FARMINGTON DISTRICT OFFICE HVAC SYSTEM IMPROVEMENT
Solicitation number
140L0624R0037
Issued by

About this file

This sources sought notice provides information for a potential HVAC system improvement project at the Bureau of Land Management's Farmington District Office in Farmington, New Mexico. The BLM seeks to gain market knowledge and develop an acquisition strategy for replacing the existing HVAC systems, which include evaporative coolers and boilers, with new variable refrigerant flow systems, energy recovery ventilators, and controls. Interested vendors should have experience providing HVAC design and installation services for commercial buildings. The notice does not request proposals but rather requests responses from both large and small businesses to inform the BLM's procurement approach.

View the file

Other files

File Type Posted
A14_Sources_Sought_25July2022_1.docx DOCX document
Farmington_DO_HVAC_Improvements_Drawing_Set_06-21-2023_1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUREAU OF LAND MANAGEMENT

FARMINGTON DISTRICT OFFICE

HVAC SYSTEM IMPROVEMENTS

PROJECT SPECIFICATIONS

Prepared by:

Bureau of Land Management

National Operations Center

Architecture and Engineering Section OC-671

Denver, CO 80225

June 21, 2023

JUNE 2023

HVAC SYSTEM IMPROVEMENTS

TABLE OF CONTENTS

TOC-1

HVAC SYSTEM IMPROVEMENTS

SPECIFICATIONS TABLE OF CONTENTS

DIVISION 1 - GENERAL REQUIREMENTS

01010 ........ SUMMARY OF WORK

01200 ........ LUMP SUM PRICES AND SCHEDULE OF VALUES

01310 ........ PROJECT MANAGEMENT

01320 ........ CONSTRUCTION SCHEDULE

01322. ....... PHOTOGRAPHIC DOCUMENTATION

01330 ........ SUBMITTAL PROCEDURES

01350 ........ SAFETY REQUIREMENTS

01351 ........ LIFE SAFETY PLAN

01400 ........ QUALITY REQUIREMENTS

01420 ........ REFERENCES

01500 ........ TEMPORARY FACILITIES AND CONTROLS

01518. ....... INDOOR AIR QUALITY MANAGEMENT

01600 ........ PRODUCT REQUIREMENTS

01700 ........ EXECUTION REQUIREMENTS

01731 ........ CUTTING AND PATCHING

01732. ....... SELECTIVE DEMOLITION

01770 ........ CLOSEOUT PROCEDURES

01781. ....... PROJECT RECORD DOCUMENTS

01782 ........ OPERATION AND MAINTENANCE DATA

01815. ....... SYSTEM DEMONSTRATION AND TRAINING

DIVISIONS 2 THROUGH 4

NOT APPLICABLE

DIVISION 5 - METALS

05120 ........ STRUCTURAL STEEL

05400 ........ COLD-FORMED METAL FRAMING

DIVISION 6 - WOOD AND PLASTICS

DIVISION 7 - THERMAL AND MOISTURE PROTECTION

07213 ....... RETROFIT ROOF CURB ADAPTERS

07410 ....... METAL WALL PANELS

07620 ....... SHEET METAL FLASHING

07920 ........ JOINT SEALANTS

Division .... Section Title ................................................................................................................................. Pages

HVAC SYSTEM IMPROVEMENTS

TABLE OF CONTENTS

TOC-2

DIVISION 8 - DOORS AND WINDOWS

08305 ........ ACCESS DOORS

DIVISION 9 - FINISHES

09250 ........ GYPSUM BOARD

09512 ........ ACOUSTICAL TILE CEILINGS

09653 ........ RESILIENT WALL BASE

09912 ........ PAINTING

DIVISIONS 10 THROUGH 12

DIVISION 13 – SPECIAL CONSTRUCTION

13100 ........ LIGHTNING PROTECTION

DIVISION 14 – CONYEYING SYSTEMS

DIVISION 15 - MECHANICAL

15010 ........ GENERAL MECHANICAL PROVISIONS

15050 ........ BASIC MATERIALS AND METHODS

15070 ........ MECHANICAL VIBRATION AND SEISMIC CONTROLS

15075 ........ MECHANICAL IDENTIFICATION

15080 ........ MECHANICAL INSULATION

15400 ........ PLUMBING SYSTEMS

15420 ........ PLUMBING EQUIPMENT

15530 ........ REFRIGERANT PIPING SYSTEMS

15700 ........ VARIABLE REFRIGERANT FLOW SYSTEMS

15730 ........ SPLIT-SYSTEM AIR CONDITIONING EQUIPMENT

15765 ........ ELECTRIC HEATERS

15785 ........ AIR-TO-AIR ENERGY RECOVERY EQUIPMENT

15810 ........ DUCTWORK

15850 ........ AIR OUTLETS AND INTAKES

15910 ........ DIRECT DIGITAL CONTROLS

15952 ........ TESTING, ADJUSTING AND BALANCING

DIVISION 16 - ELECTRICAL

16010 ........ GENERAL ELECTRICAL PROVISIONS

16050 ........ BASIC MATERIALS AND METHODS

16060 ........ GROUNDING

END OF TABLE OF CONTENTS

Division .... Section Title ................................................................................................................................. Pages

HVAC SYSTEM IMPROVEMENTS

SUMMARY OF WORK

01010-1

SECTION 01010 – SUMMARY OF WORK

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes the following:

