(x)

140R6019R0006 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Billings MT 59107

R60

PO Box 36900 Regional Office Great Plains Region Bureau of Reclamation

04/24/20190003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

02/25/2019

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Canyon Ferry Reservoir, Canyon Ferry Unit, Helena-Great Falls Division, Montana

See attachment for Changes incorporated by this amendment:

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Gerri Voto-Braun

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

140R6019R0006 Amendment No. 0003

Description of Changes: The following changes are hereby incorporated into and made a part of this solicitation:

The purpose of this amendment is to;

1. In the Performance Work Statement, remove pages C1(R) and C2 (R) and substitute therefore the attached revised pages C1 and C2.

2. In the Performance Work Statement remove page C33 and substitute therefor the attached revised page C33.

3. In the Performance Work Statement, remove page C35 and substitute therefor the attached revised page C35.

4. In Section J: General Decision Number: MT190079, Dated Jan 4, 2019 and is hereby incorporated into and made part of the solicitation.

For convenience, essential changes on the revised solicitation pages are indicated by a vertical line in the margin where lines or paragraphs changed from the previous version. However, all portions of the revised solicitation pages shall apply whether changes thereon have or have not been indicated.

In addition, attached is a list of contractor questions and their respective answers.

Receipt of Quotes: The hour and date for receipt of quotes has been extended to 5:00 pm MT on May 3, 2019.

Contractor Questions: If there are any questions as a result of any of the changes incorporated by this amendment, they shall be submitted via e-mail to the Contract Specialist no later than COB on April 25, 2019 so that they may be addressed by a future amendment. The Contract Specialist is Linda Melnick at Lmelnick@usbr.gov.

Acknowledgement: See Block 11 above regarding how to acknowledge this amendment. The Government must receive the acknowledgement at the place designated for receipt of bids (See Block 10 of the Standard Form 1442).

Third Party: If you have given a copy of the solicitation to someone else, please forward this amendment accordingly.

mailto:Lmelnick@usbr.gov mailto:lmelnick@usbr.gov

Solicitation No. 140R6019R0006 Canyon Ferry Road Maintenance

Questions from Prospective Contractors

1. Do suppliers/truck drivers who spray the water and/or magnesium fall under certified payroll?

A: Yes.

2. How is the bonding required on this project? I do see it is required within 10 days of the contract award, but at what amount? Will it be the price of each year’s entire road work amount?

A: We anticipate that the value of this road maintenance contract will be approximately $60,000 per year (base plus two option years). Contractors will be required to provide performance and payment bonds for the base year within 10 days of receipt of award. As an option year is exercised, the contractor will be required to furnish evidence of increase in bonding to cover the adjusted contract value.

3. What is the actual Bonding requirement? It appears a 100% performance bond is referenced but requirements are vague.

A: This solicitation and resultant contract includes FAR 52.225.15 Performance and

Payment Bonds. See answer to the above question for further clarification.

4. Is certified payroll required every week, including weeks where there are no projects out, with no work listed on the sheets?

A: Certified payrolls are required weekly, for those weeks when work is taking place. If no work is happening, then payrolls are not required and/or submitted.

5. What are the compaction requirements? Is it wheel rolled with the blade? A dirt roller, smooth drum roller, etc.?

A: See Revised Statement of Work, Page C35, Item K, which is incorporated into this solicitation.

6. Are there gravel specs for this project? Will ¾” or 1-1/2” CBC work?

A: Yes, this is addressed in the Revised Statement of Work, Page C33, Item E, No. 5, which is incorporated into this solicitation.

7. Will the Bureau of Reclamation allow a camper to be brought onsite for living arraignments during the work?

A: No.

8. Where is the designated parking area located for vehicles?

A: Yes. Page C31, Project Conditions, Item A.

9. Is there a local water source, on the project, that can be used for filling water trucks?

For example, we are doing a project for BLM and they have fire hydrants and a water truck filling station of their fire trucks. We are allowed to use this water source that is on the project and free of charge.

