Drawings_COWP_246372A_Construction_-_Replace_Septic_Systems_at_4_Park_Buildings_0003.pdf
PDF 7 MB Posted
- Attached to
- REPLACE SEPTIC SYSTEMS 4 PARK BLDGS
- Solicitation number
- 140P5324R0030
About this file
This document appears to be a set of construction drawings related to a federal contract opportunity to replace the septic systems at 4 park buildings. The drawings provide detailed design data, specifications, and installation details for the new septic system infrastructure, including specifications for the septic tanks, subsurface wastewater infiltration systems, and related components. Key details include the estimated daily flow rates, septic tank sizes, infiltration system dimensions, and trench specifications. The related federal contract opportunity is for the REPLACE SEPTIC SYSTEMS 4 PARK BLDGS project, with a Solicitation Number of 140P5324R0030, issued by the Department of the Interior National Park Service Southeast Region. The solicitation appears to be for the construction services required to implement the septic system replacements detailed in the drawings.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NEW PLEASANT ROAD
PI
CK
LE
SP
RI
N
G S
RO
AD SCALE: 1" = 20'
0 20' 40' 60'10'
M
CG
IN
N
IS
R
O
AD
SCALE: 1" = 20'
SCALE: 1" = 10'
0 5' 30'20'10'
SCALE: 1" = 10'
0 5' 30'20'10'
DESIGN DATA - ADMINISTRATION BUILDING
1. FLOW: TEN (10) WORKERS @ 25 GALLONS PER DAY (GPD) PER WORKER = 250
GALLONS PER DAY (GPD). FLOW IS BASED ON BUSINESSES/OFFICES/FACTORIES AT
15 GPD PER EMPLOYEE/SHIFT PLUS 10 GPD PER EMPLOYEE FOR SHOWERS.
2. SEPTIC TANK: SEPTIC TANK SIZE = 1.5 X PEAK FLOW = 1.5 X 250 GPD = 375 GPD.
USE 1 - 1,500 - GALLON SEPTIC TANK.
3. SUBSURFACE WASTEWATER INFILTRATION SYSTEM:
LONG TERM ACCEPTANCE RATE = 0.3 GPD PER SQUARE FOOT
250 GPD/0.3 GPD/SQUARE FOOT = 834 SQUARE FEET
FOR A THREE (3) FOOT WIDE TRENCH = 278 LINEAR FEET
INFILTRATOR QUICK FLOW CHAMBERS - 25% REDUCTION = 209 LINEAR FEET
USE A DISTRIBUTION BOX WITH 2- 108-FOOT LINES, 216 FEET TOTAL
0 20' 40' 60'10'
DESIGN DATA - MAINTENANCE COMPLEX AND TWO RESIDENCES
1. FLOW:
A. FIVE (5) --WORKERS @ 25 GALLONS PER DAY (GPD) PER WORKER = 125 GALLONS
PER DAY (GPD). FLOW IS BASED ON BUSINESSES/OFFICES/FACTORIES AT 15 GPD
PER EMPLOYEE/SHIFT PLUS 10 GPD PER EMPLOYEE FOR SHOWERS.
B. TWO (2) THREE (3) BEDROOM HOUSES AT 120 GPD PER BEDROOM = 720 GPD.
C. TOTAL FLOW = 125 GPD PLUS 720 GPD PLUS = 845 GPD.
2. SEPTIC TANK: SEPTIC TANK SIZE = 1.5 X PEAK FLOW = 1.5 X 845 GPD = 1,267.5 GPD.
USE 1 - 1,500 - GALLON SEPTIC TANK.
