B08_Solicitation_Bid_Schedule2.xls
XLS spreadsheet 46 KB Posted
- Solicitation number
- 140P6418R0037
About this file
B08 Solicitation Bid Schedule2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B08_DOL_Wage_Determination.pdf | ||
| A04_SOW.pdf | ||
| B08_Notice_to_Contractors.pdf | ||
| Sol_140P6418R0037.pdf | ||
| B08_Past_Performance.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Paragraph | CLIN | Description | Labor Hours | Labor Cost | @ $0.00 Per Hr. | Material Cost | Total Per Item | ||
| 0010 | |||||||||
| 1.2.2/1.4.2b | Crane/Material handling | 64 | |||||||
| 1.2.8 | Trash Removal | 30 | |||||||
| 1.2.20 | Continuous Fire Watch | 80 | |||||||
| 1.4.1 | Utilities/Services | 40 | |||||||
| 2.1 | Dry-docking | 220 | |||||||
| 2.1 | Rope Guard Fairwater & | 122 | |||||||
| Docking Plug Removal | |||||||||
| Hull Cleaning | |||||||||
| 2.3.1 | Hull Survey | ||||||||
| ABS inspection Fee | |||||||||
| Ultrasound Tech. | |||||||||
| 2.3.2 | Tailshaft & bearings | 250 | |||||||
| 2.3.3 | Propeller Hubs | ||||||||
| Tech. Rep. | |||||||||
| Yard Labor | 450 | ||||||||
| 2.3.4 | Rudder Inspection | 100 | |||||||
| 2.3.5 | Seacock & seachest | 100 | |||||||
| Inspection | |||||||||
| 2.3.6 | Anchor & Anchor Chain | 100 | |||||||
| 2.3/2.3.9 | Hull Sandblast & paint | 1000 | |||||||
| Totals | 2556 | ||||||||
| OPTION ITEMS | |||||||||
| Paragraph | CLIN | Description | Labor Hours | Labor Cost | @ $0.00 Per Hr. | Material Cost | Total Per Item | ||
| 3.1 | 0020 | Potable H2O Tank Cleaning | 75 | ||||||
| 3.2 | 0030 | Potable H2O Repainting | 75 | ||||||
| 3.3 | 0040 | Bow Thruster Tunnel | 250 | ||||||
| 3.4 | 0050 | Floor Tile Removal & | 1750 | ||||||
| Replacement | |||||||||
| 3.4a | 0060 | Floor Tile Repair Only | 200 | ||||||
| 3.5 | 0070 | Blast & Painting | 350 | ||||||
| Void Space | |||||||||
| 3.6 | 0080 | Ballst Tank Inspection | 40 | ||||||
| 3.7 | 0090 | Install Bilge Alarms | 300 | ||||||
| 3.8 | 0100 | Upgrade Electrical Power | 750 | ||||||
| Distribution Panel | |||||||||
| 3.9 | 0110 | Disassemble, Degrease, | 45 | ||||||
| Clean, Assemble, Lube | |||||||||
| Bow/Stern Winches | |||||||||
| 3.10 | 0120 | Tail Shaft & Bearing | 150 | ||||||
| Replacement | |||||||||
| 3.11 | 0130 | Seacocks & Seachest | 100 | ||||||
| Parts Replacement | |||||||||
| 3.12 | 0140 | Sewage Pipe Replacement | 50 | ||||||
| TOTALS | 4135 | ||||||||
| TOTAL Hrs. | 6691 | LABOR | $0.00 | MATERIAL COSTS | $0.00 | $0.00 | |||
| Total Labor & Material | $0.00 | ||||||||
| Profit @ 9% | $0.00 | ||||||||
| PROJECT TOTAL | $0.00 | ||||||||
| . |
&CRANGER III DRY_DOCKING 2008