIRCUITS SHALL BE RUN IN EXISTING

CONDUITS. WHEN ADDING ADDITIONAL CIRCUITS TO EXISTING CONDUITS

THE CONTRACTOR SHALL REMOVE ALL EXISTING CONDUCTORS AND

REPLACE THEM WITH NEW CONDUCTORS. ALL OF THESE CONDUCTORS

SHALL BE DERATED PER NEC TABLE 310.15.C.1.

3. REPLACE EXISTING TRANSFORMER AND OVERCURRENT DEVICES AT THIS

LOCATION. SEE ONE-LINE DIAGRAM ON SHEET E601.

4. REPLACE EXISTING OUTLET IN PIT WITH A GFCI TYPE. CONTRACTOR TO

CONFIRM THIS OUTLET IS ON A DEDICATED CIRCUIT. IF IT ISN'T, THE

CONTRACTOR SHALL UTILIZE EXISTING HOISTWAY LIGHTING CIRCUIT

BREAKER IN PANEL LDC MADE SPARE WHEN ALL NEW HOISTWAY LIGHTING

IS CONNECTED TO PANEL LDF.

5. REMOVE RECEPTACLE AND PROVIDE EXTENSION BOX. PROVIDE SURFACE

MOUNTED CONDUIT FROM EXTENSION BOX TO GFCI OUTLET IN ELEVATOR

PIT. REINSTALL RECEPTACLE ON EXTENSION BOX.

6. EXISTING RECEPTACLES AND CONDUITS ARE RETAINED. ONLY DISCONNECT

THE WIRING FROM EXISTING PANEL AND RECONNECT TO NEW PANEL.

7. PROVIDE NEW PANEL LDF PER PANELBOARD SCHEDULE ON SHEET E602.

REMOVE INTERIOR OF EXISTING PANEL LDF AND UTILIZE PANEL BOX AND

COVER FOR JUNCTION BOX. REWORK EXISTING CONDUITS AS NECESSARY

TO ENTER NEW PANEL LDF. ALL NEW CIRCUITS SHALL BE RUN IN EXISTING

CONDUITS. WHEN ADDING ADDITIONAL CIRCUITS TO EXISTING CONDUITS

THE CONTRACTOR SHALL REMOVE ALL EXISTING CONDUCTORS AND

REPLACE THEM WITH NEW CONDUCTORS. ALL OF THESE CONDUCTORS

SHALL BE DE-RATED PER NEC TABLE 310.15.C.1.

8. REPLACE EXISTING PANEL LDC WITH NEW PANEL LDC IN THE SAME

LOCATION. SEE PANELBOARD SCHEDULE ON SHEET E602. REINSTALL THE

TWO EXISTING LIGHTING CONTACTORS IN A NEW J-BOX WITH HINGED,

LOCKABLE COVER ABOVE NEW PANEL LDC.

9. PROVIDE NEW FIRE ALARM SYSTEM PULL STATION AS INDICATED AND

EXTEND WIRING TO EXISTING SMOKE DETECTOR DEVICE BOX.

10.PROVIDE NEW FIRE ALARM SYSTEM PULL STATION AND HORN/STROBE AS

INDICATED AND EXTEND NEW CONDUIT AND WIRING TO EXISTING SMOKE

DETECTOR DEVICE BOX.

11.PROVIDE NEW FIRE ALARM SYSTEM STROBE AS INDICATED AND EXTEND

NEW CONDUIT AND WIRING TO EXISITING SMOKE DETECTOR DEVICE BOX.

A

B

C

D

A

B

C

D

5 4 3 2 1

5 4 3 2 1

FILENAME DATE AND TIME PLOTTEDCADD SYSTEM

REVIT

UNITED STATES

DEPARTMENT OF THE INTERIOR

BUREAU OF RECLAMATION

DESIGNED

DRAWN

CHECKED

TECH. APPR.

SUBMITTED

APPROVED

ALWAYS THINK SAFETY

MARK DESCRIPTION DATE

2/13/2023 2:25:08 PM60690540_ACM_R21_KO DAM ELEVATOR_E.RVT

KORTES DAM, WY E-102

KORTES DAM ELEVATOR MODERNIZATION DESIGN

POWER PLANS - ELEVATOR LOBBIES

N. VIJAYARAGHAVAN

A. TRAN

D. ENGEL

R. MEADOR

R. MEADOR

E. JACOBS

E-102 Scale: 1/4" = 1'-0"

B2 POWER PLAN - 6169.75' ELEV LEVEL 5

E-102 Scale: 1/4" = 1'-0"

A2 POWER PLAN - 6159.96' ELEV LEVEL 4

E-102 Scale: 1/4" = 1'-0"

D4 POWER PLAN - 6150.17' ELEV LEVEL 3

E-102 Scale: 1/4" = 1'-0"

C4 POWER PLAN - 6140.38' ELEV LEVEL 2

E-102 Scale: 1/4" = 1'-0"

B4 POWER PLAN - 5977.50' ELEV LEVEL 1

E-102 Scale: 1/4" = 1'-0"

A4 POWER PLAN - 5968.50' ELEVATOR PIT

A ISSUED FOR CONSTRUCTION 1/13/2023

E-102 Scale: 1/4" = 1'-0"

C2 POWER PLAN - 6188.50' MACHINE ROOM

"FOR WORK ON THIS LEVEL, SEE

ENLARGED PLANS ON DRAWING E-401"

0 4' 8' 12'2'1'

SCALE: 1/4" = 1'-0"

1/13/2023 dwalker Callout These 2 notes reference the replacement of panel LDF. I assume that panel PDC needs to be replaced as well.

Can the same language be applied to panel PDC?

dwalker Line

ELEVATOR PIT ELEV. 5968.50'

ELECTRICAL MEZZ ELEV. 5976.88'

LEVEL 1 ELEV. 5977.50'

LEVEL 2 ELEV. 6140.38'

LEVEL 3 ELEV. 6150.17'

LEVEL 4 ELEV. 6159.96'

LEVEL 5 ELEV. 6169.75'

MACHINE ROOM ELEV. 6188.50'

ROOF

200AS

200AT

400AF

ELECTRIC UNIT

HEATER UH-1

WELDING

PLUG

GANTRY

CRANE

PLUG

BOAT DOCK

CRANE

MAIN GEAR ELECTRICAL RM ELEV. 5962.50'

ELEVATOR

MACHINERY

PDC

LDF

LDE

TO EXISTING SWITCHYARD PANEL LY1A

LDF-1

LDB

(ETR)

LDA

(ETR)

LDC

(ETR)

EXISTING 200A FEEDER TO

REMAIN IN SERVICE

EXISTING FEEDER TAP

TO REMAIN IN SERVICE

EXISTING FEEDER TAP BOX

LOCATED ACROSS AISLE

FROM ELEVATOR TO

REMAIN IN SERVICE

EXISTING 200A FEEDER TO

BE REPLACED WITH 3-#3/0 &

1-#6 GND. IN EXISTING

CONDUIT.

M

REPLACE EXISTING

PANEL LOCATED

IN ELECTRICAL ROOM NEXT

TO ELEVATOR SHAFT.

3#1 & 1#6G - 1 1/2"C 50KVA,

480-120/240V

3#4/0 & 1#4G - 2"C

225A, 2P

LDG

(ETR)

175A, 2P

3#2/0 & 1#6G - 2"C

5KVA,

480-120/240V

(ETR)

REPLACE EXISTING

PANEL LOCATED

IN ELECTRICAL ROOM 401.

3#4, #10G, 1"C.

SHEET KEY NOTES: 1 THIS SHEET ONLY

1. EXISTING TRANSFORMER SHALL BE REPLACED WITH NEW 50KVA,

480-120/240V TRANSFORMER AS INDICATED.

2. NEW INDIVIDUALLY MOUNTED CIRCUIT BREAKER FOR SERVICE TO NEW

PANEL LDF. SEE PANEL SCHEDULE ON DWG E-602.

3. THE EXISTING CIRCUIT BREAKER AND FEEDER CIRCUIT SHALL REMAIN AND

BE RECONNECTED TO THE NEW TRANSFORMER FOR CONTINUED SERVICE TO

PANEL LY1A.

4. ALL EXISTING BRANCH CIRCUITS SHALL BE DISCONNECTED AND

RECONNECTED TO NEW PANELBOARD.

A

B

C

D

A

B

C

D

5 4 3 2 1

5 4 3 2 1

FILENAME DATE AND TIME PLOTTEDCADD SYSTEM

REVIT

UNITED STATES

DEPARTMENT OF THE INTERIOR

BUREAU OF RECLAMATION

DESIGNED

DRAWN

CHECKED

TECH. APPR.

SUBMITTED

APPROVED

ALWAYS THINK SAFETY

MARK DESCRIPTION DATE

1/16/2023 1:05:33 PM60690540_ACM_R21_KO DAM ELEVATOR_E.RVT

KORTES DAM, WY E-601

KORTES DAM ELEVATOR MODERNIZATION DESIGN

ONE-LINE DIAGRAM

N. VIJAYARAGHAVAN

A. TRAN

D. ENGEL

R. MEADOR

R. MEADOR

E. JACOBS

A ISSUED FOR CONSTRUCTION 1/13/20230

1/13/23 dwalker Stamp dwalker Line dwalker Line dwalker Line dwalker Polygonal Line dwalker Typewritten Text 100A 2 pole dwalker Callout based on field observation, I have modified this one-line to represent what appears to be the existing condition.

My initial assumption is that the 2 pole 100A disconnect is not needed and that 2 new disconnects are needed on the secondary side of the transformer to feed LDF and LY1A.

(I did not open either of these disconnects so the above statement has not been verified) dwalker Stamp dwalker Line dwalker Line dwalker Line

A. DRAWINGS PROVIDE A GENERAL DESCRIPTION OF THE

EXTENT OF DEMOLITION. FIELD VERIFY AND REVIEW WITH

OWNER BEFORE STARTING ANY DEMOLITION OR REMOVALS.

B. DEMOLITION DRAWINGS ARE BASED ON AVAILABLE

INFORMATION PROVIDED BY THE OWNER AND MAY NOT

REPRESENT ALL EXISTING CONDITIONS.

C. ALL DEMOLITION WORK TO BE COORDINATED WITH THE NEW

CONSTRUCTION WORK AS SHOWN ON ALL OTHER

DRAWINGS.

D. CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTION AND

OCCUPANT ACCESS AND EGRESS THROUGHOUT

DEMOLITION AND CONSTRUCTION PHASES, AND

MAINTAINING THE BUILDING IN A WEATHER TIGHT

CONDITION.

E. PRIOR TO BEGINNING DEMOLITION WORK THE CONTRACTOR

SHALL INSPECT THE EXISTING BUILDING AND VERIFY THE

LOCATION AND CONDITION OF ALL ITEMS AFFECTED BY THE

WORK WITH THE OWNER. CONFLICTS OR OMMISSIONS WITH

THE DOCUMENTS SHALL BE REPORTED TO THE OWNER

BEFORE BEGINNING DEMOLITION/CONSTRUCTION IN THE

AFFECTED AREA.

F. ALL EXISTING SERVICES AND UTILITIES SHALL BE

MAINTAINED TO ADJACENT AREAS THAT ARE IN OPERATION

AND SERVED BY THESE UTILITIES. COORDINATE

DISRUPTIONS WITH THE OWNER. CONTACT THE OWNER

REGARDING UTILITY SHUT DOWN PROCEDURES AND

ADVANCE SCHEDULING OF A SHUT DOWN.

G. ALL ITEMS SHOWN DASHED SHALL BE REMOVED AND

DISPOSED OF UNLESS OTHERWISE NOTED.

H. LOAD BEARING ITEMS (SUCH AS MASONRY WALLS,

COLUMNS, ETC) ARE TO REMAIN UNLESS OTHERWISE

NOTED.

I. EXISTING FIREPROOFING THAT IS DISTURBED OR DAMAGED

SHALL BE PATCHED.

J. EXISTING ITEMS, EQUIPMENT, FIXTURES, ETC. TO REMAIN

SHALL BE PROTECTED FROM DIRT AND DAMAGE DURING

DEMOLITION AND CONSTRUCTION.

K. HOLES IN FLOOR OR DECK LEFT AFTER REMOVAL OF PIPES,

DUCTS, ETC., SHALL BE FILLED WITH MATCHING MATERIALS

THAT MAINTAIN THE PROPER FIRE RATING.

L. INFILL ALL VOIDS IN WALLS WHERE LOUVERS, GRILLS,

PIPING, ELECTRICAL PANELS, ETC. HAVE BEEN DEMOLISHED.

INFILL TO MATCH ADJACENT WALL CONSTRUCTION UNLESS

OTHERWISE NOTED.

