Sol_140R3021B0004_Amd_0002.pdf
PDF 89 KB Posted
- Attached to
- Escalator Replacement at Hoover Dam's Visitors Cen Federal contract opportunity
- Solicitation number
- 140R3021B0004
About this file
This document is an amendment to a solicitation for the Escalator Replacement at Hoover Dam Visitor Center project. The Bureau of Reclamation is seeking to replace the escalators at the visitor center. Through this amendment, the Bureau of Reclamation provides responses to questions, updates the Buy American construction materials clause and contract price schedule, and revises the statement of work. In particular, the amendment adds a line item for the demolition and capping between escalators to the contract price schedule. It also specifies that the central water feature at the visitor center shall be capped off with anti-slide decking made of stainless steel or other approved material. The deadline for proposal submission is extended to August 31, 2021 at 3:30 PM Pacific Time through this amendment. Offerors must acknowledge receipt of the amendment by the specified deadline for their proposals to be considered.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 140R21B0004_SF30_and_Attachments_0002.pdf | ||
| Sol_140R3021B0004_Amd_0001.pdf | ||
| 140R3021B0004_Amendment_01_Attachments_0001.pdf | ||
| ATTACHMENT_10_Site_Visit_Questions_Handout.doc | DOC document | |
| ATTACHMENT_9_Hazardous_Material_Authorization_Form.pdf | ||
| ATTACHMENT_8_FORM_E_Waste_Diversion_Table.pdf | ||
| ATTACHMENT_3_Wage_Determination_NV20210038_02JUL2021.pdf | ||
| ATTACHMENT_7_WBR_1432_903-1a_Construction_Payment.pdf | ||
| ATTACHMENT_5_DI-137_Release_of_Claims.pdf | ||
| ATTACHMENT_1_Statement_of_Work.pdf | ||
| ATTACHMENT_2_As-Builts_Informational.pdf | ||
| 140R21B0004_Invitation_for_Bid.pdf | ||
| Sol_140R3021B0004.pdf | ||
| ATTACHMENT_6_Bond_Forms.pdf | ||
| ATTACHMENT_4_Wage_Determination_2015-5593_Nevada_County_of_Clark.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140R3021B0004 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Boulder City NV 89005
R30
500 Fir Street Regional Office Lower Colorado Region Bureau of Reclamation
08/24/20210002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/28/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PROJECT TITLE: Escalator Replacement at Hoover Dam Visitor Center
PURPOSE OF AMENDMENT: The purpose of this amendment is to update clause 52.225-9 Buy
American Construction-Materials, update B.2 Contract Price Schedule, revise Statement of
Work and transmit responses to questions.
RECIEPT OF PROPOSALS: The date and time for receipt of proposals is changed. Proposals are due on Tuesday, August 31, 2021 at 3:30 p.m. (hour) Pacific Time.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Maribel Ruble
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R3021B0004/0002
ACKNOWLEDGEMENT: See Block 11 above regarding how to acknowledge this amendment. The acknowledgement must be received at the place designated for the receipt of proposals prior to the hour and date specified in the solicitation.
DESCRIPTON OF CHANGES: The Request for Proposal is revised to incorporate the following changes.
All changes are marked with a vertical line on the left side border.
CHANGES:
1. Page I-5, I.3 52.225-9 Buy
America-Construction Materials, (2) added
Escalator drive, chain, return stations and electrical components.
2. Pages B-1 and B-2, Update B.2 Contract Price
Schedule, Schedule A - Escalator Replacement, Added CLIN 40 Demo and Cap between Escalators
3. Update Statement of Work, Page 14 of 53, Section 2.7 Design and Construction Requirement
ADDED, subsection E. "The central water feature shall be capped off with decking containing anti-slide protrusions. Material shall be stainless steel or other material as approved by the Government".
4. Transmit responses to questions.
ATTACHMENTS
1. Pages I-4 to I-7, I.3 Clause 52.225-9 Buy
America-Construction Materials
2. Pages B-1 and B-2, B.2 Contract Price Schedule
3. Statement of Work
4. Transmit Questions and Answers
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .