About this file

This solicitation document requests proposals for the replacement of two escalators at the Hoover Dam Visitors Center. The Bureau of Reclamation seeks to replace the original escalators with two heavy-duty, in-place units designed for outdoor use. In addition to removal and installation, the contractor must provide training, critical spare parts, special tools, and as-built drawings. Proposals are due on August 31, 2021. The period of performance for procurement and installation is 270 days from notice to proceed, with an additional one-year maintenance period. Site visits will be held on August 4, 2021, and questions must be submitted in writing by August 12. The lowest bid for Schedules A and B combined will be awarded.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140R3021B0004 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Boulder City NV 89005

R30

500 Fir Street Regional Office Lower Colorado Region Bureau of Reclamation

08/24/20210002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/28/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PROJECT TITLE: Escalator Replacement at Hoover Dam Visitor Center

PURPOSE OF AMENDMENT: The purpose of this amendment is to update clause 52.225-9 Buy

American Construction-Materials, update B.2 Contract Price Schedule, revise Statement of

Work and transmit responses to questions.

RECIEPT OF PROPOSALS: The date and time for receipt of proposals is changed. Proposals are due on Tuesday, August 31, 2021 at 3:30 p.m. (hour) Pacific Time.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Maribel Ruble

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140R3021B0004/0002

ACKNOWLEDGEMENT: See Block 11 above regarding how to acknowledge this amendment. The acknowledgement must be received at the place designated for the receipt of proposals prior to the hour and date specified in the solicitation.

DESCRIPTON OF CHANGES: The Request for Proposal is revised to incorporate the following changes.

All changes are marked with a vertical line on the left side border.

CHANGES:

1. Page I-5, I.3 52.225-9 Buy

America-Construction Materials, (2) added

Escalator drive, chain, return stations and electrical components.

2. Pages B-1 and B-2, Update B.2 Contract Price

Schedule, Schedule A - Escalator Replacement, Added CLIN 40 Demo and Cap between Escalators

3. Update Statement of Work, Page 14 of 53, Section 2.7 Design and Construction Requirement

ADDED, subsection E. "The central water feature shall be capped off with decking containing anti-slide protrusions. Material shall be stainless steel or other material as approved by the Government".

4. Transmit responses to questions.

ATTACHMENTS

1. Pages I-4 to I-7, I.3 Clause 52.225-9 Buy

America-Construction Materials

2. Pages B-1 and B-2, B.2 Contract Price Schedule

3. Statement of Work

4. Transmit Questions and Answers

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

This page intentionally left blank

Foreword Document No.

140R3021B0004 Amendment 02

Document Title Escalator Replacement Hoover Dam Visitor Center

FOREWORD

DESCRIPTION: The Department of Interior Region 8, Bureau of Reclamation (Reclamation), Lower Colorado Basin, has a requirement for the replacement of two escalators with two heavy duty, in-place, fully functional escalators at Hoover Dam Visitor’s Center in Nevada 89005. The new escalators will be installed in the same location and within the footprint of the current escalators. In addition to the removal and installation, the contractor will provide training on the operation and maintenance of the escalators, select critical spare parts, any unique special tools needed to work on the escalator, and drawings of the installed escalators. The contractor will also be required to be a Registered Licensed Contractor with an Elevator/Escalator license in any US state.

DESIGN AND CONSTRUCTION REQUIREMENTS: All escalators provided shall be the product of a single manufacturer. Design and construction requirements for the escalators shall meet or exceed the minimum requirements from ASME A17.1’s latest version. The escalator manufacturer shall be a builder of heavy-duty transit type escalators and are regularly engaged in escalator building activities for, at least, the past five years. The design, engineering, and manufacture of major escalator components such as truss, drive machine, steps, controllers, and safety devices shall be of the same manufacturer, except where otherwise specified. The escalators shall be designed and fabricated to fit within the dimensions of the exiting escalators which the contractor shall verify the dimensions.

Escalators shall be heavy-duty type, designed specifically for the operation, loading and environmental conditions encountered in extensively used, heavy-rail transit systems and shall have a minimum design life of 30 years.

Escalators shall be designed for outdoor use and to operate while exposed to sunlight, rain, airborne dust and debris. Provisions shall be incorporated in the design to accommodate rainwater drainage.

Escalators installed outdoors shall be designed to operate while exposed to the natural elements of weather, at all conditions of relative humidity, while exposed to airborne dust, debris, and corrosive elements at a dry bulb temperature range of minus ten (-10) to plus one hundred and twenty (+120) degrees Fahrenheit. The anticipated installation period of performance for this requirement is 9 months after issuance of the Notice to Proceed. After the installation of the escalators, the Government anticipates including a one-year service maintenance plan under the contract.