M. ALL UNIDENTIFIED MECHANICAL AND ELECTRICAL RUNS

DISCOVERED WITHIN A DEMOLISHED WALL OR ABOVE A

DEMOLISHED CEILING ARE TO BE IDENTIFIED IN NATURE AND

EXTENT OF RUN BY THE CONTRACTOR. THEN CONTACT THE

ARCHITECT/ENGINEER FOR FURTHER CLARIFICATION AND

DIRECTION.

N. SURFACES DAMAGED DURING DEMOLITION AND/OR

CONSTRUCTION ARE TO BE PATCHED & REPAIRED AS

REQUIRED AND FINISHED TO MATCH ADJACENT AREAS.

O. EXISTING UNUTILIZED CONDUITS, CABLE TRAYS, DUCTS,

PIPING, ETC. ABOVE CEILING OR BELOW FLOOR LEVEL SHALL

BE REMOVED. SIMILARLY, REMOVE ALL UNUSED AND

ABANDONED FASTENERS, SUPPORTS, BRACKETS, HANGERS,

ETC. ABOVE THE CEILING (OR BELOW THE FLOOR).

P. DEMOLITION CONTRACTOR SHALL CAREFULLY REMOVE AND

TURN OVER SELECT ITEMS TO THE OWNER.

GENERAL NOTES - DEMO

13' - 9"

VIF

4' - 0" 5' - 9"

MACHINE

ROOM

AD101

25' - 6"

AD101

LEVEL 5

EL 6169' - 9"

MACHINE ROOM

EL 6188' - 6"

ROOF

EL 6197' - 0"

EXG CIP CONC

EXG CANOPY

EXG DOOR

STAIR LANDING

EL 6181' - 11 3/4"

1. DEMOLISH EXISTING LADDER AND PATCH WALLS WHERE

ANCHORAGE WAS REMOVED.

2. DEMOLISH EXISTING RAILING AND PATCH FLOOR WHERE

ANCHORAGE WAS REMOVED.

3. DEMOLISH PORTION OF WALL FOR NEW DOOR AND FRAME

OPENING. COORDINATE ROUGH OPENING WITH NEW DOOR

SIZE.

4. DEMOLISH LOUVER AND INFILL WALL TO MATCH EXISTING.

REF STRUCTURAL.

KEYED NOTES - DEMO #

LEVEL 5

EL 6169' - 9"

MACHINE ROOM

EL 6188' - 6"

ROOF

EL 6197' - 0"

EXG CIP CONC

STAIR LANDING

EL 6181' - 11 3/4"

LEVEL 1

WALL ABOVE

A

B

C

D

A

B

C

D

5 4 3 2 1

5 4 3 2 1

FILENAME DATE AND TIME PLOTTEDCADD SYSTEM

REVIT

UNITED STATES

DEPARTMENT OF THE INTERIOR

BUREAU OF RECLAMATION

DESIGNED

DRAWN

CHECKED

TECH. APPR.

SUBMITTED

APPROVED

ALWAYS THINK SAFETY

MARK DESCRIPTION DATE

1/12/2023 1:44:46 PM60690540_ACM_R21_KO DAM ELEVATOR_A.RVT

KORTES DAM, WY AD101

KORTES DAM ELEVATOR MODERNIZATION DESIGN

FLOOR PLANS - DEMOLITION

B. BLACK

B. BLACK

D. BLOOD

R. MEADOR

R. MEADOR

E. JACOBS

AD101 Scale: 1/4" = 1'-0"

1 FLOOR PLAN DEMOLITION - 6188.50 MACHINE ROOM

AD101 Scale: 1/4" = 1'-0"

2 SOUTH ELEVATION DEMOLITION

AD101 Scale: 1/4" = 1'-0"

3 NORTH ELEVATION DEMOLITION

1 REV. 0 - ISSUED FOR CONTSTRUCTION 13JAN2023 01/13/23

AD101 Scale: 1/4" = 1'-0"

4 FLOOR PLAN DEMOLITION- 5968.50 ELEVATOR PIT

01/12/2023 bpindell Callout Note - Existing Louver and Opening will be left as is. Requirement to demo and infill has been excluded from the scope of this contract.

bpindell Text Box Amendment 0003 Drawing AD101 - *For Information Only* As it refers to this amendment, see notes contained in this drawing.

bpindell Callout Note - Note 4 requirement to demo louver and infill with concrete has been removed from the scope of this contract.

bpindell Callout Note - Existing louver and opening will be left as is. Requirement to demo and infill has been excluded from the scope of this contract.

M

M

M

M

UP

S

S

A A-300

B A-300

C A-300

D A-300

A-200

MACHINE

ROOM

A-400

A-400

ELEVATOR

HOISTWAY

A-200

A-200

1' - 6"

A-200

A A-300

B A-300

C A-300

D A-300

ELEV LEVEL

ELEC RM

ELEVATOR

HOISTWAY

ELEC RM

54015

A A-300

B A-300

C A-300

D A-300

A-200

ELEV LEVEL

ELEVATOR

HOISTWAY

A-200

A-200

A-200

A. THE ELEVATOR TOWER LEVEL DESCRIPTIONS HAVE BEEN

ALTERED FROM THE ARCHIVE DRAWINGS. THE LOWEST

ELEVATOR LEVEL IS TO BE LEVEL 1 AT EL 5799'-6" AND THE

UPPERMOST ELEVATOR LEVEL IS TO BE LEVEL 5 AT EL

6169'-9".

B. SHIP STAIR, GUARDRAILS, HANDRAILS AND PLATFORMS TO

BE DELEGATED DESIGN; REF SPEC SECTION 05 50 00.

C. ALL FIRE RATED PARTITION INTERSECTIONS WITH NON-

RATED OR LOWER RATED PARTITIONS SHALL CONTINUE

THROUGH THE INTERSECTION.

D. DIMENSIONS FOR INTERIOR PARTITION AND EXTERIOR WALL

LAYOUT ARE TO FINISHED FACE OF WALL, UNLESS

OTHERWISE NOTED. DO NOT SCALE THE DRAWING.

E. NEW PARTITIONS OR INFILL WITHIN AN EXISTING PARTITION

SHALL MATCH THE EXISTING PARTITION TYPE, ASSEMBLY,

AND TOTAL THICKNESS.

F. PROVIDE HOUSEKEEPING PADS BENEATH MECHANICAL AND

PLUMBING EQUIPMENT IN MECHANICAL ROOMS. REF.