3. SUBSURFACE WASTEWATER INFILTRATION SYSTEM:
LONG TERM ACCEPTANCE RATE = 0.3 GPD PER SQUARE FOOT
845 GPD/0.3 GPD/SQUARE FOOT = 2,817 SQUARE FEET
FOR A THREE (3) FOOT WIDE TRENCH = 939 LINEAR FEET
INFILTRATOR QUICK FLOW CHAMBERS - 25% REDUCTION = 705 LINEAR FEET
USE A DISTRIBUTION BOX WITH 4- 180 FOOT LINES, 720 FEET TOTAL
FLOW
4"
11'-11 2"
5' -7
11'-11 2"
5' -8
9"
NOT TO SCALE
05/21/2015EMB
1 of 1DFH
Drawn by:
Scale: Checked by: Sheet:
Date:
INFILTRATOR WATER TECHNOLOGIES
4 Business Park Rd. Old Saybrook, CT 06475
(800) 221-4436
INFILTRATOR ®
water technologies
QUICK4 STANDARD CHAMBER
TYPICAL TRENCH DETAIL
SECTION VIEW
(36" WIDE TRENCH)
8" INVERT
34" 7'-0" 34"
12" MIN.
COVER
12"12"
TOPSOILNATIVE BACKFILL
INFILTRATOR WATER TECHNOLOGIES
QUICK4 STANDARD CHAMBER
TYPICAL TRENCH DETAIL
SECTION VIEW
(NOT TO SCALE)
TR
EN
C H
D
EP
TH
TO
B E
" T
O
2"
NOT TO SCALE
05/21/2015EMB
1 of 1DFH
Drawn by:
Scale: Checked by: Sheet:
Date:
INFILTRATOR WATER TECHNOLOGIES
4 Business Park Rd. Old Saybrook, CT 06475
(800) 221-4436
INFILTRATOR ®
water technologies
QUICK4 STANDARD CHAMBER
PRODUCT SPECIFICATIONS
48"
53"
(EFFECTIVE LENGTH)
12"
11.5" OUTLET END*
(EFFECTIVE LENGTH)
TOP VIEW
SIDE VIEW END VIEW
34"
QUICK4 STANDARD MULTIPORT END CAP
34"
12"
INSPECTION PORT
16"
15" INLET END*
(EFFECTIVE LENGTH)
8" INVERT
* ALL VIEWS = INSTALLED LENGTH.
INFILTRATOR WATER TECHNOLOGIES
QUICK4 STANDARD CHAMBER
PRODUCT SPECIFICATIONS
(NOT TO SCALE)
D
EP
TH
B
AS
ED
O N
M
AN
U
FA
C
TU
R
ER
12" 4'-11" 12"
12"
TYP.
2' -8
TY
P.
12"
TYP.
4'-11"
D
EP
TH
B
AS
ED
O N
M
AN
U
FA
C
TU
R
ER
12" 2'-8" 12"
D
EP
TH
B
AS
ED
O N
M
AN
U
FA
C
TU
R
ER
12" 3'-5" 12"
12"
TYP.
2' -8
TY
P.
12"
TYP.
3'-5"
D
EP
TH
B
AS
ED
O N
M
AN
U
FA
C
TU
R
ER
12" 2'-8" 12"
PI
CK
LE
SP
RI
N
G S
RO
AD
X
X X
X X
X
X
X
X
X
X X
X
X
SCALE: 1" = 20'
0 20' 40' 60'10'
DESCRIPTION
EFFECTIVE DATE: AUGUST, 2005
MAPPING SYMBOLS FOR EROSION
AND SEDIMENT CONTROL PLANS
SYMBOL
South Carolina Department of Health and Environmental Control
X
X X X X X X X X X X X X X X
X
X
X
X
X
X
X
X
X
X
X
SCALE: 1" = 20'
0 20' 40' 60'10'
DESCRIPTION
EFFECTIVE DATE: AUGUST, 2005
MAPPING SYMBOLS FOR EROSION
AND SEDIMENT CONTROL PLANS
SYMBOL
South Carolina Department of Health and Environmental Control
South Carolina Department of Health and Environmental Control
CONSTRUCTION ENTRANCE
DATE
FLAT-BOTTOM TRENCH DETAIL
V-SHAPED TRENCH DETAIL
SILT FENCE INSTALLATION
STANDARD DRAWING NO.
