This document is a Questions and Answers (Q&A) file for the Theodore Roosevelt NP Lift Station Project. The Q&A covers ten key questions related to the project's technical and administrative requirements. Key details include confirmation that the bid schedule (Contract Line 10) includes three elements: lift station, force main, and drain field, with a single bid item. The project involves removing and replacing the existing sanitary sewer lift station at the south unit campground within Theodore Roosevelt National Park. The contractor will be responsible for decommissioning, installation, and final commissioning, with a 15-day review period for submittals. Water usage requires metering and payment of use charges, and all applicable taxes must be included in the cost proposal. The project will involve installing a new dual pump sewage lift station with automatic controls, flow measurement, and electrical connections.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P6325B0003_Amd_0003.pdf | ||
| B09_Solicitation_Amendment_3_Attach_1_Clarity_on_Diversion_Box_0003.pdf | ||
| B09_Solicitation_Amendment_3_Attach_2_Oldcastle_example_0003.pdf | ||
| Sol_140P6325B0003_Amd_0002.pdf | ||
| Sol_140P6325B0003_Amd_0001.pdf | ||
| B08_Solicitation_Attach_7__Specifications_Septic_Flow_Calculations_102824_-_Copy.pdf | ||
| B08_Solicitation_Attach_4_Wage_Determination.pdf | ||
| B08_Solicitation_attach_6_Bid_Schedule.xlsx | XLSX spreadsheet | |
| B08_Solicitatoin_Attach_1__Specifications_013125_-.pdf | ||
| B08_Solicitation_Attach_2_Specifications_Submittal_List_013125_.xls | XLS spreadsheet | |
| Sol_140P6325B0003.pdf | ||
| B08_Solicitatoin_Attach_5_Drawings_013125_-.pdf | ||
| B08_Solicitation_Attach_3_Limitations_on_Subcontracting_Report.xlsx | XLSX spreadsheet |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Theodore Roosevelt NP Lift Station Project
# Question Response 1 Are we able to utilize our web based Procore System for project management functions including RFI’s, Submittals, Photos, Daily Logs for owner reviews
The government may entertain the use of alternative systems for submittal review provided the access and measures for interoperability are granted to multiple reviewing officials as required
2 The Bid schedule identified in item 10 only includes 1 line item. Section 01 10 00 12.2 includes items A 0001 lift station, B 00002 Force Main, C 0003 Drain Field Are we to provide only one bid item as per the bid schedule please clarify?
Yes, Contract Line 10 includes a base bid for three elements.
3 Has a geotechnical report completed for this area?
Perc testing and soils was completed in the Design and Engineering development of the work.
4 Are we able to access a water location for use during construction? Can you provide location?
Water Service: Water from existing water system is not available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations without any additional permit costs. Use resources wisely and minimize waste of water."
5 Are we responsible for performing commissioning functions?
The contractor shall according to 011000-1-1.2-C-a: The Notice to Proceed will be issued with a period of performance that is all inclusive of supply lead times, material deliveries, decommissioning, installation, anticipated average weather days for location, final commissioning, and acceptance of completed work.
6 Is there any government property that will be salvaged for this project?
No
7 Can you provide the review period for RFI’s including engineering review?
Refer to the project specifications.
8 Can you provide the review period for submittals including engineering review?
15 days. Per project specifications Item 9 (Submittals) (9.2)(D)
9 Is sales tax to be included in the cost proposal?
Include all applicable taxes.
10 If bid item 20 is not accepted what is the scope of work for the power requirements for the new lift station?
This item consists of removal and replacement of the sanitary sewer lift station at the south unit campground within Theodore Roosevelt National Park. This will include removing the existing lift station, installation of new gravity sewer connections, new
Theodore Roosevelt NP Lift Station Project
Contract Officer Joseph Kirk dual pump sewage lift station and valve vault with automatic controls/flow measurement and electrical connection to the lift station.
| 2025-05-08T08:35:31-0600 | |
| JOSEPH KIRK |