HOFU_Furnace_Stack_Stabilization_Questions_and_Answers_0002.pdf
PDF 100 KB Posted
- Attached to
- FY21 HOFU FURNACE STACK STABILIZATION
- Solicitation number
- 140P4221R0015
About this file
This document contains questions and answers regarding Amendment 0001 for Solicitation Number 140P4221R0015 for the FY21 HOFU Furnace Stack Stabilization opportunity with the Department of the Interior National Park Service Northeast Region. The amendment provides clarification that the scope of work includes removing paint and stain from the masonry, with quantities to be determined. It also specifies that the required mortar must match what is described in the solicitation documents. Repointing is only required in the locations noted on the structural drawings, not for all masonry.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| site_visit_furnace_stack_0002.pdf | ||
| Sol_140P4221R0015_Amd_0002.pdf | ||
| Sol_140P4221R0015_Amd_0001.pdf | ||
| Wage_Determination_PA_20210083_Chester_County_7-2-21.pdf | ||
| Form_B.docx | DOCX document | |
| Bid_Guarantee_SF24-16d.pdf | ||
| hofu_Drawings_CD_set_combined_0529_20.pdf | ||
| Addendum_1.docx | DOCX document | |
| Form_A.docx | DOCX document | |
| References_Worksheet.doc | DOC document | |
| All_Final_100__Specs_052920.pdf | ||
| Sol_140P4221R0015.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment
Document No.
140P4221R0015
Document Title HOFU Furnace Stack Stabilization
Questions and Answers
Q1. Is there a basis of bid quantity for the roof tile replacement?
A1. Yes. The quantities are noted on the drawing A0 as follows "Assume 20 lf flashing and 50 roof tiles"
Q2. Is mortar analysis required
A2. No but it is acceptable and could limit the number of samples that may need to be submitted for approval to get to an appropriate mix for the mortar
Q3. spec calls for paint/stain removal. Is paint removal part of scope? If so can a SF amount be given for bidding purposes
A3. It states remove paint/stain as a step in the sequence of preforming masonry work.
Q4. spec calls for pre-mix mortar. A local mortar will be a better match than mortar sourced 800 miles away, can NHL 3.5 and a local sand be used for mortar?
A4. We will require the mortar that is specified in the specs.
Q5. structural drawings have key notes for repointing, beside the notes is the keyword "typical"; is this a 100% re-point or only in the locations notated on the drawing?
A5. The work to be performed is what is specified in the documents provided.