Revised Specifications - EEC Campus Improvements_0003.pdf
PDF 11 MB Posted
- Attached to
- EEC Campus Improvements Federal contract opportunity
- Solicitation number
- 140P6421R0010
About this file
This document announces a solicitation for roof replacement, door and window replacement, siding repairs, painting, and gutter replacement services for the EEC Campus Improvements project at Cuyahoga Valley National Park in Peninsula, Ohio. The National Park Service, Interior Regions 3, 4, and 5 Ohio Major Acquisition Buying Office will award a firm-fixed price contract between $500,000 to $1 million under solicitation number 140P6421R0010 to a prime contractor. The NAICS code is 236115 for new commercial and institutional building construction with a small business size standard of $39.5 million. This project is set aside 100% for small businesses. The evaluation factors are technical, past performance, and price. Construction Wage Rate Requirements for Summit County, Ohio apply. The contracting office will not provide electronic or hard copies of the solicitation and interested parties must visit the site. Offerors must have a DUNS number and register in SAM to be considered for award. The point of contact is Craig D Bryant at craig_bryant@nps.gov or 330-468-2500 x6.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers_0003.pdf | ||
| Sol_140P6421R0010_Amd_0003.pdf | ||
| Site Visit sign-in sheet_0002.pdf | ||
| Sol_140P6421R0010_Amd_0002.pdf | ||
| Questions and Answers_0002.pdf | ||
| Sol_140P6421R0010_Amd_0001.pdf | ||
| 140P6421R0010_0001.pdf | ||
| Past Performance Questionnaire.docx | DOCX document | |
| Sol_140P6421R0010.pdf | ||
| Wage Determination.pdf | ||
| Specifications - EEC Campus Improvements.pdf | ||
| COVID-19 Mask Policy.pdf | ||
| Notice to Contractors.pdf | ||
| Bid Schedule - Campus Improvements.xlsx | XLSX spreadsheet | |
| Technical Questionnaire.pdf | ||
| Technical Questionnaire.docx | DOCX document | |
| Past Performance Questionnaire.pdf | ||
| Bid Schedule - Campus Improvements.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cuyahoga Valley National Park Brecksville, Ohio
STATEMENT OF WORK:
EEC Campus Improvements
PMIS:
245206: Roofing
255384: Windows and Doors 219520: Paint
DATED:
15 March 2021
REVISED: 12 MAY 2021
NATIONAL PARK SERVICE
INTERIOR REGIONS 3/4/5
OHIO MAJOR ACQUISITION BUYING OFFICE
TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
Section 01 10 00 - Division 01 Short Form General Requirements
DIVISION 07 – THERMAL AND MOISTURE PROTECTION (example text)
Section 07 31 13 – Asphalt Shingles
Section 07 46 00-Siding
DIVISION 08 DOORS and WINDOWS SPECIFICATIONS
Section 081113 Hollow Metal Doors and Frames
Section 084213 Aluminum Framed Entrances
Section 085200 Aluminum Clad Windows
Section 087100 Door Hardware
DIVISION 09 – Finishes
Section 09 91 13 – Exterior Painting
DRAWINGS
Photos
SECTION 01 10 00
DIVISION 1 SHORT FORM GENERAL REQUIREMENTS
PART 1 – GENERAL
ITEM 1 - DESCRIPTION OF WORK
1.1 Background: The Cuyahoga Valley Environmental Education Center (known as CVEEC in this document) is part of the Cuyahoga Valley National Park and is consider a school campus. The CVEEC campus is for school children and educational groups. This area requires reservations for use and is closed to the public. The CVEEC is used by school systems during the weekday for daytime programs and is also used as an overnight resident school program. The original structures date back many years and were retrofitted/remodeled 25 years ago for school/resident use. The structures are not considered historic. There are 7 buildings on campus, out of 7 buildings there will be work performed on 6 buildings under this contract. The buildings are named as follows: November Lodge, Lipscomb Dormitory (AKA Gilson House), Lipscomb Barn (AKA Gilson Barn), Administration Building, White Pines Dormitory, White Pines Barn.
This project will have three (3) line items for accounting purposes, known as PMIS numbers. Each PMIS number/project is a separate billable effort. Payments will be made to contractor on progression of each individual line item. The items are: Roofing (PMIS 245206), Windows and Doors (PMIS 255384) and Paint (PMIS 219520). Succession of work and the order of operations will be the responsibility of the prime contractor.
1.2 Work Covered by the Contract Documents:
A. Project Location: Cuyahoga Valley Environmental Education Center 3675 Oakhill Road, Peninsula Ohio 44264
B. Work consists of: Roof replacement, door replacement, window replacement, siding repairs, paint and gutter replacement. Contractor is responsible for determining final quantity required to complete this SOW.
1. Roof replacement, November Lodge: Approximately 8300 square foot asphalt shingle roof replacement, Approximately 1870 square foot metal roof replacement (3 independent metal roof systems), 12 sun tubes, all roof components to include but not limited to flashing, drip edge, vents, boots and water shield. Approximately 343 lineal feet of aluminum gutter and approximately 20 feet copper gutter. Approximately 800 lineal feet fiber cement fascia, approximately 160 lineal feet subfascia.
2. Windows and doors multiple locations: 16 complete exterior door systems to include hardware, 9 complete door hardware replacements, 19 single unit double hung windows, 3 double unit double hung windows, 1 casement window, 1 six-foot glass slider.
Reestablishing all security alarm points on doors and windows.
3. Paint, siding, gutters multiple locations: November Lodge paint approximately 6500 square feet, approximately 1300 square feet siding replacement, approximately 800 square feet fence paint and repair. Administration Building: paint approximately 3150 square feet, approximately 630 square feet siding replacement, approximately 231 lineal feet gutter replacement. Lipscomb Barn and fence: paint approximately 12,650 square feet structure and fence, approximately 485 lineal feet gutter replacement. Lipscomb Dormitory: paint approximately 5400 square feet, approximately 1080 square feet siding replacement, approximately 400 lineal feet gutter replacement
C. All work will be performed under a single contract.
D. Period of performance: Work to be completed 120 days after issuance of the Notice to Proceed
(NTP)
ITEM 2 - EXISTING UTILITIES
2.1 Existing Utilities: Notify Contracting Officer and utility companies of proposed locations and times for excavation.
2.2 Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.
2.3 Water service shall be maintained throughout construction.
2.4 Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:
2.4.1 Notify Contracting Officer not less than two days in advance of proposed utility interruptions.
2.4.2 Hours for Utility Shutdowns: Shut downs shall not exceed 2 to 3 hours. Temporary provisions will be needed by the Contractor for periods longer than stated allowance.
ITEM 3 - CONTRACTOR’S USE OF PREMISES
3.1 Conduct of Operations: At all times the contractor shall conduct his operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by the Park Superintendent
A. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.
B. Smoking is not permitted within any Federal building or within 25 feet of entrances, operable windows, or outdoor air intakes.
C. Pubic Use of Site: Contractor shall at all times conduct operations to ensure the least inconvenience to the public.
3.2 On-site work hours: Work shall be generally performed during normal business working hours of 7 a.m. to 4:30 p.m., Monday through Friday, except when otherwise indicated.
A. Work on Saturdays, Sundays, Federal holidays, early morning, or at night may not be performed without prior consent from the Contracting Officer. Submit requests for work outside of the stated normal business hours to the Contracting Officer for approval at least 48 hours in advance of the work.
3.3 Contractor Use of Site:
A. General: Contractor shall have limited use of the site for construction operations. Limit use of premises to work area, see “Plot Map”. Do not disturb portions of Project site beyond areas in which the Work is indicated.
B. Limits: within 25-feet on either side of the existing building
C. Driveways and Entrances: Keep driveways, access roads, and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize use of driveways and entrances.
D. Limit site disturbance, including earthwork and clearing of vegetation, to:
a. 40 feet beyond building perimeter
b. 10 feet beyond surface walkways, patios, surface parking, and utilities less than 12 inches in diameter
c. 15 feet beyond primary roadway curbs and main utility branch trenches
d. 25 feet beyond constructed areas with permeable surfaces (such as pervious paving areas, storm water detention facilities, and fields) that require additional staging areas in order to limit compaction in the constructed area.
E. Security and Protection facilities installation:
1. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.
4. Cleaning of Equipment: The Contractor shall ensure that prior to moving on to the Project Area, all equipment, is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Ensure that all equipment has been pressure washed and is free of exotic species prior to start-up of operations and moving of equipment to Project Area. Equipment shall be considered free of soil, seeds, and other debris when a visual inspection does not disclose such material. Disassembly of equipment components or specialized inspection tools are not required.
5. Pest Control: Follow NPS requirements and practices to minimize attraction and harboring of rodents, roaches, and other pests and to perform extermination and control procedures at regular intervals so Project will be free of pests and their residues at final acceptance/project completion. Perform control operations lawfully, using environmentally safe materials.
3.4 Storage - Staging Areas:
A. Confine Storage of materials and equipment to the project area shown on the map. Material can be stored on the back half of the administration parking lot. See the CVEEC Campus Map, Staging Area.
3.5 Preservation of Natural Features: N/A
3.6 Hauling Restrictions: Match State and County road requirements for all park work/access.
3.7 Housekeeping:
A. Keep project neat, orderly, and in a safe condition at all times. Store and use equipment, tools, and materials in a manner that does not present a hazard. Immediately remove all hazardous rubbish. Do not allow rubbish to accumulate. Provide onsite containers for collection of rubbish and dispose of it at frequent intervals during progress of work.
B. Dispose of waste materials legally outside the park.
C. Address Recycling
3.8 Occupancy Requirements for Buildings:
A. Existing Buildings:
1. Full Government Occupancy: Government will occupy buildings that will be under construction during the entire contract period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government's day-to-day operations. Maintain existing exits, unless otherwise indicated.
a. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the CO.
b. Maintain existing building in a weather tight condition throughout construction period. Repair damage caused by construction operations. Protect building and its occupants during construction period.
3.9 Photo Documentation:
All photos shall be in focus, show maximum range of depth of field general photo and then close up detail photo as needed. Shall be in JPEG digital form and submitted via CD-R Archival Gold or DVD-R Archival Gold media with printed labels and 8 mega pixels minimum within 7 days from time of taken or as approved by COR.
A. Existing Condition Images: Before starting construction, take color, dated, digital images of project site and adjacent property/roads/etc. that may be impacted by construction activity/traffic.
Include existing items to remain or be salvaged from different vantage points and with context for location identification.
B. Construction Images:
1. Document all sub-surface work/ trenches etc. prior to backfill with enough overall field view to show location and then details.
2. Maintain organized index for photos with date, description, etc..
3. Additional images as needed when questions or emergency situations occur. Submit within 24 hours.
3.10 Fire and Life Safety:
As a minimum, conduct one weekly 15-minute "toolbox" safety meetings. These meetings shall be conducted by a foreman or supervisor and attended by all construction personnel at the worksite. Topics need to coincide with work scheduled for the following week. Contractor is to document meeting minutes on the Contractor’s Quality Control Daily Reports.
