B09_Solicitatoin_attach_3_Drawings__0001.pdf
PDF 5 MB Posted
- Attached to
- PIPE - REHAB VISITOR CENTER RESTROOMS
- Solicitation number
- 140P6326Q0001
About this file
These are architectural design and construction documents for a rehabilitation project at the Visitor Center/Restrooms at Pipestone National Monument in Minnesota. The project involves a comprehensive renovation of existing facilities, with detailed plans spanning electrical, mechanical, plumbing, and architectural modifications. The documents indicate a Level 2 alteration project focused on increasing accessibility, with no change in occupancy. The project will update the facility to meet current building codes, including the 2024 International Building Code, International Mechanical Code, and National Electrical Code. The renovation includes reconfiguring restroom spaces, updating electrical and lighting systems, modifying HVAC and plumbing infrastructure, and ensuring compliance with accessibility requirements. The project is classified as a non-separated mixed-use (Assembly A-3 and Business B) construction type, with the existing building slightly exceeding standard allowable area but grandfathered under existing conditions. The design documents provide comprehensive technical details for contractors, including floor plans, demolition plans, electrical and mechanical layouts, and specific construction notes and schedules.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M :\G ro up s\ M ai nt
\A ct iv e\
PI
PE
_2
3_
VC
-R es tro om s\
_D es ig n\ _P
M D el iv er ab le s\
C
AD
\P
IP
E
A rc h.
dw g 8/
4/
:4
PM
B
Y W ei ng ar te n, J ay
N
EXISTING GYP BD
EXISTING WOOD STUD
FRAMING
5/8" TYPE C GYP BD
2x6 WOOD STUD FRAMING
AT 16" O.C.
GYP CORNER BEAD, FEATHER
INTO EXISTING WALL
TYPE DESCRIPTION
WALL TYPE SCHEDULE
TYPE DESCRIPTION
FURRING WOOD STUDS
1.1 2.1A
1.2
2.1B
1.3A
1.3B
2.2A
2.2B
CMU (EXISTING)
SINGLE LAYER 5/8" GYP BD
ADHERED TO CMU
CMU (EXISTING)
2x4 TREATED WOOD STUD
SINGLE LAYER 5/8" GYP BD
ACOUSTIC BATT INSULATION
2x4 WOOD STUD (EXISTING
AT 1.3A, NEW AT 1.3B)
SINGLE LAYER 5/8" GYP BD
2x4 WOOD STUD
SINGLE LAYER 5/8" GYP BD,
BOTH SIDES
ACOUSTIC BATT INSULATION
AT 2.1B
2x6 WOOD STUD
SINGLE LAYER 5/8" GYP BD,
BOTH SIDES
ACOUSTIC BATT INSULATION
AT 2.2B
SE
E
SC
H
ED
SEE SCHED.
2"
2"
SEE SCHED.
SE
E
SC
H
ED
2"
3' -2
/2
2' -9
"FU
LL
H
EI
G H
T
TO
C
EI
LI
N
G PT-2
EXISTING DECORATIVE
BANDING
EXISTING GYP BD
EXISTING WOOD STUD
FRAMING
5/8" TYPE C GYP BD
WOOD STUD FRAMING AS
REQUIRED TO SUPPORT
NEW GYP BD, COORDINATE
W/ EXISTING BLOCKING
2x6 WOOD STUD FRAMING
AT 16" O.C.