This acquisition is being procured under Federal Acquisition Regulations Part 14, Sealed Bidding.

MAGNITUDE OF CONSTRUCTION PROJECTS: In accordance with Federal Acquisition Regulation (FAR) 36.204 Disclosure of the Magnitude of Construction are (f) between $1,000,000.00 and $3,000,000.00.

SITE VISIT: A site visit will be held prior to the proposal due date which will allow offerors to walk the site where construction will take place. Reference Section L, FAR 52.236-27 Site Visit (Construction) for instructions. The site visit will be held on Wednesday, August 4, 2021, starting at 8:00 a.m. Pacific Standard Time. Site visits will be scheduled, participants will receive an email confirmation with the site visit time.

COVID 19 Note: Bureau of Reclamation is requiring compliance with CDC guidelines with respect to maintaining physical distance, and other public health measures by on-duty or on-site Federal employees; on-site Federal contractors; and all persons in Federal buildings or on Federal lands. Face masks/coverings are mandatory to participate in the site visit.

NOTE: In the event a contractor cannot attend the formal site visit – the escalators are available to the public and can be seen by visiting Hoover Dam.

Foreword Document No.

140R3021B0004 Amendment 02

Document Title Escalator Replacement Hoover Dam Visitor Center

Attendance at the site visit is not mandatory but is highly recommended. Failure by prospective offerors to inspect the site will not relieve prospective bidders from the responsibility of properly estimating the difficulty or cost of successfully performing the work in accordance with the contract requirements.

WRITTEN QUESTIONS. Requesting Clarification. Bidders may submit written questions requesting clarification of solicitation requirements. All questions shall be received no later than 12:00 p.m. Pacific Standard Time, August 12, 2021. Questions received after that date will not be entertained. ONLY WRITTEN QUESTIONS WILL RECEIVE A RESPONSE. Each question submitted shall contain the following information: document name, document date, specific page, paragraph, clause or other definitive citation for which clarification is requested. All questions shall be submitted electronically via email to Maribel Ruble at mruble@usbr.gov. Answers will be provided to only questions submitted in writing, and all answers will be provided in an amendment through the SAM.gov Contracting Opportunities website at SAM.gov. The Government is not obligated to acknowledge receipt of or provide response to questions submitted after the question cut-off date and time identified above in this paragraph.

Section J, Attachment 10 Question Sheet: should be used if bidder intends to submit questions.

Question sheets will not be provided at the site visit and questions will NOT be allowed at the site visit as they are required to be submitted in writing.

BID SUBMISSION: *Note: Bidders are responsible for insuring and verifying their bid and all required bid documents are received electronically as stated below by the date and time specified in block 13A of the SF 1442 Solicitation (subject to amendment). ONLY Electronic bids submitted through Kiteworks will be accepted. Bidders must submit an email to request access to Kiteworks to submit the electronic bid. The written request shall be received at least three (3) business days prior to the due date, any request received less than three (3) days prior may not be able to be accommodated. All electronic bids shall be labeled Solicitation No. 140R3021B0004.

The lowest bidder for purposes of award shall be the conforming responsible bidder offering the low aggregate amount for Section B Price Schedules A and B.

BID GUARANTEE: The original Bid Guarantee for this solicitation MUST be submitted via USPS mail, fedex or UPS addressed to Bureau of Reclamation, Yuma Area Office, Attn: Maribel Ruble (LC- 10204), 7301 Calle Auga Salada, Yuma, AZ 85364. Bid Guarantees are due on August 31, 2021 at 3:30 p.m. Pacific Standard Time.

BID OPENING: Bids are due Tuesday, August 31, 2021 at 3:30 p.m. pacific standard time at the address specified in Block 8 of the SF1442. An in person bid opening will NOT be held. The bid opening will be held via Microsoft Teams. Bidders must request access to the Microsoft Teams meeting at least one day prior to bid opening. Requests on the day of the bid opening may not be granted. Email Maribel Ruble at mruble@usbr.gov to request a meeting invitation for the bid opening.

For information regarding Bureau of Reclamation’s Publications Entitled “Reclamation Safety and Health Standards” (version that is in effect when the contract is signed will govern), which are applicable to work under this contract, see solicitation Section I.14 1452.223-81, Safety and Health. The electronic version of the publication can be found at http://www.usbr.gov/ssle/safety/RSHS/rshs.html mailto:mruble@usbr.gov http://www.fbo.gov/ http://www.usbr.gov/ssle/safety/RSHS/rshs.html

Part 1 – Continuation of Section B – Supplies or Services and Prices/Costs

Document No.