STRUCT.

G. DOOR OPENINGS SHALL BE 4" FROM A PERPENDICULAR

PARTITION TO OUTSIDE FACE OF FRAME, UNLESS

OTHERWISE NOTED. REFER TO THE DOOR SCHEDULE FOR

ADDITIONAL INFORMATION.

H. ALL EXISTING WALLS TO REMAIN ARE SHOWN GREY /

SHADED.

I. ALL SIGNAGE SHALL BE PROVIDED BY OWNER UNDER

SEPARATE CONTRACT. SIGNAGE INFORMATION SHOWN FOR

REFERENCE ONLY.

GENERAL NOTES -

FLOOR PLANS

1. INFILL FLOOR OPENING. REF. STRUCTURAL.

2. MECHANICAL EQUIPMENT. REF.

MECHANICAL .

3. ELECTRICAL EQUIPMENT. REF. ELECTRICAL.

4. PROVIDE NEW SS ELEVATOR HOISTWAY

DOORS AND TRIM, RETAIN AND REFINISH

FRAMES (JAMBS AND HEADERS) AND SILLS.

REF. SPECIFICATION SECTION 14 21 00.

5. REFINISH DOOR FRAMES AND PANELS. REF.

DOOR SCHEDULE FOR FINISHES.

6. REFINISH ALL WALLS PER FINISH SCHEDULE.

7. CLEAN AND ABATE RUST ON ELEVATOR

GUIDERAILS AND BRACKETS AND PAINT AS

REQUIRED. REF. SPECIFICATION SECTION

14 21 00.

8. INFILL WALL OPENING TO MATCH EXISTING.

REF. STRUCTURAL.

9. PROVIDE NEW LADDER.

10. ELEVATOR CONTROL PANEL.

KEYED NOTES -

FLOOR PLANS #

A

B

C

D

A

B

C

D

5 4 3 2 1

5 4 3 2 1

FILENAME DATE AND TIME PLOTTEDCADD SYSTEM

REVIT

UNITED STATES

DEPARTMENT OF THE INTERIOR

BUREAU OF RECLAMATION

DESIGNED

DRAWN

CHECKED

TECH. APPR.

SUBMITTED

APPROVED

ALWAYS THINK SAFETY

MARK DESCRIPTION DATE

1/12/2023 1:44:36 PM60690540_ACM_R21_KO DAM ELEVATOR_A.RVT

KORTES DAM, WY A-101

KORTES DAM ELEVATOR MODERNIZATION DESIGN

FLOOR PLANS - ELEVATOR TOWER

B. BLACK

B. BLACK

D. BLOOD

R. MEADOR

R. MEADOR

E. JACOBS

A-101 Scale: 1/4" = 1'-0"

3 FLOOR PLAN - 6188.50 MACHINE ROOM

A-101 Scale: 1/4" = 1'-0"

2 FLOOR PLAN - 6169.75 ELEV LEVEL 5

1 REV. 0 - ISSUED FOR CONTSTRUCTION 13JAN2023 01/13/23

01/12/2023

A-101 Scale: 1/4" = 1'-0"

1 FLOOR PLAN - 6159.96 ELEV LEVEL 4

bpindell Text Box Amendment 0003 Drawing AD101 - *For Information Only* As it refers to this amendment, see notes contained in this drawing.

bpindell Callout Note - Existing louver and opening will be left as is. Requirement to demo and infill has been excluded from the scope of this contract.

bpindell

Note - Note 8 requirement to demo louver and infill with concrete has been removed from the scope of this contract.

A. OVERALL DIMENSIONS PROVIDED ARE TO ROUGH OPENINGS

(OF DOORS AND GLAZING FRAMES), UNLESS OTHERWISE

NOTED.

B. VERTICAL DIMENSIONS ARE REFERENCED FROM THE GIVEN

ELEVATION(S).

C. CONTRACTOR SHALL VERIFY DIMENSIONS PRIOR TO

INITIATING CONSTRUCTION.

D. PROVIDE SEALANT AND BACKER ROD AT EXTERIOR JOINTS

AND GAPS BETWEEN ADJACENT BUILDING MATERIALS

UNLESS OTHERWISE NOTED.

E. EXPOSED EXTERIOR STEEL ITEMS SHALL BE GALVANIZED

AND PAINTED UNLESS OTHERWISE NOTED.

F. THE EXTERIOR ELEVATIONS ARE INTENDED TO SHOW ALL

EXTERIOR BUILDING ENVELOPE LOCATIONS, INCLUDING

DOOR, LOUVER, AND WINDOW.

G. SHIP STAIR, GUARDRAILS, HANDRAILS AND PLATFORMS TO

BE DELEGATED DESIGN; REF SPEC SECTION 05 50 00.

GENERAL NOTES -

EXTERIOR ELEVATIONS

LEVEL 5

EL 6169' - 9"

MACHINE ROOM

EL 6188' - 6"

ROOF

EL 6197' - 0"

.7

STAIR LANDING

EL 6181' - 11 3/4"

/4

/4

LEVEL 5

EL 6169' - 9"

MACHINE ROOM

EL 6188' - 6"

ROOF

EL 6197' - 0"

STAIR LANDING

EL 6181' - 11 3/4"

LEVEL 5

EL 6169' - 9"

MACHINE ROOM

EL 6188' - 6"

ROOF

EL 6197' - 0"

2' - 6"

2' - 10"

STAIR LANDING

EL 6181' - 11 3/4"

1. INFILL WALL OPENING TO MATCH EXISTING CONSTRUCTION.

REF. STRUCTURAL.

2. NEW DOOR AND FRAME. REF DOOR SCHEDULE.

3. EXISTING ENTRY DOORS TO BE REFINISHED. REF DOOR

SCHEDULE.

4. EXISTING CANOPY TO REMAIN.

5. MECHANICAL EQUIPMENT. REF. MECHANICAL .

6. ELECTRICAL EQUIPMENT. REF. ELECTRICAL.

7. WALL MOUNTED FALL ARREST ANCHOR. BODY HARNESS

AND CONNECTOR BY OWNER. REF. STRUCTURAL.

