Park_Development_Plans_and_Drawings_Collection_0001.doc

DOC document 29 KB Posted

Attached to
DOE FOR MISSION 66 ERA BUILDINGS
Solicitation number
140P5122Q0064
Issued by

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Park Development Plans and Drawings Collection

Map Case 3:

Drawer 12

1, Land Acquisition Maps, Section 1-C, 27, Paper, 1966-1971, Natchez Trace Parkway, Map Case 3, Drawer 12

2, Development Plans and Related United States Geological Survey 7.5 Minute Quad Sheets, Section 1-C, 71, Paper, 1960-1971. Natchez Trace Parkway, Map Case 3, Drawer 12

3, Land Acquisition Maps, Development Plans, Section 1-D, 62, Paper, 1945-1969, Natchez Trace Parkway, Map Case 3, Drawer 12

4, Topographic Maps and Development Plans, 1-E and 2-B, Sections 1-E and 2-B (Meriwether Lewis National Monument Included), 73, Paper, 1941-1966, Natchez Trace Parkway, Map Case 3, Drawer 12

Drawer 13

5, Maps, Plans for Development, Section 1-F, 37, Paper, 1941-1968, Natchez Trace Parkway, Map Case 3, Drawer 13

6. Interpretive Sketches, Maps, Plans for Development of Historic and Archaeological Sites, 10, Paper, 1950-1981, Natchez Trace Parkway, Map Case 3, Drawer 13

7, Geographic Maps, 34, Paper, 1948-1959, Natchez Trace Parkway, Map Case 3, Drawer 13

8, Geographic Maps, Typical Sections, Plans, Section 1-H, 60, Paper, 1940-1947, Natchez Trace Parkway, Map Case 3, Drawer 13

9, Maps, Structural Designs for Development, Section 1-J, 37, Paper, 1940-1943, Natchez Trace Parkway, Map Case 3, Drawer 13

Drawer 14:

10, Signs and Standards, Section 2-A, 8, Paper, 1962, Natchez Trace Parkway, Map Case 3, Drawer 14

11, Land Acquisition Maps, Master Plans for Seeding/Sodding, Aerial Photographs, Section 2A-B, 34, Paper, 1939-1940, Natchez Trace Parkway, Map Case 3, Drawer 14

11A, Land Acquisition Maps, Master Plans for Seeding/Sodding, Aerial Photographs, Section 2A-B, 72, Paper, 1959-1969, Natchez Trace Parkway, Map Case 3, Drawer 14

12, Developmental Plans, Section 2C-D, 74, Paper, 1938-1960, Natchez Trace Parkway, Map Case 3, Drawer 14

12A, Developmental Plans, Section 2C-D, 81, Paper, 1960-1970, Natchez Trace Parkway,Map Case 3, Drawer 14

Drawer #15

13, Developmental Plans, Geographic and Topographic Maps, Section 3-A, 63, Paper, 1939-1967, Natchez Trace Parkway, Map Case 3, Drawer 15

14, Developmental Plans, Maps, Aerial Photographs for Pharr Mounds Interpretive Center, Section 3-B

15, Development Plans, Highway Access Connections, Section 3-C, 71, Paper, 1959-1975, Natchez Trace Parkway, Map Case 3, Drawer 15

16, Development Plans, Typical Sections, Maps, Tupelo Headquarters Layout, Section 3-D, 39, Paper, 1942-1961, Natchez Trace Parkway, National Park Service-Eastern Office of Design and Construction, Map Case 3, Drawer 15

17, Architectural Plans and Drawings, Utilities, Tupelo Headquarter's Maintenance Area, Section 3-D, 8, Paper, 1944-1950, Natchez Trace Parkway, Map Case 3, Drawer 15

Map Case #4

Drawer #1 18, Development and Master Plans, Access Road Layouts, Chickasaw Village Layout, Landscapes, Section 3-D, 79, Paper, 1939-1964, Natchez Trace Parkway, National Park Service Headquarters - Washington D.C. Office (Planning and Design Service Center), National Park Service-Eastern Office of Design and Construction

19, General Development Plans, Maps, Land Acquisition Maps, Section 3-E, 23, Paper, 1939-1948, Natchez Trace Parkway, Map Case 4, Drawer 1

20, Development Plans, Land Acquisition Maps, Bynum Mounds Exhibit Center, Highway Relocations, Section 3-F, 52, Paper, 1939-1967, United States Army Corps of Engineers, Natchez Trace Parkway, National Park Service-Eastern Office of Design and Construction, Map Case 4, Drawer 1

21, Proposed Plans, Real Estate Acquisitions, Contours Maps, Section 3-G, 42, Paper, 1939-1955, Natchez Trace Parkway, Map Case 4, Drawer 1

22, Proposed Plans for Dancy Maintenance Unit, Gas Station, Restaurant and Residences, Section 3-G, 2, Paper, 1943-1957, Natchez Trace Parkway, National Park Service-Eastern Office of Design and Construction, Map Case 4, Drawer 1

23, Development Plans for Little Mountain Station, Concessionaire, Section 3-H, 21, Paper, 1960-1962, Natchez Trace Parkway, National Park Service-Eastern Office of Design and Construction, Standard Oil Company, Map Case 4, Drawer 1

