140R2022B0005_Amendment_0002_0002.pdf
PDF 2 MB Posted
- Attached to
- Friant Dam Drum Gate Corrosion Project Federal contract opportunity
- Solicitation number
- 140R2022B0005
About this file
This solicitation is for a corrosion control and drum gate rehabilitation project at Friant Dam. The scope of work includes blasting and recoating the interior and exterior of the drum gate, drum gate stands, butterfly valve, and trashrack. It also involves blast and spot repair of supply pipes, seal refurbishment, rivet replacement, and installation of a cathodic protection system. The solicitation includes a price schedule with line items for mobilization, document management, surface preparation and coating work. The Bureau of Reclamation is the contracting agency. Offerors must acknowledge any amendments and submit offers by December 29, 2022. The solicitation incorporates standard clauses on changes, termination, disputes, cost principles, and subcontracting requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendemnt_0006_0006.pdf | ||
| Sol_140R2022B0005_Amd_0006.pdf | ||
| Sol_140R2022B0005_Amd_0005.pdf | ||
| 140R2022B0005_Amend_0005_0005.pdf | ||
| Sol_140R2022B0005_Amd_0004.pdf | ||
| 140R2022B0005_Amd_0004_0004.pdf | ||
| Sol_140R2022B0005_Amd_0003.pdf | ||
| Sol_140R2022B0005_Amd_0002.pdf | ||
| Sol_140R2022B0005_Amd_0001.pdf | ||
| 140R2022B0005__Amendment_No__0001_0001.pdf | ||
| Solicitation_No__140R2022B0005.pdf | ||
| Sol_140R2022B0005.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140R2022B0005 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Sacramento CA 95825-1898 2800 Cottage Way, Room E-1815
R20
Division of Acquisition Services Regional Office Mid-Pacific Region Bureau of Reclamation
12/08/20220002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
11/22/2022
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Rosana Yousefgoarji
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The Solicitation cited in block 9A above, Friant Dam Drum Gate Corrosion Project is hereby amended.
Purpose: The purpose of this amendment is to 1) Incorporate the attached revised Section B
– Price Schedule, 2) Incorporate the attached revised Section I to include WBR 1452.232-80
- Limitation of Funds clause, 3) Incorporate the attached revised Spec Section 35 22 25,
4) Incorporate Drawings 214-D-24913-Rev1, 214-D-24914-Rev1, and 214-D-24915-Rev1, and 5) Remove Drawings 214-208-10352 and 214-208-10353.
By incorporating the clause the contract will be shown to be funded over two fiscal years, Continued ...
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R2022B0005/0002
FY 23 and FY 24.
The date and time for receipt of offers is hereby
UNCHANGED and remains December 29, 2022 at 1:00 pm Pacific Time.
The Offeror must acknowledge this amendment by submitting a signed copy of this SF30 along with their proposal.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Friant Dam Drum Gate Recoating Amendment No. 0002 Central Valley Project, California Specifications No. 20-C0901
Price Schedule B - 1
CONTINUATION OF
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
FRIANT DAM DRUM GATE RECOATING
FRIANT DIVISION
CENTRAL VALLEY PROJECT, CALIFORNIA
B.1 PRICE SCHEDULES
(a) Offers will be considered for award on the following Price Schedule, but no offer will be considered for award on only a part of the Price Schedule.
(1) Offerors shall complete the Price Schedule. Offers for less than the total of the Price Schedule will be considered nonresponsive and will not be evaluated for award.
(2) Deleted
(b) Offers are subject to the terms and conditions of this solicitation.
(c) Quantities in the Price Schedule are estimated quantities for comparison of offers only.
Except as provided in the contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against the Government for overruns or underruns. The contract clause at FAR 52.211-18, Variation in Estimated Quantity does not apply to lump sum items.
(d) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1.
(e) Definitions:
(1) CLIN – Contract Line Item Number
Friant Dam Drum Gate Recoating Amendment No. 0002
Price Schedule B - 2
PRICE SCHEDULE
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
1 WBR
1452.232 -81
Mobilization and Preparatory Work
For the lump sum of $
2 01 31 30 Contract Document Management System
For the lump sum of $
3 09 96 20 Blast and Spot Repair Supply Pipe
80 sq ft $ $
4 09 96 20 Blast and Recoat Interior of Drum Gate
For the lump sum of $
5 09 96 20 Blast and Recoat Drum Gate Stands
For the lump sum of $
6 09 96 20 Blast and Recoat 57” Butterfly Valve
For the lump sum of $
7 09 96 20 Blast and Coat New Trashrack
For the lump sum of $
8 09 97 02 Blast and Recoat Drum Gate Exterior
For the lump sum of $
9 09 97 02 Blast and Recoat Upstream End Seal Associated Metalwork
For the lump sum of $
10 09 97 02 Blast and Recoat Upstream Filler Seals Associated Metalwork
For the lump sum of $
11 09 97 02 Blast and Recoat Top Seal Plate and Associated Metalwork
For the lump sum of $
12 09 97 02 Blast and Recoat Downstream End Seal Associated Metalwork
For the lump sum of $
13 09 97 02 Blast and Recoat Seat Seal Associated Metalwork
For the lump sum of $
14 09 97 02 Blast and Recoat Pier Plates For the lump sum of $
Friant Dam Drum Gate Recoating Amendment No. 0002
Price Schedule
B - 3
PRICE SCHEDULE
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
15 26 42 10 Drum Gate Galvanic Anode Cathodic Protection System
120 each $ $
16 35 21 10 Trashracks For the lump sum of $
17 35 22 14 Seal Refurbishment For the lump sum of $
18 35 22 25 Drum Gate Rehabilitation For the lump sum of $
19 35 22 25 Rivet Replacement 100 each $ $
TOTAL FOR PRICE SCHEDULE $_________________
END OF SUPPLIES OR SERVICES AND PRICES
Friant Dam Drum Gate Recoating Amendment No. 0002
Price Schedule
B - 4
This page intentionally left blank.
