B08_DIAPR_2011-06_Worksheet.docx
DOCX document 20 KB Posted
- Attached to
- X:NOGRN NCR-NAMA: POOL/FOUNTAIN MAINT
- Solicitation number
- 140P3018R0020
About this file
Subcontract Worksheet
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B3_WD.pdf | ||
| B03_Price_Schedule.docx | DOCX document | |
| A04_SOW_Fountain_Maintenance.docx | DOCX document | |
| B08_RFP_Pool_and_Fountain_Maint.docx | DOCX document | |
| Sol_140P3018R0020.pdf | ||
| B08_Past_Performance_Questionnaire.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of the Interior
FAR Clause 52.219-14, Limitations of Subcontracting
Subcontracting Percentage Worksheet
PRIME CONTRACTOR:
SUBCONTRACTOR:
SOURCE:
PRIME CONTRACTOR
SUBCONTRACTOR
DIRECT LABOR
FRINGE BENEFITS*
SUB TOTAL
(A)$
(B) $
LABOR G&A** @ %
TOTAL LABOR COSTS
(C) $
(D) $
SOURCE:
To calculate the subcontracting percentage, first add DIRECT LABOR and FRINGE BENEFITS and enter the figures for the prime contractor in space (A) and for the subcontractor (if available)*** in space (B).
Next, calculate the LABOR G&A by multiplying the G&A rate by the SUBTOTAL figure in space (A).
Calculate the subcontractor's LABOR G&A by multiplying the subcontractor's G&A rate by the subcontractor's SUBTOTAL figure jn (B).
Add the LABOR G&A to the SUBTOTAL and record that figure in the spaces for TOTAL LABOR COSTS at (C) and (D) respectively.
Next, using the formula below, calculate the subcontracting labor percentage.
(D)
| (C) + (D) SUBCONTRACTING LABOR COST PERCENTAGE= | % | |
| * | The firm must demonstrate that their labor overhead is allowable in accordance with FAR 3 l.205- 6(m). Failure to do so will cause the entire overhead to be eliminated from the calculations. |
| ** | G&A denotes General and Administrative Costs |
| *** | You need to compare as like figures as possible. Therefore, if you have a breakdown of the subcontractor's costs use it in the formulation above. If you do not have a breakdown you need to use the TOTAL SUBCONTRACTING AMOUNT for item (D) even though you must still breakdown the contractor's costs. |
File details come from the government source that posted it.