140R3021B0004 Amendment 02

Document Title Escalator Replacement Hoover Dam Visitor Center

B-1

CONTINUATION OF SECTION B – SUPPLIES OR SERVICES AND PRICES/COST

B.1 THE REQUIREMENTS – INVITATION FOR BIDS

(a) The Contractor shall furnish the items identified in this Section, in accordance with the terms, conditions, and specifications contained in the contract.

(b) Bidders are cautioned to carefully review the bid submission requirements contained in Section L.

Failure to comply with these requirements may result in a bid being declared nonresponsive.

(c) Bids will be considered for award on the schedule in Paragraph B.2, but no bid will be considered for award for only a part of the schedules or a part of any single schedule. Bids for only a part of the schedules or parts of a single schedule will be considered nonresponsive and will be rejected.

(d) Bidders shall complete the bidding schedule(s) in Section B and furnish any additional information required in Section B, as applicable.

(e) No drawings or descriptive literature are required to be submitted with the bid.

(f) The Section I clause entitled "Payment for Mobilization and Preparatory Work" applies to Schedule item(s) for Mobilization and Preparatory Work. Also, see the Section L provision entitled “Instruction for Mobilization and Preparatory Work Schedule Line Item.”

(g) IMPORTANT NOTE: The requirement for submission of a bid guarantee and performance and payment bonds is applicable to bids in excess of $250,000.

(h) Definitions: CLIN – Contract Line Item Number

B.2 CONTRACT PRICE SCHEDULE

Schedule A – Escalator Replacement

CLIN Supplies or Services Quantity Unit Price Price Amount

10 Bonds 1 Lump Sum $ $

20 Mobilization and Preparatory Work

1 Lump Sum $ $

30 General Conditions 1 Lump Sum $ $

40 Demo and Cap between Escalators

1 Lump Sum $ $

50 Balustrades 1 Lump Sum $ $

60 Truss 1 Lump Sum $ $

70 Machine Rooms 1 Lump Sum $ $

80 Controllers 1 Lump Sum $ $

90 Steps 1 Lump Sum $ $ mruble Line

Services and Prices/Costs

Document No.

140R3021B0004 Amendment 02

Document Title Escalator Replacement Hoover Dam Visitor Center

B-2

Schedule A – Escalator Replacement

100 Crane Support 1 Lump Sum $ $

110 Removal 1 Lump Sum $ $

120 Testing/Inspections 1 Lump Sum $ $

130 Spare Parts and Hardware

1 Lump Sum $ $

140 Training 1 Lump Sum $ $

TOTAL FOR SCHEDULE A $_________________

Schedule B - Maintenance Service Option

CLIN Supplies or Services Quantity Unit Price Price Amount

1010 Monthly Maintenance Service

12 Monthly $

TOTAL FOR SCHEDULE B $_____________________

PRICE SCHEDULES – GRAND TOTALS

TOTAL FOR SCHEDULE A ESCALATOR

REPLACEMENT

TOTAL FOR SCHEDULE B MAINTEANCE

SERVICE OPTION

GRAND TOTAL FOR SCHEDULES A AND B $_____________________

Services and Prices/Costs

Document No.

140R3021B0004

Document Title Escalator Replacement Hoover Dam Visitor Center

B-3

Part II – Section I – Contract Clauses Document No.

140R3021B0004 Amendment 02

Document Title Escalator Replacement Hoover Dam Visitor Center

I-4

I.3 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES JUN 2020

(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.

(b) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of the threshold specified in Federal Acquisition Regulation (FAR) 22.1408(a) on the date of subcontract award, unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs of the U.S. Department of Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.

I.4 52.225-9 BUY AMERICAN ACT – CONSTRUCTION MATERIALS FEB 2021

(a) Definitions. As used in this clause— Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply (including construction material) that is–

(i) A commercial item (as defined in paragraph (1) of the definition at Federal Acquisition

Regulation (FAR) 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

Cost of components means—

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Domestic construction material means—

(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-

(i) An unmanufactured construction material mined or produced in the United States; or

(ii) A construction material manufactured in the United States, if–

(A) The cost of its components mined, produced, or manufactured in the United States exceeds 55 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or https://www.acquisition.gov/far/part-2#FAR_2_101

Part IV – Section M

– Evaluation Factors for Award

Document No.