Amendment 0002
Solicitation No. 140R2022B0005
Friant Dam Drum Gate Corrosion Project
Central California Area Office – California
I-1
SECTION I - CONTRACT CLAUSES
FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEB 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://www.acquisition.gov/browse/index/far (FAR 52.XXX-XX formatted clauses)
FAR Clauses
Title
Date
52.202-1
Definitions
JUN 2020
52.203-03 Gratuities APR 1984
52.203-05
Covenant Against Contingent Fees
MAY 2014
52.203-06 Restrictions on Subcontractor Sales to the Government JUN 2020
52.203-7 Anti-Kickback Procedures JUN 2020
52.203-08
Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
52.203-10
Price or Fee Adjustment for Illegal or Improper Activity
52.203-12 Limitations on Payments to Influence Certain Federal
Transactions
52.203-17
Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower Rights
52.203-19 Prohibition on Requiring Certain Internal Confidentiality
Agreements or Statements
JAN 2017
52.204-04
Printing/Copying Double-Sided on Recycled Paper
MAY 2011
52.204-07
System for Award Management
OCT 2018
52.204-10 Reporting Executive Compensation and First-Tier Subcontract
Awards
52.204-13 System for Award Management Maintenance OCT 2018
52.204-14 Service Contract Reporting Requirements OCT 2016
52.204-18 Commercial and Government Entity Code Maintenance AUG 2020
52.204-19 Incorporation by Reference of Representations and
Certifications
DEC 2014
52.204-23 Prohibition on Contracting for Hardware, Software, and
Services Developed or Provided by Kaspersky Lab and Other
Covered Entities
NOV 2021
52.204-25
Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment
I-2
52.209-6
Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for
Debarment
52.209-9 Updates of Publicly Available Information Regarding
Responsibility Matters
OCT 2018
52.209-10 Prohibition on Contracting with Inverted Domestic
Corporations
NOV 2015
52.214-26 Audit and Records – Sealed Bidding JUN 2020
52.214-27
Price Reduction for Defective Cost or Pricing Data –
Modifications – Sealed Bidding
52.214-28 Subcontractor Cost or Pricing Data – Modifications – Sealed
Bidding
52.214-29
Order of Precedence – Sealed Bidding
JAN 1986
52.215-2 Audit and Records-Negotiation JUN 2020
52.215-19 Notification of Ownership Changes OCT 1977
52.219-06 Notice of Total Small Business Set-Aside NOV 2020
52.219-08
Utilization of Small Business Concerns
52.219-09 Small Business Subcontracting Plan NOV 2019
52.219-16 Liquidated Damages-Subcontracting Plan SEP 2021
52.219-28
Post-Award Small Business Program Representation
SEP 2021
52.222-3
Convict Labor
JUN 2003
52.222-4
Contract Work Hours and Safety Standards-Overtime
Compensation MAY 2018
52.222-6
Construction Wage Rate Requirements
AUG 2018
52.222-7
Withholding of Funds
52.222-8
Payrolls and Basic Records
JUL 2021
52.222-9
Apprentices and Trainees
JUL 2005
52.222-10
Compliance with Copeland Act Requirements
FEB 1988
52.222-11
Subcontracts (Labor Standards)
52.222-12
Contract Termination – Debarment
52.222-13
Compliance with Construction Wage Rate Requirements and
Related Regulations
52.222-14
Disputes Concerning Labor Standards
FEB 1988
52.222-15
Certification of Eligibility
52.222-21
Prohibition of Segregated Facilities
APR 2015
52.222-26
Equal Opportunity
SEP 2016
I-3
52.222-27
Affirmative Action Compliance Requirements for
Construction
APR 2015
52.222-37 Employment Reports on Veterans JUN 2020
52.222-40 Notification of Employee Rights Under the National Labor
Relations Act
DEC 2010
52.222-50 Combating Trafficking in Persons NOV 2021
52.222-54 Employment Eligibility Verification MAY 2022
52.222-55 Minimum Wages for Contractor Workers Under Executive
Order 14026
JAN 2022
52.222-62 Paid Sick Leave, Under Executive Order 13706 JAN 2022
52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011
52.223-6 Drug Free Workplace
MAY 2001
52.223-18 Encouraging Contractor Policies to Ban Text Messaging While
Driving
JUN 2020
52.225-13 Restrictions on Certain Foreign Purchases FEB 2021
52.227-1
Authorization and Consent
52.227-2
Notice And Assistance Regarding Patent And Copy
Infringement
52.227-4 Patent Indemnity – Construction Contracts DEC 2007
52.228-2 Additional Bond Security OCT 1997
52.228-05 Insurance - Work on a Government Installation JAN 1997
52.228-11 Pledges of Assets FEB 2021
52.228-12 Prospective Subcontractor Requests for Bonds MAY 2014
52.228-14 Irrevocable Letter of Credit NOV 2014
52.228-15 Performance and Payment Bonds-Construction JUN 2020
52.229-03
Federal, State And Local Taxes
FEB 2013
52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014
52.232-17 Interest MAY 2014