South Carolina Department of Health and Environmental Control
PLAN SYMBOL
DATE
South Carolina Department of Health and Environmental Control
DATE
CONSTRUCTION ENTRANCE
South Carolina Department of Health and Environmental Control
SIZESPECIFICATION
PLAN SYMBOL
DATE
EROSION CONTROL NOTES
1. EROSION CONTROL MEASURES SHALL BE INSTALLED PRIOR TO BEGINNING CLEARING
AND/OR GRADING OPERATIONS.
2. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN
PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR
PERMANENTLY CEASED, BUT IN NO CASE MORE THAN FOURTEEN (14) DAYS AFTER WORK
HAS CEASED. WHERE CONSTRUCTION ACTIVITY ON A PORTION OF THE SITE IS
TEMPORARILY CEASED, AND EARTH-DISTURBING ACTIVITIES WILL BE RESUMED WITHIN
14 DAYS, TEMPORARY STABILIZATION MEASURES DO NOT HAVE TO BE INITIATED ON
THAT PORTION OF THE SITE.
3. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED ONCE EVERY
SEVEN (7) DAYS. IF SITE INSPECTIONS IDENTIFY BMPS THAT ARE DAMAGED OR ARE NOT
OPERATING EFFECTIVELY, MAINTENANCE MUST BE PERFORMED AS SOON AS PRACTICAL
OR AS REASONABLY POSSIBLE AND BEFORE THE NEXT STORM EVENT WHENEVER
PRACTICABLE.
4. PROVIDE SILT FENCE AND/OR OTHER CONTROL DEVICES, AS MAY BE REQUIRED, TO
CONTROL SOIL EROSION DURING UTILITY CONSTRUCTION. ALL DISTURBED AREAS SHALL
BE CLEANED, GRADED, AND STABILIZED WITH GRASSING IMMEDIATELY AFTER THE
UTILITY INSTALLATION.
5. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL
PHASES OF CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES
AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. REMOVE DEPOSITED SEDIMENT
COLLECTED BY SEDIMENT CONTROL MEASURE (SILT FENCE) WHEN THE DEPOSITED
SEDIMENT REACHES 1/3 THE HEIGHT OF THE ABOVE-GROUND PORTION OF THESE BMPS.
6. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER
TO CONTROL EROSION AND/OR OFFSITE SEDIMENTATION. ALL TEMPORARY CONTROL
DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS
STABILIZED.
7. THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF
MUD ONTO PAVED ROADWAY(S) FROM CONSTRUCTION AREAS AND THE GENERATION OF
DUST. THE CONTRACTOR SHALL DAILY REMOVE MUD/SOIL FROM PAVEMENT, AS MAY BE
REQUIRED.
8. LITTER, CONSTRUCTION DEBRIS, OILS, FUELS, AND BUILDING PRODUCTS WITH
SIGNIFICANT POTENTIAL FOR IMPACT AND CONSTRUCTION CHEMICALS THAT COULD BE
EXPOSED TO STORM WATER MUST BE PREVENTED FROM BECOMING A POLLUTANT
SOURCE IN STORM WATER DISCHARGES.
9. PREVENT THE DISCHARGE OF POLLUTANTS FROM SPILLS AND LEAKS AND IMPLEMENT
CHEMICAL SPILL AND LEAK PREVENTION AND RESPONSE PROCEDURES AS NEEDED.
| Sheets and Views |
| Cowpens - 22.0315 - Septic CDs-CX1 |
| Cowpens - 22.0315 - Septic CDs-CX2 |
| Cowpens - 22.0315 - Septic CDs-C1 |
| Cowpens - 22.0315 - Septic CDs-C2 |
| Cowpens - 22.0315 - Septic CDs-C3 |
| Cowpens - 22.0315 - Septic CDs-C4 |
| Cowpens - 22.0315 - Septic CDs-C5 |
| Cowpens - 22.0315 - Septic CDs-C6 |
| Cowpens - 22.0315 - Septic CDs-C7 |
| Cowpens - 22.0315 - Septic CDs-C8 |
| Cowpens - 22.0315 - Septic CDs-C9 |
| Cowpens - 22.0315 - Septic CDs-C10 |
| C0-NPS COVER-STAMP.pdf |
| Sheets and Views |
| Layout1 |
File details come from the government source that posted it. Updated .