A. Comply with the requirements of NFPA 241 (Standard for Safeguarding Construction, Alteration, and Demolition Operations).
B. Store and handle hazardous materials in accordance with manufacturer’s and OSHA 29CFR1926 Subpart D requirements. Maintain readily available, on site, MSDS/Safety Data Sheets (SDS) for each chemical.
i. Immediately report all spills of hazardous materials to the park.
ii. Maintain a spill emergency response kit.
iii. Train employees how to respond to a spill and use the emergency response kit.
3.11 Noise and Acoustics Management:
A. Noise Control: Perform demolition and re-roof operations to minimize noise. Perform noise-producing work in less sensitive hours of the day or week as directed by the Contracting Officer
(CO).
B. Repetitive and/or intermittent, high-level noise: Permitted only during Daytime.
1. Do not exceed the following dB(A) limitations at 50 feet:
Sound Level in dB(A) Time Duration of Impact Noise 70 More than 12 minutes in any hour 80 More than 3 minutes in any hour
2. Maximum permissible construction equipment noise levels at 50 feet:
EARTHMOVING dB(A) MATERIALS HANDLING dB(A) Compressors 75 Pneumatic Tools 80 Pumps 75 Saws 75 Generators 75 Vibrators 75
C. Ambient Noise:
1. Maximum noise levels (dB) for receiving noise area at property line shall be as follows:
a. Residential receiving area :
Daytime: 65 dB Nighttime: 45 dB
b. Commercial/Industrial receiving area:
Daytime: 67 dB Nighttime: 65 dB
ITEM 4 - COMMENCEMENT, PROSECUTION, AND COMPLETION
4.1 The Contractor shall commence work in accordance with the terms and conditions of the contract.
1. Work shall commence upon notice to proceed.
2. The period of performance for this project is 120 days after issuance of NTP.
ITEM 5 - EXAMINATION OF THE SITE
5.1 All bidders are urged to visit the job site and examine existing conditions before submitting bids. All bidders will be held to have the same knowledge concerning the site and the on ground conditions as if they had inspected the job site. No change orders will be approved for work obvious during a site visit.
Please see FAR 52.236-27 - Site Visit (Construction).
ITEM 6 - ABBREVIATIONS
6.1 The list of abbreviations, which may be used in the Construction Specifications or Special Provisions, refer to the organizations and specifications of the organizations may be found at the below https://www.nps.gov/orgs/1671/do-business-with-us.htm
ITEM 7 - ACCIDENT PREVENTION
7.1 Description: The work of this section consists of establishing and implementing an effective accident prevention program and providing a safe environment for all personnel and visitors.
A. It is the Contractor's responsibility to require all those working on or visiting the site to wear hard hats and other necessary personal protective equipment in good repair at all times. As a minimum, maintain four hard hats and all other APP required equipment.
7.2 Submittals:
A. Accident Prevention Program: Prior to any work commencing on site submit an accident prevention plan must be submitted and approved. The plan shall include:
1. Name of responsible supervisor to carry out the program
2. First aid procedures
3. Training, both initial and continuing
4. Planning for possible emergency situations
5. Contractor to identify nearest location of medical facility for emergencies https://www.nps.gov/orgs/1671/do-business-with-us.htm
6. Recognition that work will be performed in remote areas with limited communication or cell phone coverage
B. Meeting and Inspection Reports: Safety Meetings: As a minimum, conduct 15 minute
"toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite. Submit a report of safety meetings and inspections.
Contractor is to document meeting minutes on the Contractor’s Quality Control Daily Reports.
7.3 Qualification of Employees:
A. Ensure that employees are physically qualified to perform their assigned duties in a safe manner to include operators of vehicles and equipment. Provide operating instructions for all equipment.
B. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.
7.4 Accident Reporting: The Contractor shall report all accidents to the Contracting Officer or designee as soon as possible and assist the Contracting Officer and other officials as required in the investigation of the accident.
7.5 First Aid Facilities: Provide adequate facilities for the number of employees and the type of construction at the site.
7.6 Emergency Instructions: Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.
7.7 Protective Equipment: It is the Contractor's responsibility to require all those working on or visiting the site to wear necessary protective equipment at all times.
7.8 Hazardous Materials: It shall be the responsibility of all operators and contractors, functioning within the park to properly cleanup, mitigate and remediate if necessary, all unauthorized discharges of hazardous materials or non-hazardous chemical and biological products released from fleet and/or other support vehicles or stationary sources. Response shall be consistent with guidelines established by federal, state and local regulations, and as outlined within the operator's Safety or Hazardous Materials Business Plan.
A. If a spill, leak or other release occurs, the operator shall as soon as possible, without impeding cleanup, notify the National Park Service Emergency Dispatch at 440-546-5945 and the assigned COR.
ITEM 8 - PRECONSTRUCTION CONFERENCE: See FAR 52.236-26
ITEM 9 - SUBMITTALS
A. General Submittal Procedures: Prepare and submit submittals required by individual Specification Sections. Types of submittals are indicated in individual specific sections. CM-16 Transmittal Form: All submittals shall be transmitted via email using National Park Service form CM-16 form. The form will be provided by the Contracting Officer. No action will be taken on a submittal item unless accompanied by the CM-16 transmittal form. Contractor shall submit to Contracting Officer (CO) and Contracting Officer Representative (COR).