52.232-23
Assignment Of Claims
52.232-27
Prompt Payment for Construction Contracts
JAN 2017
52.232-33
Payment by Electronic Funds Transfer – System for Award
Management
52.232-39
Unenforceability of Unauthorized Obligations
JUN 2013
52.232-40 Providing Accelerated Payment to Small Business
Subcontractors
52.233-1 Alt I
Disputes - Alternate I (DEC 1991)
52.233-3
Protest After Award
AUG 1996
I-4
52.233-4
Applicable Law For Breach Of Contract Claim
OCT 2004
52.236-2
Differing Site Conditions
APR 1984
52.236-3
Site Investigation and Conditions Affecting the Work
52.236-5
Material and Workmanship
52.236-6
Superintendence by the Contractor
52.236-7 Permits and Responsibilities NOV 1991
52.236-8
Other Contracts
52.236-9
Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
52.236-10
Operations and Storage Areas
52.236-11
Use and Possession Prior to Completion
52.236-12
Cleaning Up
52.236-13 Alt I
Accident Prevention (NOV 1991) – Alternate I
NOV 1991
52.236-14 Availability and Use of Utility Services APR 1984
52.236-15 Schedules for Construction Contracts APR 1984
52.236-17 Layout of Work APR 1984
52.236-21 Alt I Specifications and Drawings for Construction (FEB 1997) –
Alternate I
FEB 1997
52.236-26 Preconstruction Conference FEB 1995
52.242-13
Bankruptcy
JUL 1995
52.243-4 Changes JUN 2007
52.244-6
Subcontracts for Commercial Items
JAN 2022
52.246-21 Warranty of Construction MAR 1994
52.249-2 Alt I
Termination for Convenience of the Government (Fixed-
Price) (SEP 1996) – Alternate I
APR 2012
52.249-10 Default (Fixed-Price Construction) APR 1984
52.253-1 Computer Generated Forms JAN 1991
WBR 1452.201-80 CONTRACTING OFFICER’S REPRESENTATIVE’S MAY 2018
AUTHORITIES AND LIMITATIONS –
BUREAU OF RECLAMATION
a) Performance of the work under this contract shall be subject to the technical direction of the
Reclamation Contracting Officer's Representative (COR). The term “technical direction” is defined to include, without limitation:
(1) Inspecting and accepting or rejecting work performed under the contract.
I-5
(2) Representing the Government in technical phases of the work. The COR is responsible for the technical administration of the contract and will provide instructions and interpretations to the Contractor on all technical matters relating to the contract. The COR will supervise or oversee all Government technical and administrative personnel assigned to assist the COR.
(3) Reviewing and, where required by the contract, approving submittals of technical data, shop drawings, samples, literature, plans, or other data required to be delivered by the Contractor to the Government.
(b) The Contractor will receive a copy of the written COR designation from the Contracting
Officer. It will specify the extent of the COR's authority to act on behalf of the Contracting
Officer.
(c) Technical direction must be within the scope of work stated in the contract. Only the
Contracting Officer is authorized to determine if a change is within the scope of the contract;
therefore, the COR does not have the authority to, and may not, issue any technical direction that
(1) Constitutes a direction of additional work outside the Contract requirements;
(2) Constitutes a change as defined in the contract clause entitled “Changes;”
(3) In any manner causes an increase or decrease in the total contract cost, or the time required for contract performance;
(4) Changes any of the expressed terms, conditions or specifications of the contract; or
(5) Interferes with the Contractor's right to perform the terms and conditions of the contract.
(d) All technical direction shall be issued in writing by the COR.
(e) The Contractor must proceed promptly with the performance of technical direction duly issued by the COR in the manner prescribed by this clause and within its authority under the provisions of this clause. If, in the opinion of the Contractor, any instruction or direction by the
COR falls within one of the categories defined in (c)(1) through (c)(5) of this clause, the
Contractor must not proceed and must notify the Contracting Officer in writing within five (5) working days after receipt of any such instruction or direction and must request the Contracting
I-6
Officer to modify the contract accordingly. Upon receiving the notification from the Contractor, the Contracting Officer must -
(1) Advise the Contractor in writing after receipt of the Contractor's letter that the technical direction is within the scope of the contract effort and does not constitute a change under the Changes clause of the contract; or
(2) Advise the Contractor that the Government will issue a written change order.