140R3021B0004 Amendment 02

Document Title Escalator Replacement Hoover Dam Visitor Center

I-5

(B) The construction material is a COTS item; or

(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".

Fastener means a hardware device that mechanically joins or affixes two or more objects together.

Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.

Foreign construction material means a construction material other than a domestic construction material.

Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.

Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.

Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.

"United States" means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements 41 U.S.C.chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:

Escalator drive, chain, return stations and electrical components.

(3) The Contracting Officer may add other foreign construction material to the list in paragraph

(b)(2) of this clause if the Government determines that-

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute.

(1)

(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-

(A) A description of the foreign and domestic construction materials;

http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-12#FAR_12_505

Factors for Award

Document No.

140R3021B0004 Amendment 02

Document Title Escalator Replacement Hoover Dam Visitor Center

I-6

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction Material Description

Unit of Measure Quantity Price (dollars)*

Item1:

Foreign construction material

Domestic construction material

Item2:

Foreign construction material

Factors for Award

Document No.

140R3021B0004 Amendment 02

Document Title Escalator Replacement Hoover Dam Visitor Center

I-7

Domestic construction material

[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued)].

[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.]

Spec Title: Escalator Replacement at Hoover Dam Visitor Center Solicitation No. 140R3021B0004 Amendment 02

Escalator Replacement

Hoover Dam Visitor Center

Statement of Work

Table of Contents

PART 1 GENERAL

1.1 LOCATION:

1.2 GENERAL DESCRIPTION

1.3 SCHEDULE

1.4 SECURITY / CLEARANCES

1.5 SAFETY

1.6 HAZARDOUS MATERIALS

1.7 PROTECTION OF EXISTING INSTALLATIONS AND STRUCTURES

1.8 SPECIAL WORK PERMIT

1.9 ON-SITE TRAINING

1.10 ACCESS TO THE CONSTRUCTION WORK AREA

PART 2 REPLACEMNT ESCALATORS

2.1 GENERAL DESCRIPTION

2.2 MEASUREMENT AND PAYMENT

2.3 REFERENCES

2.4 DEFINITIONS

2.5 ABBREVIATIONS AND ACRONYMS

2.6 QUALIFICATIONS

2.7 DESIGN AND CONSTRUCTION REQUIREMENTS

2.8 TRAINING

2.9 SPECIAL TOOLS

2.10 SPARE PARTS

2.11 SUBMITTALS

2.12 MAINTENANCE

2.13 RELIABILITY

PART 3 PRODUCTS

3.1 GENERAL DESCRIPTION

3.2 MATERIALS

3.3 FINISHES

3.4 TRUSSES

3.5 DRIP PANS

3.6 BALUSTRADES

3.7 SKIRT PANELS

3.8 LANDING PLATES

3.9 DECK COVERS AND MOLDINGS

3.10 COMB TEETH SEGMENT

3.11 HANDRAILS AND HANDRAIL DRIVE SYSTEMS

3.12 STEPS

3.13 STEP CHAINS

3.14 ROLLERS

3.15 TRACKS

3.16 DRIVING MACHINE AND MOTOR

3.17 LUBRICATION SYSTEM

3.18 BRAKES

3.19 CONTROLLERS AND WIRING

3.20 REMOTE CONTROL INSPECTION STATION

3.21 SAFETY DEVICES AND SWITCHES

3.22 REMOTE MONITORING SYSTEM

3.23 MISCELLANEOUS

PART 4 EXECUTION

4.1 PREPARATION

4.2 INSTALLATION

4.3 TESTING AND QUALITY CONTROL

4.4 CLEANUP

PART 5 SCHEDULE

5.1 Submittal Schedule

Escalator Replacement Hoover Dam Visitor Center

PART 1 GENERAL

1.1 LOCATION:

Hoover Dam is located 8 miles east of Boulder City, Nevada.

1.2 GENERAL DESCRIPTION

A. Furnish all engineering, materials, labor, tools, equipment, transportation, supervision, and inspections to replace the original two escalators, with two heavy duty, in-place, fully functional escalators. The new escalators will be installed in the same location and within the footprint of the current escalators. In addition to the removal and installation, the contractor will provide training on the operation and maintenance of the escalators, select critical spare parts, any unique special tools needed to work on the escalator, and drawings of the installed escalators.

B. Note: Space around the escalators is limited. At night, road closures next to the escalators are possible. Due to high-voltage electrical lines, any overhead crane work with potential to reach into the clear space around the lines will require a line outage.

Line outages will be limited in duration.