A: Yes, see Statement of Work, Page C35, Item A.

Solicitation No. 140R6019R0006 Canyon Ferry Road Maintenance

Questions from Prospective Contractors

10. Is/was site visit attendance required?

A: No. It was not required.

11. On the magnesium chloride roads, using the Base Bid items for clarification, numbers 0270, 0420 and 0610 have the magnesium chloride, but not the road/parking area listed. I wanted to double check that the road/parking areas are the same as the location listed just above it. So, 0270 – Hellgate Campground, 0420 - Chinamen Campground and 0610 – White Earth Campground.

A: See CLINS 38, 56, and 79 - updated in Amendment 0001 to include the section of road where mag chloride will be applied. Information also is included on the maps.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED PAGE OF PAGES

1 3 IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE R60 8. ADDRESS OFFER TO

Bureau of Reclamation 2021 4th Ave North Billings MT 59101

Bureau of Reclamation Great Plains Region Regional Office PO Box 36900 Billings MT 59107

9. FOR INFORMATION

CALL:

a. NAME

Linda Melnick

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

406-247-7646

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

Road Maintenance Canyon Ferry /Helena Valley Regulating Reservoirs - MT

The range of this project is $100,000 to $250,000.

This is 100% set-aside for small business.

The North American Industry Classification System (NAICS)code is 237310. The Small Business Size Standard for NAICS 237110 is $36.5 Million. Product or Service Descriptions - PSC: Z1LB (Maintenance of Highways, Roads, and Streets).

Electronic submission of Quotes is allowed and can be emailed to lmelnick@usbr.gov.

Taxpayer Identification Number: (TIN) Data Universal Number System (DUNS) Commercial and Government Entity Code:

11. The contractor shall begin performance within 10 calendar days and complete it within SEE SECTION F.1 calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See Individual Task Orders ).

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

12b. CALENDAR DAYS

a. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8 by 1700 (hour) local time 05/03/2019 (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than 30 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

STANDARD FORM 1442 (REV. 8/2014)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d)

140R6019R0006 mailto:lmelnick@usbr.gov

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31a. NAME OF CONTRACTING OFFICER (Type or print)

Gerri Voto-Braun 30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA

BY

31c. DATE

STANDARD FORM 1442 (REV. 8/2014) BACK

AMOUNTS

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY R60 27. PAYMENT WILL BE MADE BY

Invoicing Processing Platform (IPP) https://www.ipp.gov

Bureau of Reclamation - Great Plains Regional Office PO Box 36900 Billings MT 59107- 6900 http://www.ipp.gov/

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT

PRICE

AMOUNT

00010

00020

00030

SEE THE ATTACHED SECTION B

Canyon Ferry Road Maintenance Schedule A – Base Year

(CLINS 1-93)

Canyon Ferry Road Maintenance Schedule A – Option Year 1

(CLINS 1-93)

Canyon Ferry Road Maintenance Schedule A – Option Year 2

(CLINS 1-93)

AU

AU

AU

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

Bureau of Reclamation Great Plains Region Montana Area Office

Canyon Ferry Division Canyon Ferry Recreation Area

Helena, Montana

PERFORMANCE WORK STATEMENT

1. BACKGROUND

The Bureau of Reclamation anticipates award of a contract for road maintenance services at Canyon Ferry Reservoir located 20 miles east of Helena, Montana in Lewis and Clark and Broadwater Counties and the Helena Valley Regulating Reservoir located 7 miles east of Helena, MT. The Bureau of Reclamation has approximately 20 miles of road around Canyon Ferry Reservoir and the Helena Valley Regulating Reservoir. Table 01 11 00A lists the roads and parking areas that are to be maintained as needed. The location of the roads and parking areas to be worked on under this contract is provided in Figure A.

The Contractor shall furnish all necessary labor, materials, equipment, and supervision to maintain roads. No claim shall be made against the Government for any excess or deficiency therein.

2. SCOPE

Work under this contract will consist of watering, scarifying and blading Canyon Ferry Reservoir and Helena Valley Regulating Reservoir roads. Three roads may include the application of magnesium chloride.

Throughout the life of this contract, the contractor is encouraged to continuously seek ways to incorporate innovative and emerging technologies that in the most economic and efficient manner improves mission performance.

3. PERIOD OF PERFORMANCE

The term of the contract will be from May 1, 2019 through April 30, 2020 plus two 1-year option periods. The exercising of such option periods will be made at Reclamation’s discretion.

The contractor shall commence work within 10 days upon receiving written notice from the CO.

In the event of severe or wet weather, the Contracting Officer and/or COR will have authority to suspend work until such time that, in their opinion work may resume, in order to minimize damage or rutting of the travel routes.

HOURS OF OPERATION: The Contractor shall only perform work from 8:00am to 5:00pm, Monday thru Friday, unless otherwise stated.

C1 Revised

4. TASKS

The number of miles requiring maintenance each year and type of maintenance required will be dependent upon observed road conditions. The quantities specified in the PWS and in Section B are estimated quantities for the comparison of offers only except as provided in the Federal Acquisition Regulation (FAR) clause at 52.211-18, Variation in Estimated Quantity, no claim shall be made against the Government for overruns or underruns. Payments will be made for quantities actually provided by the contractor and accepted by Reclamation. Upon award and upon the exercise of each option year, the Contracting Officer will issue a letter that will specify the period of performance for the onsite work, the quantity adjustments, and any applicable funding adjustments and will include an updated General Decision. The total award per year will be a minimum of $10,000.00 and a maximum of $60,000.00.

A. Watering, scarifying and blading approximately 20 miles of Canyon Ferry Reservoir and Helena Valley Regulating Reservoir roads. Three roads may include the application of magnesium chloride. The roads and parking areas designated for maintenance in this contract are listed in Table 01 11 00A and shown in Appendix A. General location maps titled “Canyon Ferry Reservoir, Location Map- Figure A” and “Figure B- General Location Map- Canyon Ferry and Helena Valley Regulating Reservoir” show the general location of each road/parking area.

Figures 1 thru 35 show detailed location, with the figure number corresponding to the Road Figure A in Table 01 11 00A.

B. Supply the proper equipment (including pre-watering) to apply a solution of 0.5 (in two,

0.25 passes) gallons per square yard of magnesium chloride to 3 roads designated in Table 01 11 00A and shown in Appendix A.

C. Onsite work is to commence within 10 days once the letter from the CO is received. In the event of severe or wet weather, the Contracting Officer and/or COR will have authority to suspend work until such time that, in their opinion work may resume, in order to minimize damage or rutting of the travel routes.

D. Contractor will be responsible to repair or restore any damage caused by their work to the surrounding property to the satisfaction of the Contracting Officer and/or COR. Contractor’s work that causes damage to adjacent roads will be the responsibility of the Contractor to repair or restore any damage.

C2 Revised

Canyon Ferry Road Maintenance Solicitation No. 140R6019R0006

APPENDIX A

D. Incorporate all material produced in the crushing operation and passing the No. 4 mesh sieve into the base material necessary to meet the gradation requirements.

E. GRADATION

1. As determined by AASHTO Methods T11 and T27, furnish material for the grading specified in the bid documents including binder or filler, which may have been added at the plant or at the site, meeting the requirements of that grading in the Table of Gradation below:

PERCENTAGE BY WEIGHT PASSING SQUARE MESH SIEVE

Passing ¾” minus 1 ½ inch 1 inch ¾ inch ½ inch No. 4 Sieve No. 10 Sieve

40-70 25-55

No. 200 Sieve 2-10

2. Up to 5% “oversized” material is permitted provided that the “oversized” material passes the screen size immediately larger that the top size specified. The produced material between the maximum screen and the No.4 sieve shall be reasonably well graded.

3. That portion of the fine aggregate passing the No.200 sieve must be less than 60 percent of that portion passing the No.40 sieve.