EVALUATE EXISTING
CONNECTION AT TOP OF
WALL, SUPPLEMENT TO
ENSURE SUPPORT PRIOR
TO DEMO OF LOWER WALL
EXISTING WALL TO BE
DEMOLISHED
GYP CORNER BEAD, FEATHER
INTO EXISTING WALL
1' -1
0"
2'-6"
SOLID SURFACE SLAB (SSC-1)
3/4 " PLYWOOD
M :\G ro up s\ M ai nt
\A ct iv e\
PI
PE
_2
3_
VC
-R es tro om s\
_D es ig n\ _P
M D el iv er ab le s\
C
AD
\P
IP
E
A rc h.
dw g 8/
4/
:4
PM
B
Y W ei ng ar te n, J ay
ARCHITECTURAL FLAG NOTES:
2D G2
DOOR AND FRAME TYPES
3/8" = 1'-0"
5A G2
CONTROL JOINT DETAIL
1-1/2" = 1'-0"
5B G2
CEILING CONTROL JOINT
1-1/2" = 1'-0"
4A G2
FLOOR TRANSITION DETAIL
3" = 1'-0"
3A G2
DRINKING FOUNTAIN
3/8" = 1'-0"
2A G2
DOOR DETAIL - JAMB
1-1/2" = 1'-0"
1A G2
CEILING DETAIL
1-1/2" = 1'-0"
4B G2
FLOOR TRANSITION DETAIL
3" = 1'-0"
3B G2
CHANGING TABLE DETAIL
3/4" = 1'-0"
2B G2
DOOR DETAIL - HEAD
1-1/2" = 1'-0"
1B G2
CEILING DETAIL
1-1/2" = 1'-0"
1F G2
ARCHITECTURAL SITE PLAN
3/8" = 1'-0"
3C G2
TILE OUTSIDE CORNER DETAIL
1-1/2" = 1'-0"
4C G2
TILE COVE BASE DETAIL
3" = 1'-0"
5C G2
TILE EDGE DETAIL @ WALL
3" = 1'-0"
APPLICABLE CODES
2024 INTERNATIONAL BUILDING CODE
2024 INTERNATIONAL EXISTING BUILDING CODE
2024 INTERNATIONAL MECHANICAL CODE
2024 INTERNATIONAL PLUMBING CODE
2024 INTERNATIONAL FIRE CODE
2024 INTERNATIONAL ENERGY CONSERVATION CODE
2015 ARCHITECTURAL BARRIERS ACT
2023 NFPA 70 - NATIONAL ELECTRIC CODE
PIPESTONE SUPERINTENDENT'S COMPENDIUM - https://www.nps.gov/pipe/learn/management/superintendents-compendium.htm
CODE SUMMARY
WORK IS CLASSIFIED AS AN "ALTERATION - LEVEL 2" WITH NO CHANGE IN OCCUPANCY (2024 IEBC)
FOLLOWING THE PRESCRIPTIVE COMPLIANCE METHOD (2024 IEBC).
THIS IS AN ALTERATION UNDERTAKEN FOR THE PRIMARY PURPOSE OF INCREASING ACCESSIBILITY TO THE FACILITY (IEBC 801.3).
THERE IS NO EXISTING FIRE SPRINKLER SYSTEM IN THE BUILDING, OTHER THAN IN A COLLECTIONS STORAGE AREA. NO NEW FIRE
SPRINKLER SYSTEM IS REQUIRED (IEBC 803.2.2).
EXISTING FIRE ALARM SYSTEM MUST BE MAINTAINED AND MODIFIED FOR NEW SPACE CONFIGURATIONS IN THE WORK AREA (IEBC 803.4).
NEW ELECTRICAL EQUIPMENT AND WIRING MUST COMPLY WITH NFPA 70-2023 (IEBC 806.1).
REQUIRED TO MEET VENTILATION REQUIREMENTS OF 2024 IMC (IEBC 807.1).
ONLY NEW CONSTRUCTION IS REQUIRED TO MEET REQUIREMENTS OF THE IECC (IEBC 809.1).
