NWHC_Roof_Replacement_Questions_Responses_0001.docx
DOCX document 16 KB Posted
- Attached to
- MFB-ROOF REPLACEMENT Federal contract opportunity
- Solicitation number
- 140G0221R0013
About this file
This document contains questions and responses related to solicitation number 140G0221R0013 for roof replacement services at the MFB facility for the Department of the Interior US Geological Survey Office of Acquisitions and Grants. The questions and answers provide clarification on the scope of work, which involves replacing the roofing system on the main building and repairing and repainting the incinerator stack up to six feet above the roofline. Details specified include requirements for a 20-year full system warranty on the new metal roofing areas, using high-temperature paint rated to 1000 degrees Fahrenheit on the stack, roof section drawings provided as an attachment, and specifications for an external galvanized metal staircase of at least 48 inches wide with 48 inch by 48 inch landings to provide roof access.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140G0221R0013_Amd_0003.pdf | ||
| Roof_Decks_0003.pdf | ||
| A-3_DETAILSwithnewexjoint_0002.pdf | ||
| A-3_DETAILS_0002.pdf | ||
| A2-ROOF_PLAN-July_0002.pdf | ||
| NWHC_Roof_Replacement_Questions_Responses_2_0002.docx | DOCX document | |
| A-5_spec_0002.pdf | ||
| Sol_140G0221R0013_Amd_0002.pdf | ||
| A-4_Detail2_0002.pdf | ||
| Site_Visit_Sign-In_Sheet_0001.pdf | ||
| Attachment_8_-_Roof_Section_Drawings_0001.pdf | ||
| Attachment_1_-_NWHC_MFB_Roof_Replacement-SOW-FINAL-REVISED_0001.docx | DOCX document | |
| Sol_140G0221R0013_Amd_0001.pdf | ||
| Sol_140G0221R0013.pdf | ||
| Attachment_3_-_Wage_Determinations_070921.pdf | ||
| Attachment_1_-_NWHC_MFB_Roof_Replacement-SOW-FINAL.docx | DOCX document | |
| Attachment_4_-_Certified_Payroll_Form.pdf | ||
| Attachment_2_-_MFB_Roof_Pictures.doc | DOC document | |
| Attachment_7_-_COVID19_Non-Employee_Checklist_20200603_v1_LD19.pdf | ||
| Attachment_6_-_SF1413-13e.pdf | ||
| Attachment_5_-_Release_of_Claims.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NWHC Roof Replacement Questions:
1. First, the 20-year warranty on the metal areas. It calls for a full system warranty, but we are reusing the existing insulation? They won’t give you a full system warranty over somebody else’s insulation?
Answer 1: Please provide the warranty available for the replacement system as specified in the revised Statement of Work.
2. Second that stack that’s supposed to get painted, how hot does that actually get and will paint even stay on it? If it gets really hot I’m not sure anything will stay on it? Maybe the railings and stairs, but not the pipe itself. Let me know your thoughts.
Answer 2: Provide as in the revised SOW: The incinerator stack should have rust removed and repainted with high temperature paint (1000°F) from roof up 6 feet.
3. Does anyone have any core data of the existing thickness of the roof?
Answer 3: See additional drawing, Attachment 8 - Roof Section Drawings.
4. In the Statement of Work it says "The incinerator stack should have rust removed and repainted with high temperature paint from roof up 6 feet", but at the Pre-bid meeting it was mentioned that the whole stack needs to be repainted. Can you clarify whether we are figuring to paint just the 6 feet above the roof or the entire stack?
Answer 4: Provide as in the revised SOW: The incinerator stack should have rust removed and repainted with high temperature paint (1000°F) from roof up 6 feet. (see response to question 2 above)
5. Do you have any additional information or specs regarding the external roof access (e.g. metal outdoor staircase system) you would like installed?
Answer 5: See revised SOW.
· Commercial heavy-duty galvanized outdoor construction
· Minimum 48” stair width and tread depths are 12" deep diamond plate
· Minimum landing dimensions 48” x 48”
· Securable access at the ground level
· Locate on north side of Main Building
· Must be OSHA and IBC compliant.
6. In the list of documents I do not see the SF1442 bid form. Is that something that will be added to the documents soon?
Answer 6: SF1442 is available on SAM.gov along with all other bidding documents.