1. Documents to be submitted to Contracting Office before Notice to Proceed (NTP) will be issued (all are due 10 calendar days after notice of contract award):
1. Signed Contract
2. Alternative Payment Protection - Must provide either a Payment
Bond or Irrevocable Letter of Credit for construction contracts greater than $35,000, but not greater than $150,000
a. Payment Bonds - Must be provided for construction contracts exceeding $150,000
b. Performance Bond - Must be provided for any construction contracts exceeding $150,000
3. Certificate of Liability Insurance
4. Letter Designating the Project Manager and Site Superintendent and their authority as it pertains to this project
If all of the documents listed above have not been received, Notice to Proceed will not be issued, and the Contracting Officer will consider other contractual remedies. Work shall not commence until written Notice to Proceed has been issued.
2. Documents to be submitted to Contracting Office after NTP has been issued and work can be performed on-site/begin (all are due 10 calendar days after issuance of NTP or otherwise specified in the table below):
The following submittals shall be submitted with a CM-16 transmittal cover sheet to the CO/COR and submitted for approval as outlined below:
1. Work/Project Schedule -- delineating the various stages of work by phase (milestones)
2. Contractor shall provide, when applicable but not limited to, copies of product specifications, manufacturer’s literature and installation instructions of all materials and products to be furnished and installed. COR will verify that product specifications meet contract requirements.
3. Safety/Accident Prevention Plan
4. Documentation of licensing or certifications as an approved installer by manufacturer of materials for each individual product submittal and shop drawing (if required)
5. List of individuals working on the project
6. SF1413 – Statement of prime contractor/ acknowledgement of subcontractor
7. Safety Data Sheets (SDS) for each individual product submittal and shop drawing (if required)
3. The following submittals are required to be submitted before final payment is made:
1. Unless otherwise specified in the specifications, Contractor is required to provide at the end of the project a series of before, during and after pictures of what was completed. The pictures will include all areas the contractor is authorized to work on.
2. Manufacturers recommended care and cleaning requirements (if applicable)
3. Receipts from recycling companies showing quantity of material being recycled.
4. Warranty documentation for workmanship (as outlined in the
Specifications/Statement of Work: Start date of warranty will be the date shown on the Final Inspection Checklist/Report)
5. Product warranties (if applicable)
6. Pay applications
7. Certified payrolls
8. Contractor quality control daily reports (any outstanding)
9. Release of Claims - must be for the full amount of the contract (to include modifications)
10. SF1413 (any outstanding) - Statement of prime contractor/ acknowledgement of subcontractor
11. Drawings/pictures (if applicable), etc.
12. Testing Reports (if applicable)
13. Final Inspection Checklist/Report (initiated by the COR, all parties sign once complete)
A. Submittal List: A submittal list has been attached to the end of this Specification Section. The intent is to provide an overall summary of submittal requirements and not a comprehensive list. The requirements of the individual Specification Sections, terms and conditions of the Contract still apply regardless of what is shown on the submittal list.
B. The items in the Submittal List shall be submitted in accordance with the “Date Completed” column. If all of these documents have not been received in the timeframe outlined in the column, the Notice to Proceed will not be issued, and the Contracting Officer will consider other contractual remedies. Work shall not commence until written Notice to Proceed has been issued. Contracting Officer will notify the Contractor of tentative date for the Pre- Construction Conference after contract award.
Deliverable Description Quantity/
Format Date Completed
1. Signed Contract.
Electronic Copy
10 calendar days after Notice of Award
2. Payment Bond/Performance Bond or irrevocable letter of credit.
Electronic Copy
10 calendar days after Notice of Award
3. Satisfactory evidence of liability insurance coverage and workman’s compensation for the Contactor and all subcontractors.
Electronic Copy
10 calendar days after Notice of Award
4. Letter designating Project Superintendent and Site Superintendent and their authority as it pertains to this project.
10 calendar days after Notice of Award
5. Documentation of licensing or certification as an approved installer by manufacturer of materials to be used.
Electronic Copy
10 calendar days after Notice to Proceed
6. Project Schedule Electronic
10 calendar days after Notice to Proceed
7. List of individuals working on the project
10 calendar days after Notice to Proceed
8. Safety/ Accident Prevention Plan Electronic Copy
10 calendar days after Notice to Proceed - before any work is conducted/begins
9. Product Specifications manufacturer’s literature and installation instructions of all materials (when applicable)
Electronic Copy
10 calendar days after Notice to Proceed
10. List of all subcontractors Electronic Copy
10 calendar days after Notice to Proceed
11. Written statements from subcontractors certifying compliance with applicable labor standard clauses
(SF1413).
