Atch_3-Site_Visit_Info.pdf

PDF 65 KB Posted

Attached to
Berm and Trail Stabilization-De Soto NM
Solicitation number
140P5418R0042
Issued by

About this file

Atch 3-Site Visit Info

View the file

Other files

File Type Posted
Atch_1_to_Am_1-Q&As.pdf PDF
Sol_140P5418R0042_Amd_0001.pdf PDF
Sol_140P5418R0042.pdf PDF
Atch_1-Photos_&_Drawings.pdf PDF
Atch_2-DBA_WD.pdf PDF
Entire_RFP_w-Atchs-140P5418R0042.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140P5418R0042 Attachment 3

Page 1 of 1 Pages

SITE VISIT INFORMATION

The National Park Service invites you to attend a site inspection for berm and trail stabilization within De Soto Memorial Park, Bradenton, FL, Manatee County, which will be held at the time and place listed below:

LOCATION: De Soto National Memorial

8300 Desoto Memorial Hwy Bradenton, FL 34209

TIME: 10:00 a.m. (EST) DATE: July 26, 2018

The purpose of this inspection is for contractors to ascertain the complexities and the location along with general local conditions which could materially affect conduct of operations of the cost thereof. Any questions must be submitted in writing to the Contracting Officer at the email address below NO LATER THAN 10:00am (ET) on Aug 03, 2018. A summary of questions and answers arising from the site inspection and/or review of the package will be provided to all prospective contractors as a reposting to the solicitation. Only those written answers provided to all offerors will be the Government's official response to questions. Information provided at this site visit shall not qualify the terms and conditions of the solicitation and specifications. No oral questions will be accepted. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.

We consider attendance at this site inspection vital to the preparation of a competitive and cost effective offer, and to understand the total result desired by the Government. Failure to attend this inspection may not be used as an excuse for omissions or miscalculations in quotes. It is emphasized that it is most advantageous for each contractor to have qualified representation at the site inspection.

NO individual site inspections will be conducted.

Point of Contact: Mary Stefanos (Email: Mary_Stefanos@nps.gov)

File details come from the government source that posted it.