Sol_140FC324R0002_Amd_0007.pdf

PDF 195 KB Posted

Attached to
OR-HMNAR-Water System Upgrades Federal contract opportunity
Solicitation number
140FC324R0002
Issued by
Department of the Interior Fish and Wildlife Service

About this file

This document is an amendment to Solicitation #140FC324R0002 for the Hart Mountain National Antelope Refuge (HMNAR) Water System Upgrades project located in Plush, Oregon. The purpose of the amendment is to provide responses to follow-up questions regarding Task 4 - Final Connections. The amendment clarifies that the Refuge may supply the PVC Schedule 80 and AWWA C900 pipes and connectors, and the Design/Build Contractor will be responsible for the final connections, including labor, equipment, and tools. The amendment also addresses questions on pipe lengths, pressurization testing, and the inclusion of tracer wire. This amendment does not extend the period of performance, which remains June 1, 2024 to December 31, 2026. The Contracting Officer is Anthony Kuntz and the Contract Specialist is Shannon Barnhill.

View the file

Other files for this federal contract opportunity

Other files attached to OR-HMNAR-Water System Upgrades, newest first.
File Type Posted
Sol_140FC324R0002_Amd_0006.pdf PDF
Sol_140FC324R0002_Amd_0005.pdf PDF
Sol_140FC324R0002_Amd_0004.pdf PDF
Sol_140FC324R0002_Amd_0003.pdf PDF
Sol_140FC324R0002_Amd_0002.pdf PDF
Sol_140FC324R0002_Amd_0001.pdf PDF
Sol_140FC324R0002.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140FC324R0002

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

FC3

Falls Church VA 22041 5275 Leesburg Pike FWS, Construction A/E Team 3 FWS, Construction A/E Team 3

FC3

Falls Church VA 22041 5275 Leesburg Pike FWS, Construction A/E Team 3 FWS Constr A/E 3

03/12/20240007

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

03/12/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Hart Mountain National Antelope Refuge (HMNAR) Water System Upgrades located in Plush, Lake

County, Oregon in accordance with the statement of work.

The purpose of Amendment 0006 is to:

1. Provide responses to follow on questions received.

2. The questions deadline has ended.

3. All other terms and conditions remain unchanged and in full force and effect.

Period of Performance: 06/01/2024 to 12/31/2026

POINT OF CONTACT:

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Anthony Kuntz

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 5

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140FC324R0002/0007

SHANNON BARNHILL

CONTRACT SPECIALIST

SHANNON_BARNHILL@FWS.GOV

ANTHONY KUNTZ

CONTRACTING OFFICER

ANTHONY_KUNTZ@FWS.GOV

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Amendment 0007 Solicitation #140FC324R0002 – HMNAR Water System Upgrades, Plush, Oregon

Regarding, Task 4 Final Connections.

PVC schedule 80 comes in lengths of 10’, and 20’ and we would assume 20’ lengths would be used, this pipe can be purchased with a bell glue end.

HDPE DR17 Pipe can come standard in 50’, in sticks of 20’ to 40’ or in reels of 250 to 500 LF, with a mechanical connecting fitting.

For bidding this item, are we to assume all glue connections and all mechanical connections for the transmission pipe are included under the final connection option?

Response.

For Task 4 (Option Item), this task is simply for installing the final connections (labor, equipment, and tools ONLY) including glued connections and mechanical connections depending on the type of pipe selected. If the Refuge decides to partially perform the project in-house and supplies the pipe and connectors, it will be PVC Schedule 80 pipe and AWWA C900 pipe because the Refuge work crew has experience with these (2) types of pipes.

Therefore, the Design/Build Contractor should assume PVC Schedule 80 pipe and AWWA C900 pipe to determine the labor, equipment, and tools for the expected number of connectors based on the Design/Build Contractor’s selected pipe section lengths. The Design/Build Contractor should consider using shorter pipe section (stick) lengths to increase the estimated number of connections and to avoid under-estimating the number of connection points requiring the Design/Build Contractor’s labor.

