140R2019Q0016 Folsom Dam Vessel Exclusion Barrier (VEB) Central Mooring Repair Attachment 4 -Section J Amendment No. 0001
Questions and Answers
1. We need clarification on requirements of the requested options.
Option 1 Central Mooring Leg Repair:
Reattach center mooring buoy to Pearl Harbor anchor. Where is it detached?
Required items 1 each 1” x 150’ wire rope 1 each 1” x 200’ wire rope 4 each 1” shackles
Option 2 Central Anchor Replacement:
Place new anchor unit. Is this the complete anchoring system from the 10,000# anchor to the 45’ section of 1” chain below the buoy? If so, why are the only these components listed?
1 each 1” x 150’ wire rope 1 each 1” x 200’ wire rope 4 each 1” shackles
Answer: Currently unknown where the break in the mooring system is. The material listed was identified as needing replacement during an inspection in February. Part of the contractor's task will be to find the break and either re-attach it to the current anchor (Option 1) or repair the break and attach the current line to a new anchor (Option 2).
2. Do you know where the rigging parted, chain. wire rope or shackles.
Answer: Location of break is unknown