1. Background.

2. Clarification of intent for execution of Work.

3. Work covered by the Contract Documents.

4. Work phases.

5. Work under other contracts.

6. Contractor use of premises.

7. Public use of site.

8. Occupancy requirements for buildings.

9. Work restrictions.

10. Security.

11. Field verification.

12. Contractor furnished items.

13. Government furnished items.

14. Hazardous materials.

15. Soils investigation report.

16. Specification formats and conventions.

1.2 BACKGROUND

A. The Farmington District Office building was constructed in 2013 and consists of 30,000 square feet of floor area. It is a flat roof, steel-framed building with masonry and metal cladding, composed of a two-story open office area to the west and a single-story private office and public area to the east – the two-story open office area has an atrium that is open to a roof monitor that provides daylighting in the core of the building. The public portion of the building contains the entry lobby, reception area, and public restrooms, along with a Public Room and a Multi- Purpose

Room. The roof is accessible via a roof hatch and ladder located in the Mail Room.

B. Existing Mechanical Systems: The existing heating, ventilating, and air conditioning (HVAC) systems consist of two-stage rooftop mounted evaporative coolers with an underfloor air distribution system – most of the building has a raised floor system with an 18-inch deep plenum for air distribution. Two natural gas-fired modulating-condensing boilers have been installed to provide heat for the building, along with two hot water circulating pumps, air separator, and expansion tank. Fan-powered variable air volume (VAV) terminals with hot water reheat coils have been installed under the raised floor at the perimeter of the building, along with VAV and manual floor diffusers in the core of the building. The existing rooftop HVAC units are located in screened enclosures to the east and west of the central roof monitor.

HVAC SYSTEM IMPROVEMENTS

01010-2

The HVAC systems installed at the Farmington District Office have been problematic since construction on the building was completed. An abbreviated list of ongoing issues that have been experienced is as follows:

1. Even with remedial work completed at the end of the construction period, the underfloor air distribution plenum leaks supply air excessively, leading to comfort complaints due to lack of good air distribution.

2. The Multi-Purpose Room has been especially difficult to heat and cool properly. More generally, the entire east end of the building has been difficult to heat and cool properly.

3. The fan-powered VAV terminals and associated air filters located in the underfloor plenum are difficult to access for service and maintenance.

4. Dirt collecting in the floor diffusers is an ongoing maintenance issue. The dirt from people’s shoes causes both the manual damper and automatic damper mechanisms to jam and space temperature control suffers as a result.

5. Even with repeated investments and service contracts, the automatic control system (DDC

BAS or direct digital control building automation system) still does not operate correctly and requires manual operation and adjustment to achieve acceptable comfort conditions.

6. The two-stage evaporative cooling rooftop units require frequent maintenance and use an excessive amount of potable water for their operation.

7. The heating system failed during the winter of 2017/2018. District Office personnel had to be sent home due to the lack of heat, and the fix took time and was expensive. Repair parts for the boilers have been difficult or impossible to obtain in recent years.

8. The HVAC systems that are installed in the Farmington District Office are overly complex and are not standard, which has historically led to a lack of understanding on how they should be operated and maintained.

All of this affects employee and visitor comfort, along with limiting BLM maintenance staff productivity and effectiveness. Current energy use at this facility is also higher than it should be, especially considering that the facility has 67 kW of photovoltaic (PV) solar energy systems installed. Replacement of the existing HVAC systems with new high efficiency variable refrigerant flow (VRF) systems will improve occupant comfort, increase system reliability, and increase energy efficiency.

C. Existing Electrical Systems: The existing electrical system consists of a 1000A, 480/277V, three phase service. A 225 kVA dry-type transformer has been provided to power all of the 208/120V circuits in the building.

1.3 CLARIFICATION OF INTENT FOR EXECUTION OF WORK

A. The general intent of the contract is to leave as much of the existing building construction and furnishings in place as possible during execution of the Work. If the Contractor determines that more involved approaches to the work are required than what is described here, the Contractor shall state so in their proposal and include any additional costs in their bid prices. Specific clarifications of intent for the execution of the Work are as follows:

1. Systems Furniture: The intent is for the systems furniture in the open office areas to remain in place during the execution of the Work. Work surfaces (desktops) in

HVAC SYSTEM IMPROVEMENTS

01010-3 individual cubes may be removed as necessary for access. Furniture in private offices, conference rooms, etc. may be moved or removed as necessary for access.

2. Suspended Ceilings: The intent is to remove existing suspended ceiling tiles as necessary, but to leave the suspended ceiling grids in place as much as possible during the execution of the Work. If necessary, T-bar cross-pieces may be removed as necessary for access.

3. Gypsum Board Ceilings: The intent is to remove only as much of the gypsum board ceilings as necessary and to leave the ceiling joist structure in place as much as possible during the execution of the Work. The only modifications that should be required for the ceiling joist structure are any reframing required for the installation of ceiling-mounted fan coils and access doors.

4. Underfloor HVAC Equipment: The intent is to abandon the existing fan-powered VAV terminal units, ductwork, piping, conduit, and wiring in place below the raised floor. At the end of the project, the dampers in all unused floor registers shall be closed.

5. CMU Wall Openings: New cut and/or cored openings through CMU walls are small enough that no steel reinforcing should be required.

6. Protection of Existing Floors and Furnishings: Temporary floor protection (Ram Board or equal taped down to existing floors) shall be provided as necessary to protect the floors during execution of the work. Temporary protection (tarping) of furnishings shall be provided as necessary to protect furnishings during execution of the work.