If Task 4 (Option Item) is exercised and awarded, the following Option Items may or may not be exercised and awarded since those Option Items would include all materials, labor, equipment, and tools necessary for the pipe installation.

OPTION ITEM: TRANSMISSION PIPELINE: TRENCHING AND BACKFILL.

OPTION ITEM: TRANSMISSION PIPELINE: 2" DIA. BURIED SCHEDULE 80 PVC PIPE

OR HDPE DR17 PIPE (RAW WATER).

OPTION ITEM: TRANSMISSION PIPELINE: 3" DIA. BURIED SCHEDULE 80 PVC PIPE

OR HDPE DR17 PIPE (POTABLE WATER).

OPTION ITEM: TRANSMISSION PIPELINE: 4" DIA. BURIED AWWA C900 PIPE OR

HDPE DR17 PIPE (UTILITY WATER).

Follow-up Question 2.

If I understand, the Refuge would provide the pipe and place it in the ditch?

Response.

Yes, the Refuge may supply the pipe and place it in the ditch to include the pipe connectors.

If the Refuge supplies the pipe and pipe connectors, it will be National Sanitation Foundation (NSF) compliant PVC Schedule 80 pipe and associated glues / adhesives and separately AWWA C900 pipe (utility pipe) and associated pipe connectors.

If the Refuge provides the pipe, how do we know what length of pipe is provided to determine how many connections there will be?

Response.

Conservatively estimate, based on the shortest pipe section (stick) length available in the market for PVC Schedule 80 pipe and for AWWA C900 pipe to avoid under-estimating the required number of connections for each type and size of pipe. Refer to 50% construction drawings for length and extent of PVC Schedule 80 pipe and AWWA C900 pipe.

Follow-up Question 3.

Is the plan to have the pipe supplier, provide the couplers?

Response.

The Refuge will purchase all of the pipe and pipe connectors under (1) purchase order if this becomes a Refuge in-house supply and placement.

Follow-up Question 4.

This should be two separate options as 20’ length pipe connections for schedule 80 is a lot different than HDPE pipe connections maybe two connections every 250-500 feet depending on the size of the pipe.

Response.

Refer to previous response, the Refuge would be exclusively supplying PVC Schedule 80 pipe and pipe connectors and would be exclusively supplying the AWWA C900 pipe and pipe connectors.

Follow-up Question 5.

Why wouldn’t pressure testing be included in this option, as it is the connections, which would leak if not fitted correctly?

Response.

If the Refuge supplies the pipe and pipe connectors and performs placement with Design/Build Contractor performing final connections, the Refuge would be able to re-pressurize the system after install with the entire length of trench remaining open to visually observe whether or not a leak is occurring at a connection point throughout the entire length.

The hydrostatic pressure test and leakage test is included in the Design/Build Contractor’s Option Tasks for Transmission Pipeline materials and installation because the Design/Build Contractor would be performing the entire installation. This is organized this way because the Refuge does not want to delay the Design/Build Contractor’s on-site work activities.

Follow-up Question 6.

Regarding, Option Item. Transmission Pipeline 3” DIA. Buried Schedule 80 PVC or HDPE DR17 Pipe.

The assumption is, this option is to basically to supply the pipe, getting the pipe to the site and laying the pipe in the ditch, the Design/Build Contractor would come through and establish connections including glue or mechanical, is this correct?

Response.

Yes, this is correct.

To reiterate and clarify, this Option Item for the 2” and 3” Dia. Buried Schedule 80 PVC Pipe or HPDE DR17 Pipe includes supply, delivery, placement, and installation of the pipe, final connections, pressures tests, and leakage tests / observations in accordance with American Water Works Association (AWWA) standards and protocols for pipe installations.

Follow-up Question 7.

Is a tracer wire and buried pipe below tape required for all transmission and distribution piping?

Response.

Yes, we request placement and installation of tracer wire for all transmission piping.

Does not include distribution piping.