Sol_140P1421Q0078_Amd_0001.pdf

PDF 88 KB Posted

Attached to
FOBU WELCOME AND COPROLITE EXHIBIT CASES Federal contract opportunity
Solicitation number
140P1421Q0078
Issued by
Department of the Interior National Park Service Intermountain Region

View the file

Other files for this federal contract opportunity

Other files attached to FOBU WELCOME AND COPROLITE EXHIBIT CASES, newest first.
File Type Posted
Sol_140P1421Q0078_Amd_0004.pdf PDF
Sol_140P1421Q0078_Amd_0003.pdf PDF
Sol_140P1421Q0078_Amd_0002.pdf PDF
01_D__Exhibit_Blueprints.pdf PDF
Sol_140P1421Q0078.pdf PDF
01__Statement_of_Work.pdf PDF
01_A__Area_Generalized_Map.pdf PDF
02__Wage_Determination_Lincoln_WY.pdf PDF
01_C__Existing_Exhibits_Details.pdf PDF
01_B__Schematic_Sketches.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P1421Q0078 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PIR

Yellowstone NP WY 82190 Mammoth Supply Center / 22 Stable St PO Box 168 NPS, IMR - Northern Rockies MABO

07/09/20210001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/09/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amendment 0001 issued to address questions received.

Question 01: How thick is the laminated glass?

Answer 01: Contractor to determine based on size of glass pane and submit with quote.

Question 02: Does the job site have a dock and lift truck for delivery?

Answer 02: The job site has a Bobcat skid-steer with forks to assist offloading materials.

Or if heavier equipment is needed a Caterpillar backhoe with forks. Offloaded items will need to be rolled to the doors to enter the building.

The visitor center front entrance is double doors without a central post. With both doors

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Katharina O'Reilly

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P1421Q0078/0001 open the doorway is 95 inches tall by 65 inches wide. If constructing the four case complex as a single unite the height may be shortened the minimum distance necessary to bring the case into the building. Preference is for a design which results in total case height of 8 feet with maximum door height for viewing exhibit contents.

The Optional Case has limitations to navigate corners into the room for installation. The maximum length is about 9 foot 6 inches, taking into account the 25-inch case depth. The entrance door height is limited to 95 inches.

Recommendation is to fabricate the base section for the vents and the top façade pieces separate from the main case, so the case height is maximized for viewing exhibits. If case design necessitates shortening the main case in order to fit through the door, then the top façade piece will need additional height added. Preference is for a design resulting in the total height of glass doors, including shoes, of 95 inches to maximize exhibit viewing.

Question 03: All electrical and building work will be done prior to our arrival?

Answer 03: The electrical and floor supports will be completed prior to contractor arrival. The carpet removal will be complete once contractor is on site. The carpet squares make it quick to remove. The bathroom floor tiles will be removed after contractor is on site and the cabinet has been set into place and the case position marked on the floor.

Question 04: What is the species of the plywood?

Answer 04: Preference is for cabinet-grade Baltic birch plywood to maximize stability over time.

End of Amendment 0001.