This document is a Questions and Answers (Q&A) addendum for Solicitation #140P6425B0009, a Fire and Intrusion Alarm Replacement project for the Dayton Aviation Heritage National Historic Site. The Q&A covers technical details for installing new fire and security alarm systems across multiple buildings (16, 22, 26, 30, and 277), including specifics on wireless and wired device requirements, camera systems, network configurations, and installation parameters. Key details include wireless fire alarm devices for conditioned buildings, wired devices for unconditioned spaces, a requirement to maintain existing systems during installation, 30-day video storage, motion-activated camera recording, and the need to integrate new systems with Milestone camera platforms. The project allows equipment substitutions provided they meet salient characteristics, and work is generally to be performed during standard business hours with prior approval required for after-hours work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P6425B0009_Amd_0001.pdf | ||
| Drawings.pdf | ||
| Sol_140P6425B0009.pdf | ||
| Specifications.pdf | ||
| Bid_Schedule.xlsx | XLSX spreadsheet | |
| Bid_Schedule.pdf | ||
| Alarms_Product_File.pdf | ||
| DOL_Wage_Determination.pdf | ||
| Submittal_List.pdf | ||
| Limitations_on_Subcontracting_Report.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation #: 140P6425B0009
Amendment #: P0001
Fire and Intrusion Alarm Replacement – DAAV
Questions and Answers listed below:
QUESTIONS:
Question # Question Answer/Response
1. The specs and drawings call for wireless devices, are wireless devices mandatory, or can we use wired devices if we deem it possible?
Sheet E0 1: FIRE ALARM MANUAL PULL STATIONS, SMOKE DETECTORS, AND HEAT DETECTORS TO BE THE
FIRE ALARM MANUAL PULL STATIONS, SMOKE
DETECTORS, AND HEAT DETECTORS TO BE THE WIRELESS
TYPE IN THE FOLLOWING CONDITIONED BUILDINGS 16,
22, 26, 30. IF THERE ARE SPACES IN THESE BUILDINGS
THAT ARE UNCONDITIONED SUCH AS ATTIC SPACES THAN
THOSE DEVICES SHALL BE THE WIRED TYPE. 2. FIRE
ALARM MANUAL PULL STATIONS, SMOKE DETECTORS,
AND HEAT DETECTORS TO BE THE FIRE ALARM MANUAL
PULL STATIONS, SMOKE DETECTORS, AND HEAT
DETECTORS TO BE THE WIRED TYPE IN THE FOLLOWING
UNCONDITIONED BUILDING 277. 3. FIRE ALARM
HORN/STROBE LIGHTS AND STROBE LIGHTS TO BE WIRED.
FIRE ALARM HORN/STROBE LIGHTS AND STROBE LIGHTS
TO BE WIRED. 4. FIRE ALARM DUCT DETECTORS TO BE
WIRED. FIRE ALARM DUCT DETECTORS TO BE WIRED. No changes without CO/COR/Engineer Approval.
2. Is all fire alarm and security wire required to be in conduit, or can it be open ran in concealed spaces (attics & basements)?
Sheet E, Note 5: FIRE ALARM WIRING SHALL BE IN
CONDUIT
3. Do the existing fire alarm systems need to remain active until the new systems are operational?
Sheet E0, Note 13: THE EXISTING FIRE ALARM AND
INTRUSION DETECTION SYSTEMS SHALL STAY
OPERATIONAL THE EXISTING FIRE ALARM AND
INTRUSION DETECTION SYSTEMS SHALL STAY
OPERATIONAL AS LONG AS POSSIBLE AND TO KEEP
DOWN TIME TO A MINIMUM. COORDINATE ANY DOWN
TIME WITH THE CONTRACTING OFFICER OR
CONTRACTING OFFICER REPRESENTATIVE COR
4. In building 16 there is a metal drop in ceiling, does the owner have any spare/replacement tiles for this space, or know the make/model of the existing metal ceiling tiles?
Yes the facility does have a minimal supply of those tiles.