Electronic Copy
10 calendar days after Notice to Proceed
12. Safety Data Sheets (SDS) for all applicable materials (if applicable)
Electronic Copy
10 calendar days after Notice to Proceed
13. Required photographs - before, during and after pictures of what was completed.
Electronic Copy
At the time of contract acceptance/completion or as specified in the specifications
14. Manufacturers recommended care and cleaning requirements
Electronic Copy
At the time of contract acceptance/completion
15. Receipts from recycling companies showing quantity of material being recycled
Electronic Copy
At the time of contract acceptance/completion
16. Warranty documentation for workmanship
Electronic Copy
At the time of contract acceptance/completion
17. Product warranties (if applicable) Electronic Copy
At the time of contract acceptance/completion
18. Pay applications Electronic Copy
At the time of contract acceptance/completion or as needed for progress payments
19. Certified payrolls Electronic Copy
At the time of contract acceptance/completion or as needed for progress payments
20. Contractor quality control daily reports (any outstanding)
Electronic Copy
At the time of contract acceptance/completion or as needed for progress payments
21. Release of Claims - must be for the full amount of the contract (to include modifications)
Electronic Copy
At the time of contract acceptance/completion
22. SF1413 (any outstanding) - Statement of prime contractor/ acknowledgement of subcontractor
Electronic Copy
At the time of contract acceptance/completion or as needed before and throughout the life of the contract
23. Product Delivery List with true dimensions (doors and windows) Drawings/pictures
Electronic Copy
At the time of contract acceptance/completion or as specified in the specifications
24. Testing Reports (if applicable) Electronic Copy
At the time of contract acceptance/completion or as specified in the specifications
25. Final Inspection Checklist/Report Electronic Copy
At the time of contract acceptance/completion
9.2 Shop Drawings, Product Data, and Samples: Contracting Officer will provide sample cover sheet in the form of the CM-16 transmittal cover sheet.
A. Shop Drawings: See technical specifications
B. Product Data: See technical specifications
C. Samples: See technical specifications
D. For submittals specified above, forward submittals to CO and COR at least 15 calendar days before need for approval (depends on length of project).
E. Submittals are to be provided electronically, except in the case of otherwise specified physical color or materials samples (if required). After approving submittals, Contracting Officer will return one copy of the approved submittal to the Contractor. If submittals are not approved, Contracting Officer will return copy of the disapproved submittal that was provided electronically, not to include color and material samples submitted, to Contractor with reasons for rejection. Contractor will be required to resubmit, correcting the identified reasons in the returned disapproved submittal. Any work done before approval shall be at Contractor's own risk.
9.3 Approved Equals: If an item in this solicitation is identified as “brand name or equal” or lists more than 3 manufacturers, the product description reflects the characteristics and level of quality that will satisfy the Government’s needs. The salient physical, functional, or performance characteristics that “equal” products must meet are specified in the solicitation or relevant specification.
A. For each item proposed as an “approved equal,” submit supporting data, including:
1.Drawings and samples as appropriate.
2. Comparison of the characteristics of the proposed item with that specified.
3. Changes required in other elements of the work because of the substitution.
4. Name, address, and telephone number of vendor.
5. Manufacturer’s literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists. Describe availability of maintenance service, and state source of replacement materials.
B. A request for approval constitutes a representation that Contractor:
1. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.
2. Will provide the same warranties for the proposed item as for the item specified.
3. Has determined that the proposed item is compatible with interfacing items.
4. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.
5. Waives all claims for additional expenses that may be incurred as a result of the substitution.
C. Approved Equals will be evaluated and approved/disapproved during the submittal process.
9.4 Project Schedule: Within 10 calendar days after issuance of NTP and before beginning any work, submit Project Schedule. Contracting Officer Representative and Contracting Officer will review the Project Schedule for format and content. Submit Project Schedule electronically (normally in Gantt Chart format) showing estimated starting and completion dates for each part of the work. The first progress payment will not be issued until an acceptable project schedule is submitted. The following information must accompany submission of project schedule prior to processing any pay application:
A. Daily/weekly progress reports during construction as part of the administration process.
ITEM 10 – TEMPORARY SERVICES
10.1 Description: The work of this section consists of providing temporary services required for Contractor's performance of the work of this Contract.
10.2 Fire Prevention and Protection:
A. Hazard Control: Take all necessary precautions to prevent fire during construction. Provide adequate ventilation during use of volatile or noxious substances.
ITEM 11 - PROJECT CLOSEOUT
11.1 Description: The work of this section consists of final cleanup, closeout submittals, final inspection procedures, and safety precautions.
11.2 Cleaning: Remove all tools, equipment, surplus materials, and rubbish. At time of final inspection, project shall be thoroughly clean and ready for use.
11.3 Project Completion and Final Inspection: Submit written certification that project is complete, and a final inspection must be requested to the Contracting Officer in writing. The Contracting Officer or designee will make an inspection within 10 days of receipt of request or at a mutually agreeable time.
A. If the work is determined to be complete, following the final inspection, the Contracting Officer
Representative will prepare and complete the Final Project Closeout Checklist/Inspection document and provide acceptance of the work to the Contracting Officer representative.
Contracting Officer will then make final approval of the Final Project Closeout Checklist/Inspection document issuing final acceptance of the project.
B. If the work is not determined to be complete following the final inspection, the Contracting
Officer and/or Contracting Officer Representative will notify Contractor in writing and prepare the Punchlist Items on the Final Project Closeout Checklist/Inspection document. Contractor shall request a new final inspection after completing the work. Re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction contract clause.
C. Contractor shall complete the Punch List items as documented on the final project closeout checklist/inspection document.
D. If Contractor completes all items of work on the Punch List and all contractually required items, Contracting Officer will issue documentation of final acceptance/project completion of the work by issuing final approval on the Final Project Closeout Checklist/Inspection document, resulting in issuing final acceptance of the project.
E. If the Contractor fails to complete the work within the time frame, the Contracting Officer may correct the work with an appropriate reduction in contract price or charge for re-inspection costs in accordance with the Inspection of Construction contract clause.
F. Disposition of any permits and warranties required by the specifications in this section.
11.4 Acceptance of the Work: After all deficiencies have been corrected, a Letter of Acceptance will be issued. Contractor will be required to submit all items as outlined in the submittal section above before final payment will be approved and finalized.
11.5 Warranties
A. 1-year Construction Warranty on all labor and workmanship shall be based on date of Final Project Closeout Checklist/Inspection document in which final acceptance is determined/issued by COR and contractor during the project closeout phase. This warranty does not include the individual manufacturer’s part or product implied warranties.