1.4 WORK COVERED BY CONTRACT DOCUMENTS

A. Project Identification: Farmington District Office HVAC System Improvements.

B. Project Location: 6251 College Boulevard, Farmington, NM 87402 (LAT 36.78613, LONG -

108.15830, 505-564-7600, https://www.blm.gov/office/farmington-district-office)

C. The Work consists of but is not limited to the following:

1. HVAC System Demolition: Removal of existing mechanical systems and equipment as necessary to accommodate the new mechanical systems.

2. Electrical System Demolition: Removal of existing electrical systems and equipment as necessary to accommodate the new mechanical systems.

3. HVAC System Improvements: Installation of new HVAC systems consisting of VRF systems for heating and cooling, energy recovery ventilators (ERVs) for ventilating the building, new HVAC control systems, and all ductwork, piping, and appurtenances necessary for a complete and operable HVAC system. This work also includes cutting, patching, spotting, taping, sanding, painting, access doors, minor structural modifications, minor plumbing system modifications, etc. Cutting and patching will be required for demolition and for routing new ductwork, piping, and conduit in existing walls and above existing ceilings. Access doors will be required for access to piping, conduit, fan coil units, etc. as necessary for installation and maintenance purposes.

4. Electrical System Improvements: Modification and expansion of existing electrical systems as necessary to power all new HVAC systems, equipment, and controls.

5. Temporary protection shall be provided as necessary for the floors and furnishings.

http://www.blm.gov/office/farmington-district-office)

HVAC SYSTEM IMPROVEMENTS

01010-4

1.5 WORK UNDER OTHER CONTRACTS

A. Cooperate fully with separate contractors so work on those contracts may be carried out smoothly, without interfering with or delaying work under this Contract. Coordinate the Work of this

Contract with any work performed under separate contracts.

1.6 CONTRACTOR USE OF PREMISES

A. Use of Site: Limit use of premises to work in areas indicated. Do not disturb portions of the project site beyond areas in which the Work is indicated.

1. Limits: Confine construction operations to areas defined on the drawings.

a. Limit site disturbance, including earthwork and clearing of vegetation, to 10 feet beyond building perimeter and staging areas.

B. Driveways and Entrances: Keep driveways, loading areas, and entrances serving the premises clear and available to the Government, Government employees, public, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. Parking for Contractor’s and Subcontractor’s employees will be limited to the Warehouse parking lot unless other areas are approved by the Government.

a. Schedule deliveries to minimize use of driveways and entrances.

b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

C. Storage of Materials:

1. Confine storage of materials to the interior of the building work areas and to areas on the site as shown or approved by the Government.

2. Volatile Storage: Store gasoline/diesel in approved storage containers (maximum 5 gallon containers) outside the building. Total quantity of volatile storage shall be limited to 20 gallons maximum.

D. Preservation of Existing Facilities: Confine all operations to work limits of the project. Prevent damage to building surfaces. Carefully supervise construction activities to prevent damage.

Restore damaged areas, repairing or replacing damaged areas at no additional expense to the

Government.

E. Construction Camp: Establishment of a construction camp within the boundaries of the site will not be permitted.

F. Firearms: No firearms are allowed on the site.

G. Advertising: No commercial advertising or signage shall be permitted, other than that on

Contractor vehicles or equipment.

H. Existing Utilities: Utilities are available on site. Restricted use of utilities will be allowed; see

Section 01500 - Temporary Facilities and Controls.

HVAC SYSTEM IMPROVEMENTS

01010-5

I. Hauling Restrictions: Comply with all legal load restrictions in the hauling of materials.

J. Waste Disposal: All waste shall be disposed of in a legal and appropriate manner, and in accordance with Federal, State and local regulations.

K. Scheduling: Schedule and sequence operations necessary to complete the work, including coordination with other trades relative to the Contractor's requirements. Schedule work in such a manner as to avoid delays in overall construction schedule and permit proper installation of work.

L. Utilities: Service interruptions will not be allowed during normal operating hours unless required;

see Paragraph 1.9B. below.

M. Nonsmoking Building: Smoking is not permitted within the building or within 25 feet of entrances, operable windows, or outdoor air intakes. No smoking signs shall be posted and visible during working hours.

1.7 PUBLIC USE OF SITE

A. The site will be open to the public during normal operating hours - the Warehouse, Fire Station, and Crew Quarters shall remain accessible to the public during business hours. Contractor activities shall take into consideration BLM employees and site visitors in order to limit interactions and disturbance. Provide orange safety tape to separate the public and Government employees from construction activities as necessary.

1. The Contractor shall at all times conduct contractor operations to keep the site clean and free of debris. Areas around the building may be closed to employees, public, or both, when required, upon specific approval of the Government.

2. Material placed exterior to the building shall be utilized on a daily basis and cleaned up each evening and placed either inside the building or at a designated storage area. The

Government shall not be responsible for the physical security of Contractor’s materials.

1.8 OCCUPANCY REQUIREMENTS FOR BUILDINGS

A. Government Occupancy: The Government plans to vacate the building during the entire contract period. Cooperate with the Government during construction operations to minimize conflicts and facilitate any Government usage on the site. Maintain existing building and site exits, unless otherwise indicated.

1. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the Government.

2. Maintain existing building in a weather tight condition throughout construction period.

Repair any damage caused by construction operations. Protect building during construction period.

3. Consideration shall be given to minimize disturbance of everyday activities when scheduling construction activities which may be noisy or otherwise disruptive.

