THIS IS A NOTICE OF INTENT FOR REQUEST FOR PROPOSALS
Solicitation number
140P6418R0037
Issued by

About this file

140P6418R0037

View the file

Other files

File Type Posted
B08_DOL_Wage_Determination.pdf PDF
B08_Solicitation_Bid_Schedule2.xls XLS spreadsheet
A04_SOW.pdf PDF
B08_Notice_to_Contractors.pdf PDF
B08_Past_Performance.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

0040399254

NPS, MWR - Ohio MABO

1113 West Aurora Road

Sagamore Hills OH 44067-1678

PMO

Katherine Bernard 330 468-2500

1x 07/06/2018

140P6418R0037

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

The contractor shall furnish all labor, materials, equipment, blocking, staging and tools necessary to accomplish the 5-year mandatory dry-docking inspection of the

Ranger III to include all necessary repairs.

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

5 42 calendar days and complete it within ________________ ________________ calendar days after receiving

08/06/2018

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

NPS, MWR - Ohio MABO 1113 West Aurora Road

Sagamore Hills OH 44067-1678

PMO

Terri Tharp

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 39

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

140P6418R0037

Delivery Location Code: 0009060393

NPS, MWR, Isle Royale NP

800 East Lakeshore Drive

Houghton MI 49931 US

FOB: Destination

Period of Performance: 10/29/2018 to 12/08/2018

00010 Mandatory Dry Dock of MV-Ranger III

Includes items listed on the Bid Schedule and SOW in paragraphs: 1.2.2/1.4.2b; 1.2.8; 1.2.20;

1.4.1; 2.1; 2.2; 2.3.1; 2.3.2; 2.3.3; 2.3.4;

2.3.5; 2.3.6; 2.3/2.3.9

00020 Potable H2O Tank Cleaning -- OPTION ITEM 3.1

(Option Line Item)

10 Days After Award

00030 Potable H2O Repainting - OPTION ITEM 3.2

(Option Line Item)

10 Days After Award

00040 Bow Thruster Tunnel - OPTION ITEM 3.3

(Option Line Item)

10 Days After Award

00050 Floor Tile Removal & Replacement - OPTION ITEM 3.4

(Option Line Item)

10 Days After Award

00060 Floor Tile Repair Only - OPTION ITEM 3.4a

(Option Line Item)

10 Days After Award

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

4 39

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

140P6418R0037

00070 Blast & Painting Void Space - OPTION ITEM 3.5

(Option Line Item)

10 Days After Award

00080 Ballast Tank Inspection - OPTION ITEM 3.6

(Option Line Item)

10 Days After Award

00090 Install Bilge Alarms - OPTION ITEM 3.7

(Option Line Item)

10 Days After Award

00100 Upgrade Electrical Power Distribution Panel -

OPTION ITEM 3.8

(Option Line Item)

10 Days After Award

00110 Disassemble, Degrease, Clean, Assemble, Lube

Bow/Stern Winches - OPTION ITEM 3.9

(Option Line Item)

10 Days After Award

00120 Tail Shaft & Bearing Replacement, Clean, Assemble

- OPTION ITEM 3.10

(Option Line Item)

10 Days After Award

00130 Seacocks & Seachest Parts Replacement - OPTION

ITEM 3.11

(Option Line Item)

10 Days After Award

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

5 39

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

140P6418R0037

00140 Sewage Pipe Replacement - OPTION ITEM 3.12

(Option Line Item)

10 Days After Award

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

140P6418R0037 ISRO Ranger III FY18 Dry-dock Page 6 of 39

TABLE OF CONTENT

SECTION A – SOLICITATION/CONTRACT FORM

52.203-18 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements - Representation (Jan 2017) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) . 10

SECTION B - PROPOSAL PRICING

Table 1- Bid Schedule Base Requirement

Table 2 – Bid Schedule Options

SECTION C - DESCRIPTION/SPECIFICATIONS

SECTION D - PACKAGING AND MARKING

SECTION E - INSPECTION AND ACCEPTANCE

52.246-12 -- Inspection of Construction (Aug 1996)