(f) A failure of the Contractor and Contracting Officer either to agree that the technical direction is within the scope of the contract or to agree upon the contract action to be taken with respect to the technical direction will be subject to the provisions of the clause entitled “Disputes.”
(End of clause)
WBR 1452.209-82 PROHIBITION ON RELEASE OF INFORMATION -- BUREAU OF
RECLAMATION (MAR 2022)
(a) The Contractor shall not disclose information pertaining to the services performed under this contract to anyone other than Government or other personnel authorized by the Contracting
Officer. The Contractor agrees that it will protect any information obtained from other companies during the performance of this contract from unauthorized use or disclosure for as long as the information remains proprietary and shall refrain from using such information for any purpose other than that for which it was furnished.
(b) In the event that the Contractor intends to employ individuals other than its own staff or other firms in the performance of the contract, each individual or firm shall be required to furnish the same written certification.
(c) The contractor shall insert, in any subcontract that requires the performance of work similar to that being performed by the Contractor, terms that shall conform substantially to the language of this clause, including this paragraph (c).
(End of clause)
WBR 1452.223-80 ASBESTOS-FREE WARRANTY – AUG 2021
(a) The Contractor warrants that all items delivered, or work required by the contract, shall be free of asbestos in any form whatsoever.
I-7
(b) The Contractor may request the Contracting Officer to approve an exception to this prohibition when an asbestos-free product is not available. Such requests shall be fully documented and submitted as soon as possible after the contractor determines that an asbestos-free product is not available.
WBR 1452.223-81 SAFETY AND HEALTH - OCT 2022
(a) The Contractor shall not require any person employed in the performance of this contract
(including subcontracts) to work under conditions which are unsanitary, hazardous, or dangerous to an employee’s health or safety.
b) Contractor shall comply with the most current version of the Bureau of
Reclamation’s Reclamation Safety and Health Standards (RSHS) and, if incorporated, 52.236-13
Accident Prevention.
The RSHS manual shall be obtained at:
http://www.usbr.gov/safety/rshs/index.html
(c) Comply with the standards (29 CFR) issued by the Occupational Safety and Health
Administration (OSHA), U.S. Department of Labor, www.osha.gov.
(d) In the event there is a conflict between the requirements contained in paragraphs (b) and (c) referenced herein, or in the Statement of Work (SOW) or Performance Work Statement (PWS), the more stringent requirement shall prevail.
(e) If required in the SOW or PWS, the Contractor shall submit a written proposed safety program as prescribed in the RSHS and the written specifications.
(f) The Contractor shall maintain an accurate record of and shall report to the Contracting Officer
(or authorized representative) in the manner prescribed by the Contracting Officer, all cases of death, occupational diseases, or traumatic injury to employees or the public involved, and property damage in accordance with the RSHS and OSHA guidelines.
(g) If the contractor deems that an updated version of the RSHS constitutes a substantive change to the contract, affecting price or time (or both), the contractor may request a contract modification in accordance with the terms of the contract.
http://www.usbr.gov/safety/rshs/index.html https://www.osha.gov/laws-regs/regulations/standardnumber http://www.osha.gov/
Friant Dam Drum Gate Corrosion Project
Central California Area Office – California
I-8
WBR 1452.232-80 LIMITATION OF FUNDS – MAR 2022
BUREAU OF RECLAMATION
(a) Pursuant to Section 12 of the Reclamation Project Act of 1939 (43 U.S.C. 388) incremental funding for this contract will be made available in accordance with this clause. This statute permits the Secretary of the Interior to enter into contracts which will cover such periods as the Secretary may consider necessary but in which liability of the United States shall be contingent upon appropriations being made therefore. For purposes of this clause, the term "appropriations" includes the
Bureau of Reclamation’s subsequent allocation of funds for this contract.
(b) Incremental funding in the amount of $TBD is presently available for payment and allotted under this contract for the Friant Dam Drum Gate Corrosion Project.
This present funding allotment is contemplated to cover the work to be performed until September 30, 2023. A schedule for anticipated future funding allotments is as follows. This information is for planning purposes only and may not be fully representative of the funds actually allotted under this contract.
FISCAL YEAR FUNDING AMOUNT
On award of contract 50%
FY 2024 50%
(c) For work identified in paragraph (b) of this clause, the Contractor agrees to perform up to the point at which the total amount payable by the
Government, including reimbursement in the event of termination of specified work for the Government's convenience, approximates the total amount currently allotted to the contract. The Contractor shall not be obligated to continue performance of this work beyond that point. The Government shall not be obligated in any event to reimburse the Contractor in excess of the amount allotted to the contract for this work notwithstanding any contrary provisions of the Termination for Convenience of the Government clause of this contract.