C. Escalators shall be identified as “Up” and “Down”. Although both escalators shall be able to travel in either direction, the Up escalator is a normally-up travel located closest to the canyon wall and the Down escalator is a normally-down travel located closest to the river side.

1.3 SCHEDULE

A. The contractor shall submit the following schedules:

1. Escalator Fabrication Schedule;

2. Removal and installation schedule with proposed line outages and road closures;

3. Overall project schedule.

B. Daily Work Hours

1. The Contractor shall perform on-site work during off-hours, which are from 6:00 p.m. to 8:00 a.m., Pacific Standard Time, - Monday thru Friday. The Contractor will coordinate with the Government to work during daytime hours, if current conditions allow.

2. Holiday, overtime, night work or weekend work requests require approval from the Contracting Officer, at least 48 hours advance notice.

C. Top-of-Dam Lane Closures

1. Hoover Dam closes to the public from 9:00 p.m. in the evening to 5:30 a.m. in the morning. During this time, lane closures on top of the dam are possible. The contractor shall provide 48 hours advance notice.

2. Lane closures during business hours are discouraged and will not be allowed without prior approval. If allowed, the closure shall meet Manual on Uniform Traffic Control Devices (MUTCD) lane closure requirements.

D. Period of Performance

1. The period of performance for procurement and installation of the escalators is 270 days from the notice to proceed.

2. The period of performance for maintenance service is one (1) year from the date of Government acceptance and receipt of the contractors’ certificate of completion.

1.4 SECURITY / CLEARANCES

A. The contractor will be working with a red badge (one per person) provided from the Hoover Dam police security building. The contractor shall have placards on the side of their work vehicles stating the company name. The contractor shall also provide license plate information at the police building. In return, two Hoover Dam parking permits will be provided for use at designated parking locations at the Nevada Spillway parking lot.

B. Hoover Dam operations requires continuous and effective security measures. This responsibility is carried out by a Federal Guard System whose security regulations provide for controlled access to certain restricted areas including switch yards, power-plant, remote sites, and other critical areas. Restricted areas may be modified by the Government as necessary for Contractor’s access. The Contractor shall be responsible for ensuring that its employees comply with all established security rules and regulations including:

1. Construction Work Areas - All areas where work is required under this contract are designated as construction work areas. The Government shall designate suitable access ways to construction work areas for use by Contractor personnel.

Unless specifically authorized, Contractor personnel shall be restricted to these areas. It shall be the Contractor’s responsibility to ensure that its personnel remain only in these designated areas.

2. Restricted Areas - Contractor personnel shall not be permitted to enter established or designated restricted areas unless authorized by the Government. Such entry shall be in accordance with and subject to the security regulations established in the area. It shall be the Contractor’s responsibility to ensure that its personnel shall not enter these areas unless authorized as set forth above.

The Contractor’s workers will each receive an Orange Badge, that reads “No Escort Required”. If one of the contractors needs access to a secured area, an escort will be required and provided. Most of the work is at the Visitor’s Center escalator area, which is a “No Escort Required” area. Any security questions should be directed to:

Gary R. Morgan Security Officer Lower Colorado Dams Office Bureau of Reclamation, LCD-10002 Office: (702) 494-2210 Cell: (702) 308-1189

1.5 SAFETY

A. The Contractor shall comply with all federal, state and local laws and standards as well as the Bureau of Reclamation manual Reclamation Safety and Health Standards (RSHS), 2014 Edition.

B. The Contractor may also download or view the electronic version of the RSHS manual, at no charge, from the Bureau of Reclamation web site at:

http://www.usbr.gov/ssle/safety/RSHS/rshs.html

C. The contractor shall submit a Site-Specific Safety Plan (SSSP), which addresses how work will be safely executed during this contract while in compliance with applicable industrial safety standards. Contractors shall follow code requirements and utilize sound methods for, but not limited to, fall protection, rigging, material hoisting, and scaffolding.

D. For the onsite work, the contractor shall perform and submit a Job Hazard Analysis to:

1. Identify safety hazards

2. Determine methods to mitigate and eliminate those hazards

1.6 HAZARDOUS MATERIALS

A. The Contractor shall be responsible for chemicals, grouts, sealants, or other pollutants that are released into the air, the dam’s drainage system, or into the Colorado river. The contractor shall ensure precautions are taken at the work site to contain potential hazardous material release into the Colorado River System.

B. Special consideration must be taken due to activities conducted directly above water resources. If hazardous material is released into the Colorado River system, then refer to the Lower Colorado Region – Hazmat and Oil Spill Standard Operating Procedures for instructions (1-LCR Spill Reporting SOP).