SECTION F - DELIVERIES OR PERFORMANCE

52.211-10 -- Commencement, Prosecution, and Completion or Work (Apr 1984)

SECTION G - CONTRACT ADMINISTRATION DATA

1452.201-70 Authorities and Delegations (Sep 2011) Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (April 2013)

SECTION H - SPECIAL CONTRACT REQUIREMENTS

GREEN PROCUREMENT

SECTION I - CONTRACT CLAUSES

52.252-2 – Clauses Incorporated by Reference (Feb 1998) 52.202-1 Definitions. (Nov 2013) 52.203-3 Gratuities (Apr 1984) 52.203-5 Covenant Against Contingent Fees (May 2014) 52.203-6 Restrictions on Subcontractor Sales to the Government (Sep 2006) 52.203-7 Anti-Kickback Procedures (May 2014) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (May 2014) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (May 2014) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (Oct 2010) 52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower Rights (Apr 2014) 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (May 2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2016) 52.204-13 System for Award Management Maintenance (Oct 2016) 52.204-14 Service Contract Reporting Requirements (Oct 2016) 52.204-22 Alternative Line Item Proposal (Jan 2017) 52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Oct 2015) 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (Jul 2013) 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations (Nov 2015) 52.211-18 Variation in Estimated Quantity (Apr 1984) 52.215-2 Audit and Records- Negotiations (Oct 2010) 52.215-8 Order of Precedence -- Uniform Contract Format (Oct 1997) 52.215- 21 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data -- Modifications (Oct 2010) 52.219-6 Notice of Total Small Business Set-Aside (Nov 2011) 52.219-8 Utilization of Small Business Concerns (Nov 2016) 52.219-28 Post-Award Small Business Program Representation (Jul 2013) 52.222-3 Convict Labor (June 2003) 52.222-4 Contract Work Hours and Safety Standards- Overtime Compensation (May 2014) 52.222-6 Construction Wage Rate Requirements (May 2014) 52.222-7 Withholding of Funds (May 2014) 52.222-8 Payrolls and Basic Records (May 2014) 52.222-9 Apprentices and Trainees (Jul 2005) 52.222-10 Compliance with Copeland Act Requirements (Feb 1988)

140P6418R0037 ISRO Ranger III FY18 Dry-dock Page 7 of 39

52.222-11 Subcontracts (Labor Standards) (May 2014) 52.222-12 Contract Termination-Debarment (May 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (May 2014) 52.222-14 Disputes Concerning Labor Standards (Feb 1988) 52.222-15 Certification of Eligibility (May 2014) 52.222-21 Prohibition of Segregated Facilities (Apr 2015) 52.222-26 Equal Opportunity (Sep 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (Apr 2015) 52.222-37 Employment Reports on Veterans (Feb 2016) 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) 52.222-50 Combating Trafficking in Persons (Mar 2015) 52.222-54 Employment Eligibility Verification (Oct 2015) 52.222-55 Minimum Wages Under Executive Order 13658 (Dec 2015) 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2017) 52.223-02 Affirmative Procurement of Bio-based Products Under Service and Construction Contracts (Sep 2013) 52.223-3 Hazardous Material Identification and Material Safety Data (Jan 1997) 52.223-5 Pollution Prevention and Right-to-Know Information (May 2011) 52.223-6 Drug Free Workplace (May 2001) 52.223-15 Energy Efficiency in Energy-Consuming Products (Dec 2007) 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts (May 2008) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) 52.223-20 Aerosols (Jun 2016) 52.223-21 Foams (Jun 2016) 52.225-13 Restriction on Certain Foreign Purchases (Jun 2008) 52.227-1 Authorization and Consent (Dec 2007) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (Dec 2007) 52.227-4 Patent Indemnity- Construction Contracts (Dec 2007) 52.228-1 Bid Guarantee (Sep 1996) 52.228-2 Additional Bond Security (Oct 1997) 52.228-5 Insurance- Work on a Government Installation (JAN 1997) 52.228-11 Pledges of Assets (Jan 2012) 52.228-12 Prospective Subcontractor Request for Bonds (May 2014) 52.228-14 Irrevocable Letter of Credit (Nov 2014) 52.228-15 Performance and Payment Bonds- Construction (Oct 2010) 52.229-3 Federal, State, and Local Taxes (Feb 2013) 52.232-5 Payments under Fixed-Price Construction Contracts (May 2014) 52.232-17 Interest (Jan 2017) 52.232-23 Assignment of Claims (May 2014) 52.232-27 Prompt Payment for Construction Contracts (May 2014) 52.232-33 Payment by Electronic Funds Transfer - System for Award Management (Jul 2013) 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Dec 2013) 52.233-1 Disputes (May 2014) 52.233-3 Protest after Award (Aug 1996) 52.233-4 Applicable Law For Breach Of Contract Claim (Oct 2004) 52.236-2 Differing Site Conditions (Apr 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (Apr 1984) 52.236-5 Material and Workmanship (Apr 1984) 52.236-6 Superintendence by the Contractor (Apr 1984) 52.236-7 Permits and Responsibilities (Nov 1991) 52.236-8 Other Contracts (Apr 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984) 16 52.236-10 Operations and Storage Areas (Apr 1984) 52.236-11 Use and Possession Prior to Completion (Apr 1984) 52.236-12 Cleaning Up (Apr 1984) 52.236-13 Accident Prevention (Nov 1991) 52.236-14 Availability and Use of Utility Services (Apr 1984)

