Questions_and_Answers_0002.pdf

PDF 86 KB Posted

Attached to
REPLACE MOTOR VESSEL FORT JEFFERSON AIR CHILLERS
Solicitation number
140P5424Q0065
Issued by

About this file

This document contains Questions and Answers related to Solicitation Number 140P5424Q0065 for the "REPLACE MOTOR VESSEL FORT JEFFERSON AIR CHILLERS" contract opportunity issued by the Department of the Interior National Park Service Southeast Region.

The key details are:

  • The vessel has 460V 3-phase power that is stepped down to 220V 3-phase for the HVAC system.
  • The existing raw water manifold will need to be entirely replaced to accommodate 3 chillers, as the current configuration only supports 2 chillers.
  • No other details about the specific products, services, pricing, set-asides, or timeline are provided in this Q&A document.

View the file

Other files

File Type Posted
Sol_140P5424Q0065_Amd_0002.pdf PDF
Photos_0001.pdf PDF
Sol_140P5424Q0065_Amd_0001.pdf PDF
Statement_of_Work.pdf PDF
Sol_140P5424Q0065.pdf PDF
SCA_Wage_Rates.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers

140P5424Q0065

Replace A/C Chillers on M/V Fort Jefferson

Dry Tortugas National Park

1. The implication is that the vessel is three phase power but in the pictures, there are VFD's? I'm assuming it’s single phase 240 in and the VFD generates to three phase power?

Response: We do know that that we have 460 volt 3 phase that enters the ship. It goes through a transformer in which it is knocked down to 220 volt. It is our understanding that the power being supplied to the HVAC system is 220 volt 3 phase.

2. The pictures regarding the raw water manifold looks like two different pictures. It looks like the manifold was cut and adapted to fit from three chillers to two chillers. Is this something that you’re going to need remedied to install three chillers?

Response: The existing manifold will need to be entirely replaced to accommodate 3 chillers. The current configuration only shows two because we removed a chiller and modified the manifold to bypass the space where the middle chiller was located.

File details come from the government source that posted it. Updated .