C. The contractor shall maintain onsite the technical data sheet and SDS sheet for material used on site.

D. All diverted waste should be tracked using FORM E: Waste Diversion Table and submitted to the COR.

1.7 PROTECTION OF EXISTING INSTALLATIONS AND STRUCTURES

A. The contractor shall safeguard the existing facilities and equipment from any harm resulting from their operations by using enclosures, drop cloths, coverings, etc. Any materials necessary to provide protection of existing facilities and equipment will be furnished by the contractor, remains the property of the contractor, and upon completion of the work, will be removed from the facility area by the contractor.

B. The contractor shall repair, at the contractor’s expense, any damage to property caused by the contractor’s action or by failure of the contractor to adequately protect the property. If the contractor fails to make such repairs in a timely manner, the Government may elect to repair the damage and to charge the contractor the cost of repair.

C. Any damage to historical property must be restored to original condition within a time frame as coordinated with the contracting officer or contracting officer’s representative not to exceed one year. The contractor shall repair, at the contractor’s expense, any damage to existing installations due to the contractor’s failure to provide proper protection. The Government may exercise the option to repair any such damage and charge the contractor for the cost at the discretion of the Contracting Officer.

D. The contractor shall remove from Hoover Dam all unused material, tools, and debris. The contractor is responsible for proper and legal disposal of all waste materials, oils and solvents according to hazardous waste disposal regulations. Clean up shall be inspected by Government and completed to the Governments satisfaction before final payment is made.

1.8 SPECIAL WORK PERMIT

A. The contractor will be required to sign and abide by the instructions pertinent to a Special Work Permit (SWP), which lists the Hoover Dam areas the contractor can access. The SWP will also identify any unusual hazards that might exist in the construction areas and will also include any clearances required for the safe completion of work.

1.9 ON-SITE TRAINING

A. Per Facilities Instructions, Standards, and Techniques (FIST) Volume 1-1, Hazardous Energy Control Program, Section 16 Special Work Permits (SWP), 16.1.5, the Contractor’s Workplace Representative must be trained on Reclamation’s F-HECP and authorized by the RO and placed on the Employee Authorization List (EAL). This will allow the Contractor’s Workplace Representative to use their lock for the hazardous energy control procedure utilized.

1. The Contractor’s Workplace Representative is the contractor’s onsite job supervisor.

2. HECP training, also called Lockout Tagout training, is one to two hours long and is conducted in-person with the Operation’s Department. The contractor shall coordinate with the Government Inspector or Contracting Officer’s Representative (COR) to schedule training.

1.10 ACCESS TO THE CONSTRUCTION WORK AREA

A. The Contractor shall coordinate with the Government a plan for access to the installation area.

B. The Contractor shall not block traffic with parked vehicles, equipment, and/or materials.

Additional area for the Contractor’s use shall be provided at an area near the warehouse.

C. The Contractor shall place identification labels, with the Contractor’s name, on the windshield of their vehicles parked at any location on the Hoover Dam site. This shall not be required if the Contractor’s name is prominently displayed at some other location on the vehicle.

D. The contractor shall ensure all areas are cleaned and maintained in neat and orderly manner. Waste material shall be removed and properly disposed of in approved and legal manners.

PART 2 REPLACEMENT ESCALATORS

2.1 GENERAL DESCRIPTION

A. This Section includes requirements for the design, fabrication, and installation of escalators, including trusses, drip pans, step drive units, tracks, driving machine and motor, controller and wiring, safety device and switches, brakes, overspeed governor, steps, step chains, comb teeth, step demarcation lights, handrails and handrail drive systems, landing plates, balustrades, skirt panels, deck covers and moldings, signs, and safety brushes.

2.2 MEASUREMENT AND PAYMENT

A. Measurement

1. Escalators will be measured for payment on a lump sum basis for each installed fully functional escalator.

2. All spare parts will be measured for payment on a lump sum for each escalator’s spare parts and special tools.

3. Maintenance will be measured for payment on a per-escalator per-quarter basis.

Maintenance shall include required updates of Operation and Maintenance Manuals.

4. Training, drawings, O&M manuals will be measured for payment on a lump sum basis of training completion and approved submittals

5. All other work items specified in this section will not be measured separately for payment and will be considered incidental to the work.

B. Payment

1. Escalator, spare parts, and maintenance will be paid for at the contract unit and lump sum prices for quantities as determined by the measurement methods specified above.

2.3 REFERENCES

Prevailing versions in effect at the time of contract signing shall apply to the work.

