About this file
This document is an amendment to a federal solicitation providing additional clarification. It answers contractor questions about backfill requirements, start and completion dates, maximum rock size, and laydown area locations. The purpose is to connect the Rockin L residence to the Hole-in-the-Wall water system for the Mojave National Preserve. Work will be completed within 180 days of a notice to proceed with no firm start or completion dates. Backfill specifications and maximum rock sizes are clarified. A map shows laydown areas by underground storage tanks and a well. The bid opening will take place on July 19, 2023 via Microsoft Teams, with bids due by July 18.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P8123B0002 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PPL
Boulder City NV 89005-2426 601 Nevada Way
NPS, PWR - LAKE MABO
07/11/20230002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/14/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
See Continuation Page
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Maria Stubitz
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
140P8123B0002 Amendment 0002
The purpose of this amendment is to answer contractor questions, revise the specifications, post the visit site sign in sheet and provide the bid opening meeting information.
A. Contractor questions and answers are provided as follows:
Question 1: Please provide backfill requirements for the waterline installation for the scenario in which a trencher is used
Answer 1: Section 8 Trenching Guidelines subpart D.4 has been revised to read:
When chain or wheel trenching techniques are used, the trench width need only be slightly wider than the OD of the water line being installed, but a maximum chain or wheel width of six (6) inches. The backfill to be the excavated material lightly moistened and with any material greater than 3/4-inch in size removed. The backfill material must be mounded three (3) inches above grade on either side of the trench. The mounded section of material shall be compacted using a vibratory rammer (aka tamper) making three passes along the length of the backfilled trench
Question 2: Is there a firm start date and completion date required for this project?
Answer 2: There is no firm start or completion date. Work will be completed within 180 days of issuance of Notice to Proceed.
Question 3: For screened native backfill, what is the maximum rock size allowed?
Answer 3: Section 8 Trenching Guidelines subpart D.1 has been revised to read:
The bedding material must pass the #4 screen and must be retained on the #100 screen. The maximum size of rock in the select backfill material shall be ¾-inch but rock retained on the #4 screen shall comprise no more than 20% of the total volume of the select backfill material. The maximum size of rock in the backfill material shall be 2-inchs, but rock retained on the #4 screen shall comprise no more than 20% of the total volume of the backfill material.
Question 4: Please provide laydown area locations.
Answer 4: Laydown areas include area around underground storage tank and area around 33M1 Well. See attached pdf map.
B. Attached is the revised specification. Changes have been identified by highlights.
C. Attached is the site visit attendance.
D. The bid opening will be held on via Microsoft Teams on July 19, 2023, at 11am Pacific
Daylight Time (PDT). Below is the hyperlink:
Amendment 0002 https://teams.microsoft.com/l/meetup-join/19%3ameeting_NGIxOTA4NGUtZGJlZi00OTY1LTg0NjktMWZmZDIzYjNlNzU4%40t hread.v2/0?context=%7b%22Tid%22%3a%220693b5ba-4b18-4d7b-9341-f32f400a5494%22%2c%22Oid%22%3a%222da10b0b-e814-41bc-9eff-e60b77ae9f23%22%7d
E. The bid due date remains the same, July 18, 2023, at 11am PDT.
Staging / Laydown Areas for Connect Rocking L Residence to Hole-in-the-Wall Water System
Underground Storage Tanks for HITW Water System
33M1 Well Location
Rocking L Ranch
Road to Rocking L Ranch
Staging / Laydown Area
Staging / Laydown Area
CJz tu2o
EL
o
cr) I.t et t c s
\N 's F ,so c.l ftq N \9 l 0o g \n n \4v
I t- J o\
J E
=ul o 6E !i\
U J t) s
Iv a qtv
14v q{ N
Y l;
I I i N F
It c e;
sl ei v
I B $.f
V)
$4
S.;
T T
)( s \s a tu E{z z G Eoo
[nN \ \
{4 u =z.
Y+ q
-dI e.f\
"q o f' uta s
N F r i s o :+-V t )q
,4
C6 a ooJ tsa
IIJ
tsa a.
oo IUo o-v
=u,F clt
.n tr ulF E J J
UI
IF
=ul Jo
ETdc, oez('
!EE,
EPN
Sr:R $g$o-t ocr= tr
SUE
o c o lll IE
OP<(,
f;e U)T6 r*B.Z Jt!
s8 6Etrc<i
ZJ
File details come from the government source that posted it. Updated .