This document is a Statement of Work for an outdoor communications equipment enclosure to be installed at the Boulder Beach Ranger Station in the Lake Mead National Recreation Area.

The key requirements include providing a two-bay outdoor cabinet with Faraday cage technology, front and rear access doors, power and HVAC systems, grounding, and accessories such as work lights, cable entry ports, and equipment racks. The contractor is responsible for shipping, delivery, offloading, and installation of the cabinet. The period of performance is June 1, 2024 through October 1, 2024, with all equipment to be delivered and installed by the end date.

This Statement of Work is related to a federal contract opportunity with Solicitation Number 140P8124Q0037 for the "LAKE - Outdoor Comms Equipment Cabinet" issued by the Department of the Interior National Park Service Pacific West Region.

View the file

Other files

File Type Posted
Attachment_2_SCA_Wage_Rates.pdf PDF
Sol_140P8124Q0037.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lake Mead National Recreation Area

Boulder Beach Ranger Station

Outdoor Equipment Cabinet

Statement of Work

The work involved with this project is to obtain an outdoor communications equipment enclosure that is environmentally controlled, has AC Power and requires no concrete foundation. The Communications Equipment enclosure is to be delivered to the Boulder Beach Ranger Station, 115 Boulder Beach Road, Boulder City, NV. 89005.

Detailed description of project requirements are:

1. Provide a two bay outdoor communications equipment enclosure equal to a PEPRO CLP2 cabinet with the following specifications: (Note: Cabinet installation is to be installed on either precast concrete pads or directly on the ground) Overall exterior dimensions of the PEPRO cabinet are approximately 59in high, 50in wide and 122in long.

a. Enclosure to utilize Faraday Cage Technology for its construction

b. Two equipment bays with front and rear access doors.

c. One Power Bay (This unit houses the load center and back up battery trays)

d. One Air Flow Module (This unit is where the HVAC unit is mounted and also contains the cable entry ports)

e. Two interior work lights mounted inside of each of the equipment bay doors.

f. AC Load Center (100amp with 30 spaces available) Including breakers.

g. Filtered AC power entry on the exterior of the enclosure

h. Two Battery Tray shelves

i. Three Rack Mounted 19in buss bars

j. Three 19in equipment racks

k. AC Power Entry

l. 1.5 Ton HVAC Unit

m. Two (Four Port) Cable Entry

n. Eight port entry covers

o. Telco interconnect box

p. Four Ufer Grounding concrete pads (Mounting pads in lieu of concrete foundation)

2. Contractor must include in price the shipping, delivery, offloading, and installation of the cabinet at the site location. Existing ground will be level and accessible with a truck mounted crane for offloading. Contractor to provide all offloading equipment and perform all offloading.

3. The estimated period of performance is June 1, 2024 through October 1, 2024. All equipment must be delivered and installed by October 1, 2024.