HVAC SYSTEM IMPROVEMENTS

01010-6

4. The Contractor shall provide a minimum of 48 hours’ notice for concrete sawing, concrete coring, or other major demolition activities.

5. Contractor emergency egress during each phase of construction shall be and verified and planned for.

6. BLM employees with proper authorization and equipped with personal protective equipment (hardhat) shall have access to the central file room (Room 110), LEO evidence storage (Room 183), and the FIMO file room (Room 202B) as necessary during the execution of the work.

1.9 WORK RESTRICTIONS

A. Work Hour Restrictions:

1. Contractor’s work hours may be extended to 6:00 AM – 6:00 PM Monday through Friday, except Federal holidays

2. Contractor work hours during other times shall be subject to approval. Provide list of activities that Contractor proposes to be accomplished after normal operating hours.

B. Existing Utility Interruptions: Do not interrupt utilities serving the Farmington District Office facilities unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:

1. Notify the Government in writing not less than 2 days in advance of proposed utility interruptions.

2. Do not proceed with utility interruptions withoutthe Government’s written permission.

3. If extended outages (over 4 hours in duration) are required, they shall occur over a weekend. Extended outages shall be subject to minimum 14 day prior notice and approval prior to outage.

1.10 SECURITY

A. General:

1. Contractor shall submit a Security Plan at the Pre-Work Conference outlining the procedures proposed to maintain a secure project.

2. Contractor and Subcontractor employees shall be required to display a badge with a picture

ID with their name and company they work for any time they are on site. Visitors shall be required to check in at the Contractor’s trailer and obtain a visitor’s badge to be worn when the individual is on site. Visitors must be accompanied by a credentialed Contractor employee.

B. Keys and Passes:

1. The building requires a key card for entry and most of the interior rooms require a standard key for access.

2. The Contractor’s credentialed employees may be issued key card passes as well as standard keys, subject to verification, security checks, and training.

HVAC SYSTEM IMPROVEMENTS

01010-7

C. Openings:

1. During the course of the work, access to the building must remain secured. Means and methods of securing access points shall be subject to approval by the Government.

D. Personnel:

1. Contractor shall maintain security for all construction personnel and issue credentialed

(picture) identification for all construction personnel on the job site.

2. All visitors or short-term subcontractors may be issued a visitor’s pass and shall be accompanied by a credentialed Contractor employee.

1.11 FIELD VERIFICATION

A. Field verify all existing dimensions and conditions affecting the work of this contract before ordering products.

1.12 CONTRACTOR-FURNISHED ITEMS

A. All materials shall be new and Contractor-furnished from outside the site.

1.13 GOVERNMENT-FURNISHED ITEMS

A. The Government will furnish lights, power, and water from existing services in the building for the Contractor’s use. The BLM shall not allow wasteful or unauthorized use of Government furnished utilities.

1.14 SOILS INVESTIGATION REPORT

A. Not Used.

1.15 SPECIFICATION FORMATS AND CONVENTIONS

A. Specification Format: The Specifications are organized into Divisions and Sections using the

CSI/CSC “MasterFormat 95” 16-division system and "MasterFormat" numbering system.

1. Division 1: Sections in Division 1 govern the execution of the Work of all Sections in the

Specifications.

B. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations.

These conventions are as follows:

1. Abbreviated Language: Language used in the Specifications and other Contract

Documents is abbreviated. Words and meanings shall be interpreted as appropriate. Words implied, but not stated, shall be inferred as the sense requires. Singular words

HVAC SYSTEM IMPROVEMENTS

01010-8 shall be interpreted as plural, and plural words shall be interpreted as singular where applicable as the context of the Contract Documents indicates.

2. Imperative mood and streamlined language are generally used in the Specifications.

Requirements expressed in the imperative mood are to be performed by Contractor.

Occasionally, the indicative or subjunctive mood may be used in the Section Text for clarity to describe responsibilities that must be fulfilled indirectly by Contractor or by others when so noted.

a. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.

C. Terminology: In Division 2 through 16 specification sections, any references to “Owner” shall be replaced with the term “Government” . Any references to “Architect” shall be replaced with the term “Government”.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION

HVAC SYSTEM IMPROVEMENTS

LUMP SUM PRICES AND SCHEDULE OF VALUES

01200-1

SECTION 01200 – LUMP SUM PRICES AND SCHEDULE OF VALUES

1.1 SUMMARY

A. This Section includes administrative and procedural requirements for lump sum payment prices and requirements to prepare schedule of values.

1.2

SCHEDULE OF VALUES

A. Coordination: Coordinate preparation of the Schedule of Values with preparation of

Contractor's Construction Schedule.

1. Correlate line items in the Schedule of Values with other required administrative forms and schedules, including Application for Payment forms with Continuation Sheets and

Contractor's Construction Schedule.

2. Submit the Schedule of Values to the Government at pre-work conference.

B. Format and Content: Provide at least one line item for each Specification Section.

1. Identification: Include the following Project identification on the Schedule of Values:

a. Project name and location.

b. .

c. Contractor's name and address.

d. Date of submittal.

2. Provide a breakdown of the Contract Sum in enough detail to facilitate continued evaluation of Applications for Payment and progress reports. Coordinate with the

Specifications table of contents. Provide several line items for principal subcontract amounts, where appropriate.

3. Round amounts to nearest whole dollar; total shall equal the Contract Sum.

4. Provide a separate line item in the Schedule of Values for each part of the Work where

Applications for Payment may include materials or equipment purchased or fabricated and stored, but not yet installed.