8. NEW CONCRETE PAD. REF. STRUCTURAL.

KEYED NOTES - ELEVATIONS #

LEVEL 5

EL 6169' - 9"

MACHINE ROOM

EL 6188' - 6"

ROOF

EL 6197' - 0"

STAIR LANDING

EL 6181' - 11 3/4"

A

B

C

D

A

B

C

D

5 4 3 2 1

5 4 3 2 1

FILENAME DATE AND TIME PLOTTEDCADD SYSTEM

REVIT

UNITED STATES

DEPARTMENT OF THE INTERIOR

BUREAU OF RECLAMATION

DESIGNED

DRAWN

CHECKED

TECH. APPR.

SUBMITTED

APPROVED

ALWAYS THINK SAFETY

MARK DESCRIPTION DATE

1/12/2023 1:44:39 PM60690540_ACM_R21_KO DAM ELEVATOR_A.RVT

KORTES DAM, WY A-200

KORTES DAM ELEVATOR MODERNIZATION DESIGN

OVERALL EXTERIOR ELEVATIONS

B. BLACK

B. BLACK

D. BLOOD

R. MEADOR

R. MEADOR

E. JACOBS

A-200 Scale: 1/4" = 1'-0"

2 SOUTH ELEVATION

A-200 Scale: 1/4" = 1'-0"

3 WEST ELEVATION

A-200 Scale: 1/4" = 1'-0"

1 EAST ELEVATION

1 REV. 0 - ISSUED FOR CONTSTRUCTION 13JAN2023 01/13/23

A-200 Scale: 1/4" = 1'-0"

4 NORTH ELEVATION 01/12/2023

bpindell Callout Note - Note 1 requirement to demo louver and infill with concrete has been removed from the scope of this contract.

bpindell Callout Note - Existing Louver and Opening will be left as is. Requirement to demo and infill has been excluded from the scope of this contract.

bpindell Text Box Amendment 0003 Drawing AD101 - *For Information Only* As it refers to this amendment, see notes contained in this drawing.

ELEV LEVEL

B1 B1

EEX1

RE2

VS

ELEVATOR

HOISTWAY

ELEV LEVEL

ELEC RM

B1 B1

B1 B1

EEX1

3(TYP)

ELEVATOR

HOISTWAY

ELEC RM

RE1

VS

ELEV LEVEL

B1 B1

EEX

B1

VS

ELEVATOR

HOISTWAY

STORAGE

LADDER

LANDING

ELEV LEVEL

B1 B1

B1

EEX

VS

ELEVATOR

HOISTWAY

(TYP)

B1

B1

WP

ELEVATOR

HOISTWAY

LADDER

ACCESS

TUNNEL

5(TYP)

ELEVATOR

PIT

RE2 RE2 RE2

A1 A1 A1 A1

ELEVATOR

HOISTWAY

ELEV LEVEL

5 55

EEX3

5 5

(TYPICAL)

VS

J

SHEET KEY NOTES: 1 THIS SHEET ONLY

1. REMOVE LUMINAIRE AND PROVIDE EXTENSION RING ON DEVICE BOX. PROVIDE

SURFACE MOUNTED CONDUIT FROM EXTENSION BOX TO

LUMINAIRE/EMERGENCY LUMINAIRE. REINSTALL LUMINAIRE ON DEVICE BOX

EXTENSION RING.

2. LUMINARIES IN ELEVATOR HOISTWAY SHALL BE SPACED 10'-0" (TYPICAL).

3. EXISTING ELEVATOR LOBBY 3-WAY LIGHT SWITCH TO BE REPLACED WITH 3-WAY

VACANCY SENSOR. THE EXISTING MULTI-LEVEL ELEVATOR LOBBY 4-WAY

SWITCHING ARRANGEMENTS SHALL CONTINUE TO OPERATE WITH THE ADDITION

OF AUTOMATIC-ON AND AUTOMATICS-OFF OCCUPANCY SENSING FROM THE

LOCATIONS INDICATED. FOR ADDITIONAL INFORMATION SEE DETAIL B2 ON DWG.

E501. FOR INFORMATION ON WIRING OF EXISTING 4-WAY SWITCHING

ARRANGEMENTS, SEE RECORD DWG INFO INCLUDED ON DWG. E701.

4. REMOVE AND REPLACE EXISTING LAMP WITH NEW SCREW-IN TYPE LED LAMP

FOR THE EXISTING LIGHTING FIXTURE. REFER TO LUMINAIRE SCHEDULE ON

SHEET E501 FOR MORE INFORMATION.

5. PROVIDE NEW LED LIGHT FIXTURE AS SHOWN. CONNECT FIXTURES TO CIRCUIT

15 IN PANEL LDF. REUSE EXISITNG CONDUIT AS REASONABLE AND PROVIDE NEW

20A BRANCH CIRCUIT WIRING. REFER TO LUMINAIRE SCHEDULE ON SHEET E501

FOR MORE INFORMATION.

6. REMOVE LUMINAIRE AND PROVIDE DEVICE BOX EXTENSION RING FOR

EXTENDING CIRCUITRY AS INDICATED. ALL NEW WIRING SHALL BE #12AWG.

7. NEW VACANCY SENSOR FOR CONTROL OF MACHINE ROOM LIGHT FIXTURES.

SEE DETAIL B2 ON E501.

8. EXISTING HOISTWAY LIGHT SWITCH TO BE REPLACED WITH 3-WAY SWITCH. NEW

HOISTWAY 3-WAY LIGHTING CIRCUIT SHALL ORIGINATE AT PANEL LDF ON LEVEL

4. REPLACE EXISTING LIGHTING CONDUCTORS WITH #10 CONDUCTORS

INCLUDING RUNNERS BETWEEN SWITCHES. UTILIZE EXISTING CONDUITS AS

PRACTICAL.

9. REMOVE EXISTING ELEVATOR HOISTWAY FIXTURES AND REPLACE WITH NEW

FIXTURES INDICATED (TYPICAL).

ELEVATOR PIT

EL 5968.50'

LEVEL 1.

EL 5977.50'

LEVEL 2

EL 6140.38'

LEVEL 3

EL 6150.17'

LEVEL 4

EL 6159.96'

LEVEL 5

EL 6169.75'

MACHINE ROOM

EL 6188.50'

ROOF

EL 6197.00'

A2E

A2

A2E

A2

A2E

A2

A2E

A2

A2

A2E

A2

A2E

A2

A2E

A2

A2E

A2

A2

A2E

A2

A2E

A2

9 2

A

B

C

D

A

B

C

D

5 4 3 2 1

5 4 3 2 1

FILENAME DATE AND TIME PLOTTEDCADD SYSTEM

REVIT

UNITED STATES

DEPARTMENT OF THE INTERIOR

BUREAU OF RECLAMATION

DESIGNED

DRAWN

CHECKED

TECH. APPR.