OCCUPANCY: NON-SEPARATED MIXED-USE (A-3, B)
CONSTRUCTION TYPE: TYPE V-B (UNPROTECTED COMBUSTIBLE MATERIALS)
ALLOWABLE AREA: A-3 IS MOST RESTRICTIVE (6,000 SF + (6,000 SF x 0.75)) = 10,500 SF (IBC 508.3.2)
ACTUAL AREA: 10,725 SF*
*WHILE ACTUAL AREA SLIGHTLY EXCEEDS THE ALLOWABLE AREA PER 2024 IBC, THE EXISTING BUILDING IS NOT REQUIRED TO MEET
THE NEW ALLOWABLE AREA REQUIREMENTS
OCCUPANCY CALCULATIONS
ASSEMBLY - 92 OCCUPANTS
BUSINESS - 23 OCCUPANTS
STOR / MECH - 10 OCCUPANTS
PLUMBING FIXTURE COUNTS
ASSEMBLY: 46 MALE / 125 = 0.37 WC 46 FEMALE / 65 = 0.71 WC 92 OCCUPANTS / 500 = 0.19 DF BUSINESS: 11.5 MALE / 25 = 0.46 WC 11.5 FEMALE / 25 = 0.46 WC 23 OCCUPANTS / 100 = 0.23 DF STOR / MECH: 5 MALE / 100 = 0.05 WC 5 FEMALE / 100 = 0.05 WC 10 OCCUPANTS / 1,000 = 0.01 DF
TOTAL REQUIRED FIXTURES: 0.88 WC 1.22 WC 0.43 DF
1 REQUIRED 2 REQUIRED 1 REQUIRED
TOTAL FIXTURES PROVIDED: 4 PROVIDED 4 PROVIDED 2 PROVIDED
PORCELAIN TILE (PT-1)
CEMENT BACKER BOARD
2X6 WOOD FRAMING
AT 16" O.C.
2X4 CROSS BRACING
AS NECESSARY
SEALANT TO MATCH
GROUT COLOR
1/2"
4'-6"(VER)6'-6"
MECH
106OFFICE
OFFICE
VESTIBULE
MECH
106OFFICE
OFFICE
VESTIBULE
M :\G ro up s\ M ai nt
\A ct iv e\
PI
PE
_2
3_
VC
-R es tro om s\
_D es ig n\ _P
M D el iv er ab le s\
C
AD
\P
IP
E
A rc h.
dw g 8/
4/
:4
PM
B
Y W ei ng ar te n, J ay
ARCHITECTURAL FLAG NOTES:
1E D1
DEMOLITION PLAN
1/4" = 1'-0"
4E D1
DEMOLITION REFLECTED CEILING PLAN
1/4" = 1'-0"
N N4B
D1
EXISTING FOUNDATION AND STRUCTURAL FLOOR SLAB
NOT TO SCALE
K-2210CAXTONLAVATORYVITREOUS CHINA
K-2210CAXTONLAVATORYVITREOUS CHINA
K-2210CAXTONLAVATORYVITREOUS CHINA
K-2210CAXTONLAVATORYVITREOUS CHINA
3A A1
VESTIBULE
LOBBY
TOILET
HALL
TOILET
MECH
106OFFICE
OFFICE
OFFICE
OFFICE
VESTIBULE
111OFFICE
MECH
MULTI-PURPOSE
GARAGE
OFFICE
VESTIBULE
MEN
WOMEN
STORAGE
AV ROOM
EXHIBIT
HALL
VESTIBULE
VESTIBULE
PUBLIC AREA
EXHIBITS
DEMO 1
129 DEMO 2
DEMO 3
MECH
SALES
HALL
WOMEN
MEN
STORAGE & MAILING
HALL
MECH
VESTIBULE
SALES
OFFICE
ARCHIVAL STORAGE
HALL
LIMITS OF WORK AREA
A2
4E
4C
4D4F
7' -1
1/
4" (V
ER
IF
Y)
A2
4E
4C
4F4D
TOILET
TOILET
HALL
2.
2B
1.3B
1.3A
1.3A
1.3A
1.
3A
2.
2B
2.
