This document provides responses to questions from offerors on a federal solicitation for a roof replacement project. The National Wildlife Health Center is seeking proposals to remove the existing built up roof and insulation, and install a new roof and insulation on the Main Building. While original drawings show a built up roof from 1979, the current roof is made of EPDM rubber installed over the original built up roof and insulation. Offerors should assume for bidding that the built up roof and insulation were previously removed, and additional insulation was added during prior roof replacement. Per Amendment 0001, all existing insulation must now be removed and new insulation meeting specifications installed. The revised Statement of Work also requires an overlay of the Modular Office Building roof. The opportunity, listed under Solicitation 140G0221R0013, is with the Department of the Interior US Geological Survey Office of Acquisitions and Grants. The offer due dates remain unchanged.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Roof_Decks_0003.pdf | ||
| Sol_140G0221R0013_Amd_0003.pdf | ||
| A-3_DETAILSwithnewexjoint_0002.pdf | ||
| A-3_DETAILS_0002.pdf | ||
| A2-ROOF_PLAN-July_0002.pdf | ||
| A-5_spec_0002.pdf | ||
| Sol_140G0221R0013_Amd_0002.pdf | ||
| A-4_Detail2_0002.pdf | ||
| Site_Visit_Sign-In_Sheet_0001.pdf | ||
| Attachment_8_-_Roof_Section_Drawings_0001.pdf | ||
| Attachment_1_-_NWHC_MFB_Roof_Replacement-SOW-FINAL-REVISED_0001.docx | DOCX document | |
| Sol_140G0221R0013_Amd_0001.pdf | ||
| NWHC_Roof_Replacement_Questions_Responses_0001.docx | DOCX document | |
| Sol_140G0221R0013.pdf | ||
| Attachment_4_-_Certified_Payroll_Form.pdf | ||
| Attachment_2_-_MFB_Roof_Pictures.doc | DOC document | |
| Attachment_3_-_Wage_Determinations_070921.pdf | ||
| Attachment_1_-_NWHC_MFB_Roof_Replacement-SOW-FINAL.docx | DOCX document | |
| Attachment_7_-_COVID19_Non-Employee_Checklist_20200603_v1_LD19.pdf | ||
| Attachment_6_-_SF1413-13e.pdf | ||
| Attachment_5_-_Release_of_Claims.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. It looks as if these drawings are of the original roof from 1979, which is a Built Up Roof over 6" of insulation. However, the current existing roof is a rubber EPDM roof. Do you have any information regarding the current roof composition?
The government has the following drawings available and made part of this amendment for offerors to review. All available drawings have been provided to offerors.
2. Was the Built up roof removed when the rubber was installed?
Whether the built up roof and insulation was removed has not been confirmed. For the proposal bidding purposes, the offerors may assume that the built up roof and insulation were removed.
3. Was any additional insulation added at that time?
Whether the additional insulation was added when the rubber EPDM roof was installed is unknown. For the proposal bidding purposes, the offerors may assume that insulation was added at that time.
Per revised Statement of Work issued under Amendment 0001, offerors shall remove all existing insulation and install new insulation as specified in the revised Statement of Work Main Building Roof Replacement and Modular Office Building Roof Overlay, Section I. Work Requirements, A. Technical Requirements for Main Building Work.
Offer due dates remain the same.