SUBMITTED

APPROVED

ALWAYS THINK SAFETY

MARK DESCRIPTION DATE

2/13/2023 2:25:08 PM60690540_ACM_R21_KO DAM ELEVATOR_E.RVT

KORTES DAM, WY E-101

KORTES DAM ELEVATOR MODERNIZATION DESIGN

LIGHTING PLANS - ELEVATOR

LOBBIES

N. VIJAYARAGHAVAN

A. TRAN

D. ENGEL

R. MEADOR

R. MEADOR

E. JACOBS

E-101 Scale: 1/4" = 1'-0"

B2 LIGHTING PLAN - 6169.75' ELEV LEVEL 5

E-101 Scale: 1/4" = 1'-0"

A2 LIGHTING PLAN - 6159.96' ELEV LEVEL 4

E-101 Scale: 1/4" = 1'-0"

D4 LIGHTING PLAN - 6150.17' ELEV LEVEL 3

E-101 Scale: 1/4" = 1'-0"

C4 LIGHTING PLAN - 6140.38' ELEV LEVEL 2

E-101 Scale: 1/4" = 1'-0"

B4 LIGHTING PLAN - 5977.50' ELEV LEVEL 1

E-101 Scale: 1/4" = 1'-0"

A4 LIGHTING PLAN - 5968.50' ELEVATOR PIT

E-101 Scale: 1/4" = 1'-0"

C2 LIGHTING PLAN - 6188.50' MACHINE ROOM

E-101 Scale: 1/16" = 1'-0"

A5 SECTION - ELEVATOR HOISTWAY LIGHTING

A ISSUED FOR CONSTRUCTION 1/13/2023

0 4' 8' 12'2'1'

SCALE: 1/4" = 1'-0"

1/13/2023 bpindell Text Box Amendment 0003 Drawing E101- *For Information Only* As related to this amendment, see Notes contained on this drawing.

bpindell

Note - Hall light switch does not currently exist on level 1 and requirements to add one have been removed from the scope of this contract.

5/19/2023

Kortes Dam Elevator Modernization Amendment 0003

Vertical Conveyance 14 21 00 - 1

SECTION 14 21 00

CONVEYING EQUIPMENT

PART 1 GENERAL

1.01 SUMMARY

A. This section includes work required to complete the Elevator Modernization of One (1) overhead passenger elevators at Kortes Dam.

1. The elevator is designated as number Kortes elevator #1.

1.02 RELATED REQUIREMENTS (SCOPE NOT COVERED IN ELEVATOR SCOPE

A. Related Sections (Work Not Covered in Elevator Scope)

B. Div. 2 Existing Conditions

C. Div. 3 Concrete

D. Div. 5 Metals

E. Div. 7 Thermal and Moisture Protection

F. Div. 8 Openings

G. Div. 9 Finishes

H. Div. 19 Specialties

I. Div. 23 Heating, Ventilation, and Air conditioning

J. Div. 26 Electrical

K. Div. 28 Electronic Safety, and Security

L. WORK BY ELEVATOR CONTRACTOR

1. Provide all material, engineering, and labor to install

a. Controller/Selector

14 21 00 - 2

b. Isolation Transformer

c. Electrical Wiring in Machine Room/Car/Hoistway

d. Traveling Cables

e. Governor, and Governor Rope

f. Hoist Ropes

g. Deflector Sheave

h. Brake

i. AC Motor

j. Car Door Operator

k. Car doors, header, tracks, and hangers

l. Car Top Inspection Station

m. Hoistway Interlocks/Tracks/Hangers/Door Gibs

n. Hoistway Doors, tracks, and hangers.

o. Car Doors

p. Car sling and platform

q. Cab enclosure

r. Car roller guides

s. Counterweight sling

t. Counterweights

u. Counterweight roller guide

v. Buffers

w. Compensation

x. Intercoms

y. Rust removal and painting of rails, rail brackets, and pit equipment.

z. Firefighters' Service per ASME A17.1-2019/CSA B44-10

14 21 00 - 3

aa. aa. Americans with Disability Act (ADA) Compliant

bb. bb. All other elevator components as Listed in This Elevator Specification

2. Main Line Electrical Power Requirements

a. All main line electrical power, feeder sizes and electrical ground requirements shall be verified by Contractor. Contractor shall notify, via RFI prior to bid, to the government if their electrical equipment will not be compatible with the existing electrical main line feeders.

3. Elevators Speed and Size - Retain Existing:

a. Car Speed

b. Car Capacity

c. Elevator Entrance Size

4. Pit

a. Provide new code compliant pit ladder.

5. Hoisting and Rigging

a. Provide all crane and forklift requirements needed to place material in its final install location.

b. Pick Plans shall be required to be reviewed and approved prior to any hoisting and rigging.

1.03 REFERENCE STANDARDS

A. AAMA 611 - Voluntary Specification for Anodized Architectural Aluminum 2020.

1. ADA Standards - 2010 ADA Standards for Accessible Design 2010.

2. AISC 360 - Specification for Structural Steel Buildings 2016 (Revised 2021).

3. ASME A17.1 - Safety Code for Elevators and Escalators Includes Requirements for Elevators, Escalators, Dumbwaiters, Moving Walks, Material Lifts, and Dumbwaiters with Automatic Transfer Devices 2019, with Errata (2021).

4. ASME A17.2 - Guide for Inspection of Elevators, Escalators, and Moving Walks Includes Inspection Procedures for Electric Traction and Winding Drum Elevators, 14 21 00 - 4

Hydraulic Elevators, Inclined Elevators, Limited-Use/Limited-Application Elevators, Private Residence Elevators, Escalators, Moving Walks, and Dumbwaiters 2020.

5. ASME QEI-1 - Standard for the Qualification of Elevator Inspectors 2018.

6. ASTM A36/A36M - Standard Specification for Carbon Structural Steel 2019.

7. ASTM A276/A276M - Standard Specification for Stainless Steel Bars and Shapes 2017.

8. ASTM A653/A653M - Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc- Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process 2020.

9. ASTM A666 - Standard Specification for Annealed or Cold-Worked Austenitic Stainless-Steel Sheet, Strip, Plate, and Flat Bar 2015.

10. ASTM A1008/A1008M - Standard Specification for Steel, Sheet, Cold-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with Improved Formability, Required Hardness, Solution Hardened, and Bake Hardenable 2021a.