4. The liquid limit for that portion of the fine aggregate passing a No.40 sieve cannot exceed 25, nor a plasticity index exceed 6, as determined by ASSHTO T89 and T89

5. The gravel shall be 3/4 inch minus crushed material that meets the MDOT requirements of paragraph 701.02.6 (crushed top surfacing Type “A”), grade 2 of the Standards for Road and Bridge Construction, 2014 edition, Montana Department of Transportation.

BLADING AND SHAPING

A. Road reconstruction shall consist of blading and shaping the road surface and roadbeds, including shoulders and turnouts, to restore and maintain the original cross section, width, and grade of the road. Work shall include removing ruts, washes, slough, and other irregularities that prevent normal runoff from the road surface.

B. In addition, speed bumps and water bar build ups may be required upon completion of shaping or as directed by Reclamation.

C33 Revised

Canyon Ferry Road Maintenance Solicitation No. 140R6019R0006

APPENDIX A

WATERING

A. Water will be made available from various areas at Canyon Ferry Reservoir at no cost to the Contractor. The Contractor WILL BE responsible for furnishing pumps and hauling equipment. Any damage done to existing roads by the Contractor's water hauling operations shall be repaired by the contractor at no additional expense to the Government.

See section 31 02 10 "Water for Dust Abatement" for possible water access.

B. All materials, including surface gravels and road sub-base shall be placed at a moisture content that facilitates proper compaction of the material as directed by the Government.

C. Watering shall be applied so that the benefits of the water are not lost due to evaporation before compaction.

D. Scarification of the roadway section shall be completed where required. Pre-watering of the scarification areas shall be permitted if required.

E. Water shall be applied to the full width of the cross section for a maximum of one mile of roadway length. Pre-watering of the bermed material shall be permitted to reduce runoff.

F. The Contractor shall spread and process the berm material across the roadway section to insure a uniform mixture of the water and material.

G. Additional water shall be applied if necessary or as directed by Reclamation to meet the contract requirements.

H. The watered material shall be compacted immediately after the material has been processed across the roadway section. Continuous leveling and manipulating will be required to assure uniform density. Compaction equipment shall be routed uniformly over the entire surface.

I. Watering or use of moist soils will not be permitted during freezing weather.

J. The minimum equipment requirements for the water truck are that it shall have a minimum capacity of 2000 gallons and shall be equipped with a spray type distributor capable of distributing water uniformly across a 12 foot width.

K. Compaction shall be required when it is necessary to add water to the roadway. Method of compaction shall be by smooth drum roller.

PLACEMENT, SPREADING, AND COMPACTING CRUSHED BASE COURSE

A. Before placing the base course, smooth and shape the surface of the underlying subgrade, sub-base or base course to the cross section shown on the plans before placing the base cause.

General Decision Number: MT190079 01/04/2019 MT79

Superseded General Decision Number: MT20180080

State: Montana

Construction Type: Highway

Counties: Montana Statewide.

HIGHWAY CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the DavisBacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.

If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the abovementioned types of contracts entered into by the federal government that are subject to the DavisBacon Act itself, but it does not apply to contracts subject only to the DavisBacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/04/2019

* SUMT2014001 02/19/2014

Rates Fringes

CARPENTER

Carpenter/Piledriverman.....$ 29.00 11.82 Millwright..................$ 32.00 11.82

Zone 1: 0 to 25 miles Free

Zone 2: 25 to 50 miles Base Pay +$2.50

Zone 3: Over 50 miles Base Pay +$3.00 http://www.dol.gov/whd/govcontracts

The Carpenter zone hourly rate applicable to each project shall be determined by measuring the road miles over the shortest practical maintained route from the County Courthouse of the following cities to the center of the job:

Billings, Bozeman, Butte, Great Falls, Helena, Missoula, Kalispell

The agency shall calculate the mileage and include it in the special provisions of the bid documents and awarded contract