5. Provide separate line items in the Schedule of Values for initial cost of materials, for each subsequent stage of completion, and for total installed value of that part of the Work.

6. Each item in the Schedule of Values and Applications for Payment shall be complete.

Include total cost and proportionate share of general overhead and profit for each item.

a. Temporary facilities and other major cost items that are not direct cost of actual work-in-place may be shown either as separate line items in the Schedule of Values or distributed as general overhead expense, at Contractor's option.

HVAC SYSTEM IMPROVEMENTS

LUMP SUM PRICES AND SCHEDULE OF VALUES

01200-2

7. Schedule Updating: Update and resubmit the Schedule of Values before the next

Applications for Payment when Change Orders or Construction Change Directives result in a change in the Contract Sum.

PART 3 - EXECUTION

3.1 LUMP SUM PAYMENT ITEMS

A. Payment items for the work of this Contract for which contract lump sum payments will be made are listed and described below.

B. All costs for items of work, which are not specifically mentioned to be included in a particular lump sum or unit price payment item, shall be included in the listed lump sum item most closely associated with the work involved.

C. The lump sum price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

D. BID ITEM 1 – FARMINGTON DISTRICT OFFICE HVAC SYSTEM IMPROVEMENTS

1. This bid item consists of the following work - payment will be made at the contract lump sum price:

a. HVAC System Demolition: All work required for removal of existing mechanical systems and equipment as necessary to accommodate the new mechanical systems.

b. Electrical System Demolition: All work required for removal of existing electrical systems and equipment as necessary to accommodate the new mechanical systems.

c. HVAC System Improvements: All work required for installation of new HVAC systems consisting of variable refrigerant flow (VRF) systems for heating and cooling, energy recovery ventilators (ERVs) for ventilation, new HVAC control systems, and all ductwork, piping, roof curb adapters, and appurtenances necessary for a complete and operable HVAC system. This also includes all related work required for cutting, patching, spotting, taping, sanding, painting, access doors, ancillary plumbing work, etc.

d. Electrical System Improvements: All work required for modification and expansion of existing electrical systems as necessary to power all new HVAC systems, equipment, and controls, including installation of electrical submeters.

END OF SECTION 01200

HVAC SYSTEM IMPROVEMENTS

PROJECT MANAGEMENT

01310-1

SECTION 01310 - PROJECT MANAGEMENT

1.1 SUMMARY

A. This Section includes administrative provisions for coordinating construction operations on the

Project including, but not limited to, the following:

1. Project meetings.

2. Requests for Interpretation (RFIs).

1.2 DEFINITIONS

A. RFI: Request from Contractor seeking interpretation or clarification of the Contract Documents.

1.3 PROJECT MEETINGS

A. General: Schedule and conduct meetings and conferences at the Project site, unless otherwise indicated.

1. Attendees: Inform participants and others involved, and individuals whose presence is required, of date and time of each meeting. Notify the Government of scheduled meeting dates and times.

2. Agenda: Prepare the meeting agenda. Distribute the agenda to all invited attendees.

B. Pre-Work Conference: The Government will schedule and conduct a Pre-Work Conference before start of construction. The conference will review responsibilities and personnel assignments, review required work, project drawings, specifications, construction schedules, payroll, payments, and administrative provisions of the Contract. Be prepared to summarize and explain procedures planned for the project and present specified pre-work submittals.

1. Attendees: Authorized representatives of the Government and their consultants;

Contractor and Contractor’s superintendent; major subcontractors; suppliers;

and other concerned parties shall attend the conference. All participants at the conference shall be familiar with Project and shall be authorized to conclude matters relating to the Work. The mechanical and electrical subcontractor’s attendance will be required.

2. Agenda: Discuss items of significance that could affect progress, including the following:

a. Tentative construction schedule.

b. Critical work sequencing and long-lead items.

c. Designation of key personnel and their duties.

d. Procedures for processing field decisions and Change Orders.

HVAC SYSTEM IMPROVEMENTS

01310-2

e. Procedures for RFIs.

f. Procedures for testing and inspecting.

g. Procedures for processing Applications for Payment.

h. Distribution of the Contract Documents.

i. Submittal procedures.

j. Preparation of Record Documents.

k. Use of the premises.

l. Work restrictions.

m. Government occupancy requirements.

n. Responsibility for temporary facilities and controls.

o. Construction waste management and recycling.

p. Parking availability.

q. Office, work, and storage areas.

r. Equipment deliveries and priorities.

s. First aid.

t. Security.

u. Progress cleaning.

v. Working hours.

3. Minutes: The Contractor will record and distribute meeting minutes.

C. Preinstallation Conferences: Conduct a preinstallation conference at Project site before each construction activity that requires coordination with other construction.

1. Attendees: Installer and representatives of manufacturers and fabricators involved in or affected by the installation and its coordination or integration with other materials and installations that have preceded or will follow, shall attend the meeting. Advise the Government of scheduled meeting dates.

2. Agenda: Review progress of other construction activities and preparations for the particular activity under consideration, including requirements for the following:

a. The Contract Documents.

b. Options.

c. Related RFIs.

d. Related Change Orders.

e. Purchases.

f. Deliveries.

g. Submittals.

h. Review of mockups.

i. Possible conflicts.

j. Compatibility problems.

k. Time schedules.

l. Weather limitations.

m. Manufacturer's written recommendations.

n. Warranty requirements.

o. Compatibility of materials.

p. Acceptability of substrates.

q. Temporary facilities and controls.

r. Space and access limitations.

s. Regulations of authorities having jurisdiction.