(d) Notwithstanding the date specified in paragraph (b) of this clause, the
Contractor shall notify the Contracting Officer in writing at least sixty days prior to
I-9 the date when, in the Contractor's best judgment, the work will reach the point at which the total amount payable by the Government, including any cost for termination for convenience, will approximate 75 percent of the total amount then allotted to the contract for performance of work identified in paragraph (b) of this clause. The notification shall state (1) the estimated date when that point will be reached and (2) an estimate of additional funding, if any, needed to continue performance of the work up to the next scheduled date for allotment of funds identified in paragraph (b) of this clause, or to a mutually agreed upon substitute date. The notification shall also advise the Contracting Officer of the estimated amount of additional funds that will be required for the timely performance of work funded pursuant to this clause, for a subsequent period as may be specified in the allotment schedule in paragraph (b) of this clause, or otherwise agreed to by the parties. If after such notification additional funds are not allotted by the date identified in the Contractor's notification, or by an agreed substitute date, the
Contracting Officer shall terminate any work for which additional funds have not been allotted, pursuant to the Termination for Convenience of the Government clause of this contract.
(e) When additional funds are allotted for continued performance of the work identified in paragraph (b) of this clause, the parties will agree as to the period of contract performance which will be covered by the funds. The provisions of paragraph (c) through (e) of this clause will apply in like manner to the additional allotted funds and agreed substitute date, and the contract will be modified accordingly through revision of paragraph (b) of this clause. The Contracting
Officer is the only person authorized to provide notice, communication, or other form of representation to increase or decrease the amount of funds allotted by the
Government to this contract. . If agreement cannot be reached, the Contracting
Officer will make a final decision as to the period of contract performance that will be covered by the funds. This decision may be appealed by the Contractor under the
Disputes clause of the contract.
(f) If, solely by reason of failure of the Government to allot additional funds in amounts sufficient for timely performance of the work identified in paragraph (b) of this clause, the Contractor incurs additional costs or is delayed in the performance of the work under this contract and if additional funds are allotted, an equitable adjustment will be made in the price or prices (including appropriate target, billing, and ceiling prices where applicable) of work, or in the time of delivery, or both.
I-10
Failure to agree to any such equitable adjustment hereunder shall be a dispute concerning a question of fact within the meaning of the Disputes clause of this contract.
(g) The Government may at any time prior to termination allot additional funds for the performance of the work identified in paragraph (b) of this clause.
(h) The termination provisions of this clause do not limit the rights of the
Government under the Default clause of this contract. The provisions of this clause are limited to the work and allotment of funds as set forth in paragraph (b) of this clause. This clause is inapplicable once the contract is fully funded except with regard to the rights or obligations of the parties concerning equitable adjustments negotiated under paragraphs (e) or (f) of this clause.
(i) Change orders shall not be considered authorization to exceed the amount allotted by the Government as specified in paragraph (b) of this clause unless the amount is increased by inclusion of a statement contained in the change order.
(j) Nothing in this clause affects the right of the Government to terminate this contract pursuant to the Termination for Convenience of the Government clause of this contract.
(End of Clause)
WBR 1452.232-81 PAYMENT FOR MOBILIZATION MAR 2022
AND PREPARATORY WORK –
BUREAU OF RECLAMATION - ALTERNATE I (MAR 2022)
(a) General. Payment for the Mobilization and Preparatory Work line item of the schedule will be made as reflected herein. To the extent that this line item exceeds the percentage of total contract pricing as estimated by the Contracting Officer in WBR 1452.236-85, Instruction for
Mobilization and Preparatory Work Schedule Line Item, payment will be made as reflected in
Section (d)(5) below. Reclamation will make payment to the Contractor in accordance with this clause for operations including, but not limited to, those necessary for --
(1) Movement of personnel, equipment, supplies, and incidentals to the project site;
(2) The establishment of offices, buildings, plants and other facilities, at the site (excludes temporary buildings (e.g. storage sheds, shops, offices) and utilities listed in the Operations and
Storage Areas clause of this contract;
I-11
(3) Payment of premiums for project bonds and insurance; and
(4) Other work and operations which must be performed or costs incurred incident to the initiation of meaningful work at the site and for which the contract does not otherwise provide for payment.
(b) Facilities and equipment covered by mobilization work.
(1) All facilities, plant, and equipment which are established at, or brought to, the site shall be deemed to be subject to the provisions of this paragraph unless the Contracting Officer specifically provides other written authorization for a particular item or items.
(2) The Contractor shall be solely responsible for the adequacy, efficiency, use, protection, maintenance, repair, and preservation of all facilities, plant, and equipment on site.
(3) The facilities, plant, and equipment covered by this paragraph shall not be dismantled or removed from the site prior to completion of the work under the contract without the written authorization of the Contracting Officer.
(c) Termination for default. Should the Contractor be terminated for default as provided by the
Default clause of this contract --
(1) All facilities, plant, and equipment on the site shall be subject to the Government's right to take possession of and utilize such items for the purpose of completing the work;
(2) The Contractor shall provide evidence of encumbrances, liens, or other security interests, to the Contracting Officer; and
(3) Any encumbrance, lien, or other security interest on such facilities, plant, or equipment shall be subordinated to the Government's rights under the Default clause of this contract to utilize all facilities, plant, and equipment to complete the work under the contract.