CEMENT MASON/CONCRETE FINISHER...$ 24.87 10.80

Zone 1: 0 to 25 miles Free

Zone 2: 25 to 50 miles Base + $2.50

Zone 3: Over 50 miles Base + $3.00

The Cement Mason/Concrete Finisher zone hourly rate applicable to each project shall be determined by measuring the road miles over the shortest practical maintained route from the County Courthouse of the following cities to the center of the job:

Billings, Bozeman, Butte, Great Falls, Helena, Missoula, Kalispell

DIVER

Diver Tender................$ 37.16 14.52 Diving......................$ 76.32 14.52 StandBy....................$ 38.16 14.52

The tender shall receive 2 hours at the straight time pay rate per shift for dressing and/or undressing a Diver when work is done under hyperbaric conditions.

Depth Pay (Surface Diving):

020 ft.: Free zone

>20100 ft.: $2.00 per ft.

>100150 ft.: $3.00 per ft.

>150220 ft.: $4 00 per ft.

>220 ft.: $5.00 per ft.

Diving in Enclosures (Diver Only):

025 ft.: Free zone

>25300 ft.: $1.00 per ft.

DIVER ZONE PAY:

The hourly wage rates applicable to each project shall be determined by measuring the road miles over the shortest practical maintained route from the County Court House of the following cities only to the center of the job:

BILLINGS, BOZEMAN, BUTTE, GREAT FALLS, HELENA, KALISPELL,

MISSOULA

ZONE 1: 0 to 25 miles Free

ZONE 2: 25 to 50 miles Base Pay +$2.50

ZONE 3: Over 50 miles Base Pay +$3.00

ELECTRICIAN (LINE

CONSTRUCTION)

Equipment Operator..........$ 33.27 14.16 Groundman...................$ 25.98 13.25 Lineman.....................$ 43.43 15.38

TRAVEL PAY:

$50.00 per day 025 Miles From the County Courthouse of the following cities: Billings, Bozeman, Butte, Great Falls, Helena, Kalispell and Missoula

$60.00 per day Over 25 Miles

ELECTRICIAN

All Areas...................$ 32.74 13.42

Zone 1: 0 to 10 miles Free

Zone 2: 10 to 60 miles Federal mileage both ways/day

Zone 3: Over 60 miles $75.00 per day

The Electrician zone hourly rate applicable to each project

Billings, Bozeman, Butte, Great Falls, Helena, Kalispell, Missoula

IRONWORKER.......................$ 27.25 20.98

0 to 45 miles Free

4585 miles $55.00 per day

Over 85 miles $85.00 per day

The Ironworker zone hourly rate applicable to each project

Billings, Bozeman, Butte, Great Falls, Helena, Kalispell, Missoula

Zone 1: 0 to 25 miles Free

Zone 2: 25 to 50 miles Base + $2.50

Zone 3: Over 50 miles Base + $3.00

LABORER

Group 1.....................$ 20.90 9.60 Group 2.....................$ 23.97 9.60 Group 3.....................$ 24.19 9.60 Group 4.....................$ 25.18 9.60

GROUP 1: Flag Person

GROUP 2: All General Labor work; Burning Bar; Bucket Man;

Carpenter Tender; Caisson Worker; Cement Mason Tender; Cement Handler (dry); Chuck Tender; Choker Setter; Concrete Worker;

Curb MachineLay Down; Crusher and Batch Plant Worker; Fence Erector; Form Setter; Form Stripper; Heater Tender;

Landscaper; Pipe Wrapper; Pot Tender; Powderman Tender; Rail and Truck Loaders and Unloaders; Riprapper; Sealants for Concrete and other materials; Sign Erection, Guard Rail and Jersey Rail;

Stake Jumper; Spike Driver; Signalman; Tail Hoseman; Tool Checker and Houseman; Traffic Control Worker

GROUP 3: Concrete Vibrator; Dumpman (Grademan); Equipment Handler; Geotextile and Liners; HighPressure Nozzleman;