HVAC SYSTEM IMPROVEMENTS

01310-3

t. Testing and inspecting requirements.

u. Installation procedures.

v. Coordination with other work.

w. Required performance results.

x. Protection of adjacent work.

y. Protection of construction and personnel.

3. Record significant conference discussions, agreements, and disagreements, including required corrective measures and actions.

4. Reporting: Distribute minutes of the meeting to each party present and to parties who should have been present.

5. Do not proceed with installation if the conference cannot be successfully concluded. Initiate whatever actions are necessary to resolve impediments to performance of the Work and reconvene the conference at earliest feasible date.

D. Progress Meetings: Conduct progress meetings once a month. Hold the meetings at the project site. Coordinate dates of meetings with preparation of payment requests. Additional progress meetings may be requested by either the Government or Contractor.

1. Attendees: In addition to representatives of Government, each contractor, subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the conference shall be familiar with the Project and authorized to conclude matters relating to the

Work.

2. Agenda: Review, and correct or approve minutes of previous progress meeting.

Review other items of significance that could affect progress. Include topics for discussion as appropriate to status of Project.

a. Contractor's Construction Schedule: Review progress since the last meeting.

Determine whether each activity is on time, ahead of schedule, or behind schedule, in relation to Contractor's Construction Schedule. Determine how construction behind schedule will be expedited; secure commitments from parties involved to do

so. Discuss whether schedule revisions are required to ensure that current and subsequent activities will be completed within the Contract Time.

1) Review schedule for next period.

b. Review present and future needs of each entity present, including the following:

1) Interface requirements.

2) Sequence of operations.

3) Status of submittals.

4) Deliveries.

5) Off-site fabrication.

6) Access.

7) Site utilization.

8) Temporary facilities and controls.

9) Work hours.

10) Hazards and risks.

11) Progress cleaning.

HVAC SYSTEM IMPROVEMENTS

01310-4

12) Quality and work standards.

13) Status of correction of deficient items.

14) Field observations.

15) RFIs.

16) Status of proposal requests.

17) Pending changes.

18) Status of Change Orders.

19) Pending claims and disputes.

20) Documentation of information for payment requests.

3. Minutes: Record the meeting minutes.

4. Reporting: Distribute minutes of the meeting to each party present and to parties who should have been present.

a. Schedule Updating: Revise Contractor's Construction Schedule after each progress meeting where revisions to the schedule have been made or recognized. Issue revised schedule concurrently with the report of each meeting.

1.4 REQUESTS FOR INTERPRETATION (RFIs)

A. Procedure: Immediately on discovery of the need for interpretation of the Contract Documents, and if not possible to request interpretation at Project meeting, prepare and submit an RFI in the form specified.

1. RFIs shall originate with the Contractor. RFIs submitted by entities other than the Contractor will be returned with no response.

2. Coordinate and submit RFIs in a prompt manner so as to avoid delays in the

Contractor's work or work of subcontractors.

B. Content of the RFI: Include a detailed, legible description of item needing interpretation and the following:

1. Project name.

2. Contract number.

3. Date.

4. Name of Contractor.

5. .

6. RFI number, numbered sequentially.

7. Specification Section number and title and related paragraphs, as appropriate.

8. Drawing number and detail references, as appropriate.

9. Field dimensions and conditions, as appropriate.

10. Contractor's suggested solution(s). If Contractor's solution(s) impact the

Contract Time or the Contract Sum, Contractor shall state impact in the RFI.

11. Contractor's signature.

12. Attachments: Include drawings, descriptions, measurements, photos, Product

Data, Shop Drawings, and other information necessary to fully describe items needing interpretation.

C. Hard-Copy RFIs:

HVAC SYSTEM IMPROVEMENTS

01310-5

1. Identify each page of attachments with the RFI number and sequential page number.

D. Government's Action: T h e Government will review each RFI, determine action required, and return it. Allow 10 calendar days for Government's response for each RFI. RFIs received after

1:00 p.m. will be considered as received the following working day.

1. The following RFIs will be responded to without action:

a. Requests for approval of submittals.

b. Requests for approval of substitutions.

c. Requests for coordination information already indicated in the Contract

Documents.

d. Requests for adjustments in the Contract Time or the Contract Sum.

e. Requests for interpretation of the Government's actions on submittals.

f. Incomplete RFIs or RFIs with numerous errors.

2. The Government's action may include a request for additional information, in which case the Government's time for response will start again.

E. On receipt of the Government's action, update the RFI log and immediately distribute the RFI response to affected parties. Review response and notify the the Government within seven days if Contractor disagrees with response.

F. RFI Log: Prepare, maintain, and submit a tabular log of RFIs organized by the RFI number.

Submit log at each progress meeting, and include the following:

1. Project name.

2. Name and address of Contractor.

3. .

4. RFI number including RFIs that were dropped and not submitted.

5. RFI description.

6. Date the RFI was submitted.

7. Date Government's response was received.

8. Identification of related bilateral or unilateral modifications, extensions, and changes in scope, as appropriate.

PART 3 - EXECUTION (Not Used)

HVAC SYSTEM IMPROVEMENTS

CONSTRUCTION SCHEDULE

01320-1

SECTION 01320 – CONSTRUCTION SCHEDULE

1.1 SUMMARY

A. This Section consists of Construction Schedule requirements including but not limited to the following:

1. Schedule of Values

2. Construction Schedule Requirements.

3. Construction Schedule Updates.

4. Time Impact Analysis.

B. Purpose: The purpose of the Construction Schedule is to ensure adequate planning, coordination, scheduling, and reporting during execution of the work by the Contractor. The Construction

Schedule will assist the Contractor and the Government in monitoring the progress of the work, evaluating proposed changes, and processing the Contractor's monthly progress payment.

