A06_0040666828_CANY-Supply_UBC-SOW_2024.doc
DOC document 51 KB Posted
- Attached to
- CANY-SUPPLY UBC
- Solicitation number
- 140P1224Q0062
About this file
This document is a Statement of Work (SOW) for the supply and delivery of 3,500 tons of Untreated Base Course (UBC) to Canyonlands National Park's Island in the Sky District. The SOW specifies that 2,500 tons are to be delivered to the Shafer Boneyard and 1,000 tons to the Green River Boneyard, with deliveries permitted only between 7:00 AM and 5:00 PM Monday through Thursday, from July 15 to July 31, 2024. The UBC must meet UDOT specification 02721 requirements, and the contractor shall submit a signed letter of certification stating the materials will meet the requirements. Delivery trucks are limited to single end dumps, and daily deliveries are capped at 350-500 tons to avoid overwhelming the Park's capacity. Payment will be made according to the bid schedule, which includes line items for the two delivery locations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A06_0040666828_CANY-Supply_UBC-Attachment_1_2024.doc | DOC document | |
| Sol_140P1224Q0062.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK: SUPPLY AND DELIVER UNTREATED BASE COURSE (UBC)
Park: Canyonlands National Park Island in the Sky District
PART 1 GENERAL
1.1
DESCRIPTION & REQUIREMENTS
A. Synopsis. Canyonlands National Park requires supply and delivery of 3,500 tons of Untreated Base Course (UBC). 3500 tons of UBC is to be delivered at the Island in the Sky (ISKY) District – 2500 tons to the Shafer Boneyard and 1000 tons to the Green River Boneyard. The UBC shall not contain over approximately 2% water.
B. Locations.
The Island in the Sky District is approximately 35 miles northwest of Moab, Utah. Travel 9 miles north of Moab on Highway 191 and turn left (west) on Hwy 313 and travel 25 miles southwest to the ISKY District.
1. Shafer Boneyard (2500 tons): Turn left just pass the entrance station on the Shafer Trail access road, travel 1 mile to the bone yard. Do not attempt to descend below the Shafer boneyard.
2. Green River Boneyard (1000 tons): Located about 10 miles from the entrance station. From the entrance station continue on Grandview point road for about 8.5 miles, then turn right onto upheaval dome road then after about a ¼ mile make a right onto green river overlook road where you continue for about ¾ of a mile continuing straight into the boneyard where the roads bends to the left towards the overlook.
C. Period of Performance. The Contractor shall be available to supply UBC for a period of 30 calendar days after notice to proceed.
D. Warranty. The product shall be warranted to meet the requirements of this specification upon delivery.
E. Submittals. The supplier shall submit a signed letter of certification stating that materials supplied will meet the requirements of Part 2 Products. This letter of certification must be included with the quote. After award the Contractor shall submit their job mix gradation as required in table two of the referenced UDOT spec 02721.
1.2
REQUIREMENTS
A. Site Tour. A formal Site Tour will not be conducted. The Contractor should visit the site on their own, after contacting the Contracting Officer’s Representative (COR) Todd McDougall at 435.719.2160 to schedule their visit.
B. Delivery Times and Dates. Delivery is to begin on July 15th, 2024, concluding July 31st, 2024. Delivery will only be allowed between 7:00 AM to 5:00 PM Monday through Thursday, no Friday, Weekend or Federal Holiday deliveries will be allowed unless otherwise approved. All Deliveries should be on site by July 31st, 2024.
C. Delivery Coordination. Contact Todd McDougall at (435) 719-2160 (Monday thru Thursday).
D. Truck Size. It is the Contractors responsibility to assess the delivery location and determine suitable delivery trucks. However, due to the size of the delivery locations and the limited amount of space to stockpile material, double belly dumps (trains) or end dump with two pups (triples) will not be allowed.
E. Delivery Quantities. Daily deliveries shall be approximately 350-500 tons per day to ensure that the Contractor does not overwhelm the Park’s capacity.
F. Offloading. The Contractor shall comply with the COR on offloading procedures and locations to facilitate the Park in pushing the material up into a pile or hauling the material to the jobsite.
PART 2 PRODUCTS
2.1
PRODUCT REQUIRMENTS
A. UBC. The UBC shall meet the requirements of UDOT spec 02721 part 2 Products (dated January 1, 2008). The aggregate class designation for Table 1 may be A, B, or C, however the Park prefers class C. UDOT spec section 02721 is included in the statement of work as attachment 1.
PART 3 EXECUTION – N/A
PART 4 MEASUREMENT AND PAYMENT
4.1 UBC will be measured by the ton. The Contractor shall provide the COR with certified weigh tickets with each delivery. Payment will be made according to the bid schedule.
END OF SECTION
Supply and Deliver Untreated Base Course (UBC)
CANYONLANDS NATIONAL PARK
NEEDLES DISTRICT
ISLAND IN THE SKY DISTRICT
CONTRACT BID SCHEDULE
All Items or None
UNIT
ITEM
QTY
UNIT
PRICE
TOTAL
1. UBC – Supply & Deliver
TON
to Island in the Sky District – Shafer Boneyard
2. UBC – Supply & Deliver
TON
to Island in the Sky District – Green River Boneyard
GRAND TOTAL
SUPPLY UBC
230695
CANYONLANDS NATIONAL PARK
Page | 1
File details come from the government source that posted it. Updated .