B. Provide All Warranty information of products installed organized by Division. All contact information, extents and conditions shall be clearly noted as well as date of overall final acceptance/project completion.
C. Information shall include operation and maintenance manuals for each warranted material.
12. Green Requirement
A. To the greatest extent possible, provide products and materials that have a lesser or reduced effect on the environment considering raw materials acquisition, production, manufacturing, packaging, distribution, reuse, operation, maintenance, and/or disposal of the product.
B. Use products meeting or exceeding EPA’s recycled content recommendations for EPA designated products. Use materials with recycled content such that the sum of postconsumer recycled content plus on-half of the pre-consumer content constitutes at least 10% (based on cost) of the total value of the materials in the project.
END OF SECTION
SECTION 073113
ASPHALT SHINGLES
PART 2 - GENERAL
2.1 SCOPE OF WORK
A. Project Location: CVEEC, Cuyahoga Valley National Park, 3675 Oak Hill Road, Peninsula Ohio 44264
B. Building(s) Name/Identifier: November Lodge
C. Work consists of the following:
1. Full tear-off of roof system at areas indicated on Drawings or in Photographs provided.
a. Removal of existing roofing system down to existing roof deck.
b. Approximately 8300 sqft of dimensional asphalt shingles will be removed and replaced
1. New shingles will be 50 year architectural shingles (color selection pending)
2. Chimney flashing and skylight flashing will be replaced in kind
3. All roof components to include but not limited to: flashing, drip edge, vents, boots, under layments, ice and water shield and sun tubes will be replaced, see specifications of this document for detailed specifications and refer to specification sheet in the contract
c. Approximately 1870 sqft Metal Roofing: There are 3 separate metal roofs on this building.
2. Re-cover preparation of entire roof area where tear-off occurs, including installation of new roofing system.
3. Removal and replacement of flashings and counterflashing’s.
4. Removal of wood fascia and replacement with fiber cement fascia.
5. Existing fascia is 2x8 SPF white wood and approximately 800 lineal feet. All fascia will be removed and replaced with factory finished smooth fiber cement board measuring 5/4 inch thick by 7 ¼ inches wide by 12 foot long pieces. There are 2 separate distinct colors on this structure, fascia will be factory painted and match existing colors (see spec sheet).
Face nails in fascia will be touched up with manufacturer recommended matching paint.
6. Subfascia will be inspected for insect and water damage, all damaged subfascia will be replaced in-kind and in full stick original lengths. Contractor should estimate approximately 20% of subfascia will be replaced.
7. Fascia that meets on eave and rake will be touching, mitered and completely sealed. There will be no exposed subfascia on any part of the structure. All exposed surfaces will be inspected by COR or the Inspector before covering up and documented. If areas are covered before inspection and documentation are complete, the material that is covering will be removed and reinstalled at no cost to the government.
8. Contractor will apply a continuous bead of caulking on soffit side of fascia. The soffit and fascia will be completely sealed. Caulking material will be recommended by fascia manufacturer and will color match fascia.
9. Removal and replacement of all gutters and downspouts on November Lodge.
10. Approximately 343 Lineal feet of gutter and associated downspouts will be replaced with 22 gauge, aluminum seamless gutters
1. Gutters will have leaf filter technology
2. Approximately 20 foot copper gutter system will be replaced with an 8 inch box gutter, 20oz/sf copper. Approximately 25 feet rain chains will be replaced in-kind (see images). Gutter will have copper leaf filter system with stainless steel mesh.
11. Removal and replacement of vents, stacks and boots in kind.
12. Removal and replacement of 12 sun-tube system and replace with full system to include:
clear dome, flashing, mirror lining and interior diffusion lenses.
13. Temporary roofing during construction where required. Temporary roofing shall maintain the project roof is watertight and able to prevent leaks and damage to the building and structure until the reroofing work is completed. Contractor is to make sure that at the completion of work each day the projects roof is 100% watertight.
14. Remove and replace the existing asphalt shingle roof system and associated roof flashings, down to deck and patch any openings in the structural decking as required before installing the new roof system, associated metal roof flashings and trims. Replace existing roof gutters and downspouts.
15. National Park Service (NPS) requires the existing roof decks to be walked after demolition has been completed with their onsite Contracting Office Representative (COR) or designated Project Inspector prior to installation of any new roof materials to ascertain if any water penetration has caused deterioration or corrosion of the existing decks which are to remain. If there are areas of concern the COR may require the Contractor to perform pull out tests to determine if the existing decking in question can remain or if it will need to be replaced. This can include visible areas of water damage or insect related damage.
Testing and replacement of these types of unforeseen damaged areas will be by Change Order if required.
D. Roof Area:
1. Approximately 8300 square feet asphalt shingles, approximately 1870 metal roof.
2. Note the Contractor is encouraged to field verify roof dimensions prior to bidding.
Contractor is responsible for determining what quantity required to complete this SOW prior to bidding.
2.2 SUMMARY
A. Section Includes:
1. Selective Demolition.
2. Glass-fiber-reinforced asphalt shingles.
3. Underlayment materials.
4. Vents and plumbing stack boots.
5. Sheet metal flashing and trim.
6. Gutter and downspouts.
7. Sun tubes
8. Metal Roof
9. Fascia and subfacia
2.3 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
2.4 ACTION SUBMITTALS
A. Product Data: For the following:
1. Asphalt shingles.
2. Underlayment materials.
3. Ridge vents.
4. Asphalt roofing cement.
5. Elastomeric flashing sealant.
6. Vents and plumbing stack boots.
7. Sheet metal flashing and trim.
8. Gutters and down spouts
9. Sun Tubes
10. Metal Roofing
11. Fascia
B. Sustainable Design Submittals:
1. Product Test Reports: For roof materials, documentation indicating that roof materials comply with Solar Reflectance Index requirements.
