HOFU_Furnace_Stack_Stabilization_Questions_and_Answers_0002.pdf

PDF 100 KB Posted

Attached to
FY21 HOFU FURNACE STACK STABILIZATION
Solicitation number
140P4221R0015
Issued by

About this file

This document contains questions and answers regarding Amendment 0001 for Solicitation Number 140P4221R0015 for the FY21 HOFU Furnace Stack Stabilization opportunity with the Department of the Interior National Park Service Northeast Region. The amendment provides clarification that the scope of work includes removing paint and stain from the masonry, with quantities to be determined. It also specifies that the required mortar must match what is described in the solicitation documents. Repointing is only required in the locations noted on the structural drawings, not for all masonry.

View the file

Other files

File Type Posted
site_visit_furnace_stack_0002.pdf PDF
Sol_140P4221R0015_Amd_0002.pdf PDF
Sol_140P4221R0015_Amd_0001.pdf PDF
Wage_Determination_PA_20210083_Chester_County_7-2-21.pdf PDF
Form_B.docx DOCX document
Bid_Guarantee_SF24-16d.pdf PDF
hofu_Drawings_CD_set_combined_0529_20.pdf PDF
Addendum_1.docx DOCX document
Form_A.docx DOCX document
References_Worksheet.doc DOC document
All_Final_100__Specs_052920.pdf PDF
Sol_140P4221R0015.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment

Document No.

140P4221R0015

Document Title HOFU Furnace Stack Stabilization

Questions and Answers

Q1. Is there a basis of bid quantity for the roof tile replacement?

A1. Yes. The quantities are noted on the drawing A0 as follows "Assume 20 lf flashing and 50 roof tiles"

Q2. Is mortar analysis required

A2. No but it is acceptable and could limit the number of samples that may need to be submitted for approval to get to an appropriate mix for the mortar

Q3. spec calls for paint/stain removal. Is paint removal part of scope? If so can a SF amount be given for bidding purposes

A3. It states remove paint/stain as a step in the sequence of preforming masonry work.

Q4. spec calls for pre-mix mortar. A local mortar will be a better match than mortar sourced 800 miles away, can NHL 3.5 and a local sand be used for mortar?

A4. We will require the mortar that is specified in the specs.

Q5. structural drawings have key notes for repointing, beside the notes is the keyword "typical"; is this a 100% re-point or only in the locations notated on the drawing?

A5. The work to be performed is what is specified in the documents provided.