11. ASTM B36/B36M - Standard Specification for Brass Plate, Sheet, Strip, and Rolled Bar 2018.

12. ASTM B209/B209M - Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate 2021a.

B. ASTM B221 - Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes 2021.

C. ASTM B221M - Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes (Metric) 2021.

D. AWS B2.1/B2.1M - Specification for Welding Procedure and Performance Qualification 2021.

E. AWS D1.1/D1.1M - Structural Welding Code - Steel 2020, with Errata (2022).

F. ITS (DIR) - Directory of Listed Products Current Edition.

G. NEMA LD 3 - High-Pressure Decorative Laminates 2005.

H. NEMA MG 1 - Motors and Generators 2021.

I. NFPA 13 - Standard for the Installation of Sprinkler Systems Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements.

14 21 00 - 5

J. NFPA 70 - National Electrical Code Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements.

K. NFPA 80 - Standard for Fire Doors and Other Opening Protectives 2022.

L. PS 1 - Structural Plywood 2009 (Revised 2019).

M. SSPC-Paint 20 - Zinc-Rich Coating (Type I - Inorganic, and Type II - Organic) 2019.

N. UL (DIR) - Online Certifications Directory Current Edition.

1.04 EXISTING CONDITIONS

A. Elevator Contractor shall conduct a complete survey and measurement of all the equipment, hoistway, lobbies, machine room, and signal fixtures. Any discrepancies shall be submitted as an RFI Immediately.

B. Elevator contractor shall survey all sizes, dimensions, locations, weights, constructability and access. Any discrepancies shall be submitted as an RFI immediately.

C. If no existing conditions are noted and documented the government will not accept any contract modifications for Extra work.

D. After survey contractor will provide any RFI's noting any found discrepancies.

1.05 ADMINISTRATIVE REQUIREMENTS

A. Coordination:

1. Coordinate work with other installers to provide necessary conduits for proper installation of wiring, including but not limited to, the following:

2. Remote Display position Indicator panel in control room of powerplant at lower portion of dam wired from controller cabinet in machine room.

3. The panel will consist of a Discrete Position Indicator with LED jewels showing position of elevator and direction of travel only. No digital readout.

4. Telephone service for machine room.

5. Elevator pit for lighting and hoist way lighting.

14 21 00 - 6

6. Rust removal and painting of non-elevator components such as spreader beams in hoistway.

7. Moving of material for construction equipment and components to top of dam using the elevator platform with cab removed.

8. Fire alarm panel from controller cabinet.

9. Network port located in elevator machine room.

10. Coordinate work with other installers for equipment provisions necessary for proper elevator operation, including but not limited to, the following:

11. Overcurrent protection devices selected to achieve required selective coordination.

12. Preinstallation Meeting: Convene meeting at least 4 weeks prior to start of this work.

13. Review schedule of installation, proper procedures and conditions, and coordination with related work.

1.06 SUBMITTALS

A. RSN 14 21 00-1, Product Data: Submit data on following items: Data can be in the form of Cut sheets Cut sheets that show multiple product types, highlight or circle the products that will be used for this project.

1. Machine Room Components

a. Controller

b. Isolation Transformer

c. PMAC Machine

d. Governor

2. Hoistway Components

a. Landing system

b. Hoist ropes

c. Wedge Shackles

d. Governor rope

e. Compensation

f. Counterweight Frame

g. Counterweights

h. Counterweight Roller Guides

14 21 00 - 7

i. Hoistway doors

j. Hoistway door interlocks

k. Hoistway door tracks and hangers

3. Car Components

a. Car Sling and Platform

b. Car Roller guides

c. Safeties

d. Cab enclosure

e. Car Fan

f. Car Lighting

g. Car doors

h. Car Door Tracks and Header

i. Car Gate Interlock / Clutch system

j. Car Door Operator

k. Car Top Inspect station

4. Electrical Components

a. Traveling Cables

b. Cable Hangers

c. Hoistway conductors

d. Race way and conduit to include duct, j boxes, connectors, couplings, and 4 square boxes

e. Electrical characteristics and connection requirements.

5. Pit Components

a. Governor Tail Sheave

b. Compensation guide

c. Buffers

d. Paint

6. Fixtures and Signals

a. Car and Hall Signal and operating fixtures, operating panels, and indicators.

b. Electrical characteristics and connection requirements.

14 21 00 - 8

B. RSN 14 21 00-2, Shop Drawings: Include appropriate plans, elevations, sections, diagrams, and details on following items:

1. Elevator Equipment and Machines: Size and location of driving machines, power units, controllers, governors, and other components.

2. Car design, dimensions, layout, and components.

3. Hoistway Components: Size and location of car machine beams, guide rails, buffers, ropes, and other components.

4. Individual weight of principal components; load reaction at points of support.

5. Loads on hoisting beams.

6. Clearances and over-travel of car and counterweight.

7. Indicate arrangement of elevator equipment and allow for clear passage of equipment through access openings.

8. Rail bracket spacing; maximum loads imposed on guide rails requiring load transfer to building structural framing

9. Locations in hoistway and machine room of traveling cables and connections for car lighting, telephone.

10. Location and sizes of hoistway and car doors and frames.

11. Description and Performance: Elevator modernization will be in accordance with the following details and consist of the following. This will be a Geared to Gearless modernization.

a. One (1) Electric Traction Passenger Elevator Controls Simples Selective

Collective Capacity Lbs. 2500 Speed FPM 350 Class Loading C-3 Original Install 1945 Travel 192’ – 3” Landings 5 Openings 5 All Front Door Type 2 Speed Side Opening Door Size 3'-6" W X 7'-0" T Cab Height Standard 8' Tall Cab Inside Clear 5'-8"W X 4'-7 3/4" Machine Room location Overhead

14 21 00 - 9

Motor HP 30

C. RSN 14 21 00-3, Operational and Maintenance Data:

1. Calculated heat dissipation of elevator equipment in machine room.

2. Voltage Confirmation, electrical characteristics, and connection requirements.

3. Maintenance data for 5 years of operation after commissioning.

D. RSN 14 21 00-4, Manufacturer's Qualification Statement.

E. RSN 14 21 00-5, Installer's Qualification Statement.

F. RSN 14 21 00-6, Welders’ Qualification Statement: Welders’ certificates in accordance with AWS B2.1/B2.1M and dated no more than 12 months before start of scheduled welding work.