140P6418R0037 ISRO Ranger III FY18 Dry-dock Page 8 of 39

52.236-15 Schedules for Construction Contracts (APR 1984) 52.236-16 Quantity Surveys (Apr 1984) 52.236-17 Layout of Work (Apr 1984) 52.236-21 Specifications and Drawings for Construction (Feb 1997) 52.236-26 Preconstruction Conference (Feb 1995) 52.242-13 Bankruptcy (July 1995) 52.242-14 Suspension Of Work (Apr 1984) 52.243-4 Changes (Jun 2007) 52.244-6 Subcontracts for Commercial Items (Jan 2017) 52.246-21 Warranty of Construction (Mar 1994) 52.248-3 Value Engineering-Construction (Oct 2015) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (ALT I) (Apr 2012) 52.249-10 Default (Fixed-Price Construction) (Apr 1984) 52.253-1 Computer Generated Forms (JAN 1991)

CLAUSES INCORPORATED BY FULL TEXT

1452.203-70 -- Restrictions on Endorsements 1452.204-70 -- Release of Claims 1452.215-70 -Examination of Records by the Department of the Interior (APRIL 1984) 1452.228-70 -- Liability Insurance—Department of the Interior (Jul 1996) 52.204-21 – Basic Safeguarding of Covered Contractor Information Systems (June 2016) 52.222-35 Equal Opportunity for Veterans (Oct 2015) 52.222-36 Equal Opportunity for Workers with Disabilities (Jul 2014) 52.223-9-- Estimate of Percentage of Recovered Material Content For EPA Designated Items (May 2008) 52.225-9 -- Buy American–Construction Materials. Buy American–Construction Materials (May 2014)

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF BIDDERS . 23 52.252-1 – Solicitation Provisions Incorporated by Reference (Feb 1998) 52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014)

PROVISIONS INCORPORATED BY FULL TEXT

52.204-8 -- Annual Representations and Certifications (Jan 2018) 52.209-7 -- Information Regarding Responsibility Matters (Jul 2013) 52.222-23 -- Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (Feb 1999) 52.236-28 -- Preparation of Proposals – Construction (Oct 1997)

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS

52.252-1 – Solicitation Provisions Incorporated by Reference (Feb 1998) 52.204-16 Commercial and Government Entity Code Reporting (Jul 2015) 52.211-6 Brand Name or Equal (Aug 1999) 52.215-1 Instructions to Offerors-Competitive Acquisitions (Jan 2017) 52.215-16 Facilities Capitol Cost of Money (Jun 2003) 52.215-20 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data (Oct 2010)

