PIPE - REHAB VISITOR CENTER RESTROOMS
Solicitation number
140P6326Q0001
Issued by

About this file

The file appears to be a specifications and submittals list (Excel spreadsheet) for a construction services solicitation at Pipestone National Monument. The Request for Quotation (RFQ) is issued by the Department of the Interior National Park Service Midwest Region, specifically targeting rehabilitation of visitor center restrooms. While the specific technical details cannot be fully determined from the provided context, the document is likely part of the solicitation package containing required technical specifications, submittal requirements, and potentially detailed scope of work for the restroom renovation project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Submittal List with Review Estimate Instructions
National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21
DESIGN SERVICES (Construction Documents (CD) Phase)
Responsible Party: Design Architect/Engineer (A/E)
1Enter Park Acronym, Project Management Information System (PMIS) Number, and Project Title.
2Record construction submittal requirements. Complete Specification Section, Paragraph Number, and Description sections. Insert additional rows as required for sections containing multiple submittals.
3In Requirements section, enter X for submittal requirements where applicable. Insert additional columns as needed under Informational or Action. Refer to Specification Section 01 33 23 for clarification. (Action submittals require Government resposive action and Informational submittals do not.) Division 1 Specifications submittals are Information submittals.
4Attach black and white version to Specification Section 01 33 23 in project manual. Delete instructional note on top of page.
CONSTRUCTION SERVICES (Construction Phase)
Responsible Party: Construction Contracting Officer Representative (COR)
1Use Submittal List submitted with Final Construction Documents. Copy/paste submittal information into Submittal List with Review Estimate Template. If amendments issued, adjust submittal requirements as necessary.
2Attach this template to Architect/Engineer (A/E) Construction Services Scope of Services.
3Use Review Estimate to estimate time required for Architect/Engineer to accomplish Action submittal reviews. Enter estimated whole or partial number of hours per discipline.
4Add discipline heading column as required.
5Use total number of hours per discipline at bottom of template and apply hourly rates listed in Indefinite Delivery/Indefinite Quantity (IDIQ) contract (using appropriate option period rates) to formulate Government estimate for submittal reviews.
6Use information from this template to negotiate submittal review portion of Architect/Engineer Construction Services task order.
7Provide template to Construction Management Representative (CMR) to show submittals they are responsible for and submittals to be forwarded to the Architect/Engineer. All Informational submittals will be reviewed by Construction Management Representative.
Responsible Party: Architect/Engineer (A/E)
1Indicate level of effort required for each Action submittal review by entering number of whole or partial hours for each discipline under Architect/Engineer Review Time section.
2All Informational submittals will be reviewed by Construction Management Representative (CMR).
3Use total number of hours per discipline at bottom of template and apply hourly rates listed in Indefinite Delivery/Indefinite Quantity (IDIQ) contract (using appropriate option period rates) to formulate estimate.
4Use this estimate to negotiate submittals review portion of Architect/Engineer Construction Services portion of the task order.

&8&K01+024Submittal List with Review Estimate Instructions | National Park Service (NPS) - Denver Service Center (DSC) &8&K01+024page &P of &N

Template

Submittal List with Review Estimate Template
National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21
SUBMITTAL LISTACTION SUBMITTAL
REVIEW ESTIMATE
Park Acronym/Project Management Information System (PMIS) Number:PIPE 237373(Complete this portion for Architect / Engineer (A/E)
Project Title:Rehab Visitor Center Restroomsconstruction service task order negotiation.)
SUBMITTALREQUIREMENTSARCHITECT / ENGINEER REVIEW TIME
(Indicate with X)(Indicate in whole or partial hours.)
INFORMATIONALACTION
SPECIFICATION SECTIONPARAGRAPH NUMBERDESCRIPTIONCERTIFICATIONS OR LABORATORY TESTSREPORTS OR CALCULATIONS
OR PLANMANUFACTURER DATA
AND INSTRUCTIONSOTHERSAMPLESSHOP DRAWINGSMANUFACTURER DATA
AND INSTRUCTIONSOTHERARCHITECTCIVIL ENGINEERSTRUCTURAL ENGINEERMECHANICAL ENGINEERELECTRICAL ENGINEERPROJECT MANAGER COORDINATIONLANDSCAPE ARCHITECT
01 10 003.7Recycled materials usedX
01 10 007.2Accident Prevention PlanX
Safety MeetingsX
01 10 009.1Letter designating Project SuperintendentX
Construction ScheduleX
Schedule of ValuesX
List of SubcontractorsX
Subcontractor SF1413X
Quality Control PlanX
Waste Management PlanX
Indoor Air Quality PlanX
06 10 001.1Structural-use and OSB PanelsX
Oriented Strand BoardX
AdhesivesX
Preservative-treated Lumber and PlywoodX
Certifications of GradeX
Preservative TreatmentX
07 21 161.1Blanket InsulationX
Manufacturer's InstructionsX
07 92 001.1SealantsXX
BackstopsX
Field AdhesionX
Indoor Air Quality for Interior SealantsX
08 11 131.1DoorsXX
FramesXX
AccessoriesXX
Schedule of DoorsX
Schedule of FramesX
Factory-applied Enamel FinishX
08 14 001.1DoorsXX
AccessoriesXX
Water-resistant SealerX
Sample WarrantyX
Sound Transmission ClassX
Door Finish ColorsX
Cycle-Slam Hinge Loading ResistanceX
Certificates of GradeX
WarrantyX
08 71 001.3Door HardwareXXX
Keying ScheduleX
WarrantyX
Operation and Maintenance ManualX
09 29 001.1Control Joint Locations & DetailsX
Gypsum BoardX
Cementitious Backer UnitsX
AccessoriesX
VOC Content of Joint CompoundX
Asbestos Free MaterialsX
Indoor Air QualityX
09 30 101.1Detail DrawingsX
Porcelain TileXX
Transition StripsXX
Metal StripsXX
Mortar, Grout, AdhesivesXX
Manufacturer's Approved Cleaning InstructionsX
09 51 001.1Acoustic Ceiling SystemsXXX
Acoustical PerformanceX
09 51 001.5WarrantyX
09 65 131.1AdhesivesX
Wall BaseXX
09 65 131.3WarranryX
09 90 001.2CoatingX
Product Data SheetsX
ColorX
Qualification TestingX
Indoor Air QualityX
10 14 00.201.1Detail DrawingsX
Product DataX
Approved Manufacturers InstructionsX
Protection and CleaningX
10 14 00.201.4WarrantyX
10 28 131.1Product ScheduleX
Product DataX
Operation and Maintenance DataX
22 05 231.1Product DataX
22 05 291.1Product DataX
22 05 331.2Prodcut DataX
1.2Shop DrawingsX
22 05 531.2Product DataX
22 07 191.2Product DataX
22 11 161.2Product DataX
1.3System Purging and disinfecting activities reportX
1.3Field quality-control reportsX
22 11 23.211.1Product DataX
22 13 161.2Product DataX
22 13 191.1Product DataX
22 33 001.1Product DataX
1.2Sample WarrantyX
1.3Operation and maintenance dataX
23 05 931.1TAB ReportX
1.2Certified TAB reportsX
1.3TAB Specialist QualificationsX
23 33 001.2Product DataX
23 34 231.1Product DataX
23 37 13.131.1Product DataX
23 83 231.1Product DataX
1.2Operation and maintenance dataX
1.2Sample WarrantyX

Total: 0 0 0 0 0 0 0