Jackhammer (Pavement Breaker); Laser

Equipment; Nonriding Rollers; Pipelayer; Posthole Digger (power); Power Driven Wheelbarrow; Rigger; Sandblaster; Sod Cutterpower; Tampers

GROUP 4: Asphalt Raker; Cutting Torch; Grade Setter; High Scaler; Power Saws (Faller & Concrete); Powderman ($1.00 per hour above Group 4 rate); Rock & Core Drill; Track or Truck Mounted Wagon Drill; Welder including Air Arc

LABORERS ZONE PAY:

PAINTER (Pavement Marking/Milling and related work. Includes operating marking and all other equipment and all work involved in application of pavement markings including epoxies, paints, tape, buttons, thermoplastics and any other products applied for traffic marking purposes and for directing and regulating traffic and cutting rumble strips)...........$ 28.00 10.30

PAINTER ZONE PAY:

POWER EQUIPMENT OPERATOR:

GROUP 1: Air Compressor; Auto Fine Graders; Belt Finishing Machine; Boring Machine (small); Cement Silo; Crane, AFrame Truck Crane; Crusher Conveyor; DW10, 15, and 20 Tractor Roller; Farm Tractor; Forklift; Form Grader; Front End Loader Under 1 CU Yard; Heavy Duty Drills; Herman Nelson Heater;

Mulching Machine; Oiler, All Except Cranes & Shovels; Pumpman

GROUP 2: Air Doctor; Backhoe/Excavator/Shovel to and including 3 CU Yard; Bit Grinder; Bituminous Paving Travel Plant; Boring Machine Large; Broom, SelfPropelled; Concrete Travel Batcher; Concrete Float & Spreader; Concrete Bucket Dispatcher;

Concrete Finish Machine; Concrete Conveyor; Distributor;

Dozer; RubberTired, Push & Side Boom; Elevating Grader/Gradall; Field Equipment Serviceman; Front End Loader 1 CU Yard to including 5 CU Yard; Grade Setter; Heavy Duty Drills, All Types;

Hoist/Tugger, All; Hydralift & Similar; Industrial Locomotive;

Motor Patrol, Except Finish; Mountain Skidder; Oiler Cranes & Shovels; Pavement Breaker, EMSCO; Power Saw, SelfPropelled;

Pugmill; Pumpcrete/Grout Machine; Punch Truck; Roller, Other Than Asphalt; Roller, Sheepsfoot, SelfPropelled; Roller, 25 Tons and Over; Ross Carrier; Rotomill Under 6 Ft; Trenching Machine; Washing/Screening Plant

GROUP 3: Asphalt Paving Machine; Asphalt Screed;

Backhoe/Excavator/Shovel Over 3 CU Yard; Cableway Highline;

Concrete Batch Plant; Concrete Curing Machine; Concrete Pump;

Cranes; Creter; Cranes, Electric Overhead; Cranes 24 Tons and Under; Curb Machine/Slip Form Paver; Finish Dozer; Front End Loader Over 5 CU Yard; Mechanic/Welder; Pioneer Dozer; Roller Asphalt (Breakdown & Finish); Rotomill, Over 6 FT; Scraper, Single, Twin or Pulling Belly Dump; YoYo Cat

GROUP 4: Asphalt/Hot Plant Operator, Cranes, 25 Tons to 44 Tons; Crusher Operator; Finish Motor Patrol; Finish Scraper

Group 1.....................$ 26.52 10.40 Group 2.....................$ 28.55 10.40 Group 3.....................$ 29.41 10.40 Group 4.....................$ 30.10 10.40 Group 5.....................$ 31.44 10.40 Group 6.....................$ 32.13 10.40 Group 7.....................$ 34.23 10.40

GROUP 5: Cranes, 45 Tons To Including 74 Tons

GROUP 6: Cranes, 75 Tons To Including 149 Tons; Crane, Whirley (All)

GROUP 7: Cranes, 150 Tons To Including 250 Tons (Add $ 1.00 For Every 100 Tons Over 250 Tons; Crane, Tower (All)