PROVISIONS INCORPORATED BY FULL TEXT

52.204-7 System for Award Management (Oct 2016) 52.216-1 – Type of Contract (Apr 1984) 52.222-5 -- Construction Wage Rate Requirements—Secondary Site of the Work (May 2014) 52.225-10 -- Notice of Buy American Requirement—Construction Materials. Notice of Buy American Requirement--Construction Materials (May 2014) 52.228-1 Bid Guarantee (Sep 1996) 52.233-2 Service of Protest Department of the Interior (Jul 1996) (Deviation) 52.236-27 – Site Visit (Construction) (Feb 1995) 52.252-5-- Authorized Deviations in Provisions (Apr 1984) 1452.215-71 -- Use and Disclosure of Proposal Information - Department of the Interior (Apr 1984) Instructions, conditions and notices to offerors or respondents Submission Requirements

1. PROPOSAL SUBMISSION INFORMATION

1.1. WHERE TO SUBMIT

140P6418R0037 ISRO Ranger III FY18 Dry-dock Page 9 of 39

1.2. SUBMISSION DEADLINE

1.3. RETURN ADDRESS REQUIREMENTS

1.4. PROPOSAL FORMAT

1.5. ORGANIZATION OF DOCUMENTS and Submission Requirements

2. GENERAL INFORMATION

2.1. QUESTIONS

2.2. CLARIFICATIONS, COMMUNICATIONS, AND DISCUSSIONS

SECTION M- EVALUATION FACTORS

TABLE OF CONTENTS

1. EVALUATION FACTORS FOR AWARD

2. RELATIVE IMPORTANCE OF FACTORS

3. EVALUATION PROCESS

4. BASIS OF AWARD

140P6418R0037 ISRO Ranger III FY18 Dry-dock Page 10 of 39

SECTION A – SOLICITATION/CONTRACT FORM

52.203-18 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements - Representation (Jan 2017) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017)

SECTION B - PROPOSAL PRICING

Table 1- Bid Schedule Base Requirement

Paragraph CLIN

Description Labor Hours

Cost

@ $0.00 Per Hr.

Mate rial

Total Per

Item

Table 1

1.2.2/1.4.

2b

Crane/Material handling 64

1.2.8

Trash Removal 30

1.2.20

Continuous Fire Watch 80

1.4.1

Utilities/Services 40

2.1

Dry-docking 220

2.1

Rope Guard Fairwater & 122

Docking Plug Removal

Hull Cleaning

2.3.1

Hull Survey

ABS inspection Fee

Ultrasound Tech.

2.3.2

Tailshaft & bearings 250

2.3.3

Propeller Hubs

Tech. Rep.

Yard Labor

2.3.4

Rudder Inspection 100

2.3.5

Seacock & seachest 100

Inspection

2.3.6

Anchor & Anchor Chain 100

2.3/2.3.9

Hull Sandblast & paint 1000

Totals

140P6418R0037 ISRO Ranger III FY18 Dry-dock Page 11 of 39

TABLE 2

OPTION ITEMS

Paragraph CLIN

Description

Hours

@ $0.00 Per Hr.

Mate rial

Total Per

Item

3.1 20

Potable H2O Tank Cleaning

3.2 30

Potable H2O Repainting 75

3.3 40

Bow Thruster Tunnel 250

3.4 50

Floor Tile Removal & 1750

Replacement

3.4a 60

Floor Tile Repair Only 200

3.5 70

Blast & Painting 350

Void Space

3.6 80

Ballast Tank Inspection 40

3.7 90

Install Bilge Alarms 300

3.8 100

Upgrade Electrical Power 750

Distribution Panel

3.9 110

Disassemble, Degrease, 45

Clean, Assemble, Lube

Bow/Stern Winches

3.10 120

Tail Shaft & Bearing 150

3.11 130

Seacocks & Seachest 100

Parts Replacement

3.12 140

Sewage Pipe

TOTALS

TOTAL Hrs.

(combined)

6691 LABOR $0.00 MATERIAL

COSTS

$0.00

Total Labor & Material $0.00

Profit @ 9%

PROJECT TOTAL $0.00

140P6418R0037 ISRO Ranger III FY18 Dry-dock Page 12 of 39

Table 2 – Bid Schedule Options Proposal Pricing shall be provided in accordance with Section L and is incorporated herein.