A. Activity: A discrete part of a project that can be identified for planning, scheduling, monitoring, and controlling the construction project. Activities included in a construction schedule consume time and resources.

1. Critical activities are activities on the critical path. They must start and finish on the planned early start and finish times.

2. Predecessor Activity: An activity that precedes another activity in the network.

3. Successor Activity: An activity that follows another activity in the network.

B. Cost Loading: The allocation of the Schedule of Values for the completion of an activity as scheduled. The sum of costs for all activities must equal the total Contract Sum, unless otherwise approved by the Government.

C. CPM: Critical path method, which is a method of planning and scheduling a construction project where activities are arranged based on activity relationships. Network calculations determine when activities can be performed and the critical path of the Project.

D. Critical Path: The longest connected chain of interdependent activities through the network schedule that establishes the minimum overall Project duration and contains no float.

E. Float: The measure of leeway in starting and completing an activity.

1. Float: Float is not for the exclusive use or benefit of either the Government or the

Contractor but is jointly owned.

HVAC SYSTEM IMPROVEMENTS

01320-2

2. Free float is the amount of time an activity can be delayed without adversely affecting the early start of the successor activity.

3. Total float is the measure of leeway in starting or completing an activity without adversely affecting the planned Project completion date.

F. Resource Loading: The allocation of manpower and equipment necessary for the completion of an activity as scheduled.

G. Fragnet: A partial or fragmentary network that breaks down activities into smaller activities for greater detail.

1.3 SUBMITTALS

A. Electronic Copies: All schedules and reports submitted shall be posted on the Contractor’s FTP

(or cloud storage such as Google Drive, OneDrive, etc.) website, provided in the native electronic file format. It is the intent of the Government to limit the number of printed reports to only those reports determined by the project team to be essential.

B. Schedule of Values: After contract award and before the Pre-Construction conference submit a schedule of dollar values based on the Contract Price Schedule.

C. Construction Baseline Schedule: After contract award and before the Pre-Construction conference, submit a copy of the baseline schedule, complete to show entire schedule for entire construction period.

D. CPM Reports: Concurrent with CPM schedule, submit copies of each of the following computer-generated reports. Format for each activity in reports shall contain activity number, activity description, resource loading, original duration, remaining duration, early start date, early finish date, late start date, late finish date, and total float in calendar days.

1. Activity Report: List of all activities sorted by activity number and then early start date, or actual start date if known.

2. Logic Report: List of predecessor and successor tasks for all activities, sorted in ascending order by activity number and then early start date, or actual start date if known.

3. Total Float Report: List of all activities sorted in ascending order of total float.

E. Construction Schedule Updates: On or before the 7th day preceding the progress payment request date, submit copies of estimates of the percent completion of each schedule activity and necessary supporting data.

F. Construction Schedule Revisions and Time Impact Analysis: For each Construction Schedule revision submit a copy of a Time Impact Analysis. Each Time Impact Analysis shall include a

Fragmentary Network (Fragnet), incorporated into the currently accepted Construction Schedule, demonstrating how the Contractor proposes to incorporate a modification, change, delay, or

Contractor request.

HVAC SYSTEM IMPROVEMENTS

01320-3

1.4 QUALITY ASSURANCE

A. The Contractor shall meet with the Government on the day of the preconstruction conference to go over the following:

1. Review software limitations, content and format for reports.

2. Verify availability of qualified personnel needed to develop and update schedule.

3. Discuss constraints, including work stages, work area separations, interim milestones, partial Government occupancy, and temporary relocation of Government personnel.

4. Review schedule for work of separate and concurrent Government contracts.

5. Review time required for review of submittals and re-submittals.

6. Review requirements for tests and inspections by the Government and/or by independent testing and inspecting agencies.

7. Review time required for completion, startup, and commissioning procedures.

8. Review and finalize list of construction activities to be included in schedule.

9. Review baseline schedule comments, and resolve issues and progress on incorporating them.

10. Review procedures for updating schedule.

11. Discuss reporting requirements, and establish a protocol for naming and transmitting electronic schedules.

B. Contractor's Schedule Representative: Before or at the preconstruction conference, designate an authorized representative to be responsible for the preparation and maintenance of the

Construction Schedule. The Scheduler shall have prepared and maintained at least 5 previous schedules of similar size and complexity similar to this Contract, demonstrating proficiency in the use of scheduling software. The authorized representative will be responsible for preparing the Baseline Schedule, all required updates, revisions, Time Impact Analyses, and preparation of reports.

1.5 COORDINATION

A. Coordinate preparation and processing of schedules and reports with performance of construction activities, and with scheduling and reporting of separate and concurrent Contractors.

B. Coordinate Construction Baseline Schedule with the Schedule of Values, list of subcontracts, Submittals Schedule, progress reports, payment requests, and other required schedules and reports.

1. In developing the Construction Baseline Schedule, ensure that the Subcontractor’s work at all tiers, as well as the prime Contractor’s work, is included and coordinated.