C. Shop Drawings: For sheet metal flashing and trim.
D. Samples: For each exposed product and for each color and blend specified.
http://www.arcomnet.com/sustainable_design.aspx?topic=6
2.5 INFORMATIONAL SUBMITTALS
A. Product test reports.
B. Research reports for synthetic underlayment.
C. Sample warranty.
1. Material warranty.
2. Roofing installer warranty.
2.6 SUBMITTAL COORDINATION
A. Submittal List: A submittal list has been attached to the end of this Specification Section. The intent is to provide an overall summary of the submittal requirements and not a comprehensive list. The requirements of the individual Specification Sections, terms and conditions of the Contract still apply regardless of what is shown on the submittal list.
2.7 CLOSEOUT SUBMITTALS
A. Maintenance data.
2.8 QUALITY ASSURANCE
A. Installer Qualifications: An authorized installer who is trained and approved by manufacturer.
Contractor must provide updated written qualifications from manufacturer.
2.9 WARRANTY
A. Materials Warranty: Manufacturer agrees to repair or replace asphalt shingles that fail within specified warranty period.
1. Materials Warranty Period: 50 years from date of final acceptance/project completion, prorated, with first 10 years no prorated.
2. Wind-Speed Warranty Period: Asphalt shingles will resist blow-off or damage caused by wind speeds of up to 130 mph (58.1 m/s) for 15 years from date of final acceptance/project completion. Contractor must ensure all materials and installation requirements are met by manufacturer to achieve the warranty period.
3. Algae-Resistance Warranty Period: Asphalt shingles will not discolor for 10 years from date of final acceptance/project completion.
B. Roofing Installer’s Warranty: Roofing installer to provide and sign a Roofing Installer’s Warranty in which Installer agrees to repair or replace components of asphalt-shingle roofing that fail in materials or workmanship within specified warranty period.
1. Warranty Period: Ten years from date of final acceptance/project completion.
PART 3 - PRODUCTS
3.1 PERFORMANCE REQUIREMENTS
A. Exterior Fire-Test Exposure: Provide asphalt shingles and related roofing materials identical to those of assemblies tested for Class A fire resistance in accordance with American Society of Testing Materials (ASTM) E108 or UL 790 by Underwriters Laboratories or another testing and inspecting agency acceptable to authorities having jurisdiction. Identify products with appropriate markings of applicable testing agency.
B. Wind Resistance: Provide asphalt shingles that comply with requirements of ASTM D7158/D7158M, Class H.
C. Energy Performance, ENERGY STAR: Provide asphalt shingles that are listed on the DOE's "ENERGY STAR Roof Product List" for steep-slope (2:12 or greater) roof products.
D. Solar Reflectance Index (SRI): Three-year-aged SRI not less than 0.15 or initial SRI not less than
0.25 when calculated according to ASTM E 1980, based on testing identical products by a qualified testing agency.
E. Shingles:
1. Mineral granular-surfaced asphalt shingles.
a. Self-sealing.
b. Dimensional.
c. Fungus-resistant.
d. Impact resistant shingles, Class 4.
e. Type I, weighing not less than 270 pounds per 100 square feet.
3.2 GLASS-FIBER-REINFORCED ASPHALT SHINGLES
A. Laminated-Strip Asphalt Shingles: ASTM D3462/D3462M, laminated, multi-ply overlay construction; glass-fiber reinforced, mineral-granule surfaced, and self-sealing.
1. Basis of Design: Atlas Pinnacle Pristine High Performance Shingles.
2. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Atlas Molded Products; a Division of Atlas Roofing Corporation.
b. CertainTeed Corporation.
c. GAF.
d. Owens Corning.
e. Tamko Building Products, Inc.Other Approved Equals.
3. Strip Size: Manufacturer's standard approximately 42 inch.
4. Algae Resistance: Granules resist algae discoloration.
5. Impact Resistance: Underwriters Laboratory (UL) 2218, Class 4.
6. Fire Resistance: UL 790 for Class A.
7. Color and Blends: As selected by COR from manufacturer's full range.
B. Hip and Ridge Shingles: Manufacturer's standard units to match asphalt shingles.
http://www.arcomnet.com/sustainable_design.aspx?topic=28 http://www.specagent.com/Lookup?ulid=4726 http://www.specagent.com/Lookup?uid=123457152155 http://www.specagent.com/Lookup?uid=123457152156 http://www.specagent.com/Lookup?uid=123457152154 http://www.specagent.com/Lookup?uid=123457152159 http://www.specagent.com/Lookup?uid=123457152161
3.3 UNDERLAYMENT MATERIALS
A. Synthetic Underlayment: UV-resistant polypropylene, polyolefin, or polyethylene polymer fabric with surface coatings or treatments to improve traction underfoot and abrasion resistance;
evaluated and documented to be suitable for use as a roof underlayment under applicable codes by a testing and inspecting agency acceptable to authorities having jurisdiction.
1. Basis of design: RhinoRoof U20, as manufactured by InterWrap, Inc.
a. Product requirements include the following minimum characteristics listed below:
1) Permeability ASTM E96 - .05 perms.
2) Water Transmission ASTM D4869 – pass.