A. American National Standards Institute (ANSI):

1. ANSI A17.5 Elevator and Escalator Electrical Equipment

2. ANSI B18.12 Glossary of Terms for Mechanical Fasteners

B. American Society of Mechanical Engineers (ASME):

1. ASME A17.1 Safety Code for Elevators and Escalators

2. ASME A17.2 Inspectors Manual for Elevators and Escalators

3. ASME A17.2.3 Escalator and Moving Walkway Inspection and

Maintenance

4. ASME A17.3 Safety Code for Existing Elevators and Escalators includes Requirements for Electric and Hydraulic Elevators and Escalators

5. ASME A17.5 Elevator and Escalator Electrical Equipment

6. ASME B18.12 Glossary of Terms for Mechanical Fasteners

C. American Society for Testing and Materials (ASTM):

1. A90/A90M Method for Weight [Mass] of Coating on Iron and steel Articles with Zinc or Zinc-Alloy Coatings

2. A123/A123M Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products

3. A153/A153M Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware

4. ASTM A167 Specification for Stainless and Heat-Resisting Chromium-Nickel Steel Plate, Sheet, and Strip

5. ASTM A385 Standard Practice for Providing High-Quality Zinc Coatings (Hot-Dip)

6. A653/A653M Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot- Dip Process

7. ASTM A780 Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings

8. TM A1008/A1008M Specification for Steel, Sheet, Cold-Rolled, Carbon, Structural, High-Strength Low-Alloy and High- Strength Low-Alloy with Improved Formability

9. ASTM B209 Specification for Aluminum and Aluminum-Alloy Sheet and Plate

10. ASTM B211 Specification for Aluminum and Aluminum-Alloy Bar, Rod, and Wire

11. ASTM B308/B308M Specification for Aluminum-Alloy 6061-T6 Standard Structural Profiles

12. ASTM B633 Specification for Electroplated Coating of Zinc, on Iron and Steel.

13. ASTM E18 Standard Test Methods for Rockwell Hardness of Metallic Materials

14. ASTM E84 Test Method for Surface Burning Characteristics of Building Materials

15. ASTM E136 Test Method for Behavior of Materials in a Vertical Tube Furnace at 750◦C

16. ASTM E384 Standard Test Methods for Knoop and Vickers Hardness of Materials

17. ASTM F593 Standard Specification for Stainless Steel Bolts, Hex Caps, Screws, and Studs

18. ASTM F594 Standard Specification for Stainless Steel Nuts

D. American Welding Society (AWS):

1. AWS D1.1 Structural Welding Code – Steel (CSA equivalent is acceptable)

E. Anti-Friction Bearing Manufacturers Association (AFBMA):

1. AFBMA No. 9 Ball Bearing Loading Ratings

2. AFBMA No. 11 Roller Bearing Loading Ratings

F. Military Specifications (MIL)

1. MIL-P-21035 Paint High Zinc Dust Content, Galvanizing Repair (Metric)

G. National Association of Architectural Metal Manufacturers (NAAMM):

1. AMP 503 Finishes for Stainless Steel

H. National Electrical Manufacturers Association (NEMA):

1. NEMA AB 1 Molded Case Circuit Breakers and Molded Case Switches

2. NEMA PB 1 Panelboards

I. National Fire Protection Association (NFPA)

1. NFPA 70 National Electrical Code

2. NFPA 101 Life Safety Code

3. NFPA 130 Standard for Fixed Guideway Transit and Passenger Rail Systems

J. Steel Structures Painting Council (SSPC)

1. SSPC-SP 3 Power Tool Cleaning

K. American Public Transit Association (APTA)

1. APTA RT-RP-FS-007-02

2.4 DEFINITIONS

A. Heavy-duty escalator: An escalator designed specifically for transit system usage, which is substantially different from commercial units in the design of the truss, drive machine, step, step chain, step chain tensioning device, brake, handrail drive and other components and associated equipment.

B. Working points: Points of intersection of step nosing lining and the horizontal of the top and bottom landing plates at finish elevation.

C. Special tools: Tools designed specifically for tasks associated with escalator inspections, maintenance, and repair, or those which are required for these tasks and are not readily available through normal purchasing channels.

D. Escalator support: These are the upper, lower and intermediate supports needed to support the total loads of the escalator.

E. Slip joints: A slip joint is a sliding joint required to support escalators in a transit system and high-rise applications. Location shall be at bottom support areas or as indicated on the contract drawings.

F. Structural Rated Load: For the purpose of structural design, the rated load shall comply with ASME A17.1 requirements.