Drawer #2

24, Development Plans for Little Mountain park, Interpretive Shelter, Gas Station, Concessionaire, 50, paper, 1939-1955, Natchez Trace Parkway, National Park Service-Eastern Office of Design and Construction, Map Case 4, Drawer 2

24A, Development Plans for Little Mountain Park, Interpretive Shelter, Gas Station, Concessionaire, 50, Paper, 1956-1965, Natchez Trace Parkway, National Park Service-Eastern Office of Design and Construction, Map Case 4, Drawer 2

25, Development Plans for French Camp, BYWY Overlook, Bridge over Dry Creek, Section 3-J, 37, paper, 1941-1967, Natchez Trace Parkway, Map Case 4, Drawer 2

26, Development Plans, Land Acquisition Maps, Layout and Grading Plans Project, Section 3-K, 33, Paper, 1937-1956, Natchez Trace Parkway, Map Case 4, Drawer 2

27, Development Plans for Berea Church Picnic Area, Hurricane Creek Foot Trail, Relocation of County Road, Section 3-L, 9, Paper, 1941-1961, Natchez Trace Parkway, Map Case 4, Drawer 2

28, General Development Plans for Kosciusko Information Center, Section 3-M, 67, Paper, 1938-1983, Natchez Trace Parkway, Map Case 4, Drawer 2

29, General Development Plans, Residences, Maintenance Shop, Storage and Utilities of Koscisko Area, Section 3-M, 19, Paper, 1944-1958, Natchez Trace Parkway, Map Case 4, Drawer 2

30, Development Plans for Roses Bluff, Pine Grove, Brashear's Stand, Ridgeland Craft Center, Pearl River, Sections 3-N and 3-0, 73, Paper, 1936-1980, Natchez Trace Parkway, Map Case 4, Drawer 2

31, Development Plans for Public Road Crossings, Choctaw Boundary, Cypress Swamp, Section 3-N and 3-D (Continued), 39, Paper, 1947-1970, Natchez Trace Parkway, Map Case 4, Drawer 2

Drawer #3

32, Pearl River Reservoir Development, Section 3N-3-0, 122, Paper, 1950-1961, Natchez Trace Parkway, Jackson County Commerce Commission, United States Army Corps of Engineers, Map Case 4, Drawer 3

32A, Pearl River Reservoir Development, Sections 3-N and 3-0, 52, Paper, 1961-1965, Natchez Trace Parkway, Jackson Commerce Commission, United States Army Corps of Engineers, Map Case 4, Drawer 3

33, General Development of Ridgeland District Headquarters Area and Associated Facilities, Section 3-0, 61, paper, 1940-1969, Natchez Trace Parkway, Map Case 4, Drawer 3

34, Development Plans for Highway Intersections, Historic and Archaeological Sites, Contour Maps, Section 3-9, 50, paper, 1941-1973, Natchez Trace Parkway, Map Case 4, Drawer 3

Drawer #4

35, Development Plans for Junction U.S.Highway 80, Airport Road, Section 3-Q, 35, Paper, 1941-1968, Natchez Trace Parkway, Map Case 4, Drawer 4

36, Development Plans for Project, Section 3-R, 35, Paper, 1940-1962, Natchez Trace Parkway, Map Case 4, Drawer 4

37, Development Plans for Rocky Springs Park, Section 3-S, 30, Paper, 1940-1969, Natchez Trace Parkway, National Park Service-Eastern Office of Design and Construction, Map Case 4, Drawer 4

38, General Development Plans, Bridge Construction, Sections 3-U and 3-V, 40, Paper, 1953-1959, Natchez Trace Parkway, Map Case 4, Drawer 4

38A, General Development Plans, Bridge Construction, Sections 3-U-3-V, 39, Paper, 1967-1968, Natchez Trace Parkway, National Park Service-Eastern Office of Design and Construction, Map Case 4, Drawer 4

Drawer #5

39, Plans for Project 3V-1 as Constructed, Section 3V-1 (Four Part Construction Plans for Single Project 3V-1/Part 1 of 4, Parts: Sheets 1-59 [Ink and Linen], 35, Linen, 1982-1983, United States Department of Transportation, Map Case 4, Drawer 5, 39A, Plans for Project 3V-1, as Constructed, Section 3V-1, (Four Part Construction Plans for Single Project 3V-1/Part 2 of 4, Parts: 60-89 [Ink on Linen], 23, Linen, 1982-1983, United States Department of Transportation, Map Case 4, Drawer 5

39B, Plans for Project 3V-1 as Constructed, Section 3V-1, (Four Part Construction Plans for Single Project 3V-1/Part 3 of 4 Parts, Sheets 90-118 [Ink on Linen], 28 Linen, 1982-1983, United States Department of Transportation, Map Case 4, Drawer 5

39C, Plans for Project 3V-1 as Constructed, Section 3V-1 (Four Part Construction Plans for Single Project 3V-1/Part 4 of 4 Parts, Sheets 125-189, 38, Linen, 1982-1983, United States Department of Transportation, Map Case 4, Drawer 5

40, Signs, Standards, Construction Details for Development of Turpin Creek, Emerald Mound, Section 3-W, 13, Paper, 1950-1961, Natchez Trace Parkway, Map Case 4, Drawer 5

41, Development Plans, Construction Details for Natchez Trace Terminus, Section 3-X, 39, Paper, 1967-1968, Natchez Trace Parkway, Map Case 4, Drawer 5

File details come from the government source that posted it. Updated .