(d) Payment. Payment for mobilization and preparatory work under paragraph (a) of this clause shall be made at the contractor lump-sum price for this item as contained in the Schedule.
Progress payments for mobilization and preparatory work shall be made as follows --
(1) In accordance with paragraph (g) of the Payments under Fixed Price Construction Contracts clause of this contract and upon submission of a proper invoice, the Government will reimburse the Contractor for the total amount of premiums paid for performance and payment bonds as required by the Performance and Payment Bond Requirements clause of this contract and for any insurance which is specified as payable by the Government under this contract.
(2) Except as provided in (d)(1) above, progress payments for mobilization and preparatory work shall not be considered a separate division of work for the purposes of progress payments and
I-12 shall be subject to retainage before payment of the total amount for this contract line item.
(3) When progress payments totaling 5 percent of the total original contract amount have been made by the Government for all other work accomplished under the contract, the Government shall pay the Contractor 50 percent of the mobilization and preparatory work contract line item amount or 5 percent of the total original contract amount (whichever is the lower) exclusive of any payment already made to the Contractor for performance and payment bond premiums and specified insurance under subparagraph (d).
(4) When progress payments totaling 10 percent of the total original contract amount have been made by the Government for all other work accomplished under the contract, the balance of the amount for the mobilization and preparatory work contract line item or 10 percent of the total original contract amount (whichever is the lower) shall be paid to the contractor.
(5) If the contract amount for mobilization and preparatory work exceeds the total of the payments allowed under (3) and (4) above, the balance shall be paid when the contract work is substantially complete as determined by the Contracting Officer.
(End of Clause)
WBR 1452.236-84 PRESERVATION OF CULTURAL RESOURCES – MAR 2022
(a) Definitions.
"Cultural items" as defined by Native American Graves Protection and Repatriation Act
(NAGPRA) include Native American human remains, funerary objects, sacred objects, and objects of cultural patrimony.
"Cultural resources" is a broad term that includes prehistoric, historic, architectural, and traditional cultural properties; specific items include, but are not limited to, human skeletal remains, archaeological artifacts, records, and material remains related to such properties.
"Funerary objects" means Native American items that, as part of the death rite or ceremony of a culture, are reasonably believed to have been placed intentionally at the time of death or later with or near individual human remains.
"Human remains" means the physical remains of the body of a person.
"Native American" means of, or relating to, a tribe, people, or culture that is indigenous to the
United States.
"Sacred objects" means Native American items that are specific ceremonial objects needed by traditional Native American religious leaders for the practice of traditional Native American religions by their present-day adherents. These items are specifically limited to objects that were devoted to a traditional Native American religious ceremony or ritual and which have religious significance or function in the continued observance or renewal of such ceremony.
"Objects of cultural patrimony" means Native American items having ongoing historical, traditional, or cultural importance central to the Native American tribe or Native Hawaiian organization itself, rather than property owned by an individual tribal or organization member.
I-13
These objects are of such central importance that they may not be alienated, appropriated, or conveyed by any individual tribal or organization member.
(b) General. Federal legislation provides for the protection and preservation of cultural resources that may be impacted or altered as a result of any Federal project, activity, or program or federally licensed or assisted project, activity, or program.
(c) Discovery of Resources. Should the Contractor, or any of the Contractor's employees, subcontractors, or parties operating or associated with the Contractor, in the performance of this contract discover evidence of possible cultural resources, the Contractor shall immediately cease work at that location and provide oral notification to the contracting officer, giving location and nature of the findings. The Contractor shall forward a written report of findings to the
Contracting Officer within 48 hours.
(i) If a cultural resource is determined by Reclamation to be a Native American cultural item, then the Contractor shall cease the activity in the area of the discovery, make a reasonable effort to protect the items discovered, and wait for written approval from the Contracting Officer before resuming activity.
(ii) If the discovery occurs on tribal lands, the Contractor shall immediately orally notify the responsible tribal official and the Contracting Officer and follow with written confirmation within 48 hours to the responsible tribal official and the contracting officer. (The contracting officer will supply the name and phone number of the tribal official.
(iii) The Contractor shall exercise care so as not to disturb or damage any cultural resources discovered during the execution of this contract and shall provide such cooperation and assistance as may be necessary to preserve the findings for removal or other disposition by
Reclamation. The Contractor shall not resume work in the area of a discovery until written notice to proceed is received from the contracting officer.
(d) Approval of Use Areas and Borrow Sources. If the Contractor proposes to use a location other than an approved location (approved locations to be provided by the contracting officer), the location(s) must first be approved for use by the contracting officer. When considering an unapproved use area or borrow source, the Contractor shall submit a map showing the location to the contracting officer at least 45 calendar days in advance of any proposed use. The Contractor or his subcontractors shall take no action to use or alter the proposed location until written approval is provided by the contracting officer.
(e) Compensation for Delays. Where appropriate by reason of discovery, the contracting officer may order changes in the schedule or work. If such delays or changes are ordered, any equitable adjustment under the contract will be provided in accordance with the applicable clauses of the contract.
