This document is an amendment to a solicitation for steel pipe and well casing. The Bureau of Reclamation is seeking quotes for the supply of stainless steel pipe and casing in various sizes, with quantities specified as numbers of 20-foot sticks. Key details include responses to contractor questions on tolerances for roundness, bevel angles, and root faces. The amendment clarifies that landing or root facing is not required but can reduce field labor costs. Bevel angles of 35-37 degrees are recommended but not less than 30 degrees. Quotes are due on August 16, 2022 at 2:00 PM Pacific Time, with no changes to the receipt date. The amendment must be acknowledged by offerors per the instructions provided.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140R3022Q0061 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Boulder City NV 89005
R30
500 Fir Street Regional Office Lower Colorado Region Bureau of Reclamation
07/29/20220001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/29/2022
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
STAINLESS STEEL PIPE AND WELL CASINGS
PURPOSE OF AMENDMENT: The purpose of this Amendment is to respond to questions submitted by contractors.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
140R3022Q0061/0001 Page 2 of 2
PURPOSE OF AMENDMENT: The purpose of this Amendment is for the following:
1. Provide responses to the contractor's questions submitted and an updated Statement of Work based on questions and responses. The questions and answers are listed below:
1) Less than +/- 1/32" deviation from roundness and weld intrusion in the ID of the pipe. This is an extremely tight tolerance and much tighter than required in the A53 spec which is +/- 1% of the diameter on all sizes over 2". Also a very tight weld intrusion to guarantee, not sure it is achievable. This would be extremely difficult if not impossible to achieve, I'm not sure any of the pipe mills themselves would even agree to it.
Answer: The roundness should be +/- 1/32" but not to exceed ¼ of an inch out of tolerance. The half inch we spoke of is not recommended. If it is out of tolerance, then the guys will have to weld on a rod and pull it back to match the roundness. Creates more work.
2) Bevels of 35 degrees +/- 2-1/2 degrees with a "root face" of 1/16" +/- 1/32". A "root face" or "land" of this tight tolerance can ONLY be achieved by MACHINING each end of each piece of pipe - very expensive and will add a lot of cost to the material. Most pipe cut & beveled today is done with a mechanical torch without a precise land, and it works fine. 30 degree bevel is more common in the industry, although 35 may be do-able.
Answer: Landing or root facing is NOT required but saves labor costs in the field. The SOW has been updated to reflect this.
3) Are these above requirements mandatory? Will they be checked on receipt & enforced? OR would your end user more normal tolerances as noted above?
Answer: The 30 degree is minimal compared to the 35 degrees. I recommend we say 35-degree bevels recommended but not less than 30 degree and no more than 35 degree. Not every material will be measured upon receipt but will be visually inspected upon receipt. Any visual defects out of tolerances will be checked and communicated.
4) Is the casing for potable water or irrigation?
Answer: It is for irrigation.
5) Is there any domestic specs that the casing needs to meet?
Answer: There aren¿t any no domestics specs that we know of, other than what was provided.
6) Just to make sure I got the footage correct listed below is what you¿re needing.
100¿ of 30¿ x .375 x 20¿ 840¿ of 24¿ x .375 x 20¿ 20¿ of 20¿ x .375 x 20¿ 40¿ of 18¿ x .375 x 20¿ 160 of 12 ¾ x .375 x 20¿ Answer: Per the solicitation, quantities will be based on number of 20¿ sticks.
7) Where this is being used as casing if the material meets the A53 specs but has a fusion bond epoxy coating on the O.D with that be ok?
Answer: Fusion bond epoxy coating is NOT desired. We need it raw as we¿ll have to scrape the paint off for welding.
2.No new questions will be accepted. Only question/clarifications pertaining to this Amendment will be accepted. Your question must be submitted via email to Kathy Berry no later than 10:00 AM PD on August 11, 2022.
RECEIPT OF QUOTES: The date and time for receipt of quotes has not changed. Quotes are still due on August 16, 2022 at 2:00 PM PD.
ACKNOWLEDGEMENT: This Amendment must be acknowledged. Block 11 states the required process to acknowledge this Amendment.
ACQUISITION OFFICE POINT OF CONTACT: Kathy Berry at kberry@usbr.gov.
ATTACHMENT:
Attachment 2 - Statement of Work Revised