2B
HK
105A
STOR
104A
3' -4
/4
3'-1 1/4"
TA-1.2
TA-1.1
TA-2.0
TA-1.3
TA-5.0
TA-8.0
TA-7.0
TA-1.3
TA-6.1TA-6.1
TA-1.1
TA-2.0
TA-1.3
TA-7.0
TA-1.2
TA-5.0
TA-8.0
1.3A
2.1A 2.1A
1.2
1.
3A
1.3A
105A 104A
4TA-4.0 TA-4.0
3A A2
OPP
HAND
TA-9.0
G2
3A
1.
1.
5' -1
0"
2'-6"2'-6"
5' -1
0"
TA-1.3
TYPE HEIGHT REMARKS
TOILET ACCESSORY SCHEDULE
MARK
N 1E A1
FLOOR PLAN
1/8" = 1'-0"
3A A1
ENLARGED PLAN
1/2" = 1'-0"
M :\G ro up s\ M ai nt
\A ct iv e\
PI
PE
_2
3_
VC
-R es tro om s\
_D es ig n\ _P
M D el iv er ab le s\
C
AD
\P
IP
E
A rc h.
dw g 8/
4/
:4
PM
B
Y W ei ng ar te n, J ay
ARCHITECTURAL FLAG NOTES:
TYPE HEIGHT REMARKS
TOILET ACCESSORY SCHEDULE
MARK
APC-1
9'-0"
TOILET
TOILET
APC-1
9'-0"
GB-1 (P-1)
7'-6"
GB-1 (P-1)
7'-4 3/4" (VERIFY)
GB-1 (P-1)
7'-6"
HALL
STOR
104A
HK
105A
1A G2
1B G2
MECH
TA-8.0
TA-5.0
TA-1.2
TA-1.1
TA-1.3
TA-2.0
7' -2
TA-4.0
2' -1
0"
6" 7' -2
2' -1
0"
TA-7.0
7' -2
TA-6.1
TA-2.0
TA-1.1
TA-1.3
TA-1.2
9"
2'-6"
3"
3'-4"
1'-0"
7' -2
2' -1
0"
1' -1
0"
5'-10"
REMARKS
HEIGHT
CEILING
SOUTH WEST MATERIALEASTNORTH
BASEFLOOR/ FINISH WALLS
NO.
ARCH.
ROOM
DESCRIPTION
ROOM FINISH SCHEDULE
NO.
ARCH.
ROOM
TOILET
TOILET
HALL
STOR
104A
HK
105A
4A
G
4A
G 24B / G2 4B / G2
MECH
105A 104A
5'-0"
3' -0
EQ EQ
4A / G2
PT-1
TOILET
HALL
MECH
NO.REMARKS GLAZING
JAMB TYPE
HDWR
MAT.
FRAMES
DEPTH FINISH HEADFINISH
DOORS
TYPE MAT.WIDTHNO.
DOOR
HEIGHT
DOOR AND FRAME SCHEDULE
TYPE
LABEL DOOR
COLORMANUFACTURERMARK PRODUCT
MATERIAL LEGEND
NOTES
1C A2
REFLECTED CEILING PLAN
1/4" = 1'-0"
M :\G ro up s\ M ai nt
\A ct iv e\
PI
PE
_2
3_
VC
-R es tro om s\
_D es ig n\ _P
M D el iv er ab le s\
C
AD
\P
IP
E
A rc h.