2. Secure time commitments for performing critical elements of the Work from all parties involved.

3. Coordinate each construction activity in the network with other activities and schedule them in proper sequence.

PART 2 - PRODUCTS

HVAC SYSTEM IMPROVEMENTS

01320-4

2.1 SCHEDULE OF VALUES

A. Break down each lump-sum bid item into component work activities used in the schedule, for which progress payments may be requested. The work activities broken out within the schedule of values shall be integrated into and made a logical part of the construction baseline schedule submitted under this specification. The total costs for the component work activities shall equal the contract price for that lump-sum item. The Government may request data to verify accuracy of dollar values. Include mobilization, general condition costs, overhead and profit in the total dollar value of unit price items and in the component work activities for each lump- sum item; do not include mobilization, general condition costs, overhead or profit as a separate item.

B. The total cost of all items shall equal the contract price. The Schedule of Values shall form the basis for progress payments.

C. An acceptable Schedule of Values shall be agreed upon by the Contractor and the Government before the first progress payment is processed.

2.2 CONSTRUCTION SCHEDULE REQUIREMENTS

A. Construction Baseline Schedule: Prepare Construction Baseline Schedule using a computerized, resource-loaded, time-scaled CPM network analysis diagram for the Work.

1. Develop and finalize Construction Baseline Schedule so it can be accepted for use no later than 30 days after date established for the Notice of Award.

a. Failure to include any work item required for performance of this Contract shall not excuse Contractor from completing all work within applicable completion dates, regardless of Government’s acceptance of the schedule.

2. Establish procedures for monitoring and updating Construction Baseline Schedule and for reporting progress. Coordinate procedures with progress meeting and payment request dates.

B. Construction Baseline Schedule Preparation: Prepare a list of all activities required to complete the Work. Using the preliminary CPM network diagram, prepare a skeleton network to identify probable critical paths.

1. Activities: Indicate the estimated duration, sequence requirements, and relationship of each activity in relation to other activities.

2. Critical Path Activities: Identify critical path activities, including those for interim completion dates. Scheduled start and completion dates shall be consistent with Contract milestone dates.

3. Processing: Process data to produce output data on a computer-drawn, time-scaled network. Revise data, reorganize activity sequences, and reproduce as often as necessary to produce the CPM schedule within the limitations of the Contract Time.

4. The Construction Baseline Schedule as developed shall show the sequence and interdependence of activities required for complete performance of the work. Ensure all

HVAC SYSTEM IMPROVEMENTS

01320-5 work sequences are logical and the Construction Baseline Schedule shows a coordinated plan of the work.

5. Resource loading of each activity shall include all personnel by labor category and equipment type and capacity proposed to complete the activity in the duration shown.

6. Consider seasonal weather conditions in planning and scheduling all work influenced by high and low ambient temperatures, wind, or precipitation to ensure completion of all work within the contract time.

7. Time Frame: Proposed duration assigned to each activity shall be the Contractor's best estimate of time required to complete the activity considering the scope and resources planned for the activity.

a. An early finish date may be shown but the late finish date must be the same date as the last day of the contract period. An early completion schedule must contain the following:

1) Insert an activity titled “Project Float” as a successor to the last activity in the early project completion schedule network.

2) Add a milestone titled “Contract End Date” as a successor to the activity

“Project Float”.

3) Add duration to the activity “Project Float” as required so the milestone

“Contract End Date” equals the last day of the Contract Period.

b. Contract completion date shall not be changed by submission of a schedule that shows an early completion date.

c. The Contractor shall limit use of lead or lag durations between schedule activities.

d. Project Calendars: Develop and incorporate the following calendars:

1) Administrative Calendar: Include a calendar that is based on a 7 day week to be used on any activities that are based on calendar days. Apply this calendar to administrative tasks or any other tasks that are not affected by non-working days (Federal Holidays, weather, etc.).

2) Project Calendar: Include a calendar that is based on the planned work week for the project. Include Federal Holidays, weekends, and any other non- work days indicated in the contract documents. Apply this calendar to activities which are not anticipated to be affected by weather.

3) Weather Calendar: Utilize the Project Calendar and show anticipated normal downtime related to weather as non-working time. Weather days shall be based on data for the local area from a reliable source like the National

Oceanic and Atmospheric Administration (NOAA), BLM records, or source acceptable to the Government. Apply this calendar to activities that are anticipated to be affected by weather.

e. Activity Duration: Define activities so no activity is longer than 15 days, except for non-construction activities including mobilization, shop drawings and submittals, fabrication, and delivery of materials and equipment.

f. Procurement Activities: Include procurement process activities for the following long lead items and major items, requiring a cycle of more than 60 calendar days, as separate activities in the schedule. Procurement cycle activities include, but are not limited to, submittals, approvals, purchasing, fabrication, and delivery.

HVAC SYSTEM IMPROVEMENTS

01320-6

1) Retrofit roof curb adapters.

2) Variable refrigerant flow (VRF) systems equipment.

3) Energy recovery ventilators.

4) HVAC controls.

5) Domestic water heaters.

6) Electrical equipment.

g. Submittal Review Time: Include review and re-submittal times indicated.

Coordinate submittal review times in Construction Baseline Schedule.

h. Startup and Testing Time: Include not less than 10 days for startup, testing, and commissioning activities.

i. Substantial Completion: Allow time for Government administrative procedures necessary for certification of Substantial Completion. (For more information, refer to Division 1 Specification 01770, Closeout Procedures.)

8. Constraints: Include constraints and work restrictions indicated in the Contract Documents and as follows in the schedule and show…