(f) Subcontractors. The Contractor shall insert this clause in all subcontracts that involve performance of work on job site terrain.
I-14
(g) Cost. Except as provided in subsection (e) above, the cost of complying with this contract clause shall be included in the prices offered in the schedule for other items of work.
(h) Government Access. The Contractor's arrangement with landowners shall permit the
Government or its representatives access to the land to identify cultural resources and conduct appropriate inspections during the Contractor's use of the area or during material procurement.
WBR 1452.237-80 SECURITY REQUIREMENTS – BUREAU MAR 2022
OF RECLAMATION
(a) General Security Requirements:
(1) This clause addresses security requirements, including general procedural requirements, information security requirements, contractor employee suitability requirements, identification card requirements, site security requirements, vessel exclusion barriers, and information technology security requirements. Within this clause, COR means Contracting
Officer's Representative. If there is no COR appointed and identified to the Contractor, the term instead will mean the Program Manager or any other authorized individual responsible for technical oversight under the contract. “Work site” means the Government facility, office, construction site, and any other area within the Government office or facility that the
Contractor must access to accomplish work under this contract.
(2) The work performed under this contract shall only be accomplished by individuals (in the employment of the Contractor or any subcontractors) whose conduct and behavior is consistent with the efficiency of the Federal Service and the requirements of this contract, and who are acceptable to the contracting officer. If Reclamation finds a Contractor employee to be unsuitable or unfit for his or her assigned duties, the contracting officer will direct the Contractor to remove the individual from the contract and access to the Federal facility at which the contract activities are occurring.
(3) The Contractor’s employees governed by this contract may need access to sensitive information and/or sensitive areas. The Federal Government (Government) reserves the right, in its sole discretion, to determine suitability of Contractor personnel and deny access to any sensitive information or project specific area to any personnel for any cause.
(4) The Contractor is responsible for informing and ensuring compliance by its employees with any applicable security procedures of the Government facility where work may be performed under this contract.
(5) Any Contractor employee that will have access to a Federally-controlled facility or information system will be required to have a Government-issued identification card, consisting of a Personal Identity Verification (PIV) Card, a temporary identification card, or a visitor badge. (Note: within the Department of the Interior this card is known as a DOI
Access Card.) During performance of the contract, the Contractor shall keep the COR apprised of any changes in personnel, or changes in personnel access or duration, to ensure that performance is not delayed by compliance with credentialing processes.
I-15
(6) A Contractor employee will not be provided access to a Government facility or information system until a Government PIV Card, temporary identification card, or visitor identification badge has been issued to the Contractor employee. For those individuals that will be receiving a PIV Card, the Government may, at its discretion, issue a temporary identification card or visitor identification badge after the electronic background investigation forms have been received and the investigation is initiated.
(7) All Contractor employees shall access the facility via the facility’s entry screening system and visibly display the Government-issued PIV Card, temporary identification card, or visitor identification badge at all times. Contractor employees must visibly wear the
Government-issued identification card at all times they are on Government facilities.
Contractor employees are responsible for the safekeeping of all Government-issued identification cards, whether on-site or off-site. Cards that have been lost, damaged, or stolen must be reported to the COR and DOI Access Sponsor immediately, but not later than within 24 hours. The Contractor shall return all identification cards and card keys and any other Government property and information upon completion of performance or when personnel depart permanently or for a period of 7 days or more. The Contractor may be required to turn in access control cards or identification cards on a daily basis.
(8) Misuse or loss of access control or identification cards, or failure to comply with required surrender of such cards may, at Government discretion, result in Contractor personnel being denied access to the work site, at no cost to Government. The Contractor may be charged up to $500 for each occurrence for any required replacement of
Government-issued access control or identification cards due to loss or misuse. At the end of contract performance, or when a Contractor employee is no longer working under this contract, the Contractor shall ensure that all access control and identification cards are returned to the COR.
(9) All Contractor personnel, including subcontractor personnel, with access to the work site shall be U.S. citizens or foreign individuals legally residing in, or legally admitted to, the U.S. For all non-U.S. citizens working under this contract, irrespective of length of time working on the contract, the Contractor shall provide to the COR, legible and valid copies of the individual’s passport and visa (unless individual is on the Visa Waiver Program) a minimum of 14 calendar days prior to beginning work or arriving at the facility. A driver’s license is not acceptable identification. In addition, a completed form I-94 shall be submitted to the COR upon the individual’s arrival at the work facility and prior to beginning work.
(10) The Contractor shall report all contacts with entities, individuals, and counsel/representatives (including foreign entities and foreign nationals) who seek in any way to obtain unauthorized access to sensitive information or areas. The Contractor shall report any violations of contract provisions, laws, executive orders, regulations, and guidance to the contracting officer. The Contractor shall report any information raising a doubt as to whether an individual’s eligibility for continued employment or access to sensitive information is consistent with the interests of National Security and the Public
Trust.