1. The contractor must furnish an itemized breakdown. Contractor shall use the Bid Schedule referred to under SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS.

2. The Government may require the delivery of the numbered line items identified in the Schedule as option items at the price stated in the Schedule. If there are sufficient funds available, the Contracting Officer will add these items at the time of award. Performance of added line item tasks shall be at the price negotiated in the contract Schedule.

SECTION C - DESCRIPTION/SPECIFICATIONS

The contractor shall furnish all labor, materials, equipment, blocking, staging and tools necessary to accomplish the 5-year mandatory dry-docking inspection of the Ranger III to include all necessary repairs.

SECTION D - PACKAGING AND MARKING

N/A

SECTION E - INSPECTION AND ACCEPTANCE

52.246-12 -- Inspection of Construction (Aug 1996)

(a) Definition. “Work” includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

(c) Government inspections and tests are for the sole benefit of the Government and do not --

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph

(i) of this section.

(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.

(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes re-inspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

140P6418R0037 ISRO Ranger III FY18 Dry-dock Page 13 of 39

(g) If the Contractor does not promptly replace or correct rejected work, the Government may --

(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or

(2) Terminate for default the Contractor’s right to proceed.

(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.

(End of Clause)

SECTION F - DELIVERIES OR PERFORMANCE

52.211-10 -- Commencement, Prosecution, and Completion or Work (Apr 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 48 days. The time stated for completion shall include final cleanup of the premises.

(End of Clause)

SECTION G - CONTRACT ADMINISTRATION DATA

Katherine Bernard Contract Specialist / Officer

National Park Service 1113 W. Aurora Rd

Sagamore Hills, OH 44067 Telephone No. (330) 468-2500 ext: 9 Fax No. (330) 468-2507 Email: katherine_bernard@nps.gov

1452.201-70 Authorities and Delegations (Sep 2011)

(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.

(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment. The COR for this contract will be:

(c) The COR is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;

mailto:katherine_bernard@nps.gov

140P6418R0037 ISRO Ranger III FY18 Dry-dock Page 14 of 39

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the Disputes Clause;

(4) Terminate, for any reason, the Contractor's right to proceed;

(5) Obligate in any way, the payment of money by the Government.

(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR’s appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.

(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.

(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.

(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor’s risk.

Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (April 2013)

Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).

"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:

1. Copy of vendor invoice document in PDF format, which shows pricing breakdown for all line items.

2. Updated Schedule of Values

3. Updated Progress Schedule

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) prior to the contract award date, but no more than 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

https://www.ipp.gov/

140P6418R0037 ISRO Ranger III FY18 Dry-dock Page 15 of 39

SECTION H - SPECIAL CONTRACT REQUIREMENTS

GREEN PROCUREMENT

To the extent that the construction services provided by the Contractor require provision of any of the types of products listed at https://sftool.gov/greenprocurement, the Contractor is expected to provide the green type of product unless that type of product is not available competitively within a reasonable time, at a reasonable price, is not life cycle cost efficient in the case of energy consuming products, or does not meet reasonable performance standards.

SECTION I - CONTRACT CLAUSES

52.252-2 – Clauses Incorporated by Reference (Feb 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://www.acquisition.gov/far/