G. RSN 14 21 00-7, Testing Agency's Qualification Statement.

H. RSN 14 21 00-8, Parts catalog with complete list of equipment replacement parts; identify each entry with equipment description and identifying code.

I. RSN 14 21 00-9, Warranty Documentation: Submit manufacturer warranty and ensure that forms have been completed in the government’s name and registered with manufacturer.

1.07 ACCEPTABLE MANUFACTURERS OF EQUIPMENT

A. All elevator equipment shall be Non-Proprietary.

B. Elevator Controls (Non-Proprietary) Include as part of the controls: Surge Suppressor, Brown Out Circuit, Regenerative Drive and Isolation Transformer.

1. Vantage Group (Elevator Controls Pixel)

2. Motion Control Engineering, Inc. (MCE) - I Box

3. Smart Rise C-4

4. Or Approved Equivalent

C. Elevator Hoist Machine and Deflector Sheaves

14 21 00 - 10

1. Imperial Electric - PM- AC Gearless Machine / 500 series

2. Torin - PM-AC Gearless Machine TGD1 Series

3. Vantage Group (Hollister Whitney) - PM-AC Gearless Machine

D. Governor

1. Vantage Group (Hollister Whitney)

2. Torin

3. Wittur

E. Hoist and Governor ropes

1. Drake

2. Gustav Wulf GMBH

3. Brugg elevator

F. Car sling and platform

2. Or Approved Equivalent

G. Counterweight Sling

H. Alarm Bell

14 21 00 - 11

1. Nylube - Model ELB-6

2. Kone Elevator

3. Otis Elevator Company

4. ThyssenKrupp Elevator

5. Or Approved Equivalent

I. Battery Lowering

1. Reynolds & Reynolds

J. Car Door Operator:

1. Vantage Group (GAL Manufacturing Company) Linear Door Operator MOVFE HL

2. Wittur SVG

3. Or Approved Equivalent

K. Car Door Protective Device:

1. Janus "Panachrome" 3-D

2. TL Jones

3. Cedes

L. Car Doors:

1. National Elevator Cab and Door Corp

2. Columbia Elevator

3. EDI-ECI

14 21 00 - 12

M. Car Door Tracks, Hangers, Gate Switch:

1. Vantage Group (GAL Manufacturing Company)

2. Wittur

3. Or Approved Equivalent

N. Car Roller Guides

1. Elsco - Model B

2. Vantage Group (Hollister Whitney)

O. Car/Hall Position Indicators/Signals

1. Vantage Group (MAD elevator)

2. Innovation Elevator

3. CJ Anderson Elevator

P. Counterweight Roller Guides

1. Elsco - Model D

2. Vantage Group (Hollister Whitney)

Q. Compensation

1. Draka

14 21 00 - 13

R. Fixtures

1. Innovation Industries, Inc., - The Bruiser-Vandal Resistant

2. Vantage Group (MAD Elevator Inc. - Vandal Resistant)

3. Or Approved Equivalent

4.

S. Hoistway and Car Doors

T. Hoistway Door Hangers, Interlocks:

1. Vantage Group (GAL Manufacturing Company)

2. Wittur Elevator

3. Otis Elevator Company

4. TKelevator

5. Or Approved Equivalent

U. Hoistway Doors:

V. Door Gibs

1. See's Enforcer

14 21 00 - 14

W. In-Car Exhaust Fan

1. Nylube - X12F9

X. In-Car to Elevator Machine Room Intercom

1. JFillips, LLC.

Y. In-Car to Lobby Intercom

1. JFillips, LLC.

1.08 QUALITY ASSURANCE

A. OUTLINE OF EQUIPMENT

1. The completed Elevator Modernization shall conform to the Elevator Safety Codes.

2. Elevator Modernization equipment, material, workmanship, design, manufacturing and testing shall be in accordance with the standards, rules and specifications referenced.

3. All material and equipment shall be new.

4. Electrical materials shall meet and bear evidence of meeting the requirements of a Nationally Recognized Testing Laboratory (NRTL).

5. The equipment shall be the product of a manufacturer regularly engaged in the manufacture and modernization of this type of equipment.

6. Working parts shall be accessible for inspection, servicing and repair.

7. Adequate means shall be provided for the lubrication of wearing parts.

14 21 00 - 15

B. Maintain one copy of each quality standard document on site.

C. Manufacturer Qualifications: Company specializing in manufacturing products specified in this section with minimum ten years documented experience.

D. Installer Qualifications: Company specializing in performing work of the type specified and with at least 10 years of documented experience.

1. Installers must be certified elevator mechanics and apprentices through IUEC NEIEP program, or NAEC CET program levels 1 and 2.

2. Welder Qualifications: Welding processes and welding operators qualified in accordance with AWS D1.1/D1.1M and no more than 12 months before start of scheduled welding work.

E. Testing Agency Qualifications: Independent firm specializing in performing testing and inspections of type specified in this section.

F. Products Requiring Fire Resistance Rating: Listed and classified by ITS (DIR), UL (DIR), or testing agency acceptable to authorities having jurisdiction.

G. Products Requiring Electrical Connection: Listed and classified by a (NRTL) National Recognized Testing Laboratory, UL (DIR) or testing agency acceptable to authorities having jurisdiction as suitable for the purpose indicated in construction documents.

1.09 INTERIM MAINTENANCE

A. There shall be no interim maintenance required on this elevator.

B. Elevator shall remain in the care of the government until removed from service for modernization.

1.10 WARRANTY

A. Provide manufacturer's warranty for elevator operating equipment and devices for one year from Date of Substantial Completion.

1.11 ACCEPTABLE INSTALLERS OF EQUIPMENT

14 21 00 - 16

A. Awarded Contractor shall provide certificates showing that Installers are properly certified and trained by NEIEP (National Elevator Industry Educational Program), or CET( Certified Elevator Technician) NAEC.

PART 2 PRODUCTS

2.01 MACHINE ROOM EQUIPMENT

A. HOIST MACHINES / DEFLECTOR SLEEVES

1. Provide new permanent magnet AC fearless hoist machines including brake, secondary brakes, and required support beams / brackets / channels / bolts / nuts / washers.

2. Provide new deflector sheave that shall be installed in the top of the shaft in same location as existing.

3. Provide bevel washers for any bolt/nut that is installed in a plane of five (5) degrees or greater.

4. Paint hoist machine with machinery Gray enamel to match the factory color.

5. Paint all guard’s safety yellow

B.…