dw g 8/
4/
:4
PM
B
Y W ei ng ar te n, J ay
ARCHITECTURAL FLAG NOTES:
4C A2
INTERIOR ELEVATION
3/8" = 1'-0"
4D A2
INTERIOR ELEVATION
3/8" = 1'-0"
4E A2
INTERIOR ELEVATION
3/8" = 1'-0"
4F A2
INTERIOR ELEVATION
3/8" = 1'-0"
1A A2
FINISH FLOOR PLAN
1/4" = 1'-0"
3A A2
PARTIAL BUILDING SECTION
3/8" = 1'-0"
N N
TOILET
TOILET
HALL
STOR
104A
HK
105A
MECH
G
FI
G
FI
GFI
18"
GFI
46"
RETURN TO EXISTING PANEL,
NEW DEDICATED 20-AMP CIRCUIT
RETURN TO EXISTING PANEL,
NEW DEDICATED 20-AMP CIRCUIT G
FI
G
FI
GFI
25"
RETURN TO EXISTING PANEL,
NEW DEDICATED 15-AMP CIRCUIT
J
RETURN TO EXISTING PANEL
CIRCUIT 20A (VERIFY)
RP-1 RP-1
RETURN TO EXISTING PANEL,
NEW DEDICATED 15-AMP CIRCUIT
J J
S S
S
SESE S
EF F
A
B
A
DD
B
B
B
B
F FSOS SOS
S E
J
RETURN TO EXISTING PANEL
CIRCUIT 19 (VERIFY)
SOS SOS
EF-1 EF-1
S S
S
F F
TOILET
TOILET
HALL
STOR
104A
HK
105A
MECH
MARK
A
B
D
F
G
MANUFACTURER / CATALOG NO.
LITHONIA LIGHTING BLT (BASIS OF DESIGN)
2BLT2 20L ADSM 120 LP940 EL14L
NO.
LAMP
WATTS
TYPE
LED
4000K
VOLTS
MOUNTING NOTES
OR APPROVED EQUAL, PROVIDE EMERGENCYLAY-IN
CEILING
WALL1
LDN6 40/10 L06WR LSS 120 TRW
NEORAY DEFINE 2 WALL MOUNT (BASIS OF DESIGN)
BAA-S122DW-C290D940-2F0-1-UDD-A-S
LITHONIA LIGHTING LDN6 (BASIS OF DESIGN)
1 17.5 4000K
LED
L I G H T I N G F I X T U R E S C H E D U L E
4000K
LED
RECESSED
CEILING
1 36 120
LITHONIA LIGHTING ZL1D (BASIS OF DESIGN)
ZL1D L24 3500LM FST MVOLT 40K 90CRI BAA WH 4000K
LED
CEILING
SURFACE
SURFACE
BATTERY PACK INTEGRAL TO FIXTURE
OR APPROVED EQUAL
OR APPROVED EQUAL
OR APPROVED EQUALOR APPROVED EQUAL
C
E
NOT USED
NOT USED
NOT USED
M :\G ro up s\ M ai nt
\A ct iv e\
PI
PE
_2
3_
VC
-R es tro om s\
_D es ig n\ _P
M D el iv er ab le s\
C
AD
\P
IP
E
A rc h.
dw g 8/
4/
:4
PM
B
Y W ei ng ar te n, J ay
SE
SOS
S
H
F
F
DH
S
F
F
J
ARCHITECTURAL FLAG NOTES:
2F A3
ELECTRICAL LAYOUT PLAN
1/4" = 1'-0"
4F A3
ELECTRICAL DEMOLITION PLAN
1/4" = 1'-0"
2D A3
LIGHTING PLAN
1/4" = 1'-0"
OS
| COVER |
| G1 - GENERAL NOTES, SYMBOLS & ABBREVIATIONS |
| G2 - ARCHITECTURAL SITE PLAN, WALL TYPES, & DETAILS |
| D1 - DEMOLITION PLANS & NOTES |
| A1 - FLOOR PLAN, ENLARGED PLAN & SCHEDULES |
| A2 - REFLECTED CEILING PLAN & ELEVATIONS |
| A3 - ELECTRICAL LAYOUT & REQUIREMENTS |
| P0.0 - GENERAL NOTES, PLUMBING SCHEDULE AND DETAILS |
| P1.0 - SANITARY AND DOMESTIC WATER DEMOLITION AND LAYOUT |
| M1.0 - MECHANICAL SCHEDULES, DEMOLITION, AND LAYOUT |
File details come from the government source that posted it. Updated .