3) Tear Strength ASTM D4533 – MD 30 lbs (14 kg).
4) Tensile Strength ASTM D751 – MD 80 lbs (36 kg).
5) Bursts Strength ASTM D751 – 150 psi (1033 kPa)
6) Nominal Thickness ASTM D1777 – 6 mils (0.15 mm).
7) Width Per Roll – 36 inches.
2. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Atlas Roofing Corporation.
b. CertainTeed Saint-Gobain.
c. GAF.
d. Owens Corning.
e. Tamko Building Products, Inc.
f. Other Approved Equals.
B. Valleys, Eaves, Rake, and Roof/Wall Intersections ,Upper Termination of Shed Roof: Install Self- Adhering, Polymer-Modified Bitumen Sheet: ASTM D1970/D1970M, minimum 55-mil- (1.4-mm-) thick sheet; glass-fiber-mat-reinforced, polymer-modified asphalt; with slip-resistant top surface and release backing; cold applied. Material to be supplied in 36 inch wide rolls. Provide primer for adjoining concrete, masonry, and metal surfaces to receive underlayment as recommended by the manufacturer. Approved product includes but is not limited to the following:
1. Grace Ice & Water Shield; Grace Construction Products.
2. WinterGuard Waterproofing underlayment; CertainTeed.
3. RhinoRoof Granulated Self-Adhered underlayment.
4. Other Approved Equals.
3.4 VENTS
A. Rigid Ridge Vent: Manufacturer's standard, rigid-section, high-density, UV-stabilized plastic ridge vent for use under ridge shingles. Provide vents to match the size and net free area of the existing vents being replaced.
1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:
a. VenturiVent Plus, as manufactured by Air Vent Inc.
b. Certainteed Ridge Vent - 12".
c. Owens Corning VentSure.
d. Other Approved Manufacturers.
http://www.specagent.com/Lookup?ulid=9296 http://www.specagent.com/Lookup?uid=123457152955 http://www.specagent.com/Lookup?uid=123457152918 http://www.specagent.com/Lookup?uid=123457152205 http://www.specagent.com/Lookup?uid=123457152207 http://www.specagent.com/Lookup?uid=123457152209
2. Minimum Net Free Area: 18 sq. in. per ft.
B. Hood / Static Vent: Where shown on the drawings install slant-back, box type vents with minimum free area of 50 sq. inches (0.35 sq. ft) with filters. Provide vents to match the size and net free area of the existing vents being replaced. Color to be selected by COR from manufacturer’s standard finishes. Approved products as manufactured by but not limited to the following:
1. Air Vent, Inc.
2. CertainTeed.
3. Broan.
4. Other Approved Manufacturers.
C. Continuous Soffit Vents: Where shown on the drawings install continuous soffit vents with 9 sq.
in. per ft. minimum net free area. Provide soffit vents to match the size and net free area of the existing soffit vents being replaced. Approved products as manufactured by but not limited to the following:
1. Air Vent Inc.
2. Tymlyn.
3. Warehouebay Corp.
4. Other Approved Manufacturers.
D. Under-eave Vents: Where shown on the drawings install under-eave vents to match the size and net free area of the existing under-eave vents being replaced. Approved products as manufactured by but not limited to the following:
1. Air Vent Inc.
2. Tymlyn.
3. Warehouebay Corp.
4. Other Approved Manufacturers.
3.5 ACCESSORIES
A. Asphalt Roofing Cement: ASTM D4586/D4586M Type II, asbestos free.
B. Roofing Nails: ASTM F1667, aluminum, stainless steel, copper, or hot-dip galvanized-steel wire shingle nails, minimum 0.120-inch- (3-mm-) diameter, sharp-pointed, with a 3/8- to 7/16-inch- (10-to 11-mm-) diameter flat head and of sufficient length to penetrate 3/4 inch (19 mm) into solid wood decking or extend at least 1/8 inch (3 mm) through sheathing less than 3/4 inch (19 mm) thick.
1. Where nails are in contact with metal flashing, use nails made from same metal as flashing.
C. Synthetic Underlayment Fasteners: As recommended in writing by synthetic-underlayment manufacturer for application indicated.
3.6 SELECTIVE DEMOLITION
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Full Roof Tear-off: Removal of existing roofing system down to existing roof deck or structure.
2. Temporarily protect existing roofing system and components that are to remain as required from damage.
3. Existing roof drains and roof drainage shall be protected during each stage of reroofing, and roof-drain plugs shall be installed when demolition is taking place so that debris cannot be lost down the drains. Contractor shall remove all drain plugs when demolition is completed in the area affecting the drain.
4. Do not remove more roof than can be replace in a day, and the roof will be made watertight each night.
5. Remove debris and materials so as not to impose excessive loads on supporting roof, structure or framing.
6. Dispose of demolished items and materials promptly.
B. Inspect deck after tear-off of roofing system.
1. If broken or loose fasteners that secure deck panels to one another or to structure are observed, or if deck appears or feels inadequately attached, immediately notify COR.
a. Do not proceed with installation until directed by COR.
2. If deck surface is unsuitable for receiving new roofing or if structural integrity of deck is suspect, immediately notify COR.
a. Do not proceed with installation until directed by COR.
C. Disposal of Demolished Materials:
1. General: Except for items or materials indicated to be reused, salvaged, reinstalled, or otherwise indicated to remain NPS's property, remove demolished materials from Project site.
a. Do not allow demolished materials to accumulate on-site.
b. Remove and transport debris in a manner that will prevent spillage on adjacent…
This is the start of the file's text. The full file is on GovTribe.