B08_DIAPR_2011-06_Worksheet.docx

DOCX document 20 KB Posted

Attached to
X:NOGRN NCR-NAMA: POOL/FOUNTAIN MAINT
Solicitation number
140P3018R0020
Issued by

About this file

Subcontract Worksheet

View the file

Other files

File Type Posted
B3_WD.pdf PDF
B03_Price_Schedule.docx DOCX document
A04_SOW_Fountain_Maintenance.docx DOCX document
B08_RFP_Pool_and_Fountain_Maint.docx DOCX document
Sol_140P3018R0020.pdf PDF
B08_Past_Performance_Questionnaire.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Department of the Interior

FAR Clause 52.219-14, Limitations of Subcontracting

Subcontracting Percentage Worksheet

PRIME CONTRACTOR:

SUBCONTRACTOR:

SOURCE:

PRIME CONTRACTOR

SUBCONTRACTOR

DIRECT LABOR

FRINGE BENEFITS*

SUB TOTAL

(A)$

(B) $

LABOR G&A** @ %

TOTAL LABOR COSTS

(C) $

(D) $

SOURCE:

To calculate the subcontracting percentage, first add DIRECT LABOR and FRINGE BENEFITS and enter the figures for the prime contractor in space (A) and for the subcontractor (if available)*** in space (B).

Next, calculate the LABOR G&A by multiplying the G&A rate by the SUBTOTAL figure in space (A).

Calculate the subcontractor's LABOR G&A by multiplying the subcontractor's G&A rate by the subcontractor's SUBTOTAL figure jn (B).

Add the LABOR G&A to the SUBTOTAL and record that figure in the spaces for TOTAL LABOR COSTS at (C) and (D) respectively.

Next, using the formula below, calculate the subcontracting labor percentage.

(D)

(C) + (D) SUBCONTRACTING LABOR COST PERCENTAGE=%
*The firm must demonstrate that their labor overhead is allowable in accordance with FAR 3 l.205- 6(m). Failure to do so will cause the entire overhead to be eliminated from the calculations.
**G&A denotes General and Administrative Costs
***You need to compare as like figures as possible. Therefore, if you have a breakdown of the subcontractor's costs use it in the formulation above. If you do not have a breakdown you need to use the TOTAL SUBCONTRACTING AMOUNT for item (D) even though you must still breakdown the contractor's costs.

File details come from the government source that posted it.