G. Machinery Rated Load: For the purpose of driving machine, power transmission and braking calculations, the rated load shall not be less than:

Machinery rated load (pounds) = 7.0 (W + 8) B Where:

W = width of the step tread (inches) rounded to the next whole inch.

B =√3 X Total Escalator Rise (feet)

H. Authority having jurisdiction (AHJ): As defined by ASME A17.1.

I. Beneficial Use: The time when the escalator is placed into service, which may be prior to the site being ready for public use.

J. Contracting Officer (CO):

K. Contracting Officer Representative (COR): The designated Conracting Officer’s Representative.

L. Contractor: The responsible party who installs the escalator.

M. Escalator Support: The upper, lower and intermediate supports needed to support the total loads of the escalator.

N. Final Acceptance: The point at which the Government accepts the escalator project as being complete, including all submittal requirements. This may be a different point in time than substantial completion.

O. Flat Steps: The distance, expressed in step lengths, that the leading edge of the escalator step travels after emerging from the comb before moving vertically.

P. Human-Machine Interface (HMI): The software interface between the SCADA and the Programmable Logic Controller (PLC).

Q. Notice to Proceed (NTP): The formal notification in which the escalator Contractor is notified to proceed with the project.

R. Step Width: The horizontal distance between skirt panels.

S. Substantial Completion: The point at which the escalator is ready for use, whether the site is finished or not. This is where the jurisdictional inspection usually takes place.

T. Supervisory Control and Data Acquisition (SCADA): A control system architecture that uses computers, networked data communications and user interfaces for high-level process supervisory management.

U. The Government: The Government agency in control of the facility.

2.5 ABBREVIATIONS AND ACRONYMS

A. ABMA Anti-Friction Bearing Manufacturers Association

B. AC Alternating Current

C. ADA Americans with Disabilities Act

D. AHJ Authority Having Jurisdiction

E. ANSI American National Standards Institute

F. APTA American Public Transportation Association

G. ASME American Society of Mechanical Engineers

H. AWS American Welding Society

I. BIM Building Information Modeling

J. CSA Canadian Standards Association

K. FFT Fast Fourier Transform

L. FPM Feet Per Minute

M. GFCI Ground Fault Circuit Interrupter

N. HMI Human-Machine Interface

O. HP Horsepower

P. HVAC Heating, Ventilation, Air Conditioning

Q. kN Kilonewton

R. LCD Liquid Crystal Display

S. LSHF Low-Smoke, Halogen Free

T. NEC National Electric Code

U. NFPA National Fire Protection Association

V. NTP Notice to Proceed

W. O&M Operation and Maintenance

X. OEM Original Equipment Manufacturer

Y. OSHA Occupational Safety & Health Act

Z. PLC Programmable Logic Controller

AA. PST Pacific Standard Time

BB. PVC Polyvinyl Chloride

CC. SCADA Supervisory Control and Data Acquisition

DD. SDS Safety Data Sheet

EE. UL Underwriters Laboratories

FF. VFD Variable Frequency Drive

GG. VVVF Variable Voltage Variable Frequency

2.6 QUALIFICATIONS

A. Manufacturer’s Qualifications: The escalator manufacturer shall have been a builder of heavy-duty transit type escalators and regularly engaged in escalator building activities for, at least, the past five years. The design, engineering and manufacture of major escalator components such as truss, drive machine, steps, controllers, and safety devices shall be of the same manufacturer, except where otherwise specified.

B. Contractor’s Qualifications: The Escalator shall be installed by a Registered Licensed Contractor with an Elevator / Escalator license in any US state.

2.7 DESIGN AND CONSTRUCTION REQUIREMENTS

A. All escalators provided under the contract shall be the product of a single manufacturer.

Design and construction requirements for the escalators shall meet or exceed the minimum requirements from ASME A17.1’s latest version, at the time of contract signing, except as specified herein and as shown on the Contract Drawings.

B. Escalators shall be heavy-duty type, designed specifically for the operation, loading and environmental conditions encountered in extensively used, heavy-rail transit systems and shall have a minimum design life of 30 years.

C. Escalators shall be designed for outdoor use. Escalators shall be designed to operate while exposed to sunlight, rain, airborne dust and debris. Provisions shall be incorporated in the design to accommodate rainwater drainage. Escalators installed outdoors shall be designed to operate while exposed to the natural elements of weather, at all conditions of relative humidity, while exposed to airborne dust, debris, and corrosive elements at a dry bulb temperature range of plus five (+5) to plus one hundred and twenty (+120) degrees Fahrenheit.

D. The Contractor shall design and fabricate escalators to fit…