OR

http://farsite.hill.af.mil

52.202-1 Definitions. (Nov 2013) 52.203-3 Gratuities (Apr 1984) 52.203-5 Covenant Against Contingent Fees (May 2014) 52.203-6 Restrictions on Subcontractor Sales to the Government (Sep 2006) 52.203-7 Anti-Kickback Procedures (May 2014) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (May 2014) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (May 2014) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (Oct 2010) 52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower Rights (Apr 2014) 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (May 2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2016) 52.204-13 System for Award Management Maintenance (Oct 2016) 52.204-14 Service Contract Reporting Requirements (Oct 2016) 52.204-22 Alternative Line Item Proposal (Jan 2017) 52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Oct 2015) 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (Jul 2013) 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations (Nov 2015) 52.211-18 Variation in Estimated Quantity (Apr 1984) 52.215-2 Audit and Records- Negotiations (Oct 2010) 52.215-8 Order of Precedence -- Uniform Contract Format (Oct 1997) 52.215- 21 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data -- Modifications (Oct 2010) 52.219-6 Notice of Total Small Business Set-Aside (Nov 2011) 52.219-8 Utilization of Small Business Concerns (Nov 2016) 52.219-14 Limitations on Subcontracting (Nov 2011) 52.219-28 Post-Award Small Business Program Representation (Jul 2013) 52.222-3 Convict Labor (June 2003) 52.222-4 Contract Work Hours and Safety Standards- Overtime Compensation (May 2014) 52.222-6 Construction Wage Rate Requirements (May 2014) 52.222-7 Withholding of Funds (May 2014) 52.222-8 Payrolls and Basic Records (May 2014) 52.222-9 Apprentices and Trainees (Jul 2005) 52.222-10 Compliance with Copeland Act Requirements (Feb 1988) 52.222-11 Subcontracts (Labor Standards) (May 2014) 52.222-12 Contract Termination-Debarment (May 2014) https://sftool.gov/greenprocurement http://www.acquisition.gov/far/ http://farsite.hill.af.mil/

140P6418R0037 ISRO Ranger III FY18 Dry-dock Page 16 of 39

52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (May 2014) 52.222-14 Disputes Concerning Labor Standards (Feb 1988) 52.222-15 Certification of Eligibility (May 2014) 52.222-21 Prohibition of Segregated Facilities (Apr 2015) 52.222-26 Equal Opportunity (Sep 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (Apr 2015) 52.222-37 Employment Reports on Veterans (Feb 2016) 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) 52.222-50 Combating Trafficking in Persons (Mar 2015) 52.222-54 Employment Eligibility Verification (Oct 2015) 52.222-55 Minimum Wages Under Executive Order 13658 (Dec 2015) 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2017) 52.223-02 Affirmative Procurement of Bio-based Products Under Service and Construction Contracts (Sep 2013) 52.223-3 Hazardous Material Identification and Material Safety Data (Jan 1997) 52.223-5 Pollution Prevention and Right-to-Know Information (May 2011) 52.223-6 Drug Free Workplace (May 2001) 52.223-15 Energy Efficiency in Energy-Consuming Products (Dec 2007) 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts (May 2008) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) 52.223-20 Aerosols (Jun 2016) 52.223-21 Foams (Jun 2016) 52.225-13 Restriction on Certain Foreign Purchases (Jun 2008) 52.227-1 Authorization and Consent (Dec 2007) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (Dec 2007) 52.227-4 Patent Indemnity- Construction Contracts (Dec 2007) 52.228-1 Bid Guarantee (Sep 1996) 52.228-2 Additional Bond Security (Oct 1997) 52.228-5 Insurance- Work on a Government Installation (JAN 1997) 52.228-11 Pledges of Assets (Jan 2012) 52.228-12 Prospective Subcontractor Request for Bonds (May 2014) 52.228-14 Irrevocable Letter of Credit (Nov 2014) 52.228-15 Performance and Payment Bonds- Construction (Oct 2010) 52.229-3 Federal, State, and Local Taxes (Feb 2013) 52.232-5 Payments under Fixed-Price Construction Contracts (May 2014) 52.232-17 Interest (Jan 2017) 52.232-23 Assignment of Claims (May 2014) 52.232-27 Prompt Payment for Construction Contracts (May 2014) 52.232-33 Payment by Electronic Funds Transfer - System for Award Management (Jul 2013) 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Dec 2013) 52.233-1 Disputes (May 2014) 52.233-3 Protest after Award (Aug 1996) 52.233-4 Applicable Law For Breach Of Contract Claim (Oct 2004) 52.236-2 Differing Site Conditions (Apr 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (Apr 1984) 52.236-5 Material and Workmanship (Apr 1984) 52.236-6 Superintendence by the Contractor (Apr 1984) 52.236-7 Permits and Responsibilities (Nov 1991) 52.236-8 Other Contracts (Apr 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984) 52.236-10 Operations and Storage Areas (Apr 1984) 52.236-11 Use and Possession Prior to Completion (Apr 1984) 52.236-12 Cleaning Up (Apr 1984) 52.236-13 Accident Prevention (Nov 1991) 52.236-14 Availability and Use of Utility Services (Apr 1984) 52.236-15 Schedules for Construction Contracts (APR 1984) 52.236-16 Quantity Surveys (Apr 1984)