5121 MW Torsion Spring CAT_225
5. Is there any asbestos, lead paint or any other hazardous materials present within any of the buildings?
With the age of the facility there is assumed lead-based paint encapsulated in the walls.
6. There is a security connex/building next to building 227, does any work need to be performed in the connex or is it not a part of the project?
Demo existing Cameras only
7. Per the drawings & scope of work, we are to tie the new cameras into the existing Milestone camera system.
Will the owner be providing licenses for new cameras?
For Milestone you typically have to transfer the main SLC license to the new Milestone distributor before they can install/purchase new licenses.
There is no Existing Milestone server at DAAV
Sheet E1C: THE NATIONAL PARK SYSTEM SHALL PAY FOR
THE LICENSE FEES AND MAINTENANCE FEES TO SUPPORT
THE VIDEO SURVEILLANCE CAMERA SYSTEM
8. Building 16 has existing Avigilon camera equipment, is the Avigilon equipment going away and being converted to the Milestone?
converted to the Milestone
9. Will we be allowed to work within the buildings during normal business hours, or will we have to perform any afterhours work?
Division 1 Section 3.2: On-site work hours: Work shall be generally performed during normal business working hours of 8 a.m. to 5 p.m., Monday through Friday, except when otherwise indicated. Work on Saturdays, Sundays, Federal holidays, early morning, or at night may not be performed without prior consent from the CO and COR.
Submit requests for work outside of the stated normal business hours to the CO and COR for approval at least 48 hours in advance of the work.
10. Are the buildings connected to the same network?
Yes, Buildings 16-22-26-30 are on one system and B 277 is a standalone system.
11. Is any new fiber optic cable that we need to run?
Yes, Multiple locations, See 100% Construction Document Drawings for exact Locations
12. Is there to be a camera server in each building?
During the walkthrough they stated the two houses are connected. So, would there be 3 servers total or will they all connect over the same network? (See question 1
Sheets E2C, E3C, E6C Buildings 16,22, B 277 is a standalone system.
13. Are the cameras to be terminated to a patch panel or directly to the switches?
Sheet E2C Flag Notes 1-7: PROVIDE NEW CAMERA, AND INDOOR PLENUM-RATED CATEGORY 6A
CABLING IN EXISTING CONDUIT TO COPPER PATCH
PANEL IN EXISTING COMMUNICATIONS RACK IN
BASEMENT.
14. How many viewing client stations are needed for the camera system?
What are the locations of the viewing stations?
How many remote viewing stations are there, if any?
Sheets E2C, E3C, E6C: Office B277, Basements of B 22 and 16
None, however, need the capability of logging in through the network to view remotely
15. Are the existing P2P systems to be replaced or utilized in any way? Will any point to point wireless points need to be added?
Existing P2P cameras are to be removed and not replaced.
16. Building #4 had a maintenance shed area?
Are there to be cameras installed there? if so, what are the locations? is that building connected to the larger building or would point to point devices be needed ?
Sheet E6C, No additional Cameras to be installed on buildings other than B277 at the Maintenance area
17. How many days of storage are expected for footage review?
30 Days
18. Are all cameras to be set on motion record or constant? Or is there a recording schedule?
set on motion record
19. Will we have keys for the installers? or will we have to contact someone to unlock doors as needed?
Keys will be available by contacting staff each morning
20. If floor pass throughs are full or cannot be used for some reason, are we allowed to make new ones?
Yes, with park CO/ COR approval
21. Can we get exact device counts to verify against the drawings/prints?
You are welcome to schedule another walk through to verify counts with the 100% drawings.
22. Are the existing pole cams to be left alone and removed by others
Sheet ED01C Existing Pole Cameras are to be removed by the winning contractor.
23. I am interested; however, it looks like this project requires specific manufacturer products (Honeywell, and Bosch) that I am not certified for installation. My system products would be Kidde and 2GIG/Alarm.com - it does not look like substitutions are allowed (correct me if that is not the case).
Substitutes are allowed as long as they meet the salient characteristics provided.