POWER EQUIPMENT OPERATOR ZONE PAY:

TRUCK DRIVER

Group 1.....................$ 22.39 10.16 Group 2.....................$ 28.06 10.16

GROUP 1: Pilot Car

GROUP 2: Combination Truck and Concrete Mixer and Transit Mixer; Dry Batch Trucks; Distributor Driver; Dumpman; Dump Trucks and Similar Equipment; Dumpster; Flat Trucks; Lumber Carriers; Lowboys; Pickup; Powder Truck Driver; Power Boom;

Serviceman; Service Truck/Fuel Truck/ Tireperson; Truck Mechanic; Trucks With Power Equipment; Warehouseman, Partsman, Cardex and Warehouse Expeditor; Water Trucks

TRUCK DRIVER ZONE PAY:

WELDERS Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the DavisBacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other healthrelated needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other healthrelated needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

http://www.dol.gov/whd/govcontracts

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and nonunion rates. Example: SULA2012007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVGOH0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the DavisBacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Page C33 Revised for Amendment 0003.pdf
APPENDIX A
PERCENTAGE BY WEIGHT PASSING SQUARE MESH SIEVE
BLADING AND SHAPING
SF 1442 Pages 3 4 5.pdf
SF-1442 Canyon Ferry UPDATED.pdf
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
Road Maintenance Canyon Ferry /Helena Valley Regulating Reservoirs - MT The range of this project is $100,000 to $250,000.
10
OFFER (Must be fully completed by offeror)
18. The offeror agrees to furnish any required performance and payment bonds.

AWARD (To be completed by Government)

3 Table of Contents 1.pdf
TABLE OF CONTENTS PART I – THE SCHEDULE
SECTION D – Reserved
SECTION F – Deliveries or Performance
SECTION G – Contract Administration Data
Canyon Ferry Road Maint PWS edits (6).pdf
The contractor is responsible for the management and quality control actions necessary to meet the quality standards set forth by the contract. The contractor shall develop and maintain a quality control program to ensure maintenance services are per...
12. PERFORMANCE REQUIREMENTS SUMMARY TABLE (PRST). The following table summarizes the tasks, the performance standard, monitoring method, and disincentives/incentives for performance standards.
All work shall be subject to inspection, approval, and acceptance by the Government. The Government will compare the contractor's performance to industry standards and will not exclude common sense considerations as applied by the COR. The CO will f...
- The contractor did not perform any or all of the tasks.
- The contractor was not timely.
If the performance of any required service is unsatisfactory, and poor performance is clearly the fault of the contractor, the Government may reduce the contract price to reflect the reduced value of defective services, if the Government notifies the ...
The CO will determine the payment deduction amount by calculating the percentage of acceptable services performed by the contractor. The Government will use the total number of deficiencies found to determine the percentage found unacceptable. The p...
16. RECLAMATION POINTS OF CONTACT Contracting Officer (CO): Bureau of Reclamation - GP-5000; Attn: Gerri Voto-Braun; PO Box 36900; Billings, MT 59101
Contract Specialist (CS): Bureau of Reclamation - GP-5000; Attn: Linda Melnick; PO Box 36900; Billings, MT 59101
Contracting Officer’s Representative (COR): Bureau of Reclamation, Attn: Taryn Preston, 7700 Canyon Ferry Rd, Helena, MT 59602
CF Road Maps Figure A Part 2.pdf
Duck Creek RM
Hellgate RM
Goose Bay RM
Confederate RM
Chinamen RM
Jo Bonner RM
Shannon RM
Eagle Bay Drive RM
White Earth RM
Sandy Beach RM
HVRR RM
SECTION F pages F-1 and F-2 Updated.pdf
SECTION F -- DELIVERIES OR PERFORMANCE
Page C33 Revised for Amendment 0003.pdf
APPENDIX A
PERCENTAGE BY WEIGHT PASSING SQUARE MESH SIEVE
BLADING AND SHAPING