140P6418R0037 ISRO Ranger III FY18 Dry-dock Page 17 of 39

52.236-17 Layout of Work (Apr 1984) 52.236-21 Specifications and Drawings for Construction (Feb 1997) 52.236-26 Preconstruction Conference (Feb 1995) 52.242-13 Bankruptcy (July 1995) 52.242-14 Suspension Of Work (Apr 1984) 52.243-4 Changes (Jun 2007) 52.244-6 Subcontracts for Commercial Items (Jan 2017) 52.246-21 Warranty of Construction (Mar 1994) 52.248-3 Value Engineering-Construction (Oct 2015) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (ALT I) (Apr 2012) 52.249-10 Default (Fixed-Price Construction) (Apr 1984) 52.253-1 Computer Generated Forms (JAN 1991)

CLAUSES INCORPORATED BY FULL TEXT

1452.203-70 -- Restrictions on Endorsements.

Restriction on Endorsements—Department of the Interior (JUL 1996)

The Contractor shall not refer to contracts awarded by the Department of the Interior in commercial advertising, as defined in FAR 31.205–1, in a manner which states or implies that the product or service provided is approved or endorsed by the Government, or is considered by the Government to be superior to other products or services. This restriction is intended to avoid the appearance of preference by the Government toward any product or service. The Contractor may request the Contracting Officer to make a determination as to the propriety of promotional material.

(End of clause)

1452.204-70 -- Release of Claims.

Release of Claims—Department of the Interior (JUL 1996)

After completion of work and prior to final payment, the Contractor shall furnish the Contracting Officer with a release of claims against the United States relating to this contract. The Release of Claims form (DI–137) shall be used for this purpose. The form provides for exception of specified claims from operation of the release.

(End of clause)

1452.215-70 -Examination of Records by the Department of the Interior (APRIL 1984)

For purposes of the Examination of Records by the Comptroller General clause of this contract (FAR 52.215-1), the Secretary of the Interior, the Inspector General, and their duly authorized representative(s) from the Department of the Interior shall have the same access and examination rights as the Comptroller General of the United States.

(End of Clause)

1452.228-70 -- Liability Insurance—Department of the Interior (Jul 1996)

(a) The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer. The named insured parties under the policy shall be the Contractor and the United States of America. The amounts of the insurance shall be not less than as follows:

$200,000.00 each person

$500,000.00 each occurrence

$500,000.00 property damage

(b) Each policy shall have a certificate evidencing the insurance coverage. The insurance company shall provide an endorsement to notify the Contracting Officer 30 days prior to the effective date of cancellation or termination of the

140P6418R0037 ISRO Ranger III FY18 Dry-dock Page 18 of 39 policy or certificate; or modification of the policy or certificate which may adversely affect the interest of the Government in such insurance. The certificate shall identify the contract number, the name and address of the Contracting Officer, as well as the insured, the policy number and a brief description of contract services to be performed. The contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate prior to beginning the work.

(End of clause)

52.204-21 – Basic Safeguarding of Covered Contractor Information Systems (June 2016)

(a) Definitions. As used in this clause– “Covered contractor information system” means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.

“Federal contract information” means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government, but not including information provided by the Government to the public (such as on public websites) or simple transactional information, such as necessary to process payments.

“Information” means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual (Committee on National Security Systems Instruction (CNSSI) 4009).

“Information system” means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44 U.S.C. 3502).

“Safeguarding” means measures or controls that are prescribed to protect information systems.

(b) Safeguarding requirements and procedures.

(1) The Contractor shall apply the following basic safeguarding requirements and procedures to protect covered contractor information systems. Requirements and procedures for basic safeguarding of covered contractor information systems shall include, at a minimum, the following security controls:

(i) Limit information system access to authorized users, processes acting on behalf of authorized users, or devices (including other information systems).