(11) Unsanctioned, negligent, or willful inappropriate action on the part of the Contractor
(or its employees) may result in termination of the contract or removal of some Contractor employees from Reclamation facilities at no cost to the Government. These actions include, I-16 but are not limited to, exploration of a sensitive system and/or information, introduction of unauthorized and/or malicious software, inappropriate release of sensitive information, or failure to follow prescribed access control policies and/or security procedures. Failure to comply with Reclamation policies, procedures, or other published security requirements may result in termination of the contract or removal of some contracted employees from
Reclamation buildings and/or facilities at no cost to the Government.
(12) All provisions of this clause shall equally apply to all subcontractors. The Contractor shall incorporate the substance of this clause in all subcontracts.
(13) These security requirements apply to all sections of this Contract including Contract
Drawings and other Contract Specifications as applicable. Related documents include other general provisions of Construction or Operations and Maintenance type Contracts, including
FAR clauses by reference or as amended by related documents.
(b) Information Security Requirements.
(1) Sensitive Information. The term “sensitive information” means any information which warrants a degree of protection and administrative control as defined by Reclamation or that meets the criteria for exemption from public disclosure set forth under Sections 552 and
552a of Title 5, United States Code: the Freedom of Information Act and the Privacy Act.
Sensitive information is generally categorized as CONTROLLED UNCLASSIFIED
INFORMATION (CUI), but in some cases may include other unclassified information. (The protection of National Security information is beyond the scope of this clause. If any work on National Security information is required under this contract, it is addressed under other contract clauses.) The Contractor shall protect this type of information from unauthorized release into public domain, or to unauthorized persons, organizations, or subcontractors.
Information which, either alone or in aggregate, is deemed sensitive by Reclamation shall be handled and protected in accordance with Reclamation Directives and Standards SLE 02-01
Identifying and Safeguarding Controlled Unclassified Information (CUI), which is available from the COR or at http://www.usbr.gov/recman/DandS.html#sle.
(i) Any Government-furnished information or material does not become the property of the
Contractor and may be withdrawn at any time. Upon expiration or termination of the contract, all documents released to the Contractor and any material created using data from such documents shall be returned to the COR for final disposition. Government-furnished information residing on any electronic systems (laptops, servers, desktops, media) shall be deleted from those systems using a COR-approved data erasure solution. Only with prior authorization from the contracting officer may the Contractor retain the material. The
Contractor or subcontractor shall not disclose or release the materials provided to the
Contractor to any individuals of the Contractor's organization not directly engaged in providing services under the contract or that do not have a valid need-to-know. All technical data provided to the Contractor by the Government shall be protected from public or private disclosure in accordance with the markings printed on them. All other information relating to the items to be delivered or the services to be performed under this contract shall not be disclosed by any means without prior approval of the contracting officer. Prohibited dissemination or disclosure includes, but is not limited to: permitting access to such information by foreign nationals or by immigrant aliens who may be employed by the
Contractor, publication of technical or scientific papers, advertising, disclosure to
I-17
Contractor staff not investigated and deemed acceptable at the appropriate information sensitivity level, and any other public release. The Contractor shall maintain, and furnish upon request of the contracting officer, records of the names of individuals who have access to sensitive material in its custody and the sensitive material to which the individuals had access. All questions regarding information security, access, and control shall be referred to the COR.
(ii) The Contractor shall not release to anyone outside the Contractor’s organization any sensitive, or otherwise protected information, regardless of medium in which it is contained
(for example, film, tape, document, electronic), pertaining to any part of this contract or any
Reclamation program or activity, unless the contracting officer has given prior written approval. This includes, but is not limited to, news releases, marketing promotions, articles, interviews, reports, social media posts, and any other media releases. Requests for approval shall identify the specific information to be released, the medium to be used, the purpose for the release, and a description of the need-to-know. The Contractor shall submit its request to the contracting officer ten business days before the proposed date for release. Subcontractors shall submit requests for authorization to release through the prime Contractor to the contracting officer.
(iii) The Contractor shall notify the COR immediately when known or suspected loss/compromise of sensitive information or other documents, notes, drawings, sketches, reports, photographs, exposed film or similar information which may affect the security interests of Government has occurred. This requirement extends to employees and other personnel working on behalf of the Contractor, and expands responsibility to include prompt reporting of security issues, including observed or subsequently discovered efforts by unauthorized persons to gain unauthorized access to sensitive information.
(2) Classified Information.
(i) The disclosure of U.S. Government documents by third parties can result in damage to our national security. While this contract may not deal directly with classified information, each contractor is obligated to protect classified information pursuant to all applicable laws and to use Government information technology systems in accordance with agency procedures so that the integrity of such systems is not compromised.
(ii) Unauthorized disclosures of classified documents (whether in print, on a blog, or on websites, or other electronic or non-electronic media) do not alter the documents' classified status or automatically result in declassification of the documents. To the contrary, classified information, whether or not already posted on public websites or disclosed to the media, remains classified, and must be treated as such by Federal employees and contractors, until it is declassified by an appropriate U.S. Government authority.
This is the start of the file's text. The full file is on GovTribe.