(ii) Limit information system access to the types of transactions and functions that authorized users are permitted to execute.

(iii) Verify and control/limit connections to and use of external information systems.

(iv) Control information posted or processed on publicly accessible information systems.

(v) Identify information system users, processes acting on behalf of users, or devices.

(vi) Authenticate (or verify) the identities of those users, processes, or devices, as a prerequisite to allowing access to organizational information systems.

(vii) Sanitize or destroy information system media containing Federal Contract Information before disposal or release for reuse.

(viii) Limit physical access to organizational information systems, equipment, and the respective operating environments to authorized individuals.

(ix) Escort visitors and monitor visitor activity; maintain audit logs of physical access; and control and manage physical access devices.

(x) Monitor, control, and protect organizational communications (i.e., information transmitted or received by organizational information systems) at the external boundaries and key internal boundaries of the information systems.

(xi) Implement subnetworks for publicly accessible system components that are physically or logically separated from internal networks.

(xii) Identify, report, and correct information and information system flaws in a timely manner.

(xiii) Provide protection from malicious code at appropriate locations within organizational information systems.

http://uscode.house.gov/

140P6418R0037 ISRO Ranger III FY18 Dry-dock Page 19 of 39

(xiv) Update malicious code protection mechanisms when new releases are available.

(xv) Perform periodic scans of the information system and real-time scans of files from external sources as files are downloaded, opened, or executed.

(2) Other requirements. This clause does not relieve the Contractor of any other specific safeguarding requirements specified by Federal agencies and departments relating to covered contractor information systems generally or other Federal safeguarding requirements for controlled unclassified information (CUI) as established by Executive Order 13556.

(c) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (c), in subcontracts under this contract (including subcontracts for the acquisition of commercial items, other than commercially available off-the-shelf items), in which the subcontractor may have Federal contract information residing in or transiting through its information system.

(End of clause)

52.222-35 Equal Opportunity for Veterans (Oct 2015)

(a) Definitions. As used in this clause--

“Active duty wartime or campaign badge veteran,” “Armed Forces service medal veteran,” “disabled veteran,” “protected veteran,” “qualified disabled veteran,’ and “recently separated veteran” have the meanings given at FAR 22.1301.

(b) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-300.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified protected veterans, and requires affirmative action by the Contractor to employ and advance in employment qualified protected veterans.

(c) Subcontracts. The Contractor shall insert the terms of this clause in subcontracts of $150,000 or more unless exempted by rules, regulations, or orders of the Secretary of Labor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate of identify properly the parties and their undertakings.

(End of Clause)

52.222-36 Equal Opportunity for Workers with Disabilities (Jul 2014)

(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60.741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.

(b) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of $15,000 unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs of the U.S. Department of Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.

(End of Clause) 52.223-9-- Estimate of Percentage of Recovered Material Content For EPA Designated Items (May 2008)

(a) Definitions. As used in this clause—

“Postconsumer material” means a material or finished product that has served its intended use and has been discarded for disposal or recovery, having completed its life as a consumer item. Postconsumer material is a part of

140P6418R0037 ISRO Ranger III FY18 Dry-dock Page 20 of 39 the broader category of “recovered material.”

“Recovered material” means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.

(b) The Contractor, on completion of this contract, shall—

(1) Estimate the percentage of the total recovered material content for EPA-designated item(s) delivered and/or used in contract performance, including, if applicable, the percentage of postconsumer material content; and

(2) Submit this estimate to Contracting Officer’s Technical Representative.

(End of clause)

52.225-9 -- Buy American–Construction Materials. Buy American–Construction Materials (May 2014)

(a) Definitions. As used in this clause--

“Commercially available off-the-shelf (COTS) item”—

(1) Means any item of supply (including construction material) that is—

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

“Component” means an article, material, or supply incorporated directly into a construction material.

“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.

Materials purchased directly by the Government are supplies, not construction material.

“Cost of components” means--

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

“Domestic construction material” means—

(1) An unmanufactured construction material mined or produced in the United States;